DOUGLAS COUNTY ADMINISTRATIVE POLICIES AND PROCEDURES

Similar documents
Okaloosa County BCC. Okaloosa County BCC. MSBU / MSTU Policy. Municipal Service Benefit Units Municipal Service Taxing Units.

ENGINEERING DEPARTMENT

ESCAMBIA COUNTY MUNICIPAL SERVICES BENEFITS UNITS GUIDELINES AND PROCEDURES

CITY POLICY. Process for Developed Properties that are Currently Unserviced to Connect to City Services

TABLE OF CONTENTS. Page No. MSBU Background Highlights 1. General Guidelines 4. Detailed Procedures: Construction Districts 13

ADMINISTRATIVE REGULATION AR: DATE APPROVED July 14, 2009 ORIGINATING DEPARTMENT:

Neighborhood Line Extension Program

Neighborhood Line Extension Program

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

4. Itemized cost data for cost of construction certified by a Professional Engineer.

Town of Bristol Rhode Island

Goals and Policies Concerning Use of MELLO-ROOS COMMUNITY FACILITIES ACT OF 1982

Village of Richton Park Special-Use/Rezoning Petition Packet

Arkansas REALTORS Executive Center Drive Little Rock, Arkansas PH. (501) LOCAL; STATEWIDE TOLL FREE

PROCEDURE FOR BOUNDARY (LOT LINE) ADJUSTMENT

Combined Zoning/Minor Variance and Boulevard Parking Agreement Exception

MUNICIPAL SERVICE BENEFIT UNIT (MSBU) CREATION AND ADMINISTRATION POLICY 16-01

AGENDA Special Infrastructure Committee Thursday, October 11, 5:00 PM Peoria County Courthouse, Room 402

EXHIBIT A PROPERTY IMPROVEMENT FORM WILLOW HAVEN COMMUNITY ASSOCIATION

CRA/LA, A DESIGNATED LOCAL AUTHORITY (Successor Agency to the Community Redevelopment Agency of the City of Los Angeles, CA) M E M O R A N D U M

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA

TOWN OF MANSFIELD RULES AND REGULATIONS FOR THE EXTENSION OF PUBLIC SEWERS

PLANNED UNIT DEVELOPMENT (PUD) AREA PLAN/REZONING REVIEW PROCEDURE

Charter Township of Lyon P.A. 198 Industrial Facilities Tax Exemption Tax Abatement Guidelines

Steps For Resurfacing Your Street by HOA Online

ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS

TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER

District Formation Instructions ORS Chapter 198. Instructions for Filing an Application by Individuals

Chapter 25 ESCROW FEE REQUIREMENTS

MOBILEHOME PARK RENT STABILIZATION PROGRAM

CARRIAGE HILLS METROPOLITAN DISTRICT SUMMARY DESCRIPTION AND FREQUENTLY ASKED QUESTIONS AS OF NOVEMBER 2015

Ordinance No Affordable Housing Ordinance Borough of Glen Ridge, Essex County

CITY OF PITTSBURG, KANSAS COMMUNITY IMPROVEMENT DISTRICT POLICY I. PURPOSE

AWARD FOR EXCELLENCE GUIDELINES AND REQUIREMENTS For transactions in calendar year 2017 Last revised: 2/23/17

MINOR LAND DIVISIONS APPLICATION

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council June 14, 2016

CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the Town Council Meeting

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

Guide to Minor Developments

THE CORPORATION OF THE TOWNSHIP OF NORTH FRONTENAC BY-LAW #123-13

Committed to Service

NOTICE OF REQUESTS FOR PROPOSALS (RFP) COMMUNITY PLACEMENT PLAN (CPP) FISCAL YEAR

A. This ordinance shall not be effective until approved by COAH pursuant to NJAC 5:

Condominium Unit Requirements.

PROCEDURE FOR BOUNDARY (LOT LINE) ADJUSTMENT

CHAPTER SHORT SUBDIVISIONS

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS

SECTION 7000 LAND DEVELOPMENT REQUIREMENTS

March 12, The meeting was called to order at 7:00 p.m. by Mayor Docimo. The meeting was advertised in the following manner:

500 ft. or 200 ft. from the perimeter of the PUD District, whichever is the lesser, for application areas of 20 acres or less.

LOT LINE ADJUSTMENT APPLICATION GUIDE (BCC , ET SEQ.)

CONDOMINIUM REGULATIONS

Guide to Combined Preliminary and Final Plats

ARTICLE 14 PLANNED UNIT DEVELOPMENT (PUD) DISTRICT

Stormwater Fees for Cemeteries

CHAPTER 8 TAX SALES Process, Pertinent Elements, and Review Criteria. Presented by The State Controller s Office Burlingame, CA October, 2015

City of Los Angeles CALIFORNIA. O Kji ERIC GARCETTI MAYOR ARTS DISTRICT LOS ANGELES BUSINESS IMPROVEMENT DISTRICT (PROPERTY BASED)

Natural Resources Assistance Council DISTRICT 12 - LUCAS COUNTY, OHIO

LOCAL GOVERNMENT CODE CHAPTER 372. IMPROVEMENT DISTRICTS IN MUNICIPALITIES AND COUNTIES SUBCHAPTER A. PUBLIC IMPROVEMENT DISTRICTS

CALIFORNIA MUNICIPAL FINANCE AUTHORITY

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

August 13, The meeting was called to order at 7:00 p.m. by Mayor Docimo. The meeting was advertised in the following manner:

Amending Chapter 9 Establishment of Fees, Section 9.04 Ambulance Service Fees. (Second Reading)

TOWNSHIP OF MANALAPAN. Ordinance No

TOWN OF DENNIS BOARD OF SELECTMEN ROAD ACCEPTANCE POLICY AND PROCEDURE TIME LINE

City of Edwardsville, Kansas Special Benefit District Policy

Capital Improvement Program

Administrative Zoning Variation Application Procedures and Checklist

KASSON TOWNSHIP PRIVATE ACCESS ROAD ORDINANCE ORDINANCE NO (EFFECTIVE: MAY 12, 2007)

SPECIAL USE FOR A PLANNED UNIT DEVELOPMENT (P.U.D.), REZONING, and COMPREHENSIVE PLAN AMENDMENT APPLICATION PACKET

2/22/2016. Planning and Zoning. David Owens March 2016 SOME CONTEXT

METROPOLITAN TRANSPORTATION AUTHORITY ALL-AGENCY GUIDELINES FOR THE DISPOSAL OF PERSONAL PROPERTY

WESTERLY MUNICIPAL LAND TRUST RULES AND REGULATIONS

EXHIBIT A. City of Corpus Christi Annexation Guidelines

Public Improvement District (PID) Policy

ARCHITECTURAL MODIFICATION GUIDELINES

PLANNED UNIT DEVELOPMENTS (Ordinance No.: 3036, 12/3/07; Repealed & Replaced by Ordinance No.: 4166, 10/15/12)

IC Chapter 7. Real Property Transactions

PUBLIC EASEMENT ROAD POLICY TOWN OF OGUNQUIT, MAINE Adopted April 5, 2016 Effective July 1, 2016

(a) Commercial uses on Laurel Avenue, abutting the TRO District to the

REQUEST FOR PROPOSAL BANKING SERVICES FOR UPPER DEERFIELD TOWNSHIP, NEW JERSEY

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS

3. Adopt the Preliminary Use and Management Plan for the property granted to the District.

Development Opportunity: Priority Development Site

ARTICLE 100 SUBDIVISION APPLICATION PROCEDURE AND APPROVAL PROCESS

REQUEST FOR PROPOSAL. SEEKING A MANAGEMENT AGENT for the CASA DE LOS ARCOS HOUSING PROJECT. RFP No

AN ACT RELATING TO HOUSING; AMENDING AND ENACTING SECTIONS OF THE AFFORDABLE HOUSING ACT; ADDING AND CLARIFYING DEFINITIONS;

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT PLANNING BOARD APPLICATION PACKAGE SUBDIVISIONS

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY

ADMINISTRATIVE PROCEDURES. For WATER DEMAND OFFSET REQUIREMENTS

Charter Township of AuSable

Plat Reviews. Richard Powell, P.L.S.

Residential Subdivision Preliminary Plat Application

CHAPTER 35 PARKS AND RECREATION

BARROW COUNTY, GEORGIA

BROOKLYN BRIDGE PARK CORPORATION POLICY ON THE ACQUISITION AND DISPOSITION OF REAL PROPERTY. Board of Directors Meeting.

ARLINGTON COUNTY TENANT RELOCATION GUIDELINES

ORDINANCE NO. 41. PRIVATE ROAD ORDINANCE As Amended Through April 10, 2008

Transcription:

DOUGLAS COUNTY ADMINISTRATIVE POLICIES AND PROCEDURES TITLE County Assisted Paving Project (CAPP) Gravel Road Paving Assistance POLICY CUSTODIAN Approval Date April 16, 2014 Revision Date April 30, 2014 PURPOSE: DEPARTMENTS RESPONSIBLE: DEPARTMENT(S) AFFECTED: POLICY: To provide a method for partnering with residents to pave public residential gravel roads. This policy provides criteria for the formation and implementation of County- Assisted Paving Projects (CAPPs). The purpose of the CAPP program is to provide a method for assisting property owners in the paving of public residential gravel roads that were not paved when the development was initiated. The primary reasons that graveled roadways are paved are; a) to improve driver safety including stopping distance, b) to reduce required routine maintenance, and c) to reduce airborne particulates. The CAPP program is designed to be an alternative program to the establishment of a Local Improvement District (LID) and is intended to be used on public residential gravel roads where LIDs are not considered practical. If the property owners in a neighborhood desire to implement a CAPP, this policy requires them to partner with the County by paying the estimated cost of paving and shouldering materials, ditch stabilization materials and drainage improvements ( Construction Materials ) to be used on the project. If the formation of a CAPP is approved, Douglas County will provide in-house manpower and equipment to construct the improvements. County funding and manpower may affect the timing of a CAPP. Property owners will be responsible for determining neighborhood support for a potential CAPP by initiating discussions and by garnering financial support for the project. The contribution of funds toward the cost of Construction Materials is voluntary, and it is expected that property owners in support of the project will contribute the cost of Construction Materials. 1

Although the paving of gravel roads can have perceived positive benefits to property owners, paving can also have perceived negative impacts, particularly in regard to equestrian use and to changes to the character of the neighborhood. Procedures contained within this policy require notification of a proposed CAPP to be made outside the immediate project area and require consideration of equestrian use in the roadway design. ELIGIBILITY: Neighborhoods with gravel roads may be eligible for the formation of a Countyassisted Paving Project (CAPP) provided the following requirements are met: 1. The roadway(s) must be currently maintained by Douglas County. Construction of new roads or paving of roads that are currently privately maintained will not be considered for a CAPP. 2. The project must be free of complex design issues and must only involve minor earthwork and drainage work or other utility work. 3. The project can be completed by in-house crews without affecting other scheduled work. 4. The project will have the support of seventy percent (70%) of the affected property owners. Affected property owners will be those as shown on Attachment A Illustration of Properties to be Included in County-Assisted Paving Project (CAPP) Voting Area. 5. The proposed paving project must connect to an existing paved road (maintained by the County) to provide continuity of travel and maintenance. 6. The traffic volume on the roadways, within the proposed CAPP, is more than 100 vehicle trips per day or the project is an extension of a previous CAPP or LID. PROCEDURES: Property owners responsibilities: Property owners within the proposed CAPP will be responsible for initiating the formation process which may include holding informal meetings and discussions, to determine preliminary support for the project. A property owner within the proposed CAPP will be designated by project supporters as the liaison between the County ( Director or his designee) and the CAPP proponents and will be referred to as the CAPP Representative. A map similar to Attachment A Illustration of Properties to be included in County - Assisted Paving Project (CAPP) Voting Area will be the responsibility of the CAPP liaison. Development of costs for Construction Materials: Douglas County Public Works Engineering staff will prepare a cost estimate for the Construction Materials to be used on the proposed paving project. The cost estimate will be derived from proposed roadway dimensions per County criteria and from annually established County material bid prices. A contingency amount of ten percent (10%) will be added to the estimated material costs to account for potential cost overruns. 2

Development of a project information sheet: The CAPP Representative will prepare a project information sheet that will be distributed by the CAPP representative to property owners within the proposed CAPP. County staff will assist the CAPP representative in the preparation of the project information sheet. In order to minimize potential misunderstanding, the CAPP Representative will distribute only County-approved or County-prepared informational material. Neighborhood informational meeting: The CAPP Representative will initiate a neighborhood informational meeting, scheduled and coordinated with Douglas County staff, to discuss: 1. Potential benefits from forming a CAPP 2. Potential impacts from paving gravel roads 3. CAPP formation process 4. Anticipated cost of the project 5. Anticipated schedule 6. Roadway design considerations The CAPP Representative will be responsible for coordinating and arranging the venue for the meeting. With assistance from County staff, the CAPP Representative will provide a formal meeting notification to the owners within the proposed CAPP. Said notification will be sent to owners of property as they appear on the County s assessment records. The notification will contain a description of the proposed CAPP, the meeting location, the meeting date and the meeting time. A project information sheet will be sent via first-class mail to all property owners within the proposed CAPP (per Attachment A) informing them of the informational meeting. County staff will review the project information sheet and the mailing list prior to notifications being sent out. The cost of mailing said notifications will be the responsibility of the CAPP proponents. Preliminary notification to neighborhood associations: The intent of the CAPP process is to provide an opportunity for property owners to improve roadways to a paved condition; however, Douglas County also realizes that paving public residential gravel roadways can be a divisive issue that can affect interests well beyond the area of the proposed CAPP. For that reason, Douglas County requires notification of the proposed CAPP to be sent to all adjacent neighbors, homeowner associations, civic associations, districts, and any other Douglas County recognized entity within the subdivision. With oversight from County staff, the CAPP Representative will send an informational meeting notice to each of these neighboring entities. When appropriate, these entities will be encouraged to place information regarding the proposed CAPP within their newsletter to inform other residents within the neighborhood of the informational meeting. 3

Petition process to determine project support: If CAPP proponents wish to proceed with the CAPP process after completion of the neighborhood informational meeting, the CAPP Representative will circulate a petition to the property owners (as shown on Attachment A), who are immediately adjacent to the paving project. The petition shall contain a description of the proposed project, including the cost of Construction Materials that property owners within the CAPP will be financially responsible for. Those owners who are in support of the proposed CAPP will sign the petition. The petition must have the support of at least seventy percent (70%) of the owners of property within the proposed CAPP. Each individual lot within the CAPP, as recognized by the County Assessor s Office, will receive one vote in the petition process. All owners on the property deed must be in support of the CAPP in order for the property to be considered in support of the CAPP. County staff will contact those property owners who have signed the petition to verify the vote. Collection and deposit of funds for Construction Materials: The CAPP Representative will be responsible for collecting the necessary funds for the Construction Materials and for depositing those funds into a bank escrow account. The bank account will be set up to recognize individual contributions from property owners so said funds can be returned in the event the CAPP does not proceed. It is expected that all project supporters who sign the petition will contribute financially toward the project. Full project funding must be deposited into escrow before County approval of the CAPP. County approval of the CAPP: It will be the responsibility of the Douglas County Manager to provide final approval of the CAPP. County verification of adequate property owner support and verification of the deposit of funds for Construction Materials will be required prior to approval. If the CAPP is approved by the County Manager, the CAPP Representative will be responsible for providing an electronic transfer to the County Treasurer s Office, in the amount necessary to cover the estimated cost of Construction Materials. Said funds will be used by the County to pay the cost of Construction Materials, as needed. No reimbursement will be made if the cost of Construction Materials is less than that estimated and no additional funds will be required if the cost of Construction Materials is greater than that estimated. A receipt from the Douglas County Treasurer s Office will be provided to the CAPP Representative for the funds that have been deposited. Douglas County Finance will coordinate appropriating these funds through a supplemental budget providing spending authority to draw upon for Construction Materials during the construction period. 4

County contribution to the CAPP: Douglas County will provide in-house construction crews, equipment, construction plans, drainage analysis, vehicle trips per day (vpd) determination, and supervision necessary to construct the project, provided such support will not affect other scheduled projects. The potential for County support will vary from year to year and CAPPs will be evaluated on a first come first served basis. Consideration of equestrian use: If the subdivision or road where paving is to occur is considered by the County to be an area of equestrian use, the roadway design for the CAPP will take into consideration the construction of wider shoulders to accommodate equestrian use. Use of wider shoulders will be constructed unless such construction will necessitate the acquisition of additional right-of-way, will severely impact adjacent roadway drainage, or require the construction of permanent water quality improvements. The additional cost of widened shoulders will be included in the cost of Construction Materials to be paid by CAPP proponents. Final notification prior to construction: Upon approval of the CAPP, a second notification containing the project schedule and additional project information shall be sent to all property owners of record within the proposed CAPP, and to representative neighborhood associations. The information within the notification will be developed jointly by the CAPP Representative and County staff. The County will pay the cost of preparing and mailing the second notification. 5