CHECKLIST FOR DEVELOPERS

Similar documents
Township of Collier 2418 Hilltop Road Presto, PA 15142

THE SUBDIVISION AND LAND DEVELOPMENT REVIEW PROCESS

APPLICATION PROCESS FOR PROJECT REVIEW

Planning Commission Land Disturbance Permit Application

CHECKLIST FOR DEVELOPMENT REVIEW

Residential Major Subdivision Review Checklist

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

Lake County Planning, Building and Development Department

ZONING & LAND USE APPLICATION

CHAPTER 5 ENVIRONMENTAL COMPLIANCE PLAN REQUIREMENTS

TOWN OF LEWISTON PLANNING BOARD APPLICATION

I. Requirements for All Applications. C D W

ARTICLE 100 SUBDIVISION APPLICATION PROCEDURE AND APPROVAL PROCESS

BYRON TOWNSHIP ZONING APPLICATION

CERTIFIED SURVEY MAPS

CECIL COUNTY TECHNICAL ADVISORY COMMITTEE Wednesday, January 5, 2011, 9:00 a.m. County Administration Building 200 Chesapeake Blvd.

Plan and Zoning Commission Review Process

Residential Minor Subdivision Review Checklist

APPLICATION FOR FILING SUBDIVISION and/or DEVELOPMENT PLANS

SECTION 10 STANDARD PLATS

Instructions to the Applicant

APPLICATION PROCEDURES FOR A MAJOR SUBDIVISION PRELIMINARY PLAT

THE BUILDING PERMIT PROCESS FOR SINGLE-FAMILY DWELLINGS REVISED MAY 2006

Septic Tank / Drainfield / Holding Tank Permit Application

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION

CHAPTER XVIII SITE PLAN REVIEW

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651)

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

Residential Subdivision Preliminary Plat Application

APPLICATION FOR 555 Washington Street Tentative Map Red Bluff, CA Subdivision Map (530) ext Parcel Map.

CECIL COUNTY PLANNING COMMISSION MEETING MINUTES Monday, January 20, :00 p.m.

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

CECIL COUNTY TECHNICAL ADVISORY COMMITTEE MEETING AGENDA

Gates County Planning and Zoning

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

PLANNING & ZONING DEPARTMENT 401 South Rogers Street Waxahachie, Texas (469)

APPLICATION REVIEW CHECKLISTS

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat

Use permitted by: Right Special Exemption

Preliminary Plat Information & Application Packet

Time Extension Staff Report

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

CECIL COUNTY, MARYLAND

Section SKETCH PLAN REVIEW

There was not a meeting of the Technical Advisory Committee in January 2009 due to a lack of agenda items.

CARROLL COUNTY BUREAU OF DEVELOPMENT REVIEW OFF-CONVEYANCE SUBMITTAL CHECKLIST AND REVIEW FEE SHEET NOTICE: INCOMPLETE SUBMITTALS WILL BE RETURNED

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

Time Extension Staff Report

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

ARTICLE 6 PRELIMINARY PLAT

PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

MAJOR AND MINOR SUBDIVISIONS. Section 26-8: Plat Shall be Required on Any Subdivision of Land

Septic Tank / Drainfield / Holding Tank Permit Application

SUBDIVISION APPLICATION

Special Use Permit - Planned Unit Development Checklist. Property Address:

R e z o n i n g A p p l i c a t i o n S u b m i s s i o n R e q u i r e m e n t s

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include:

TABLE OF CONTENTS. Page TITLE, SHORT TITLE, AND PURPOSE SUBMISSION AND REVIEW PROCEDURES

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

City of Midland Application for Site Plan Review

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

APPENDIX B. SUBMISSION REQUIREMENTS

APPLICATION PACKET ARC SIGN REVIEW. COMMUNITY DEVELOPMENT DEPARTMENT CHARTER TOWNSHIP OF PLYMOUTH 9955 N. Haggerty Road Plymouth, MI 48170


Economic Non-Viability Application

CHESAPEAKE BAY PRESERVATION AREA EXCEPTION APPLICATION INSTRUCTIONS

SUBDIVISION AND LAND DEVELOPMENT ORDINANCE. For ENACTED: DECEMBER 12, 1991

*For Special Exception and Conditional Uses, Complete Page 3 of this application.

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

CONDITIONAL USE PERMIT (CUP)

APPLICATION PROCEDURE

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

Initial Subdivision Applications Shall Include the Following:

Request for Action form is also defined as an application to be considered by the Planning Commission.

Purpose: Regulations:

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

TENTATIVE MAP INFORMATION SHEET

Incorporated Village of Lattingtown 299 Lattingtown Road P.O. Box 488 Locust Valley, New York

CITY OF CORNING TENTATIVE MAPS

APPLICATION PACKET ARC SIGN REVIEW. COMMUNITY DEVELOPMENT DEPARTMENT CHARTER TOWNSHIP OF PLYMOUTH 9955 N. Haggerty Road Plymouth, MI 48170

Peters Township Planning Department Fee Schedule

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

Major Subdivision Application Packet. Revised June 2018

TOWN OF WARWICK PLANNING BOARD SKETCH PLAN APPLICATION PACKAGE

Planning Department st St SE PO Box 5006 Minot, ND (701) Acknowledgment and Signature

WASHINGTON COUNTY CUP SUBMITTAL CHECKLIST

Preliminary Subdivision Application (Major) (Four (4) lots or more)

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

Transcription:

TOWN OF PERRYVILLE DEPARTMENT OF PLANNING AND ZONING Dianna M. Battaglia, Director dbattaglia@perryvillemd.org Amanda Hickman, Coordinator ahickman@perryvillemd.org 515 Broad Street P.O. Box 773 Perryville, MD 21903 410-642-6066 Fax 410-642-2677 CHECKLIST FOR DEVELOPERS SITE PLAN PROCESS NOTE: See Appendix A Basic Information Required With Zoning and Building Permit Applications for all plan submittals; Appendix B Bufferyard Requirements as per Zoning Ordinance Article XVII requirements. Concept Plan Approval Concept Plan application review fee shall be required. See enclosed disclosure of fees. The applicant shall prepare a sketch of the property drawn to the approximate scale showing boundaries, general topography, important physical features and other significant information, as the proposed scheme for the development of the property, including proposed streets, parking, open space, and proposed improvements. In addition, the critical area boundary line, flood plain area, and habitat protection areas shall be shown. It is recommended to contact Planning & Zoning staff prior to submittal. An Application for Site Plan Review and fifteen (15) copies* of the concept plan shall be submitted. The deadline for submissions for Planning Commission review is twenty (20) business days prior to a meeting. Planning & Zoning meetings are held on the third Monday of the month. Meetings are held 6:30 p.m. at Town Hall 515 Broad Street second floor. After Town approval of Concept Plan, applicant shall submit 18 copies to Cecil County Government Office of Planning & Zoning for review by the Technical Advisory Committee (TAC). TAC consists of various agencies such as the State Highway, Soil Conservation, MDE, Fire Company, Cecil County Department of Public Works, Planning & Zoning, Emergency Management, Utility Companies, Corp of Engineer, and Citizen Representatives. Contact person is Lisa Jones or Tony DiGiacomo: Cecil County Government Planning & Zoning, 129 Main Street, Elkton, MD 21921, 410-996- 5220. Submission shall be two (2) weeks prior to the hearing. TAC meets on the first Wednesday of the month. TAC will review the project and submit a copy of the minutes and recommendations to the developer and the Town. Due to new regulations for Storm Water Management (effective May 2010) Cecil County Department of Public Works require proposed storm water plans are submitted for review at concept stage of project. The Town will work closely with Cecil County at the beginning stages of a project to ensure compliance with the new regulations. Preliminary Site Plan Approval Site plan application review fee shall be required. See enclosed disclosure of fees. Prior to submittal to the Planning Commission a meeting shall be held with the Town Staff to review general elements of the preliminary plan and to address any project specific issues. The Town must receive comments from TAC, Critical Area and Cecil County Department of Public Works regarding proposed storm water management before the Preliminary Site Plan review is scheduled. Fifteen (15) copies* of the preliminary site plan shall be submitted to the Town in order to be placed on the Planning and Zoning Meeting Agenda. Planning and Zoning meetings are held every third Monday of the month. Submissions must be received by the Town twenty (20) business days before the next meeting. After Preliminary Site Plan Approval, a Water Distribution Network Analysis shall be completed. The town s Engineering firm, URS, shall prepare a proposal for the project. The developer shall pay the analysis fee. The estimate fee for this project shall be placed in escrow. Upon completion of the analysis, the Town will verify the cost of the project by providing a copy of the report and a receipt. The balance in the escrow account will be refunded.

Final Site Plan Approval Fifteen (15) copies* of the Final site plan shall be submitted to the Town. Prior to review and approval of the final plat by the Planning Commission, the Department of Planning and Zoning will assure that the following information and approvals have been received. See list of required approvals below. Once all the necessary approvals, agreements, and sureties are received, a meeting will be scheduled for the Planning & Zoning Commission to review and approve the final plat. Final plat shall be prepared, filed and recorded. Construction cannot begin until Final Plat approval is obtained. *REQUIRED WITH ALL SUBMITTALS: Plat Posting Image Requirements -- Please submit legible, readable plats in either JPG or GIF format and 5 MB or less in size. The file's name must match the name of the proposed subdivision for identification purposes. Required Approvals: *Developer is responsible for obtaining all county and state approvals. The Town is responsible for obtaining Town approvals (Perryville Fire Dept., Town Engineer, Town Critical Area Planner, etc.) AGENCY PLAN REQUIRED SHA Access plans for state road Copy of Gary Davis Access Permit (410) 545-5585 SHA Plans for utility work in SHA Copy of Permit easement. Cecil County Access plans for county road Copy of DPW Access permit (410) 996-5270 Cecil County Plans for utility work in county Copy of permit DPW easement (410) 996-5270 Cecil County Sediment & Erosion Plan Approved Plan Natural Resource If in Critical Area, S&E Standard Provide a signed Conservation Service Plan must be reviewed by the E&S Copy (NRCS) (410) 398-4411 Critical Area Planner. Cecil County Forest Conservation Plan Review and Planning & Zoning If applicable. Deed restrictions shall be Recommendation (410) 996-5220 recorded for long term protection of forest Letter retention areas prior to recordation of plat. Chapter 48 regulations. Includes a Forest Stand Delineation Plan. Projects in the Critical Area are exempt from Forest Conservation Regulations. A note to that effect should appear on the Final Plat (as suggested by the Cecil County 2

Technical Advisory Committee). Critical Area Circuit Rider will review the planting plan for conformance with the Town s Critical Area Program, and issue an approval letter. Town Environmental Assessment Report Copy of Report Critical Area which the Critical Area has reviewed Critical Area Planner (Including 10% calculation worksheet Approval letter for SWM see above). Cecil County Storm Water Management Review/Approval DPW If the property is in the Critical Area Letter (410) 996-5270 IDA, the stormwater management plans/calculations must show ten (10) percent reductions in pollutant loading between the pre-development conditions and post-development conditions. A 10% calculation worksheet must be submitted with the Environmental Assessment for review by the Critical Area Planner. An agreement shall be executed between the developer and Cecil County that guarantees that any stormwater management facilities shall be constructed in accordance with the approved plans. The agreement shall grant perpetual access to the stormwater facilities to County personnel for inspection. Cecil County Mass and Final Grading Plans Review/Approval DPW As required by Cecil County TAC - Mass and (410) 996-5270 Final Grading Plans must be approved by Cecil County DPW prior to submittal for Final Plat approval. The Final Plat must include a note recognizing the applicability of lot grading plans. (applies to Residential) Town Staff Landscaping Plan/Agreement Review and Landscaping Agreement shall be executed with Approval the Town that guarantees that the required landscaping is installed and maintained in accordance with the approved plan. Cost estimate shall be provided for approval. Article XVII, Section 300.5 requires a performance bond/letter of Credit. Lighting to be included on Landscape Plan. Perryville Water plans, hydrant locations, Approval letter Community hydrant spacing, and fire flows Fire Company are reviewed by Fire Chief. Town Staff Floodplain 100 year Elevation Construction must be in accordance with Certificate Chapter 46 requirements; inspection for compliance during construction and receipt of Elevation Certificate required prior to U&O. 3

Town Staff Non-tidal Wetlands Approval Developer must complete the disclaimer or provide wetland delineation and provide a Jurisdictional Determination and necessary permits, where applicable. Town Engineer Water Model Distribution Analysis Allocation URS Fee to be held in escrow. Approval Analysis done by URS. From Town Town Engineer Construction Plans URS Parking, Grading, Approval by Water & Sewer Utility Plan Town Engineer Road and Storm Drain Plans Town Staff The Town may require the Public Works Owner/Developer to execute an Agreement Public Works Agreement and provide A surety bond (10% of estimated cost of improvements) or other such surety to secure the completion of all required work and improvements based upon an estimate of costs of the improvements as provided by the Town s engineer. Prior to the execution of the PWA an inspection and review fee shall be paid to the Town in an amount of four percent (4%) of the approved estimated cost of improvements. Health Department Review and approval. Approval (Send letter prior to Final approval re: Signature on Water & sewer is available.) Final Plat Additional Requirements/Approvals (If Applicable): Town Rezoning Approval of Public Hearing Mayor and Commissioners Town Growth Allocation Final Approval of Public Hearings Critical Area BG&E Letter permitting parking in the Approval Letter BG&E right-of-way is required. In addition, the developer must determine and provide for dedication to the Town. This issue should be addressed in the PWA. HOA A Homeowners Association should Association be formed for the maintenance of the Documents open space. The Association documents should clearly describe the members responsibilities including the typical maintenance requirements of the stormwater management facility. 4

In addition the Association documents should clearly describe the process for turning over the open space from the developer to the Association. The Homeowners Association documents should be reviewed by the Town Attorney. State of MD Condominium Act- need documentation that defines how the ownership of the building and land is going to be maintained by parties buying units Town Proposed street names must be Approval Letter approved by the Cecil County 911 Emergency Services Center and Town Mayor & Commissioners. Open Space Open Space requirements are met or Approved or a fee-in-lieu agreed upon by the Town and Funds Receipt the Developer to meet the requirement. Town Prior to the issuance if any U&O, any structures marked to be moved or removed shall be removed. All requirements must be complete and documentation received. Project Status: Public Works Agreement Executed Landscaping Agreement Executed Final Plat Signed (Town Engineer, Planning Commission Chairman) Zoning Certificate Issued Attachments to the Zoning Certificate: Pre-Construction Meeting Construction Schedule Received Shop Drawings Received URS Final Inspection PWA Bond Release Date Landscaping Bond Release Date (may be reduced 18 months after date of planting; released after 3 growing seasons) Dedication (Roads, Utilities) to the Town NOTE Prior to dedication, an as built survey shall be submitted to the Town for any roads or water and sewer facilities to be dedicated to the Town; improvements must be inspected by the Town Engineer prior to Town approval. 5

At final completion the Developer shall provide a value of the project for tax purposes, as an attachment to the Dedication Agreement. This information shall be provided to the Town Finance Department. Additional Required Plans: Town Post Construction Complete set of as-builts. Final Inspection (Confirmation of site with as-built plans (landscaping, parking, striping, lighting) Notes: 1. Zoning Certificates for grading, site construction, etc. will be issued as requested following the recordation of the final plat. 2. A pre-construction meeting with Town Staff and Town Engineers is required. 3. Shop drawings must be approved by the Town Engineer, prior to commencement of work. 4. Prior to the issuance of a U&O, any structures marked to be moved or removed shall be moved or removed. 5. Final dedication to the Town of all public improvements require inspection by Town Engineer and approval of Town; if applicable, may require Dedication Agreement. Notify of Approval: Cecil County Public Schools Transportation Department 1637 East Old Philadelphia Road Suite #2 Elkton, MD 21921 (Notify for new residential development when approved, # of homes, street names, house numbers and date it was reviewed by TAC) New Street Names Town will coordinate Must be approved by Cecil County Department of Emergency Services and Town of Perryville s Mayor & Commissioners. Designation of new streets and house/building numbers Town will coordinate Perryville Post Office Perryville Fire Company Once designated street names and addresses have been approved and Zoning Certificate has been issued - Town will notify Perryville DPW Perryville Post Office Perryville Fire Company Cecil County Department of Emergency Services Cecil County Department of Assessments & Taxation 6