UNIVERSITY OF ROCHESTER STANDARD CONTRACT FOR CONSTRUCTION (OWNER-CONTRACTOR LUMP SUM AGREEMENT)

Similar documents
ESCROW AGREEMENT - MAINTENANCE

INVITATION TO BID & CONTRACT

REAL ESTATE PURCHASE AND SALE CONTRACT

AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)

AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT

VILLAGE OF SOUTH LEBANON, OHIO RESOLUTION NO

AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)

CONTRACT TO BUY AND SELL REAL ESTATE

CONSENT TO ASSIGNMENT OF LEASE

Construction Agreement

Master Repurchase Agreement

COMMERCIAL PROPERTY ASSESSED CLEAN ENERGY ( C-PACE ) AGREEMENT

ESCROW DEPOSIT AGREEMENT WIT N E SSE T H:

ACQUISITION AGREEMENT

DEVELOPMENT AGREEMENT

CITY AND COUNTY OF BROOMFIELD SUBDIVISION IMPROVEMENT AGREEMENT FOR (PROPERTY NAME - ALL CAPS)

EJCDC STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE

COMMERCIAL PROPERTY ASSESSED CLEAN ENERGY ( C-PACE ) AGREEMENT

Unit 53 Arden S.R. 80 & Onsite Earthwork, Roadway, Drainage & Utility Improvement Project for Northern Palm Beach County Improvement District

ARIZONA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY GROUP/PROPERTY MANAGEMENT SECTION EXCESS LAND PURCHASE AGREEMENT AND RECEIPT FOR DEPOSIT

PURCHASE AGREEMENT FOR STAIR STEP SCREENS AND WASHING PRESSES

FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (C ) DRAFT

WHEREAS, the HDFC will be the co-general partner of the Partnership; and

GENERAL TERMS AND CONDITIONS FOR THE SALE OF GOODS

OFFER TO PURCHASE AND CONTRACT

WATER LINE & INGRESS/EGRESS EASEMENT AGREEMENT WITNESSETH:

PREPARED BY: David Hertz Midwest Rentals, LLC East Highway 50 Vermillion, SD 57069

BUSINESS PURCHASE AGREEMENT

ESCROW AGREEMENT. by and among HARBOR DEPARTMENT OF THE CITY OF LOS ANGELES. and. U.S. BANK NATIONAL ASSOCIATION, as Trustee and as Escrow Agent

SUBSCRIPTION ESCROW AGREEMENT (PRIVATE PLACEMENT)

CITY OF BOISE. Finance and Administration and Public Works Departments

AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (ON CALL)

EQUIPMENT LEASE AGREEMENT

NOTICE OF SEALED BID FOR SALE OF REAL PROPERTY

DAYTON PUBLIC SCHOOLS. THE CONTRACT, evidenced by this Contract Form, is made and entered into by and between: < Contractor >

Tax Map Key Nos. (1) : 003, :004 and :008 CPR No. Total Pages: Unit No.

SITE LEASE. between. CITY OF WESTWOOD, KANSAS, as Site Lessor. and. SECURITY BANK OF KANSAS CITY, as Site Lessee

BROOD MARE LEASE AGREEMENT

ESCROW AGREEMENT. Dated, Relating to

THIS LOT PURCHASE AGREEMENT is made and entered into this the day. of, 2016, by and between Welch Real Estate Holdings, LLC

VIRGINIA ASSOCIATION OF REALTORS Commercial Purchase Agreement

SCHEDULE B FOR RFP13-03 DRAFT AGREEMENT OF PURCHASE AND SALE (hereinafter called the AGREEMENT ) -and- SECTION I GENERAL

This Escrow Agreement and Instructions, entered into this day of, 20, by and between

FRACTIONAL INTEREST AGREEMENT

Purchase Terms and Conditions

PURCHASE AND SALE AGREEMENT

THE SCHOOL BOARD OF BROWARD COUNTY, FLORIDA acting as the governing body of the School District of Broward County, Florida and U.S. BANK NATIONAL ASSO

LOT PURCHASE AGREEMENT. Real Estate Purchase Agreement

AGREEMENT FOR PURCHASE AND SALE OF VACANT LAND

Assignment, Assumption and Amendment of Lease

Exhibit B LOS ALAMITOS HIGH SCHOOL INFRASTRUCTURE REPLACEMENT PROJECT SUBLEASE AGREEMENT LOS ALAMITOS UNIFIED SCHOOL DISTRICT

Public Sealed Bid Auction. State of Ohio Ohio University. Tract II and 919 East State Street Athens, Ohio 45701

LIMITED FINANCIAL SERVICES AGREEMENT. THIS AGREEMENT dated for reference as of the day of, 20.

, as Grantor (Borrower) -to-, as Beneficiary (Lender) ASSIGNMENT OF LEASES AND RENTS. Dated: As of May, Address:, California

BUY/SELL AGREEMENT. 4. Possession will be given to Buyer at closing. Exceptions: Subject to tenant s rights.

R E C I T A L S. 1. Incorporation of Recitals. The foregoing recitals are incorporated herein as if rewritten.

STATE OF SOUTH CAROLINA ) ) ESCROW AND OPERATION AGREEMENT COUNTY OF GREENWOOD ) This agreement made and entered this day of, 200, by and between

AUCTION REAL ESTATE SALES CONTRACT


K & R Properties of Fayetteville, Inc. PO Box Fayetteville, NC (910)

WATER QUALITY TRADING CONTRACT

THESE FORMS ARE NOT A SUBSTITUTE FOR LEGAL ADVICE.

WATER SERVICE AGREEMENT. Water One Assurance Monitoring Service

CONTRACT FOR SALE AND PURCHASE

NOTICE OF ADOPTION OF

ESCROW AGREEMENT (ACQUISITIONS)

JH:SRF:JMG:brf AGENDA DRAFT 4/06/2016 ESCROW AGREEMENT

EXCLUSIVE PROPERTY MANAGEMENT AGREEMENT Long-term Rental Property

KSS Sales Proposal Terms & Conditions

CONTRACT FOR SALE AND PURCHASE

TRUST TRANSFER MAINTENANCE DEPOSIT AGREEMENT R E C I T A L S:

SITE LEASE. Dated as of April 1, between the. ELK GROVE UNIFIED SCHOOL DISTRICT as lessor. and the

PURCHASE AND SALE AND ASSIGNMENT AGREEMENT [Germania Hall Participation Interest]

STANDARD TERMS AND CONDITIONS OF SALE

Town of Poland, Maine Notice of Public Sale of Tax Acquired Property

803WAIMANU ESCROW AGREEMENT (Hawaii Revised Statutes 5148}

ESCROW AGREEMENT RELATING TO THE DEFEASANCE OF PORTIONS OF

NEIGHBORHOOD RESPONSIBILITY AGREEMENT FOR CANNABIS PROJECTS

THIS CONVEYANCE IS SUBJECT TO

Trademark Assignment Agreement

ENCROACHMENT AGREEMENT

Appendix A - REQUIRED PLAT CERTIFICATES... A-1

Contract of Sale. Witnesseth:

ESCROW AGREEMENT. Dated as of August [ ], 2017

EXCLUSIVE PROPERTY MANAGEMENT AGREEMENT Long-term Rental Property

CONTRACT FOR SALE AND PURCHASE

REAL ESTATE CONTRACT

GLOUCESTER/SALEM COUNTIES BOARD OF REALTORS STANDARD FORM OF BROKER-SALESPERSON INDEPENDENT CONTRACTOR AGREEMENT

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K

1.0 Terms and Conditions of Sale

LEASE OF GROUNDWATER

Terms and Conditions of Sales

COMMERCIAL REAL ESTATE PURCHASE AGREEMENT AND DEPOSIT RECEIPT. This Real Estate Purchase Agreement and Deposit Receipt ( Agreement ) is made between:

REALTORS ASSOCIATION OF NEW MEXICO REAL ESTATE CONTRACT 2016

Assignment of Leases and Rents

Residential Management Agreement

MEMORANDUM OF AGREEMENT FOR THE TRANSFER OF TITLE TO REAL PROPERTY City of Lompoc & Lompoc Healthcare District. Recitals

Municipality of Anchorage PURCHASE AND SALE AGREEMENT FOR HLB Parcel C in Chugiak, Alaska

Town of Chelsea, Maine Notice of Public Sale of Tax Acquired Property OFFICIAL NOTICE

SAMPLE. Construction Contract

Transcription:

UNIVERSITY OF ROCHESTER STANDARD CONTRACT FOR CONSTRUCTION (OWNER-CONTRACTOR LUMP SUM AGREEMENT) Project: Project Number: Owner: UNIVERSITY OF ROCHESTER Campus Planning, Design & Construction Management 271 East River Road Box 270347 Rochester, New York 14627-0347 Contractor: Consultant: THIS AGREEMENT is made as of the day of, and is entered into by and between, a Contractor having its principal place of business at (the Contractor ) and the University of Rochester, an educational corporation organized under the laws of the State of New York, with its address for purposes of this Agreement c/o Campus Planning, Design & Construction Management, 271 East River Road, Box 270347, Rochester, New York, 14627-0347 (the Owner ). The terms of this Agreement will apply to all portions of the Work (as defined in Paragraph 1.1.4 of the General Conditions of the Lump-Sum Owner-Contractor Agreement, hereafter referred to as the General Conditions ), which the Contractor will perform in connection with the construction of. Therefore, in consideration of the Contractor s promise to perform the Work and the Owner s promise to pay for the same, and in consideration of other mutual promises and obligations hereinafter set forth, the parties hereto, each intending to be legally bound, do mutually covenant, promise and agree as follows: ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, the Conditions of the Contract (General, Supplementary and other Conditions), the Drawings, the Specifications, all documents incorporated by reference as set forth in Paragraph 1.1.2 of the General Conditions, all Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and all Modifications issued after execution of this Agreement; these form the Contract, and are as fully

-2- a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 8. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. than 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later, subject to adjustments of this Contract Time as provided in the Contract Documents. [Set forth liquidated damages, if any.] ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay to the Contractor in current funds for the Contractor s performance of the Contract the Contract Sum of Dollars ($ ), subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon labor, materials, and performance included in base bid [Insert accepted alternates here or leave blank.]. The Contract sum is based upon Drawings and Specifications dated as noted in Exhibit A. 4.3 Unit prices, if any, are as follows: [Attach Exhibit, if necessary.]

-3- ARTICLE 5 PROGRESS PAYMENTS 5.1 Based upon Applications for Payment submitted to the Consultant by the Contractor and Certificates for Payment issued by the Consultant, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and in Article 9 of the General Conditions. 5.1.1 At least five (5) days before the date for each progress payment established in this Agreement, the Contractor shall simultaneously submit to the Consultant and the Project Manager an itemized Application for Payment in the form required by Subparagraph 9.2.2 of the General Conditions, notarized, supported by such data substantiating the Contractor s right to payment as the Owner and the Consultant may require and reflecting retainage, if any, as provided elsewhere in the Contract Documents. Applications for Payment must include adjustments (adds or deducts) to the Lump Sum of the Contract, resulting from Work performed under approved Change Orders (specified under Article 7 of the General Conditions) and shall be shown separately on the Application for Payment. The Contractor shall provide a Partial Waiver of Lien warranting that title to all Work and product covered by the Application for Payment will pass to the Owner either by incorporation into the Work or upon receipt of payment by the Contractor, whichever occurs first, free and clear of all liens, claims, security interests or encumbrances, and that no Work or product covered by an Application for Payment will have been acquired by the Contractor or by any other person performing Work at the site or furnishing product for the Project, subject to an agreement under which an interest therein or an encumbrance thereon is retained by the seller or otherwise imposed by the Contractor or such other person. Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.3 The Consultant will, within ten days after the receipt of the Contractor s Application for Payment, either issue a Certificate for Payment to the Project Manager, with a copy to the Contractor, for such amount as the Consultant determines is properly due, less retainage of 10% until the final payment as provided below, or notify the Contractor in writing of the reasons for withholding a Certificate as provided in Subparagraph 9.6.1 of the General Conditions. This provision shall in no way affect the warranties of the entire Project which shall not commence until Substantial Completion and a Certificate of Occupancy have been accomplished for each Phase of the Work. 5.4 After the Consultant has issued a Project Certificate for Payment, the Owner shall make payment in the manner and within the time provided in the Contract Documents. However, if after issuance of the Certificate for Payment the Owner discovers mathematical errors in the Certificate, the Owner shall notify the Consultant and the Contractor of the errors and make payments in the correct amount. The Owner shall make payments as follows:

-4-5.4.1 Not later than thirty (30) days following receipt of an acceptable Application for Payment, 90% of the value of each line item based on the Contractor s prices for labor and product incorporated in the Work and product suitably stored up to the first day of the month in which such Application was submitted, as estimated by the Consultant and Project Manager, less the aggregate of the previous payments. 5.4.2 Applications and Recommendations for Payment shall be notarized by a duly authorized Notary Public so licensed in the State of New York. 5.4.3 The Contractor shall promptly pay each Subcontractor, upon receipt of payment from the Owner, out of the amount paid to the Contractor on account of such Subcontractor s Work, the amount to which said Subcontractor is entitled, reflecting the percentage actually retained, if any, from payments to the Contractor on account of such Subcontractor s Work. The Contractor shall, by an appropriate agreement with each Subcontractor, require each Subcontractor to make payments to its Sub-subcontractors in similar manner. 5.4.4 No certificate for a progress payment, nor any progress payment, nor any partial or entire use or occupancy of the Project by the Owner, shall constitute an acceptance of any Work not in accordance with Contract Documents. ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor as provided below and in Article 9.9 of the General Conditions. 6.1 Following the Consultant s issuance of the Certificate of Substantial Completion of the Work or designated portion thereof, and Contractor s completion of the Work, the Contractor shall simultaneously forward to the Consultant and the Project Manager a written notice that the work is ready for final inspection and acceptance and shall also simultaneously forward to the Consultant and the Project Manager a final Application for Payment. Upon receipt the Consultant will promptly make such inspection. When the Consultant finds the Work acceptable under the Contract Documents and the Contract fully performed, the Consultant will issue a Final Certificate for Payment approving and recommending final payment to the Contractor. ARTICLE 7 TERMINATION OR SUSPENSION 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. 7.2 The Work may be suspended by the Owner as provided in Article 14.2.3 of the General Conditions.

-5- ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS 8.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 8.1.1 The Agreement is this executed Standard Contract for Construction. 8.1.2 The General Conditions are the University of Rochester General Conditions of the Lump-Sum Owner-Contractor Agreement, 12th Edition, dated December 11, 2014. 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated, or as set forth in Article 9. 8.1.4 The Specifications are those referenced in Exhibit A and contained in the Project Manual dated. 8.1.5 The Drawings are as enumerated on the List of Drawings and Dates, annexed to this Agreement as Exhibit A or as set forth in Article 9. [List Addenda.] 8.1.6 The Addenda, if any, are as follows: ARTICLE 9 MISCELLANEOUS PROVISIONS 9.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 9.2 The Contractor represents that it has familiarized itself with the nature and extent of the Contract Documents. Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 9.3 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.4 The Owner and the Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal

-6- representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. 9.5 This Agreement shall be construed and enforced in accordance with the laws of the State of New York. 9.6 The Contractor agrees that: A. It hereby voluntarily and irrevocably submits itself to the jurisdiction and venue of any court of competent jurisdiction over the subject matter of this Agreement located within the State of New York in which any litigation is brought based on or arising out of this Agreement. B. Any litigation brought by the Contractor based on or arising out of this Agreement shall be brought only in the Supreme Court of the State of New York sitting in Monroe County. C. Any legal process or notice connected with any litigation may be served on the Contractor by United States registered mail, postage prepaid, addressed to the Contractor at its address stated in this Agreement or at the address stated in this Agreement for the furnishing of notices to the Contractor or at the Contractor s last known address, and that service in such manner shall constitute good and valid service of process upon the Contractor. D. The Contractor hereby waives any defense which might be available to it in any such litigation based on an alleging lack of jurisdiction or venue, or, if process is served in the manner provided in subparagraph (c) immediately above, invalid service of process, and that it will duly enter its appearance in any such action. E. This Agreement may be presented in court as conclusive evidence of the foregoing agreement. 9.7 The Contractor shall provide insurance in accordance with the requirements included in article 11 of the General Conditions. 9.8 The Contractor shall address all correspondence, except invoices, to the attention of the Project Manager, Jennifer Baldwin. Invoices shall be addressed to the attention of the Financial Manager. All correspondence and invoices shall be addressed to the University of Rochester, Campus Planning, Design & Construction Management, 271 East River Road, Box 270347, Rochester, New York 14627. All documentation shall clearly show the University s project name, and the University s project number,. [The remainder of this page is intentionally left blank.]

-7- IN WITNESS WHEREOF, the Owner and the Contractor have signed this Agreement in triplicate. One counterpart has been delivered to the Contractor. All portions of the Contract Documents have been signed or identified by the Owner and the Contractor on their behalf. UNIVERSITY OF ROCHESTER CONTRACTOR By: Wayne Goodwin Its: Director of Operations By: Signer Its: Title