City of Port Washington_Downtown Visioning Community Design Solutions

Similar documents
TOWNHOUSE. TYPICAL UNIT SIZE 1,200 to 1,600 square foot average unit (two to three stories) DENSITY dwelling units/acre without cottages

The 12.1-net acre property is the premier development site in the western United States, sitting at the gateway of San Diego s Broadway office

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

We contacted all RNOs in the area to come to their meetings and personally explain the draft, and take questions. Four RNOs took us up on the offer,

MEMORANDUM. B4S-2 Downtown Service District DP Downtown Parking Overlay District 42,390 square feet / 0.97 acres. DMNA; adjacent to North Loop

AGENDA SLOT HOME EVALUATION & TEXT AMENDMENT. 5:30 - Welcome

Concept 1: Entertainment Favor/Opposed Pros Cons Favor: 56 Opposed: 7

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

Goal 1 - Retain and enhance Cherry Creek North s unique physical character.

2.0 EXISTING SITE CONDITIONS ALASKAN WAY WESTERN AVE POST ALLEY ANALYSIS

PUBLIC NOTICE* Studies Requested: Parking analysis. Other Required Permits: Building Permit, Site Development Permit

UPTOWN RACINE BUILDING REDEVELOPMENT CONCEPTS 1322, 1418, 1511 Washington Ave Racine, Wisconsin

The Miramar Santa Monica

Rick Noll Commercial Realtor Direct (813)

LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA

$187,000. LIVE. SHOP. DINE. It's not just a home, it's a lifestyle. Stunning Price Point Starting at A MARKET COMMON COMMUNITY

Borough Council January 28, 2010

August 17, 2016 PROJECT INFORMATION:

C-2C District Schedule

ACKNOWLEDGMENTS TABLE OF CONTENTS. Page 3...Site Map Precedents Project Overview

Delivering 300,000 SF First Phase Summer 2018 DESIGN & CONNECT.

DEVELOPMENT DEPARTMENT STAFF REPORT THE PARK AT 5 TH

RODE. Article 80 Small Project Review Application. 110 Savin Hill Avenue Mixed Use Development 110 Savin Hill Avenue Dorchester, MA 02125

2015 Downtown Parking Study

WASHINGTON SQUARE 1ST LEVEL RETAIL. $20/SF NNN $40.00/SF TIA Usable Square Feet +/-

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

C-2C1 District Schedule

Village of Queen Charlotte OCP and Bylaw Review Open House April 29, 2017 Highlights, Policy Directions, and Choices

Cozy by Design Communities for the 21 st Century

AVAILABLE 2,760 SF - 37,052 SF THERETAILATRIVEREAST.COM

Staff Contact: Darcy C. Schmitt Phone No.: PC Agenda: November 16, 2016

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Wood Dale Comprehensive Plan Open House #2 Summary

T H E B A L L A R D T R I P L E X

in an exceptional new development in Milwaukee s Bay View neighborhood

Development Permit No Government Road Amblepath Townhomes

Greater Goethe Neighborhood Association Zoning and Planning Committee

Draft Plan Open House Public Comments February 28, 2017

Planned Residence District (PR) To review a plan to construct 11 single family homes on approximately 4.01 acres.

AT THE INTERSECTION OF WHERE CONTEMPORARY MEETS TIMELESS. Perfectly situated amidst Calgary s thriving south central district

NORTH ATLANTA S PREMIER RETAIL & OFFICE MIXED-USE DEVELOPMENT OFFERING SUMMARY

LEASE A DIVISION OF KELLER WILLIAMS SELECT REALTY

Jasper 115 Street DC2 Urban Design Brief

FIREHOUSE ROW WH / CIN / OH

See what the power of the river can do for a business. OFFICE, RETAIL & RESTAURANT SPACE FOR LEASE Old Main Street Richmond, Virginia

BOROUGH OF HOPATCONG ORDINANCE No

200 Liberty Street 225 Liberty Street 200 Vesey Street 250 Vesey Street 300 Vesey Street

C-2 District Schedule

Dairy Market Delivering Spring

Brian de la Fe Senior Associate

RM-2 District Schedule

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting

NORWALK LAND DEVELOPMENT. NORWALK PLANNING COMMITTEE AND REDEVELOPMENT AGENCY NOVEMBER 19 th 2014

RESIDENTIAL Site Plan Architecture Review Cannon Trail Project Narrative

A APPENDIX A: FORM-BASED BUILDING PROTOTYPES

UNCOMMON INSPIRATION AT THE INTERSECTION OF WORK AND SPACE

RM-1 and RM-1N Districts Schedule

COUNTY OF MILWAUKEE INTEROFFICE COMMUNICATION

College Avenue. Sowers Street. Calder Way. Beaver Avenue

EXHIBIT 1 PROJECT DESCRIPTION AND DESCRIPTION OF REQUESTED AREA VARIANCES REDEVELOPMENT OF 201 ELLICOTT STREET

Bike/Pedestrian Connection at Street Level. Project Underway. Illustrative Master Plan: Traditional Downtown VISION DOWNTOWN STATE COLLEGE MASTER PLAN

RM-8 and RM-8N Districts Schedule

ONE ELMCROFT AT HARBOR POINT, STAMFORD, CT

8.14 Single Detached with Granny Flat or Coach House Edgemere

The Village at Autumn Lake

ORDINANCE NO (As Amended)

Truax Park Apartments

BLOCK M TOWNHOMES - DOWNTOWN BOZEMAN AUGUST 2013

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

Introducing Holiday Sands at South Beach LIMITED AVAILABILITY AT DEVELOPER CLOSE-OUT PRICING!!

FOR LEASE AVAILABLE NOW! RENTS STARTING AT $12/SF* OFFICE & RETAIL Street, Edmonton, AB

RM-3 District Schedule

a. South of Sherman Hill b. Gateway West

International Village By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

BLUE ASH CITY COUNCIL. October 27, 2016

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Ann Arbor Downtown Premium Prioritization

8.5.1 R1, Single Detached Residential District

201 College Avenue. Zoning Compliance. City of Ithaca, New York Date:

Article XIII-A. A-1000-M Apartment District Regulations

790 N. WATE R STREET. Development

Bay Mall. Southwest Corner of Charlevoix Ave (US Rt 31) and Spring Street (US Rt 131) Petoskey, Michigan

z BALLARD VIEW F L A T S

RM-7, RM-7N and RM-7AN Districts Schedules

ANTHEM STREET BLOCK E5B

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Report to the Plan Commission August 20, 2012

RETAIL SPACE IN BOULDER S NEWEST TRANSIT-ORIENTED DEVELOPMENT Bluff Street and 3390 Valmont Road Boulder, Colorado

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

Request for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006

RM 4 and RM 4N Districts Schedule

Community Workshop Public Comments January 14, 2015 #CantonForward

PHASE II NOW LEASING! PRIME RETAIL + RESTAURANT OPPORTUNITIES

View Looking East on Rivers Street at US 321

BRIGHOUSE UNITED CHURCH BENNETT ROAD

C-2B District Schedule

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS

LETTER OF INTENT - SUBMITTAL PACKAGE FOR EDGEWATER HOTEL REDEVELOPMENT, 666 WISCONSIN AVENUE, MADISON, WI 53703

From Policy to Reality

Cumberland Development. Where Downtown Meets the Lake

Transcription:

City of Port Washington_Downtown Visioning 11.24.2014

Project Introduction In the summer of 2014, (CDS) assisted the City of Port Washington, WI with a re-visioning effort for their historic downtown. The City encouraged development along the edge of Lake Michigan, but needed assistance in developing a vision for balancing development, public spaces, and parking. CDS met with multiple Port Washington stakeholders and held a large community input session to gauge the interest and market viability for a wide scope of proposals. Based on public input, CDS developed concepts to a schematic design level and presented them to the Community Development Authority. CLIENT: CLIENT REPRESENTATIVE: CDS DESIGN TEAM: CDS PROJECT MANAGER: CDS DIRECTOR: CDS FACULTY ADVISORS: CITY OF PORT WASHINGTON COMMUNITY DEVELOPMENT AUTHORITY MEMBERS: ADVISORS: City Of Port Washington Randy Tetzlaff Nick Zukauskis Anna Doran Ryan Shortridge Amber Piacentine Carolyn Esswein Mark Keane Mike Haggenjos, Chair Tom Mlada, Mayor Mike Ehrlich, Alderman Ruth Lansing, Vice-chair Mary Becker Erica J. Roller Bill Prince Kate Ansay Jason Wittek Missy Larson Rory Pabluski Randy Tetzlaff, Director of Planning and Development 2

Index Overall Map Precedent Analysis Public Input Session Jadair_Site 1 Concept Plan Renderings Townhomes_Site 2 Concept Plan Rendering Grocery_Site 3 Concept Plan Renderings Mixed Use_Site 4 Concept Plan Rendering Marina Gateway Concept Plan Rendering Restaurant_Site 5 Concept Plan Rendering 4 5 6-7 8-11 12-14 15-18 19-21 22-24 25-27 3

Webster St Webster St Overall Map Franklin St Jackson St Pier St Washington St Main St Main St Montgomery St Milwaukee St Wisconsin St Franklin St Lake Street Port Site 2 Site 3 Site 4 Site 5 Site 6 - Marina Lot Grand Ave SITE 1 Chestnut St Wisconsin St KEY Development Sites Open Space Wooded Areas 4 Port Washington Visioning 8.11.2014

Precedent Analysis These two cities were studied because of the similar manner in which they address the waterfront. Both contain a marina as a defining element of the city and are located in a similar climate. From these precedents, public space shaping, as well as material choices, were drawn for the ultimate proposal for Port Washington. Charlevoix, MI Traverse City, MI 5

Public Input Session At the public input session, participants were split into groups of 4 to 8 people gathered around tables containing large overall maps and detailed maps of the focus areas. Participants spent 10-20 minutes per site discussing and sketching potential uses and ideas. At the end of the evening, CDS collected the text and sketches and presented them to the overall group. The following lists represent the concept ideas that were generated by the group. The drawings represent a small sampling of the images created. Site 1 Residential Connect to Grand Avoid isolation No retail, focus retail downtown Performing arts Lofts/artist housing/townhomes Grocery Repair bridge Senior center Creek beautification Site 2 Restaurant/microbrewery Grocery Banquet facility Demolish building Public market Open up to lake Housing on second story Break into multiple buildings Year round patio Replace offices with housing Public use/community center 6

Public Input Session Site 3 Banquet center 1-2 Stories Permanent indoor market Condos/mid-rise/ shops Mixed use Combine with gateway project Bike lanes/safety is important Walkup residential Don t block views of lake Site 4 Rental apartments/townhomes Oyster bar/restaurant Small scale Wait on site 2 until this site is done High-end grocery All age recreation Site 5 70% Greenspace with 30% parking Pavers to create a parking/plaza space Ice rink/splash pad Interactive fountain Public art Private use Community sailing center Youth sailboat rental Site 6 Entryway signage Narrow the street Move farmers market to Washington Public space at dead end Add gardens/seating Sports bar Market running 3-4 days a week Move farmers market to dead end by lake Roundabout with public space in center Restaurant along main st Add bike paths Expand farmers market west 7

Jadair Site_235 W Grand Avenue SITE CHARACTERISTICS Montgomery St Grand St Milwaukee St Large site setback behind Grand Avenue Alleyway access Wisconsin St Dense wooded area and creek to the south Limited views to the lake Adjacent to the downtown businesses Opportunity for larger scale development because its location would not disrupt the views of surrounding businesses and residences. 8

Jadair Site_Site Plan (15) 2 in rea (50) 1 at gra 20,00 W Grand Avenue S Milwaukee Street (15) 2500 sf townhomes with private parking in rear (50) 1250 sf apartments with shared parking at grade 20,000 sf commercial, parking provided 20,000 sf retail/service/assembly (Target Express, Grocer, Theatre) S Wisconsin Street shared green roof space 5) 2500 sf townhomes with private parking rear 0) 1250 sf apartments with shared parking grade,000 sf commercial, parking provided 0,000 sf retail/service/assembly arget Express, Grocer, Theatre) Parking proposed walking path and connection to Inter-urban trail S Wisconsin Street [15] 2,500 sf townhomes with private parking in rear [50] 1,250 sf apartments with shared parking at grade 20,000 sf commercial, parking provided Parking Entry Parking 25 50 Design Goals: 100 Create an area of dense housing that has access to downtown and the lakefront. Provide greenspace along the creek bed. Pay tribute to the industrial nature that once defined Port Washington. 300 5 floors @ 12,500 sf = (50) 1250 sf units 50 units x 1.75 stalls per = 87.5 stalls 9 at grade parking under building

Jadair Site_View Looking West 10

Jadair Site_View Looking East Located near the downtown core and waterfront, though offering only limited views of the lake, this parcel s scale allows for the creation of a large housing development. Two different housing typologies were created: a large six story structure containing loft style apartments with parking on the first floor and a series of row-house style walk-ups with parking in the rear. A third proposal for this site was a 20,000 sf retail building on the corner of Grand and Wisconsin. All of the residential units would have access to a naturalized yard and the creek to the south. 11

Townhome Site_218 E Washington Street SITE CHARACTERISTICS Currently vacant restaurant Pier St On-site, surface parking Larger lot with opportunity for outdoor space along with adjacent building development Located adjacent to and across from single family homes Franklin St Washington St 12

Townhome Site_Site Plan Pier St [5] 1,200 sf townhomes [5] 1,920 sf townhomes Private parking accessed from rear of units via one-way alley Franklin St One Way Drive Entry Parking Design Goals: Parking Entry Townhome Diagram Washington St Create a housing configuration that meshes into the surrounding fabric, accomodates the tight site constraints, and provides a pedestrian friendly street frontage. Provide lake views where possible. 25 50 100 13

Townhome Site_View Looking West on E. Washington Street The surrounding context of this site dictated a small scale residential development. Two sets of townhomes share a common alley that allows access to private garages tucked under the units. Private main entrances face Pier and Washington streets respectively. Balconies in the rear of the units allow for grilling and larger groups, while smaller balconies in the front of the units offer views of the lake and the hill. 14

Grocery Site_222 E Main Street SITE CHARACTERISTICS Lakefront property with public access Pier St Unobstructed views of the lake and marina On-site, surface parking Bike and pedestrian path directly to the east of the building Main St 15

Grocery Site_Site Plan Pier St Rentable suites ranging from 1,200-2,400 sf -weddings -indoor winter farmers market -conferences and city events -private parties and events for community members Classrooms and meeting space -public meetings -adult/child education and art classes -business meetings/conferences Outdoor Deck Total Building Size = 11,000 sf Community Center and Banguet Hall Total Building Size = 11,000 sf Roof Terrace Classrooms and meeting spaces Community Center w/rentable banguet space Roof Terrace Classrooms and meeting spaces Community Center w/rentable banguet space Design Goals: Community Center and Banguet Hall Outdoor Deck Community Center and Banguet Hall - Rentable suites ranging from 1200-2400 sf for small and large events -weddings -indoor winter farmer s market -conferences and city events - private parties and events for community members - Classroom and meeting spaces -public meetings -adult/child education and art classes -business meetings/conferences Provide a multi-use facility that activates the site, adds value to downtown and the lakefront, and accommodates a variety of uses. Potential activities could include weddings, meetings and community events. Define a new look for a structure that has sat vacant for some time. Create new outdoor space associated with building. Main St 25 50 100 16

Grocery Site_View Looking South from E. Washington Street 17

Grocery Site_View Looking Northwest A former grocery store, this building has suitable ceiling heights and square footage to act as an event space, be it a wedding, indoor farmers market, or public meeting. The building is re-skinned to give it a contemporary feel and small outdoor gathering spaces have been added to the lakeside of the property. Space within the building would be flexible so that adjacent buildings could use it as flex space for seating and could adapt to groups of different sizes. The form of the building is in unison with the restaurant site which sits to its immediate east. 18

Mixed Use Site_301 E Pier Street SITE CHARACTERISTICS Located along a potential gateway into the marina Pier St Unobstructed views of the lake and marina On-site, surface parking Harborview Ln Lake St Large lot with opportunity for outdoor space along with building development Washington St 19

Mixed Use Site_Site Plan 3 levels- approximately 8,000 sf each level 1 - Retail on south side Space 1-4,000 sf Space 2-1,800 sf Space 3-1,800 sf level 2-3 - Condos [8] 3 bedroom condos 2,000 sf [16] 2 bedroom condos 1,050-1,200 sf Condos E Washington Street Retail Condos Parking Design Goals: Provide market rate housing with a lake view. Create destination type retail that will tie in with the overall downtown marina district. 25 50 100 20

Mixed Use Site_View Looking Northwest The site proximity to the waterfront makes it a prime candidate for a multistory mixed-use development. The first floor has retail looking towards the harbor, with parking on the north side. The upper floor would have modern loft style condos that would be afforded great views of the lake from private balconies. A portion of the surface lot to the east is reserved for trailer parking and customers of the retail component. 21

Marina Gateway Site Design Goals: Enhance the entrance to the marina - providing a prominent gateway. Maintain marina parking while also providing an aesthetically pleasing public space for residents and visitors to enjoy the lakefront and marina. 22

Marina Gateway_Entryway Plan Low Concrete Wall Entry Signage Pedestrian Scale Gateway Semi Access Points with Turning Radius Permeable Concrete Current Parking Capacity: 215 car stalls 96 trailer stalls Proposed Parking Capacity: 176 car stalls 87 trailer stalls Marina Gateway View without Proposed Development on Sites 4 and 5 23

Marina Gateway_Renderings 24

Restaurant_Site Plan Total Site Area - 15,000 sf Total Site Area ~ 15,000 sf Total Site Area ~ 15,000 sf 8,000 sf brewery, restaurant, storage 2,000 sf indoor/outdoor beer garden -option to rent for outdoor events 8000 sf Brewery,Restaurant, storage 8000 sf Brewery,Restaurant, storage 2000 sf indoor/outdoor beer garden 2000 sf indoor/outdoor beer garden - option - option to rent to out rent for out event for space event space *no onsite parking, parking available in surrounding * No * onsite No onsite parking parking - - Parking public Parking available lots available to in surrounding promote surrounding biking/walking public lots public to lots to promote promote walking/biking Beer Garden Restaurant Beer Garden Restaurant Design Goals: Provide public access along the waters edge. 25 25 50 50 100 100 Create a destination type development that will draw people to the marina district and provide views of the waterfront. Include a public space as part of the development. 25

Restaurant Site_View Looking West Currently functioning as a public parking lot, the proposal for this site is to maintain public access along the waterfront while adding a restaurant feature that would serve the public. The two story height of the building does not obstruct views of the water and offers the opportunity for a second story patio. 26

Restaurant Site_View Looking South 27