Chapter 18 RENTAL ASSISTANCE DEMONSTRATION VOUCHERS

Similar documents
Chapter 22 HOUSING CHOICE VOUCHER PROJECT-BASED PROGRAM. 1. Purpose of Program: The program goals for the Project-Based Voucher (PBV) Program are:

Rental Assistance Demonstration (RAD) A. Introduction

Rental Assistance Demonstration (RAD) Quick Reference Guide for Public Housing Projects Converting to Project-Based Voucher (PBV) Assistance

2016 EHA Agency Plan

Project-Based Voucher Program CHAPTER 16 PROJECT-BASED VOUCHER PROGRAM

Project-Based Vouchers [24 CFR through ]

OWNERS INFORMATION PACKET

Project-Based Voucher Program CHAPTER 16 PROJECT-BASED VOUCHER PROGRAM

THE RENTAL ASSISTANCE DEMONSTRATION RAD. Key Features For Public Housing Residents

Chapter 12 TRANSFER POLICY

Housing Assistance Payments Contract (HAP Contract) Section 8 Tenant-Based Assistance Housing Choice Voucher Program

PROJECT-BASED ASSISTANCE HOUSING CHOICE VOUCHER PROGRAM HOUSING ASSISTANCE PAYMENTS CONTRACT EXISTING HOUSING

Chapter 1 OVERVIEW OF THE PROGRAM AND PLAN

Chapter 12 TRANSFER POLICY

CHAPTER 1 OVERVIEW OF THE PROGRAM AND PLAN

Chapter 17 PROJECT-BASED VOUCHERS

HCV Administrative Plan

Overview of Major Rental Assistance Demonstration (RAD) Provisions

Housing Assistance Payments Contract Regular Tenancy Section 8 Tenant-Based Assistance Rental Certificate Program

SAMPLE. Housing Assistance Payments Contract (HAP Contract) Section 8 Tenant-Based Assistance Housing Choice Voucher Program

Chapter 17 PROJECT-BASED VOUCHERS

Chapter 1 OVERVIEW OF THE PROGRAM AND PLAN

PHA 101: A Guide for CoC s Understanding PHA Programs and Policies. August 26, 2013

Chapter 17 PROJECT-BASED VOUCHERS

Chapter 9 REEXAMINATIONS [24 CFR , , 966.4]

Table of Contents. A. Introduction B. Eight Steps To Establish A Lease C. Program Information Exhibit 1. Rental Voucher (HUD 52646)

Chapter 9 REQUEST FOR APPROVAL OF TENANCY AND CONTRACT EXECUTION [24 CFR ]

Chapter 1 OVERVIEW OF THE PROGRAM AND PLAN

and move), if the gross rent for the unit exceed the applicable payment standard for the family, the family share of rent my not exceed 40 percent of

Chapter 9 REQUEST FOR TENANCY APPROVAL AND CONTRACT EXECUTION [24 CFR ]

Chapter 9 GENERAL LEASING POLICIES INTRODUCTION

Chapter 17. VERMONT STATE HOUSING AUTHORITY SECTION 8 PROJECT-BASED VOUCHER PROGRAM Administrative Plan

Public Housing: Rental Assistance Demonstration

Lease for Voucher Tenancy Section 8 Tenant-Based Assistance Housing Choice Voucher Program

policy are discussed below. Proposed Change: 90 consecutive days (to be consistent with Ch. 12, p12-8)

This is a 45 day notice with an opportunity to present public comments regarding this change.

Part C of HAP Contract: Tenancy Addendum. 1. Section 8 Voucher Program. 5. Family Payment to Owner. 2. Lease. 3. Use of Contract Unit

Chapter 9 GENERAL LEASING POLICIES

SIGNIFICANT AMENDMENT: RENTAL ASSISTANCE DEMONSTRATION PROJECT BASED VOUCHER CONVERSION

Chapter 17 PROJECT-BASED VOUCHERS

Tenancy Addendum Section 8 Tenant-Based Assistance Housing Choice Voucher Program (To be attached to Tenant Lease)

Honorable Chairman and Housing Authority Board Members Attn: Laura C. Kuhn, Executive Director

HOUSING AUTHORITY OF SNOHOMISH COUNTY ADMINISTRATIVE PLAN FOR THE SECTION 8 HOUSING CHOICE VOUCHER PROGRAM

BIEGGER ESTATES. Project Update and Rental Assistance Demonstration (RAD) Presentation

RENTAL ASSISTANCE DEMONSTRATION PROGRAM (RAD) RESIDENT INFORMATION NOTICE (RIN)

TENANT SELECTION PLAN Providence Elizabeth House 3201 SW Graham Street, Seattle WA Phone: TRS/TTY: 711

Boulder County Housing Authority Section 8/Housing Choice Voucher 2016 Administrative Plan

Maine State Housing Authority Owner of Contract Unit****

Chapter 9 GENERAL LEASING POLICIES

U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT WASHINGTON, DC

Section 8 Voucher Program Basics

Landlord Summary. The landlord must perform necessary maintenance so the unit continues to comply with Housing Quality Standards.

Housing Authority of the City of Pittsburgh 2015 Moving to Work Annual Plan Rental Assistance Demonstration Amendment

Chapter 1 OVERVIEW OF THE PROGRAM AND PLAN

GRIGGS FARM TENANT SELECTION POLICY

Guidelines For Creating a TBRA Administrative Plan

Housing Choice Voucher Program OMB Approval (Exp. 04/30/2014)

Purpose. Authority. Amendments to the HAP Contract

PART VII: HOMEOWNERSHIP [24 CFR through ]

Chicago Housing Authority FY2015 Administrative Plan for the Housing Choice Voucher Program

Affordable Housing and Self-Sufficiency Improvement Act of 2012 Section-by-Section Summary

Subsidized Housing Programs: A Basic Overview for Advocates

SECTION 8 HOUSING CHOICE VOUCHER PROGRAM

Auburn Housing Authority (AHA)

Chapter 6 ESCROW ACCOUNT

Subject: Enhanced Voucher Requirements for Over-housed Families

Addendum to Rental Assistance Demonstration Program (RAD) Lease for RAD Residents in Mixed-Income Developments

Fair Housing and Tenant Selection Policy for Properties Monitored by the North Carolina Housing Finance Agency

HOUSING CHOICE VOUCHER PROGRAM ADMINISTRATIVE PLAN. Housing Choice Voucher Program Page 1 of 401

Peninsula Housing Authority Clallam and Jefferson Counties Tenant-Based Rental Assistance (TBRA) Program. Policies and Procedures

Significant Amendment to CMHA s FYs 2016 and 2017 Capital Statements. Rental Assistance Demonstration

CHRISTOPHER HOMES OF ARKANSAS PRAC Properties

FAIRVILLE MANAGEMENT COMPANY, LLC Resident Screening & Selection Policy

Housing Opportunity Through Modernization Act of Overview. February 8, 2017 Presenter: Seth Embry, Senior Associate

CHA Plan Amendment (adopted March 21, 2017)

Housing Choice Voucher Updates Regarding Eligibility, Income and Rent

Part One. What s New with RAD? 9/19/2017. HUD Increases Unit Cap. HUD Increases the Public Housing Unit Cap

SANTA MONICA HOUSING AUTHORITY ADMINISTRATIVE PLAN FOR THE HOUSING CHOICE VOUCHER PROGRAM

TENANT SELECTION PLAN

Chapter 8. LEASING AND INSPECTIONS [24 CFR 5, Subpart G; 24 CFR 966, Subpart A]

BIEGGER ESTATES. Project Update and Rental Assistance Demonstration (RAD) Presentation

RESIDENT INFORMATION NOTICE RENTAL ASSISTANCE DEMONSTRATION PROGRAM (RAD)

ADMINISTRATIVE PLAN FOR THE SECTION 8 HOUSING CHOICE VOUCHER PROGRAM SECTION 8 MODERATE REHABILITATION PROGRAM

Landlord Packet Section 8 Housing Choice Voucher Program

Landlord Packet Section 8 Housing Choice Voucher Program

Request for Proposals Project-Based Voucher Program

Chapter 16 PROJECT-BASED VOUCHERS

GUIDEBOOK FOR PARTICIPANTS

Chapter 8. LEASING AND INSPECTIONS [24 CFR 5, Subpart G; 24 CFR 966, Subpart A]

Housing Opportunity Through Modernization Act of 2016: Initial Guidance

Guidebook for Owners

Uniform Relocation/ Section 104(D)/ Environmental Review

PROJECT-BASED VOUCHERS Chapter 17. This chapter describes HUD regulations and PHA policies related to the project-based voucher (PBV) program.

CHAPTER 8 VOUCHER ISSUANCE AND BRIEFINGS [24 CFR , ]

Streamlined Annual PHA Plan (High Performer PHAs)

TENANT SELECTION PROCEDURE

Section 811 Project Rental Assistance Tenant Selection Plan

Landlord Briefing for. The Housing Choice Voucher Program

East Village Growth Partners, LLC Tenant Selection Plan Effective 10/1/14

Federally Subsidized Housing Tenant-Based

Transcription:

INTRODUCTION Chapter 18 RENTAL ASSISTANCE DEMONSTRATION VOUCHERS This chapter describes HUD regulations concerning the Rental Assistance Demonstration (RAD) Program found in PIH Notice 2012-32 and the Quick Reference Guide for Public Housing Projects Converting to Project-Based Voucher (PBV) Assistance, October 2014, as well as PHA policies related to the (RAD) program in eight parts. If the RAD regulations do not differ from the rules and policies set forth in the first sixteen chapters of this book, then those policies apply. Please refer to the appropriate chapter. Part I: General Requirements. This part describes general provisions of the RAD program. Part II: Dwelling Units. This part describes requirements related to housing quality standards and the flexibility provided by the RAD Rider in relation to pre-hap contract inspections. Part III: Owner Information and Housing Assistance Payments Contract. This part discusses owner information and RAD PBV HAP contract requirements and policies including the execution, term, and termination of the RAD PBV HAP contract. Part IV: Selection of RAD PBV Program Participants. This part describes the requirements and policies governing how the PHA and the owner will select a family to receive RAD PBV assistance. Part V: Occupancy. This part discusses occupancy requirements related to the lease, and describes under what conditions families are allowed or required to move. In addition, exceptions to the occupancy cap (which limits PBV assistance to 25 percent of the units in any project) are also discussed. Part VI: Determining Rent to Owner. This part describes how the initial rent to owner is determined, and how rent will be redetermined throughout the life of the RAD PBV HAP contract. Rent reasonableness requirements are also discussed. Part VII: Payments to Owner. This part describes the types of payments owners may receive under this program. Part VIII: RAD PBV Resident Rights and Participation: This part describes the requirements under the RAD notice that include types of services offered, continued FSS participation, resident participation and funding, resident procedural rights, and phased in tenant rents. Page 18-1

18-I.A. OVERVIEW [PIH Notice 2012-32] PART I: GENERAL REQUIREMENTS The Rental Assistance Demonstration (RAD) is a voluntary program of the Department of Housing and Urban Development (HUD). RAD seeks to preserve public housing by providing Public Housing Agencies (PHAs) with access to more stable funding to make needed improvements to properties. Public housing units across the country need more than $26 billion in repairs. HUD refers to these repair costs as capital needs. Congress has not provided enough funding for PHAs to keep up with capital needs. As a result, PHAs have had to make tough choices between things like repairing roofs and replacing plumbing or worse, demolishing public housing. RAD provides PHAs a way to rehabilitate, or repair, units without depending on additional money from Congress. Under the First Component of RAD, properties that are currently funded under the Public Housing program convert their assistance to long-term, project-based Section 8 contracts while removing HUD from the deed of trust. By drawing on an established industry of lenders, owners, and stakeholders, RAD allows PHAs to use private investment in Low Income Housing Tax Credits and private activity bond financing to preserve and improve affordable housing units that could be subject to vouchers and demolition. RAD provides greater funding certainty for potential lenders and increased operational flexibility for PHAs and owners to serve their communities. In the case of Boulder Housing Partners, RAD conversion applies to the following four properties: Diagonal Court, Iris Hawthorne, Manhattan and Northport 18-I.B. TENANT-BASED VS. RAD PROJECT-BASED VOUCHER ASSISTANCE [24 CFR 983.2] Much of the tenant-based voucher program regulations also apply to the RAD PBV program. Consequently, many of the PHA policies related to tenant-based assistance also apply to RAD PBV assistance. The provisions of the tenant-based voucher regulations that do not apply to the RAD PBV program are listed in the RAD Notice (PIH 2012-32) and are further outlined and explained in this chapter. BHP Policy Except as otherwise noted in this chapter, or unless specifically prohibited by RAD PBV program regulations, or amended by the MTW Standard Agreement and Annual Plan, the PHA policies for the tenant-based voucher program contained in this administrative plan also apply to the RAD PBV program and its participants. Page 18-2

18-I.C. EQUAL OPPORTUNITY REQUIREMENTS [24 CFR 983.8] The PHA must comply with all equal opportunity requirements under federal law and regulations in its implementation of the RAD PBV program. This includes the requirements and authorities cited at 24 CFR 5.105(a). In addition, the PHA must comply with the PHA Plan certification on civil rights and affirmatively furthering fair housing, submitted in accordance with 24 CFR 903.7(o). Page 18-3

PART II: DWELLING UNITS 18-II.A. OVERVIEW This part identifies the special housing quality standards that apply to the RAD program, housing accessibility for persons with disabilities, and special procedures for conducting housing quality standards inspections. 18-II.B. HOUSING QUALITY STANDARDS The housing quality standards (HQS) for the tenant-based program, including those for special housing types, generally apply to the RAD PBV program. 18-II.C. INSPECTING UNITS Pre-HAP Contract Inspections The RAD Rider to the PBV HAP contract provides that an owner may certify that all units will meet HQS no later than the date of completion of initial repairs, in place of the requirement that all units must past an HQS inspection prior to the HAP contract effective date. Turnover Inspections [24 CFR 983.103(c)] Before providing assistance to a new family in a contract unit, the PHA must inspect the unit. The PHA may not provide assistance on behalf of the family until the unit fully complies with HQS. Regularly Scheduled Inspections Per MTW Activity 2013-1, BHP will follow the same inspection schedule for PBVs as with all other voucher holders. See Chapter 8 of this Administrative Plan. Other Inspections [24 CFR 983.103(e)] The PHA must inspect contract units whenever needed to determine that the contract units comply with HQS and that the owner is providing maintenance, utilities, and other services in accordance with the RAD PBV HAP contract. The PHA must take into account complaints and any other information coming to its attention in scheduling inspections. The PHA must conduct follow-up inspections needed to determine if the owner (or, if applicable, the family) has corrected an HQS violation, and must conduct inspections to determine the basis for exercise of contractual and other remedies for owner or family violation of HQS. In conducting PHA supervisory quality control HQS inspections, the PHA should include a representative sample of both tenant-based and project-based units. Inspecting PHA-Owned Units In the case of PHA-owned units, per MTW Activity 2013-1, the PHA is allowed to inspect PHAowned units. Page 18-4

PART III: OWNER INFORMATION AND HOUSING ASSISTANCE PAYMENTS CONTRACT (HAP) 18-III.A. OVERVIEW The PHA must enter into a RAD PBV HAP contract with the owner for units that are receiving RAD PBV assistance. The purpose of the RAD PBV HAP contract is to define the terms under which the PHA will provide housing assistance payments to the owner for eligible families. Housing assistance is paid for contract units leased and occupied by eligible families during the HAP contract term. With the exception of single-family scattered-site projects, a HAP contract shall cover a single project. If multiple projects exist, each project is covered by a separate HAP contract. The HAP contract must be in the form required by HUD under the RAD regulations. 18-III.B. OWNERSHIP OR CONTROL (PIH Notice 2012-32, Section 1.6.B.3) Pursuant to the RAD statute, during the initial term and all renewal terms of the HAP contract, HUD will require ownership or control of assisted units by a public or non-profit entity. BHP qualifies under this definition as a public entity. However, as HUD, in its sole discretion, determines necessary pursuant to foreclosure, bankruptcy, or termination and transfer of assistance for material violations of, or default under, the HAP contract, HUD will require ownership or control of assisted units in the following priority: (1) a capable public entity; and (2) a capable non-public entity (e.g., a private entity), as determined by the Secretary. HUD may allow ownership of the project to be transferred to a for-profit entity to facilitate such entity s use of tax credits, but only if the PHA preserves its interest in the property in a manner approved by the Secretary. All current and future ownership entities are subject to the eligibility requirements of Section 1.3 of the PIH Notice 2012-32, including the civil rights threshold requirements. BHP Policy The owner for the properties under this RAD Conversion is Boulder Communities, LLLP. Boulder Housing Partners subsidiary BCGP, LLC is the.01% general partner of the owner partnership. 18-III.C. OVERSIGHT OF OWNER COMPLIANCE WITH RAD PBV CONTRACT (Quick Reference Guide to RAD PBV, Section 3.7) The PHA administering the contract shall be responsible for monitoring owner compliance with the RAD PBV HAP contract starting on the effective date of the contract. Owner responsibilities are spelled out in Section 6 of the contract and include such things as performing all management and rental functions for the contract units, maintaining the units in accordance with HQS, and enforcing tenant obligations under the lease. Page 18-5

In the event the administering PHA determines that an owner has breached the RAD PBV HAP contract, the PHA must notify the owner in writing and require the owner to take corrective action. If the owner fails to do so, then the PHA may exercise any of the remedies available under the RAD PBV HAP contract, from abating assistance payments to termination of the contract. Section 15 of the RAD PBV HAP contract addresses owner defaults. HUD retains the authority under Section 14 of the RAD PBV HAP contract to step in if HUD determines that the contract administrator has failed to take appropriate enforcement action against an owner. In addition to the responsibilities that are typical of PBV contracts, there are additional requirements described in the RAD PBV HAP contract and RAD Notice, including: Owners must maintain at all times commercially available property and liability insurance. Owners must receive HUD approval for any refinancing or restructuring of permanent debt. 18-III.D. HAP CONTRACT REQUIREMENTS Term of HAP Contract (PIH Notice 2012-32, Section 1.6.B.1) Covered projects shall have an initial HAP term of at least 15 years (up to 20 years upon request of the PHA and with approval by the agency administering the vouchers). Owners of covered projects are required to make available for occupancy by eligible tenants the number of assisted units under the terms of the contract and may not reduce the number of assisted units without HUD approval. Any HUD approval of a PHA s request to reduce the number of assisted units under the contract shall be subject to conditions that HUD may impose. BHP Policy The term of the contract will be twenty (20) years. Mandatory Renewal of HAP Contract (PIH Notice 2012-32, Section 1.6.B.2) By statute, upon contract expiration, the agency administering the vouchers shall offer, and the PHA shall accept, renewal of the contract subject to the terms and conditions applicable at the time of renewal and the availability of appropriations each year for such renewal. RAD Use Agreement (PIH Notice 2012-32, Section 1.6.B.4) Pursuant to the RAD statute, covered projects shall have an initial RAD Use Agreement that: a. Will be recorded superior to other liens on the property; Page 18-6

b. Will run for the same term as the initial HAP contract, automatically renew upon extension or renewal of the HAP contract for a term that runs with the renewal term of the HAP contract, and remain in effect even in the case of abatement or termination of the HAP contract (for the term the HAP contract would have run, absent the abatement or termination), unless the Secretary provides approval for the RAD Use Agreement to be terminated when an owner requests a transfer of assistance; c. Requires that in the event that the HAP contract is removed due to breach, noncompliance or insufficiency of Appropriations, for all units previously covered under the HAP contract, new tenants must have incomes at or below 80 percent of the area median income (AMI) at the time of admission and rents may not exceed 30% of 80% of median income for an appropriate size unit for the remainder of the term of the RAD Use Agreement; and d. Requires compliance with all applicable fair housing and civil rights requirements, including the obligation to affirmatively further fair housing and all applicable site selection and neighborhood standards requirements. 18-III.E. ADDITIONAL HAP REQUIREMENTS RAD Rehab Assistance (PIH Notice 2012-32, Section 1.6.B.8) Units that are not occupied and will be undergoing rehabilitation or construction as identified in the approved Financing Plan and RAD Conversion Commitment will be eligible for assistance equal to the Public Housing Operating Fund and the Capital Fund amounts that formed the basis for the calculation of initial contract rents (see Attachment 1C of PIH Notice 2012-32). During the period of rehabilitation or construction as identified in the approved Financing Plan and RCC, the maximum RAD Rehab Assistance a PHA may receive (i.e. for occupied units, units eligible for vacancy payments, or units eligible for Rehab Assistance Payments) is limited to the number of units eligible for Operating Fund subsidy prior to conversion. As a result, not all units included in the converting property will be eligible for rehab assistance payments. RAD Rehab Assistance Payments are separate and distinct from the two currently authorized RAD PBV assistance payments: (i) regular housing assistance payments; and (ii) discretionary, postoccupancy vacancy payments. Following the earlier of (1) the end of the construction period determined within the HUDapproved Financing Plan or (2) the end of actual construction, the PHA will no longer be eligible to receive RAD Rehab Assistance Payments and all units under contract will be eligible for payment only for occupied units or for vacancy payments, as applicable. Page 18-7

Vacancy Payments [24 CFR 983.352(b)] At the discretion of the PHA, the HAP contract may provide for vacancy payments to the owner for a PHA-determined period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the moveout month. The amount of the vacancy payment will be determined by the PHA and cannot exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner (including amounts available from the tenant s security deposit). BHP Policy The PHA will decide on a case-by-case basis if the PHA will provide vacancy payments to the owner. The RAD PBV HAP contract with the owner will contain any such agreement, including the amount of the vacancy payment and the period for which the owner will qualify for these payments. Page 18-8

PART IV: SELECTION OF RAD PBV PROGRAM PARTICIPANTS 18-IV.A. OVERVIEW This part describes the requirements and policies specifically related to eligibility and admission to the RAD PBV program that differ from the tenant based voucher regulations [24 CFR 982]. 18-VI.B. ELIGIBILITY FOR RAD PBV ASSISTANCE In-Place Families at time of Conversion to RAD No Re-screening of Tenants upon Conversion (PIH Notice 2012-32, Section 1.6.C.1) Pursuant to the RAD statute, at conversion, current households are not subject to rescreening, income eligibility, or income targeting provisions. Consequently, current households will be grandfathered for conditions that occurred prior to conversion but will be subject to any ongoing eligibility requirements for actions that occur after conversion. For example, a unit with a household that was over-income at time of conversion would continue to be treated as an assisted unit. Thus, 24 CFR 982.201, concerning eligibility and targeting, will not apply for current households. Once that remaining household moves out, the unit must be leased to an eligible family. Right to Return (PIH Notice 2012-32, Section 1.6.C.2) Any residents that may need to be temporarily relocated to facilitate rehabilitation or construction will have a right to return to an assisted unit at the development once rehabilitation or construction is completed. Residents of a development undergoing conversion of assistance may voluntarily accept a PHA or Owner s offer to permanently relocate to another assisted unit, and thereby waive their right to return to the development after rehabilitation or construction is completed. Right size unit All in-place residents at the time of conversion are eligible to remain in the project. Over-housed families should be moved into appropriately sized units if such units are available in the new or rehabbed project. If appropriately sized units are not available, the existing household may continue to be over-housed until an appropriately sized unit becomes available or until the resident leaves the project. Once the unit turns over, it must be leased to an appropriately sized household. Households that are over-housed will be moved into the right size unit if there is one available within the newly rehabbed building in the order that they were temporarily relocated. Households that are over housed will be given priority over households that are under housed. For example, if there are five families at a property who are over housed they will be offered the Page 18-9

right size unit based on the date that they were relocated into the temporary unit. If there is not an appropriately sized unit available for the household determined to be over-housed, they may move back into the rehabbed unit and stay in place until the appropriate sized unit becomes available. Households determined to be under-housed will be offered the appropriate sized unit after households that are over housed have been placed in right size units. Households that are under housed will not be forced into the right size units. New Families Admitted after Conversion to RAD Applicants for RAD PBV assistance must meet the same eligibility requirements as applicants for the tenant-based voucher program. Applicants must qualify as a family as defined by HUD and the PHA, have income at or below HUD-specified income limits (in the case of RAD, the income limit is the low-income limit, or 80% of Area Median Income), and qualify on the basis of citizenship or the eligible immigration status of family members [24 CFR 982.201(a) and 24 CFR 983.2(a)]. In addition, an applicant family must provide social security information for family members [24 CFR 5.216 and 5.218] and consent to the PHA s collection and use of family information regarding income, expenses, and family composition [24 CFR 5.230]. The PHA may also not approve a tenancy if the owner (including a principal or other interested party) of the unit is the parent, child, grandparent, grandchild, sister, or brother of any member of the family, unless needed as a reasonable accommodation. An applicant family must also meet HUD requirements related to current or past criminal activity. BHP Policy The PHA will determine an applicant family s eligibility for the RAD PBV program in accordance with the policies in Chapters 3 and 4. 18-IV.C. ORGANIZATION OF THE WAITING LIST [24 CFR 983.251(c)] Establishment of Waiting List (PIH Notice 2012-32, Section 1.6.D.4) In establishing the waiting list for the converted project, the PHA shall utilize the project-specific waiting list that existed at the time of conversion, unless the assistance is being transferred to another neighborhood. If a project-specific waiting list does exist, but the PHA is transferring the assistance to another neighborhood, the PHA must notify applicants on the wait-list of the transfer of assistance, and on how they can apply for residency at the new project site or other sites. Applicants on a project-specific waiting list for a project where the assistance is being transferred shall have priority on the newly formed waiting list for the new project site in accordance with the date and time of their application to the original project's waiting list. In addition, the waiting list must be established and maintained in accordance with PBV program requirements. Page 18-10

BHP Policy Upon completion of the renovations, applicants on the public housing wait lists that exist at the time of conversion will be offered housing first. 18-IV.D. SELECTION FROM THE WAITING LIST [24 CFR 983.251(c)] Upon completion of the renovations, applicants will be pulled from the waiting list in order of date and time of application, using the local preferences established by the PHA in Chapter 4. Once the previous public housing wait lists are exhausted, BHP will use MTW Activity 2015-1, whereby applicants who will occupy units with PBV assistance will be selected by the service partner first and then passed on to the PHA for eligibility screening for the Section 8 voucher, for those units where services will be offered. For elderly and disabled households, they will be selected from a lottery pool which will be conducted in accordance with the policies set forth in Chapter 4. Income Targeting [24 CFR 983.251(c)(6)] At least 75 percent of the families admitted to the PHA s tenant-based and project-based voucher programs during the PHA fiscal year from the waiting list must be extremely-low income families. The income targeting requirement applies to the total of admissions to both programs. Units with Accessibility Features [24 CFR 983.251(c)(7)] When selecting families to occupy RAD PBV units that have special accessibility features for persons with disabilities, the service partner or owner must first refer families who require such features. Preferences [24 CFR 983.251(d), FR Notice 11/24/2008] The PHA allows the service partner or agency to use the same selection preferences that are used for the tenant-based voucher program, establish selection criteria or preferences for the RAD PBV program as a whole, or for occupancy of particular RAD PBV developments or units. The PHA must provide an absolute selection preference for eligible in-place families as described in Section 18-VI.B. above. 18-IV.E. OFFER OF RAD PBV ASSISTANCE Acceptance of Offer Pre-lease Briefing (Quick Reference Guide for RAD PBV Section 5.1) When a family accepts an offer of PBV assistance, the PHA must provide an oral briefing that meets the requirements of 24 CFR 983.252. All tenants are required to sign Form HUD- Page 18-11

52578b, Section 8 Project-Based Voucher Program Statement of Family Responsibility. This form must be signed by the family prior to occupancy of a PBV-assisted unit voucher assistance. Persons with Disabilities If an applicant family s head or spouse is disabled, the PHA must assure effective communication, in accordance with 24 CFR 8.6, in conducting the oral briefing and in providing the written information packet. This may include making alternative formats available (see Chapter 2). In addition, the PHA must have a mechanism for referring a family that includes a member with mobility impairment to an appropriate accessible RAD PBV unit. Persons with Limited English Proficiency The PHA should take reasonable steps to assure meaningful access by persons with limited English proficiency in accordance with Title VI of the Civil Rights Act of 1964 and Executive Order 13166 (see Chapter 2). 18-IV.F. OWNER SELECTION OF TENANTS The owner is responsible for developing written tenant selection procedures that are consistent with the purpose of improving housing opportunities for very low-income families and reasonably related to program eligibility and an applicant s ability to fulfill their obligations under the lease. An owner must promptly notify in writing any rejected applicant of the grounds for any rejection [24 CFR 983.253(a)(2) and (a)(3)]. Leasing During the term of the RAD PBV HAP contract, the owner must lease contract units to eligible families that are selected and referred by the PHA from the waiting list (dependent on answer from HUD). The contract unit leased to the family must be the appropriate size unit for the size of the family, based on the subsidy standards. Filling Vacancies To be determined based on Waiver Request (due from HUD by 5/21/15). 18-IV.G. TENANT SCREENING [24 CFR 983.255] PHA Responsibility The PHA is not responsible or liable to the owner or any other person for the family s behavior or suitability for tenancy. However, the PHA may opt to screen applicants for family behavior or suitability for tenancy and may deny applicants based on such screening. Page 18-12

BHP Policy The PHA will not conduct screening to determine a RAD PBV applicant family s suitability for tenancy. The PHA must provide the owner with an applicant family s current and prior address (as shown in PHA records) and the name and address (if known by the PHA) of the family s current landlord and any prior landlords. In addition, the PHA may offer the owner other information the PHA may have about a family, including information about the tenancy history of family members or about drug trafficking and criminal activity by family members. The PHA must provide applicant families a description of the PHA policy on providing information to owner. The PHA may not disclose to the owner any confidential information provided in response to a request for documentation of domestic violence, dating violence, sexual assault, or stalking except at the written request or with the written consent of the individual providing the documentation [24 CFR 5.2007(a)(4)]. BHP Policy The PHA will inform the owner of their responsibility to screen prospective tenants, and will provide the owner with the required known name and address information, at the time of the turnover HQS inspection or before. The PHA will not provide any additional information to the owner, such as tenancy history, criminal history, etc. Owner Responsibility The owner is responsible for screening and selection of the family to occupy the owner s unit. When screening families the owner may consider a family s background with respect to the following factors: Payment of rent and utility bills; Caring for a unit and premises; Respecting the rights of other residents to the peaceful enjoyment of their housing; Drug-related criminal activity or other criminal activity that is a threat to the health, safety, or property of others; Compliance with other essential conditions of tenancy; and In the case of the RAD program, eligibility for the Tax Credit Program. Page 18-13

PART V: OCCUPANCY 18-V.A. OVERVIEW After an applicant has been selected, determined eligible by the owner and the PHA, the family will sign the lease and occupancy of the unit will begin. 18-V.B. LEASE [24 CFR 983.256] The tenant must have legal capacity to enter a lease under state and local law. Legal capacity means that the tenant is bound by the terms of the lease and may enforce the terms of the lease against the owner. Lease Requirements (Quick Reference Guide for RAD PBV, Section 5.3) There is no model lease for the PBV program. The owner must provide a written lease that meets the requirements spelled out in 24 CFR 983.256. In addition to the names of the owner and tenant, the lease must include: The unit rented (address, apartment number, any other information needed to legally identify the unit); The term of the lease; The amount of tenant rent to owner (subject to change in accordance with HUD income verification and recertification requirements); Specification of any services, maintenance, equipment, and utilities to be provided by owner; The amount of any charges for food, furniture, or supportive services; A requirement that the owner renew the lease upon expiration, unless good cause exists for non-renewal (see below); and The resident procedural rights identified in Section 1.6.C.7 of the RAD Notice. Tenancy Addendum (Quick Reference Guide for RAD PBV, Section 5.3) The lease must include the HUD-required tenancy addendum (Form HUD-52641-A), in accordance with 24 CFR 983.256(d). Initial Term (Quick Reference Guide for RAD PBV, Section 5.3) The initial lease term must be for at least one year. Leases for residents who will remain in place (i.e., who will not be relocated solely as a result of conversion) must have an effective date that Page 18-14

coincides with and must be signed on or before the effective date of the RAD PBV HAP contract. Lease Renewal (PIH Notice 2012-32, Section 1.6.C.3) Under current regulations at 24 CFR 983.257(b)(3), upon lease expiration, a PHA can choose not to renew the lease, without good cause. In such a case, the regulatory consequence is the loss of the assisted unit. Under RAD, the PHA must renew all leases upon lease expiration, unless cause exists. Consequently, 24 CFR 983.257(b)(3) will not apply. This provision must be incorporated by the RAD PBV owner into the tenant lease or tenancy addendum, as appropriate. Owner Termination of Tenancy [24 CFR 983.257] With two exceptions, the owner of a RAD PBV unit may terminate tenancy for the same reasons an owner may in the tenant-based voucher program (see Section 12-III.B. and 24 CFR 982.310). In the RAD PBV program, terminating tenancy for good cause does not include doing so for a business or economic reason, or a desire to use the unit for personal or family use or other nonresidential purpose. Non-Compliance with Supportive Services Requirement [24 CFR 983.257(c), FR Notice 11/24/2008] If a family is living in a RAD project-based unit and the family fails to complete its supportive services requirement without good cause, such failure is grounds for lease termination by the owner. Tenant Absence from the Unit [24 CFR 983.256(g) and 982.312(a)] The lease may specify a maximum period of family absence from the unit that may be shorter than the maximum period permitted by PHA policy. According to program requirements, the family s assistance must be terminated if they are absent from the unit for more than 180 consecutive days. PHA termination of assistance actions due to family absence from the unit are subject to 24 CFR 981.312, except that the unit is not terminated from the RAD HAP contract if the family is absent for longer than the maximum period permitted. Continuation of Housing Assistance Payments [24 CFR 982.258] Housing assistance payments shall continue until the tenant rent equals the rent to owner. The cessation of housing assistance payments at such point will not affect the family's other rights under its lease, nor will such cessation preclude the resumption of payments as a result of later changes in income, rents, or other relevant circumstances if such changes occur within 180 days following the date of the last housing assistance payment by the PHA. After the 180-day period, the unit shall be removed from the HAP contract pursuant to 24 CFR 983.211. Page 18-15

BHP Policy If a participating family receiving zero assistance experiences a change in circumstances that would result in a HAP payment to the owner, the family must notify the PHA of the change and request an interim reexamination before the expiration of the 180-day period. Security Deposits (Quick Reference Guide for RAD PBV, Section 5.2) Owners are permitted to recognize security deposit amounts that have been previously provided by tenants who are in-place at the time of the RAD conversion. If tenants in-place at RAD conversion have not previously been required to provide a security deposit, then the owner may collect a security deposit at the time of initial lease execution. The security deposit must be determined in accordance with the provisions of 24 CFR 983.259. Generally, a security deposit for a PBV unit shall not be greater than amounts charged by the owner to unassisted tenants nor greater than private market practice in the locality in which the owner is operating. When the tenant moves out of a contract unit, the owner, subject to state and local law, may use the security deposit, including any interest on the deposit, in accordance with the lease, as reimbursement for any unpaid tenant rent, damages to the unit, or other amounts owed by the tenant under the lease. The owner must give the tenant a written list of all items charged against the security deposit and the amount of each item. After deducting the amount used to reimburse the owner, the owner must promptly refund the full amount of the balance to the tenant. If the security deposit does not cover the amount owed by the tenant under the lease, the owner may seek to collect the balance from the tenant. The PHA has no liability or responsibility for payment of any amount owed by the family to the owner. 18-V.C. FAMILY RIGHT TO MOVE/MOBILITY (Quick Reference Guide for RAD PBV, Section 3.11) After one year of living in a PBV unit, a family may exercise its right to move with tenant-based assistance by contacting the administering voucher agency (PHA), in accordance with 24 CFR 983.261. The PHA must offer the family the opportunity for continued tenant-based rental assistance, either in the form of a Housing Choice Voucher or other comparable tenant-based assistance. If such assistance is available at the time of the request, then the family may terminate its lease and accept the assistance. If the administering PHA does not have such assistance available, then the PHA must give the family priority to receive the next available tenant-based assistance. Page 18-16

PART VI: DETERMINING RENT TO OWNER 18-VI.A. INITIAL RENTS (PIH Notice 2012-32, Section 1.6.B.5) The amount of the initial rent to an owner of units receiving RAD PBV assistance is established at the beginning of the HAP contract term and will be established according to the terms described in the RAD Notice. 18-VI.B. CONTRACT RENT ADJUSTMENTS (PIH Notice 2012-32, Section 1.6.B.6) The administering PHA will be responsible for processing rent adjustments, at each contract anniversary date, in accordance with the prevailing Operating Cost Adjustment Factors (OCAF). At least 120 days before the contract anniversary date of the RAD PBV HAP, HUD recommends that the owner submit the OCAF Rent Adjustment Worksheet (Form HUD-9625), to the PHA administering the RAD PBV assistance. The PHA will validate the data on the form and determine whether the rent exceeds the reasonable rent charged for comparable unassisted units in the private market, in accordance with 24 CFR 983.303. However, the rent to owner shall not be reduced below the initial rent to owner for dwelling units under the initial HAP contract. If rents would be unreasonable following application of the requested OCAF, then the rent can only be increased up to the reasonable rent. The approved rent adjustment will go into effect and the new rents to owner will take effect on the date of the contract anniversary. Page 18-17

PART VII: PAYMENTS TO OWNER 18-VII.A. HOUSING ASSISTANCE PAYMENTS [24 CFR 983.351] During the term of the HAP contract, the PHA must make housing assistance payments to the owner in accordance with the terms of the RAD PBV HAP contract. During the term of the RAD PBV HAP contract, payments must be made for each month that a contract unit complies with HQS and is leased to and occupied by an eligible family. The housing assistance payment must be paid to the owner on or about the first day of the month for which payment is due, unless the owner and the PHA agree on a later date. Except for discretionary vacancy payments, the PHA may not make any housing assistance payment to the owner for any month after the month when the family moves out of the unit (even if household goods or property are left in the unit). The amount of the housing assistance payment by the PHA is the rent to owner minus the tenant rent (total tenant payment minus the utility allowance). In order to receive housing assistance payments, the owner must comply with all provisions of the RAD PBV HAP contract. Unless the owner complies with all provisions of the RAD PBV HAP contract, the owner does not have a right to receive housing assistance payments. 18-VII.B. VACANCY PAYMENTS [24 CFR 983.352] If an assisted family moves out of the unit, the owner may keep the housing assistance payment for the calendar month when the family moves out. However, the owner may not keep the payment if the PHA determines that the vacancy is the owner s fault. BHP Policy If the PHA determines that the owner is responsible for a vacancy and, as a result, is not entitled to the keep the housing assistance payment, the PHA will notify the landlord of the amount of housing assistance payment that the owner must repay. The PHA will require the owner to repay the amount owed in accordance with the policies in Section 16-IV.B. At the discretion of the PHA, the RAD PBV HAP contract may provide for vacancy payments to the owner. The PHA may only make vacancy payments if: The owner gives the PHA prompt, written notice certifying that the family has vacated the unit and identifies the date when the family moved out (to the best of the owner s knowledge); The owner certifies that the vacancy is not the fault of the owner and that the unit was vacant during the period for which payment is claimed; Page 18-18

The owner certifies that it has taken every reasonable action to minimize the likelihood and length of vacancy; and The owner provides any additional information required and requested by the PHA to verify that the owner is entitled to the vacancy payment. The owner must submit a request for vacancy payments in the form and manner required by the PHA and must provide any information or substantiation required by the PHA to determine the amount of any vacancy payment. BHP Policy If an owner s HAP contract calls for vacancy payments to be made, and the owner wishes to receive vacancy payments, the owner must have properly notified the PHA of the vacancy in accordance with the policy in Section 18-VI.F. regarding filling vacancies. In order for a vacancy payment request to be considered, it must be made within 10 business days of the end of the period for which the owner is requesting the vacancy payment. The request must include the required owner certifications and the PHA may require the owner to provide documentation to support the request. If the owner does not provide the information requested by the PHA within 10 business days of the PHA s request, no vacancy payments will be made. 18-VII.C. TENANT RENT TO OWNER [24 CFR 983.353] The tenant rent is the portion of the rent to owner paid by the family. The amount of tenant rent is determined by the PHA in accordance with HUD requirements. Any changes in the amount of tenant rent will be effective on the date stated in the PHA notice to the family and owner. The family is responsible for paying the tenant rent (total tenant payment minus the utility allowance). The amount of the tenant rent determined by the PHA is the maximum amount the owner may charge the family for rental of a contract unit. The tenant rent covers all housing services, maintenance, equipment, and utilities to be provided by the owner. The owner may not demand or accept any rent payment from the tenant in excess of the tenant rent as determined by the PHA. The owner must immediately return any excess payment to the tenant. Tenant and PHA Responsibilities The family is not responsible for the portion of rent to owner that is covered by the housing assistance payment and the owner may not terminate the tenancy of an assisted family for nonpayment by the PHA. Likewise, the PHA is responsible only for making the housing assistance payment to the owner in accordance with the HAP contract. The PHA is not responsible for paying tenant rent, or any Page 18-19

other claim by the owner, including damage to the unit. The PHA may not use housing assistance payments or other program funds (including administrative fee reserves) to pay any part of the tenant rent or other claim by the owner. Utility Reimbursements Under MTW Activity 2013-1, Utility Reimbursement Payments have been eliminated. 18-VII.D. OTHER FEES AND CHARGES [24 CFR 983.354] Other Charges by Owner The owner may not charge extra amounts for items customarily included in rent in the locality or provided at no additional cost to unsubsidized tenants in the premises. Page 18-20

PART VIII: RAD PBV RESIDENT RIGHTS AND PARTICIPATION 18-VIII.A. TYPES OF SERVICES OFFERED In general, the PHA may not select a proposal to provide RAD PBV assistance for units in a project or enter into an agreement to enter into a HAP or a HAP contract to provide RAD PBV assistance for units in a project, if the total number of dwelling units in the project that will receive RAD PBV assistance during the term of the RAD PBV HAP contract is more than 25 percent of the number of dwelling units (assisted or unassisted) in the project. Exceptions to 50 Percent per Project Cap (PIH Notice 2012-32, Section 1.6.A.2) Exceptions are allowed and RAD PBV units are not counted against the 50 percent per project cap if: The units are in a single-family building (one to four units); The units are excepted units in a multifamily project because they are specifically made available for elderly and/or disabled families or families receiving supportive services (also known as qualifying families). PHAs must include in the PHA administrative plan the type of services offered to families for a project to qualify for the exception and the extent to which such services will be provided. It is not necessary that the services be provided at or by the project, if they are approved services. To qualify, a family must have at least one member receiving at least one qualifying supportive service. A PHA may not require participation in medical or disability-related services other than drug and alcohol treatment in the case of current abusers as a condition of living in an excepted unit, although such services may be offered. If a family at the time of initial tenancy is receiving, and while the resident of an excepted unit has received, FSS supportive services or any other supportive services as defined in the PHA administrative plan, and successfully completes the FSS contract of participation or the supportive services requirement, the unit continues to count as an excepted unit for as long as the family resides in the unit. The PHA must monitor the excepted family's continued receipt of supportive services and take appropriate action regarding those families that fail without good cause to complete their supportive services requirement. The PHA administrative plan must state the form and frequency of such monitoring. BHP Policy The PHA will develop housing for occupancy by families in need of services. A family must have at least one member receiving at least one of the qualifying supportive services to be eligible for continued occupancy. Families that do not receive at least one of the qualifying services may be terminated in accordance with the PHA policies in Section Page 18-21

12-II.F. The following types of services may be provided, depending on the needs of the family: Service assessment and referral; Child care; Education; After school activities; Counseling; Parenting skills; Work skills development, including volunteer opportunities; Job training; Family budgeting; Housekeeping support; Community meetings; Transportation support. At the time of recertification, the PHA will monitor all families that are receiving services to determine if such families will be allowed to continue receiving RAD PBV assistance 18-VIII.B. PUBLIC HOUSING FAMILY SELF SUFFICIENCY (PH FSS) AND RESIDENTS OPPORTUNITIES AND SELF SUFFICIENCY SERVICE COORDINATOR (ROSS-SC) PROGRAMS (PIH Notice 2012-32 Section 1.6.C.5) Current PH FSS participants will continue to be eligible for FSS once their housing is converted under RAD, and PHAs will be allowed to use any PH FSS funds granted previously or pursuant to the FY 2013 PH FSS NOFA, to serve those FSS participants who live in units converted by RAD and who will as a result be moving to the HCV FSS program, subject to the following: a. If a PHA has an HCV FSS program, a PHA must convert the PH FSS program participants at the covered project to their HCV FSS program. b. If a PHA does not have an HCV FSS program, the PHA must establish an HCV FSS program and convert the PH FSS program participants at the covered project into their HCV FSS program. PHAs are not required to offer enrollment in FSS to residents in converting projects and other HCV participants, other than to residents in converting projects that were enrolled in the PH FSS program. Page 18-22

All PHAs will be required to administer the FSS program in accordance with FSS regulations at 24 CFR Part 984 and in accordance with the participants contracts of participation. However, residents who were converted from the PH FSS program to the HCV FSS program through RAD may not be terminated from the HCV FSS program or have HCV assistance withheld due to the participant s failure to comply with the contract of participation. Consequently, 24 CFR 984.303(b)(5)(iii) does not apply to FSS participants in converted properties. Current ROSS-SC grantees will be able to finish out their current ROSS-SC grants once their housing is converted under RAD. However, once the property is converted, it will no longer be eligible to be counted towards the unit count for future public housing ROSS-SC grants, nor will its residents be eligible to be served by future public housing ROSS-SC grants. 18-VII.C. RESIDENT PARTICIPATION AND FUNDING (PIH Notice 2012-32, Section 1.6.C.6) In accordance with Attachment 1B of PIH Notice 2012-32, residents of covered projects converting assistance to RAD PBVs will have the right to establish and operate a resident organization for the purpose of addressing issues related to their living environment and be eligible for resident participation funding. 18-VII.D. RESIDENT PROCEDURAL RIGHTS (PIH Notice 2012-32, Section 1.6.C.7) The following items must be incorporated into both the Section 8 Administrative Plan and the owner s lease, which includes the required tenancy addendum, as appropriate. Evidence of such incorporation may be requested by HUD for purposes of monitoring the program. a. Termination Notification. HUD is incorporating additional termination notification requirements to comply with section 6 of the Act for public housing projects that convert assistance under RAD. In addition to the regulations at 24 CFR 983.257, related to owner termination of tenancy and eviction, as modified by the waiver in Section 1.6(C)(3) of the RAD Notice, the termination procedure for RAD conversions to RAD PBV will require that PHAs provide adequate written notice of termination of the lease which shall not be less than: i. A reasonable period of time, but not to exceed 30 days: If the health or safety of other tenants, PHA employees, or persons residing in the immediate vicinity of the premises is threatened; or In the event of any drug-related or violent criminal activity or any felony conviction; ii. 14 days in the case of nonpayment of rent; and iii. 30 days in any other case, except that if a State or local law provides for a shorter period of time, such shorter period shall apply. Page 18-23

b. Grievance Process. HUD is incorporating additional procedural rights to comply with the requirements of section 6 of the Act. For issues related to tenancy and termination of assistance, RAD PBV program rules require the PHA to provide an opportunity for an informal hearing, as outlined in 24 CFR 982.555. RAD will waive 24 CFR 982.555(b) in part, which outlines when informal hearings are not required, and require that: i. In addition to reasons that require an opportunity for an informal hearing given in 24 CFR 982.555(a)(1)(i)-(vi), an opportunity for an informal hearing must be given to residents for any dispute that a resident may have with respect to a PHA (as owner) action in accordance with the individual s lease or the contract administrator in accordance with RAD PBV requirements that adversely affect the resident s rights, obligations, welfare, or status. For any hearing required under 24 CFR 982.555(a)(1)(i)-(vi), the contract administrator will perform the hearing, as is the current standard in the program. For any additional hearings required under RAD, the PHA (as owner) will perform the hearing. ii. An informal hearing will not be required for class grievances or to disputes between residents not involving the PHA (as owner) or contract administrator. This hearing requirement shall not apply to and is not intended as a forum for initiating or negotiating policy changes between a group or groups of residents and the PHA (as owner) or contract administrator. iii. The PHA (as owner) give residents notice of their ability to request an informal hearing as outlined in 24 CFR 982.555(c)(1) for informal hearings that will address circumstances that fall outside of the scope of 24 CFR 982.555(a)(1)(i)-(vi). iv. The PHA (as owner) provides opportunity for an informal hearing before an eviction. 18-VII.D. PHASE-IN OF TENANT RENT INCREASES (PIH Notice 2012-32, Section 1.6.C.4) Under RAD conversion, no rent increases will be a result purely of conversion; therefore not phase-in period is required per the RAD Notice. Any tenant rent increases will be capped at 7% as based on MTW Activity 2014-1 flat tiered rent structure for work-abled families. Page 18-24