Environmental Policy Health & Safety Policy

Similar documents
TENTE CASTORS LIMITED TERMS & CONDITIONS Page 2 of 6 credit limit is established, payment will usually be collected prior to goods being dispatched.

R O B E R T L A N G F O R D

TERMS AND CONDITIONS OF SALE

General Sales of Goods Terms & Conditions

APPLICATION FOR A CREDIT ACCOUNT

SABIC GENERAL TERMS AND CONDITIONS OF SALE

CHENSO INC Chemical Engineering Solution. Standard Terms and Conditions for the Sale of Goods

Summit Engineering (Birmingham) Ltd. Standard Terms and Conditions for the Purchases of Goods

STANDARD TERMS AND CONDITIONS FOR THE PURCHASE OF GOODS

TERMS AND CONDITIONS OF SALE

TERMS AND CONDITIONS

COMMERCIAL TERMS OF SALE CRITICAL - AIRFLOW EUROPE LTD 1. Definitions

Terms and Conditions of Sale

TERMS OF SALE. 3.2 Each order accepted constitutes a separate legally binding Contract between FAV and the Buyer.

4 Payment 4.1 Credit accounts are available for corporate customers against approved references. 4.2 In the case of sales to Buyers who do not

TERMS AND CONDITIONS OF SALE England Greene, Tweed & Co., Limited. Act the Late Payment of Commercial Debts (Interest) Act 1998;

OIL TECHNICS (HOLDINGS) LTD STANDARD TERMS & CONDITIONS FOR PURCHASE OF GOODS

GENERAL TERMS & CONDITIONS FOR THE SALE OF GOODS AND SERVICES. EnerSys Reserve Power Pte. Ltd. (Singapore) Last revised August 1, 2014

STANDARD CONDITIONS OF SALE. WILLIAM ROWLAND LIMITED ( the Seller)

Bioquell Inc. Standard Terms and Conditions for the Sale of Goods & Supply of Services (version: [December 2010])

General Terms and Conditions of Purchase of HBM United Kingdom Limited

Siemens Healthcare Diagnostics Manufacturing Limited

STANDARD TERMS AND CONDITIONS OF PURCHASE. 1. Interpretation

HT MOULDING TECHNOLOGY LTD TERMS AND CONDITIONS

1. DEFINITIONS. For the purposes of these Conditions:

UNIVERSITY OF CHICHESTER PURCHASING TERMS AND CONDITIONS 1. INTERPRETATION

WHITTLE FLOORING COMPANY LIMITED CONDITIONS OF SALE

SUZUKI AUSTRALIA PTY. LIMITED ACN ABN TERMS AND CONDITIONS OF SALE

Skyways Technics - General Terms and Conditions for the Sale of Goods and Services

TERMS AND CONDITIONS OF SALE METZ SPECIALTY MATERIALS PTY LTD ABN METZ PROJECT SERVICES PTY LTD ABN

CONDITIONS OF PURCHASE - GOODS AND SERVICES

TERMS AND CONDITIONS OF SALE

AIRBOSS RUBBER SOLUTIONS - TERMS AND CONDITIONS OF SALE

Terms and Conditions of Sales

VETROSEAL TERMS AND CONDITIONS OF SALE

In these Terms and Conditions, unless the context otherwise requires:

BRITISH POTATO TRADE ASSOCIATION CONDITIONS FOR THE PURCHASE AND SALE OF SEED POTATOES

Don Ruffles Limited 138 Victoria Road, Horley, Surrey RH6 7BF Tel Fax

TERMS AND CONDITIONS OF SALE. (as recommended by The British Antique Dealers' Association)

United Performance Metals, Hungary Terms and Conditions of Sale

Version dated 1 st October 2007 TERMS AND CONDITIONS OF SALE

SABIC INNOVATIVE PLASTICS ARGENTINA CONDITIONS OF SALE

STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS

CHRISTY METALS, INC. AND AFFILIATES TERMS AND CONDITIONS

EUROMED, S.A. GENERAL SALES CONDITIONS ( GSC )

TERMS AND CONDITIONS FOR THE SUPPLY OF GOODS AND SERVICES

PumpNSeal Australia Pty Ltd

Glatfelter [Glatfelter Gernsbach GmbH & Co. KG (Germany)] Conditions of Purchase (Goods and Services)

PARKSIDE STEEL (STOCKHOLDERS) LTD

JOS MALAYSIA - GENERAL TERMS AND CONDITIONS OF SALE

Terms of Sale Terms of Sale: Samples: Quantities: Buyer s Material:

DAYTON Lamina Corporation

NORGREN LIMITED ONLINE TERMS AND CONDITIONS OF SALE JUNE 2013

TERMS AND CONDITIONS OF SALE AND PRIVACY STATEMENT

GENERAL TERMS AND CONDITIONS OF QUOTATION & SALE

Standard Terms and Conditions of Sale (Rev. 03/2017) Page 1 of 5

Projects Unlimited, Inc. PURCHASE ORDER TERMS AND CONDITIONS September 15, 2013

1.1. Purchase Order means the purchase order issued to the Seller contemporaneously with these Standard Terms and Conditions.

MOLDED FIBER GLASS COMPANIES Terms and Conditions of Sale (Custom Molding Products)

1.1.1 days means any day other than a Friday, or official public holiday in the United Arab Emirates;

NALCO S STANDARD TERMS & CONDITIONS OF SALE FROM PLANT.

Confirmation of Purchase Order/Terms and Conditions of Sale 1. ACCEPTANCE OF ORDER: Natel Engineering Co., Inc. or it s Powercube division ( Natel or

CONDITIONS OF SALE AND/OR SUPPLY

A.B.N NON-AUCTION TERMS AND CONDITIONS

CONDITIONS OF PURCHASE (GOODS AND SERVICES) DOMESTIC AND INTERNATIONAL

"Sale of goods act, "The sale of goods and services act, Consumer protection from unfair trades regulations".

CONDITIONS OF PURCHASE (GOODS AND SERVICES) DOMESTIC AND INTERNATIONAL

Order & Quotation Terms & Conditions DEFINITIONS: Buyer Order Product Quotation RFQ Seller Terms and Conditions 1. Applicability:

the cost of replacing or repairing the goods or of acquiring equivalent goods.

Please attach a copy of your company headed paper.

GW Plastics, Inc. Terms & Conditions of Sale

CONDITIONS OF CONTRACT FOR THE PURCHASE OF GOODS AND SERVICES BY PENNON GROUP PLC AND/OR SOUTH WEST WATER LIMITED

GENERAL TRADE RULES FOR WOOD PULP

ROTOR CLIP PURCHASE ORDER GENERAL TERMS AND CONDITIONS

Standard conditions of sale for deliveries effective on orders accepted by Halmstad Steel Service Centre AB (the Conditions )

PURCHASE ORDER TERMS AND CONDITIONS

IMI NORGREN LIMITED (IRELAND) GENERAL CONDITIONS OF SALE

TERMS AND CONDITIONS OF SALE

GENERAL TERMS AND CONDITIONS OF SALE FOR MARINE FUEL

TERMS AND CONDITIONS OF SALE

GENERAL TERMS AND CONDITIONS OF SALE. December 2010

General sales conditions North America Strip products from IJmuiden. Effective April 1, 2013

STANDARD TERMS OF TRADING

GENERAL CONDITIONS OF PURCHASE

ELMEC TECHNOLOGY OF AMERICA, INC. STANDARD TERMS AND CONDITIONS OF SALE

APPLICABLE TERMS AND CONDITIONS

sold under a separate Order. Failure of Seller to deliver any installment shall not entitle Buyer to cancel the balance of the Order. 4.3 Any time quo

APPLICATION FOR CREDIT - Page 1 of 7

Title: GENERAL TERMS AND CONDITIONS OF SALE TFMD AS Europa Revision: 00 Effective Date 01. June 2014

TERMS AND CONDITIONS FOR THE SALE OF PRODUCTS

Muntons plc. Terms and Conditions for the Sale of Goods

Ref: Application for Credit Account. Please find attached an application form for a credit account.

GENERAL TERMS AND CONDITIONS OF PURCHASE OF FONDEL REFINERY PRODUCTS AG

TERMS AND CONDITIONS OF SALE

TERMS AND CONDITIONS

Customer Account Application Form

GENERAL CONDITIONS OF SALE. Valid from July 1 st, 2014

Molex Standard Terms and Conditions for the Asia Pacific Region

Standard Terms and Conditions of Purchase Order - Suppliers

ACKNOWLEDGEMENT YOUR ORDER IS ACCEPTED SUBJECT TO THE MOLEX TERMS AND CONDITIONS APPEARING HEREON

Transcription:

Technical Guide

Contents Company Profile Page 03 Policy Statements Quality Policy Page 04 Environmental Policy Page 05 Health & Safety Policy Page 06 Product Specifications/Technical Information Engineering Copper Tubes Page 07 Plumbing Copper Tubes Page 09 Medical Gas Tubes Page 11 Medical Gas Metric Endfeed Fittings Page 13 Refrigeration and Air Conditioning Tubes Page 14 Approvals Quality System ISO 9001:2008 Page 16 Kitemark BS EN 1057 copper tubes Page 18 Kitemark IS EN 1057 copper tubes Page 22 Kitemark BS EN13348 medical tubes Page 23 25 & 30 Year Guarantee Page 24 COSHH - Hazard Data Sheet Copper CU And Its Salts Page 25 Standard Conditions of Sales Page 27 Page 2 of 29

Company Profile Established in 1917 and based in Coventry, The Lawton Tube Company is the UK s largest independent copper tube maker. The Company is a Private Limited Company without any group associations with the freedom necessary to satisfy customer requirements and respond to product and process changes with the latest technical requirements. We offer a wide range of quality assured copper tubes, complying with the latest specifications, to both the construction and engineering markets. Lawton Tube is able to supply a range of standard products or special one off orders. Plant developments and installations have kept pace with market demands for a high integrity product and employ the latest manufacturing techniques. A fully integrated production system based on high speed block drawing and semi automated benches form the core of our primary processing. From initial extrusion to finished tube, Lawton Tube ensures that diameter, thickness, temper and length are all controlled within predetermined limits with the most up-to date manufacturing and inspection standards. Lawton Tube has been assessed and registered as a BSI Approved Company operating Quality Systems to meet the requirements of BS EN ISO 9001-2008 and qualifies for the KITEMARK EN 1057 and EN 13348 (Medical). Lawton Tube was the first company in the United Kingdom to have the EN 13348 (Medical) KITEMARK. From receipt of certified raw materials to final inspection and despatch the aim is to manufacture a tube fit for purpose. During 2001, Lawton Tube acquired Dorset Tube in Poole, which added to the breadth of Engineering tube supplied by the Coventry unit and included the production of cupro-nickel brake pipe tube. Dorset Tube has been assessed and registered as a BSI Approved Company and are operating Quality Systems to meet the requirements of BS EN ISO 9001-2008. Page 3 of 29

Policy Statements Quality Policy Lawton Tube Company is committed to maintain, on a continuous basis, an effectively Quality Management System, which complies with the requirements of the BS EN ISO 9001:2008 System for Quality Management. The QMS is a framework guiding Lawton Tube Management and Employees to focus on identifying and meeting customer requirements consistently in an environment in which people understand, and are fully involved in achieving the business objectives through effective communication and leadership. Lawton Tube is committed to complying with the requirements of the QMS and continually improving its effectiveness. Lawton Tube is committed to continually improve on the organisational performance, making use of appropriate decision making tools to establish, analyse and improve through monitoring of agreed quality objectives. Lawton Tube is committed to ensuring that resources required for the QMS processes are provided, adequately maintained and improved in order to meet customer s requirements. In the interest of complying with customer requirements, Lawton Tube will enter into, and develop mutually beneficial relationships with suppliers of services and goods where deemed appropriate. Lawton Tube will make arrangements to comply with current Health and Safety Legislation. The Company is committed to the Quality Management System Procedures stated in this Manual and all employees are responsible for meeting the requirements laid down. The Works Manager is authorised to control and ensure the system is maintained. In the event of a major problem, which could have an adverse effect on the operation of the Quality System, this should be brought to the attention of the Managing Director for resolution. Page 4 of 29

Environmental Policy We recognise as a manufacturer of copper and copper alloy tube products, on two sites, that the operational activities of the organisation has an impact on the environment. The aim of this policy is, through the office of the Works Manager Coventry, to lessen the environmental impact of the organisation through a programme of continuous improvement. The Company will Endeavour to comply with current legislation using available technology and meet future legislative requirements. Identify and monitor environmental impacts in order to develop a plan to reduce overall impact. The environmental improvement plan will be documented and communicated internally to the workforce and their representatives through training and team briefing. The annual report will include environmental reporting. The Company will endeavour to minimise waste, optimise recycling and ensure appropriate disposal. Page 5 of 29

Health & Safety Policy 1 It is an important duty of this Company, in the conduct of its business operations, to ensure a safe and healthy-working environment for all its employees. The Company accepts the fact that this implies the corresponding duty of ensuring that the necessary organisation, equipment and training is provided to fulfil this obligation. An effective health and safety policy requires the full collaboration and co-operation of all employees and, therefore, everybody is asked to read this document and accept personal responsibility for health and Safety at work; It is the responsibility of Management and Supervision:A To promote the spirit and the letter of the principles and provisions incorporated in the relevant legislation to ensure that safe systems of work and a safe and healthy working environment exists; adequate resources will be made available to ensure the success of this Policy. B By consultation and joint involvement of Management and employees, to enlist the active interest, participation and support of employees in promoting good standards of Health and Safety at Work: It is the responsibility of every employee:a To take all reasonable care for the health and safety of himself and of fellow employees and to report any hazard which cannot be controlled personally; B To co-operate with the Company by observing safety rules and complying with any measures designed to ensure a safe and healthy working environment; 4 The role of the Safety Committee is of vital importance for maintaining a continuous and critical scrutiny of working conditions throughout the factory; reviewing the safety performance and promoting safer working; 5 The Managing Director accepts ultimate responsibility for Health and Safety within the Company as a whole. All Management, Supervision and employees generally are expected to support and implement this policy whole-heartedly: 6 The Policy and procedures will be reviewed annually by the Health and Safety Committee. Page 6 of 29

Product Specifications/Technical Information Engineering Copper Tubes Pipeline solutions for Engineering applications. Made to order so contact our Sales department with FULL enquiry. Average manufacturing time is 4 weeks. We manufacture/distribute to the following European Specifications(American ASTM can also be offered): BS EN 12449:1999 BS EN 12541:1999 BS EN 13600:2002 BS EN 12449 Seamless, round tubes for general purposes Material Analysis (C106) Material Grade Phosphorus de-oxidised copper; Cu-DHP or CW024A as defined in BS EN 1976. Minimum Copper Content 99.90 % (including silver) Phosphorus 0.015-0.040 % Total Impurity Maxima 0.060 % (excluding phosphorus and silver) Mechanical Properties Material Temper R200 (soft) R250 (Half ) R290 () Tensile Strength min. (N/mm2) Elongation min. (%) 200 250 290 40 20 5 ness (Indicative) HV5 VPN 40-65 70-100 95-120 Dimensions and Tolerances Please enquiry with our sales department as we make to order so product will be customer specific. BS EN 12451 Seamless, round tubes for heat exchangers Material Analysis Material Grade Phosphorus de-oxidised copper; Cu-DHP or CW024A as defined in BS EN 1976. Minimum Copper Content 99.90 % (including silver) Phosphorus 0.015-0.040 % Total Impurity Maxima 0.060 % (excluding phosphorus and silver) Mechanical Properties Material Temper R250 (Half ) R290 () Tensile Strength min. (N/mm2) Elongation min. (%) 250 290 20 5 ness (Indicative) HV5 VPN 75-100 Over 100 Dimensions and Tolerances Please enquiry with our sales department as we make to order so product will be customer specific. Page 7 of 29

BS EN 13600 Seamless, round tubes for electrical purposes Material Analysis (HC C101) Material Grade Phosphorus de-oxidised copper; Cu-ETP or CW004A as defined in BS EN 1976. Minimum Copper Content min 99.90 % (including silver) Max Oxygen 0.060 % is permitted, subject to agreement between the purchaser and Lawton Tubes Max Lead 0.005 % Total Impurity Maxima 0.030 % (excluding oxygen, lead and silver) Material Analysis (HC C103) Material Grade Phosphorus de-oxidised copper; Cu-OF or CW008A as defined in BS EN 1976. Minimum Copper Content min 99.95 % (including silver) Max Lead 0.005 % Total Impurity Maxima 0.030 % (excluding lead and silver) Mechanical Properties Material Temper R200 (soft) R250 (Half ) R290 () Tensile Strength min. (N/mm2) Elongation min. (%) 200 250 290 40 15 5 ness (Indicative) HV5 VPN 35-65 65-95 90-110 Dimensions and Tolerances Please enquiry with our sales department as we make to order so product will be customer specific. Page 8 of 29

Plumbing Copper Tubes BS EN 1057 Material Analysis Material Grade Phosphorus de-oxidised copper; Cu-DHP or CW024A as defined in BS EN 1976. Minimum Copper Content 99.90 % (including silver) Phosphorus 0.015-0.040 % Total Impurity Maxima 0.060 % (excluding phosphorus and silver) The melting point of copper is 1083ºC and it has a density of 8.9 gm/cc Packaging All tubes are bundle tied, 15-28mm (TX) are Yellow end capped in tubes of 10 (UK market only). Marking Sizes 15-54mm copper tubes are stamped with: Tube size Kitemark EN 1057 Temper Manufacturer Date (quarter) Sizes 67mm and above are stamped at either end of the tube. Mechanical Properties Material Temper EN 1173 R220 (soft) R250 (Half ) R290 () Tensile Strength min. (N/mm2) Elongation min. (%) 220 250 290 40 30 (TX) 20 (TY) 3 Page 9 of 29 ness (Indicative) HV5 VPN 40-70 75-100 Over 100

Dimensions and Tolerances (includes chrome plated and PVC covered) Max Working Thickness O.D. (mm) Wall (mm) Temper Pressure bar* Tolerance up to 65ºC 6 0.6 (TX) Half 133 6 0.6 Soft 90 6 0.8 (TY) Half 188 8 0.6 (TX) Half 97 8 0.6 Soft 66 8 0.8 (TY) Half 136 10 0.6 (TX) Half 77 10 0.7 (TY) Soft 62 10 0.8 (TY) Half 106 12 0.6 (TX) Half 63 12 0.8 (TY) Half 87 15 0.7 (TX) Half 58 15 1.0 (TY) Half 87 ±13% 15 1.0 (TY) Soft 67 ±13% 22 0.9 (TX) Half 51 22 1.2 (TY) Half 69 22 1.2 (TY) Soft 57 28 0.9 (TX) Half 40 28 1.2 (TY) Half 55 35 1.0 (LiteX) 42 35 1.2 (TX) Half 42 35 1.5 (TY) 64 42 1.0 (LiteX) 35 42 1.2 (TX) Half 35 42 1.5 (TY) 53 54 1.0 (LiteX) 27 54 1.2 (TX) Half 27 54 2.0 (TY) 55 66.7 1.2 (TX) 26 66.7 2.0 (TY) 45 76.1 1.5 (TX) 29 76.1 2.0 (TY) 39 108 1.5 (TX) 20 108 2.5 (TY) 34 133 1.5 (TX) 16 159 2.0 (TX) 18 219 3.0 (TX) 20 Diameter Tolerance mean Including ovality ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.04mm ±0.05mm ±0.05mm ±0.05mm ±0.05mm ±0.05mm ±0.06mm ±0.06mm ±0.06mm ±0.06mm ±0.06mm ±0.06mm ±0.06mm ±0.06mm ±0.06mm ±0.07mm ±0.07mm ±0.07mm ±0.07mm ±0.07mm ±0.07mm ±0.20mm ±0.20mm ±0.60mm ±0.09mm Not applicable ±0.09mm ±0.09mm Not applicable ±0.09mm ±0.09mm Not applicable ±0.09mm ±0.09mm ±0.09mm ±0.09mm ±0.09mm Not applicable ±0.10mm ±0.10mm Not applicable ±0.10mm ±0.10mm ±0.07mm ±0.11mm ±0.07mm ±0.07mm ±0.11mm ±0.07mm ±0.07mm ±0.11mm ±0.07mm ±0.10mm ±0.10mm ±0.10mm ±0.10mm ±0.20mm ±0.20mm ±0.70mm ±0.70mm ±1.50mm *Working pressures are to BS 2871:part1:1971 Page 10 of 29

Medical Gas Tubes to BS EN 13348 Specifically designed for copper medical gas and vacuum systems. Superseding earlier 'hybridised' copper tube standards such BS EN 1057 & BS 2871 Part 1 Table X Conforms to HTM 02-01:2006 & NHS engineering spec. C11 Specific Benefits Include: Tighter limits on cleanliness determination. Improved identification to avoid confusion with similar sizes of water service tube. Lawton Tubes are the first British company to be awarded the kitemark licence to supply to this standard. Material Analysis Material Grade Phosphorus de-oxidised copper; Cu-DHP or CW024A as defined in BS EN 1976. Minimum Copper Content 99.90 % (including silver) Phosphorus 0.015-0.040 % Total Impurity Maxima 0.060 % (excluding phosphorus and silver) The melting point of copper is 1083ºC and it has a density of 8.9 gm/cc Cleanliness Maximum total carbon content 0.20 mg/dm2. Packaging Each tube individually end capped, tube bundles polythene wrapped* and sealed. Marking Sizes 12-108mm copper tubes are stamped with: Tube size Kitemark EN 13348 Temper Manufacturer Date & Batch Code 12mm to 28mm sizes are also inkjet marked with additional data to enable traceability Sizes above 108mm (133mm/159mm/219mm) are made to EN 1057 and cleaned to EN 13348 Mechanical Properties Material Temper EN 1173 R250 (Half ) R290 () Tensile Strength min. (N/mm2) Elongation min. (%) 250 290 30 (TX) 20 (TY) 3 Page 11 of 29 ness (Indicative) HV5 VPN 75-100 Over 100

Dimensions and Tolerances O.D. (mm) Wall (mm) Temper Max Working Pressure bar* up to 65ºC 12 12 15 15 22 22 28 28 35 35 35 42 42 42 54 54 54 66.7 66.7 76.1 76.1 108 108 133 159 219 0.6 (TX) 0.8 (TY) 0.7 (TX) 1.0 (TY) 0.9 (TX) 1.2 (TY) 0.9 (TX) 1.2 (TY) 1.0 1.2 (TX) 1.5 (TY) 1.0 1.2 (TX) 1.5 (TY) 1.0 1.2 (TX) 2.0 (TY) 1.2 (TX) 2.0 (TY) 1.5 (TX) 2.0 (TY) 1.5 (TX) 2.5 (TY) 1.5 (TX) 2.0 (TX) 3.0 (TX) Half Half Half Half Half Half Half Half Half Half Half 63 87 58 87 51 69 40 55 42 42 64 35 35 53 27 27 55 26 45 29 39 20 34 16 18 20 Thickness Tolerance ±13% Diameter Tolerance mean Including ovality ±0.04mm ±0.09mm ±0.04mm ±0.09mm ±0.04mm ±0.09mm ±0.04mm ±0.09mm ±0.05mm ±0.10mm ±0.05mm ±0.10mm ±0.05mm ±0.10mm ±0.05mm ±0.10mm ±0.06mm ±0.07mm ±0.06mm ±0.11mm ±0.06mm ±0.07mm ±0.06mm ±0.07mm ±0.06mm ±0.11mm ±0.06mm ±0.07mm ±0.06mm ±0.07mm ±0.06mm ±0.11mm ±0.06mm ±0.07mm ±0.07mm ±0.10mm ±0.07mm ±0.10mm ±0.07mm ±0.10mm ±0.07mm ±0.10mm ±0.07mm ±0.20mm ±0.07mm ±0.20mm ±0.20mm ±0.70mm ±0.20mm ±0.70mm ±0.60mm ±1.50mm *Working pressures are to BS 2871:part1:1971 Page 12 of 29

Medical Gas Metric Endfeed Fittings Degreased copper end feed type fittings manufactured to BS EN 1254-1:1998 Part 1 Specification for copper and copper alloy fittings with capillary ends for soldering and brazing for use with copper tubes. All fittings are supplied in individually sealed protective polythene bags and are specifically designed for copper medical gas and vacuum systems. Specific Benefits Include: Complies to NHS (UK) Health Technical Memorandum 02-01:2006 All fittings supplied contain less than 100mg/m2 (0.01mg/cm2) of hydrocarbons on the degreased surface. Improved identification to avoid confusion with similar sizes of water service fittings. Each fitting is engraved with unique branding together with the EN spec and fitting size where space permits. All individually sealed protective polythene bags are product labelled. Fittings are supplied in re-inforced cardboard boxes, labelled with product information and outline drawing of fitting. Size 8mm to 28mm 35mm to 54mm 67mm Min -40º C 25 bar 25 bar 16 bar Service Temperature* 30ºC 65ºC 25 bar 25 bar 25 bar 16 bar 16 bar 16 bar Max 110ºC 16 bar 10 bar 10 bar *LTC Fittings performance when correctly assembled with Lawton Tube s EN13448 copper tube using tin/copper soft solder EN 29453 or tin/silver soft solder EN 29453 Size 8mm 10mm 12mm 15mm 22mm 28mm 35mm 42mm 54mm Min -196º C 62.5 bar 50.9 bar 42.9 bar 40.3 bar 35.6 bar 28.2 bar 25.2 bar 23.2 bar 19.8 bar 65ºC 62.5 bar 50.9 bar 42.9 bar 40.3 bar 35.6 bar 28.2 bar 25.2 bar 23.2 bar 19.8 bar Service Temperature** 120ºC 150ºC 58.8 bar 46.7 bar 47.9 bar 38.0 bar 40.3 bar 32.0 bar 37.9 bar 30.1 bar 33.5 bar 26.6 bar 26.5 bar 21.1 bar 23.7 bar 18.8 bar 21.8 bar 17.3 bar 18.6 bar 14.7 bar 175ºC 35.5 bar 28.9 bar 24.3 bar 22.8 bar 20.2 bar 16.0 bar 14.3 bar 13.1 bar 11.2 bar Max 200ºC 23.3 bar 19.0 bar 16.0 bar 15.0 bar 13.3 bar 10.5 bar 9.4 bar 8.6 bar 7.4 bar ** Max hydraulic working pressure for LTC fittings when assembled with Lawton Tube s EN13348 copper tube using hard solder (brazing alloy) to EN 1044 Size 67mm 76mm 108mm 133mm 159mm Min -196º C 18.6 bar 18.6 bar 17.2 bar 10.5 bar 11.7 bar Service Temperature*** 65ºC 120ºC 18.6 bar 17.5 bar 18.6 bar 17.5 bar 17.2 bar 16.2 bar 10.5 bar 8.5 bar 11.7 bar 9.7 bar 150ºC 14.0 bar 14.0 bar 12.9 bar 7.7 bar 8.6 bar Max 200ºC 6.9 bar 6.9 bar 6.4 bar 4.1 bar 4.6 bar *** Max hydraulic working pressure for LTC fittings when assembled with Lawton Tube s EN13348 copper tube using silver brazing alloy to EN 1044 Page 13 of 29

Refrigeration and Air Conditioning Tubes Pipeline solutions for refrigeration and air conditioning, all to EN 12735-1. Our copper tubing is designed specifically for refrigeration and air conditioning use and accordingly cleaned, nitrogen-purged and capped. Material Analysis Material Grade Phosphorus de-oxidised copper; Cu-DHP or CW024A as defined in BS EN 1976. Minimum Copper Content 99.90 % (including silver) Phosphorus 0.015-0.040 % Total Impurity Maxima 0.060 % (excluding phosphorus and silver) The melting point of copper is 1083ºC and it has a density of 8.9 gm/cc Mechanical Properties Material Temper EN 1173 R220 (soft) R250 (Half ) R290 () Tensile Strength min. (N/mm2) Elongation min. (%) 220 250 290 40 30 3 Page 14 of 29 ness (Indicative) HV5 VPN 40-70 75-100 Over 100

Dimensions and Tolerances O.D. (mm) Wall (mm) Temper Max Working Pressure bar* up to 65ºC 1/4 3/8 3/8 1/2 1/2 5/8 5/8 3/4 3/4 3/4 7/8 7/8 1 1/8 1 3/8 1 5/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 5/8 3 1/8 3 1/8 3 5/8 4 1/8 4 1/8 0.028 0.032 0.032 0.036 0.032 0.036 0.036 0.048 0.040 0.040 0.048 0.040 0.048 0.048 0.048 0.048 0.064 0.080 0.048 0.064 0.080 0.064 0.104 0.080 0.080 0.104 Soft Half Soft Half Soft Half Soft Half Half Soft Half Soft Half Half Half 113 110 84 91 62 72 55 80 66 50 68 43 52 42 35 32 45 55 26 36 44 30 49 32 28 37 Thickness Tolerance Diameter Tolerance mean Including ovality ±0.04mm Not applicable ±0.04mm ±0.09mm ±0.04mm Not applicable ±0.04mm ±0.09mm ±0.04mm Not applicable ±0.04mm ±0.09mm ±0.04mm Not applicable ±0.05mm ±0.10mm ±0.05mm ±0.10mm ±0.05mm Not applicable ±0.05mm ±0.10mm ±0.05mm Not applicable ±0.07mm ±0.11mm ±0.07mm ±0.11mm ±0.07mm ±0.11mm ±0.07mm ±0.11mm ±0.07mm ±0.11mm ±0.07mm ±0.11mm ±0.10mm ±0.11mm ±0.10mm ±0.11mm ±0.10mm ±0.11mm ±0.15mm ±0.20mm ±0.15mm ±0.20mm ±0.20mm ±0.30mm ±0.20mm ±0.30mm ±0.20mm ±0.30mm *Working pressures are to BS 2871:part1:1971 Page 15 of 29

Approvals Quality System ISO 9001:2008 Page 16 of 29

Page 17 of 29

Kitemark BS EN 1057 Page 18 of 29

Page 19 of 29

Page 20 of 29

Page 21 of 29

Kitemark IS EN 1057 Page 22 of 29

Kitemark BS EN13348 Page 23 of 29

25 Year Guarantee The Lawton Tube Company Limited ("Lawton") guarantees its plain copper tubes for water, heating, gas and sanitation purposes, for the period of 25 years from the date of purchase, against fault or defect due to defective materials or manufacture or failure to comply with the provision of the quality stamped on the tube. If any tube shall fail this guarantee Lawton shall: Replace the faulty tube Pay the installer s costs of removing or replacing the faulty tube (up to an amount of 75,000 per claim.) pay any costs or damages suffered/incurred as a result of the failure (up to an amount of 250,000 per claim.) Lawton reserves the right to remedy the failure itself or by its own nominated contractor. Conditions This guarantee is conditional upon: Proper installation of the tube in accordance with all relevant practices and regulations. Lawton being notified of the failure as soon as practicable but in any event within 14 days after the failure. The claimant taking all appropriate or necessary measures to mitigate the damages or losses suffered. Lawton being given the opportunity to inspect the faulty tube and the installation (with or without its own experts) to satisfy itself as to the failure of the tube, and if required to remove the faulty tube for testing. Lawton having no liability for any indirect or consequential losses. Lawton s total liability under this guarantee not exceeding the sum of 250,000. This guarantee extends only to the original purchaser/installer of the tube and is not capable of assignment and applies only to the tube sold and installed in the United Kingdom. 30 Year Guarantee Enjoy the added bonus of an extra 5 year warranty with no additional premiums if Lawton s EN1057 15-219mm range is fitted with any flame-free jointed piping system. (contact us for full terms and conditions) Page 24 of 29

COSHH Hazard Data Sheet Copper CU and Its Salts General Data Grade 11 Chemical Copper is reddish brown ductile malleable metal. It is highly conductive for heat and electricity. There are many alloys of copper, brass and bronze being the most common. It forms two ranges of salts, cuprous and cuprice the latter being more stable. Uses 1. The manufacture of a wide range of alloys e.g. a. Brass which contains 37% zinc and other elements such as tin, manganese, nickel, iron and aluminum. b. Bronze which contains tin, lead, nickel phosphorous and silicon. c. High conductivity alloys containing silver, cadium and chromium. d. High strength alloys with beryllium, nickel, cobalt and silicon. e. For machinability with tellurium. f. When combined with 10%-30% nickel provides an alloy suitable for welding and capable of carrying corrosive liquids. 2. In the electricity industry for high conductivity. 3. Building industry for piping water and gas. 4. Copper Salts are colouring agents and fungicides. Hazard Copper itself is virtually non-toxic in its industrial application. Some of the salts however, and particular copper sulphate are toxic if swallowed. Inhalation of the fume from welding or melting of brass leads to metal fumer fever but this effect is attributed to zinc oxide fume. Similarly the inhalation of powered bronze can cause metal fume fever. Acute Poisoning In industrial practice acute poisoning may arise in 2 ways:1. By inhalation of fume from welding or brazing copper alloys. Metal fume fever develops some hours after exposure. 2. By swallowing copper sulphate solution which produces abdominal cramp, nausea, vomiting and diarrhea. Chronic Poising Unknown Occupational Exposure Limits HSE EH40/89 Long Term Exposure Limit Short Term Exposure Limit PPM Mg M3 Fume - 0.2 - - Dust - 1-1 PPM Page 25 of 29 Mg M3

Precautions All melting, welding and brazing operations should be performed in controlled atmospheric conditions and should not be undertaken in enclosed spaces without exhaust ventilation and fresh airline respirators. Personal Protective Equipment A respirator to BS 2091 should be worn when other safety measures are not available. First Aid 1. Inhalation of fume rarely causes immediate symptoms but if they occur remove from the fume. Oxygen and artificial respiration rarely called for. 2. Ingestion of solutions of copper salts, particularly copper sulphate dilute the poison by giving copious quantities of water to drink. 3. Remove the patient to hospital immediately together with a sample of fluid drunk and preserving specimens of vomits. Page 26 of 29

Standard Conditions of Sales 1. FORMATION OF CONTRACT No binding contract shall be deemed to have been effected until confirmed, in writing, as such by the Seller; quotations, price lists and other publications of the Seller do not constitute offers. 2. APPLICATION OF CONDITIONS 2.1 These Conditions shall apply to all contracts for the sale of goods by the Seller to the Buyer to the exclusion of all other terms and conditions including any terms or conditions which the Buyer may purport to apply under any purchase order confirmation of order or similar document. All orders for goods shall be deemed to be an offer by the Buyer to purchase goods pursuant to these Conditions. 2.2 Acceptance of delivery of goods shall be deemed conclusive evidence of the Buyer s acceptance of these Conditions. 2.3 Any variation to these Conditions (including any special terms and conditions agreed between the parties) shall be inapplicable unless agreed in writing by the Seller 3. DELIVERY Any day for delivery named by the Seller is an estimate only and in no circumstances shall the failure of the Seller to deliver on or before the named date either entitle the Buyer to rescind or terminate the Contract or make the Seller liable in any way for the consequence of any delay. Material from stock is subject to being unsold upon receipt of order. 4. DEFERMENT OF DELIVERY Where the Buyer has given firm instructions for the manufacture and delivery of goods and subsequently requests the Seller to defer delivery, any goods completed will be invoiced and any goods in the process of manufacture will be completed and invoiced on completion, holding and storage charges at the reasonable cost of storage including delivery will be invoiced subsequently when applicable. 5. AVAILABILITY OF RAW MATERIAL AND SPECIAL TOOLS. Contracts and orders are accepted subject to the Seller being able to obtain at all necessary times the raw materials and any special tools required to execute the order. 6. OWNERSHIP OF SPECIAL TOOLS Any dies or tools made or obtained specially for an order remain the Seller's property, even when the Buyer has been charged with part cost. 7. SPECIFICATIONS 7.1 If the goods are to be manufactured or any process is to be applied to the goods by the Seller in accordance with a specification submitted by the Buyer:7.1.1 The Buyer shall supply such specification within sufficient time to enable the Seller to complete delivery of the goods by the estimated delivery date. 7.1.2 The Buyer shall indemnify the Seller against all loss damages costs and expenses awarded against or incurred by the Seller in connection with or paid or agreed to be paid by the Seller in settlement of any claim for infringement of any patent, copyright, design, trade mark or other industrial or intellectual property rights of any other person which results from the Seller s use of the Buyer s specification. 7.1.3 The Seller reserves the right to make any changes in the specification of the goods which are required to conform with any applicable statutory or EC requirements. 7.1.4 The Seller shall be under no liability in respect of any defect in the goods arising from any drawing design or other specification supplied by the Buyer. 8. EXPORT ORDERS 8.1 Unless the context otherwise requires any term or expression which is defined in or given a particular meaning by the provisions of Incoterms, the definition of meaning given by the Incoterms in force at the date when the contract is made, shall have the same meaning in these Conditions or any contract for the sale or supply of goods by the Seller to the Buyer, but if there is any conflict between the provisions of Incoterms and these Conditions, the latter shall prevail. 8.2 The Buyer shall be responsible for complying with any legislation or regulations governing the importation of the goods into the country of destination and for the payment of any duties on them. 9. WARRANTY AND DEFECTIVE GOODS 9.1 The goods shall be manufactured and supplied in accordance with the description contained in the Seller s specification (if any) and shall be of normal industrial quality. 9.2 The Seller may from time to time make changes in the specification of the goods which are required to comply with any applicable safety or statutory requirements or which do not materially affect the quality of fitness for the purpose of the goods. 9.3 The Buyer shall inspect the goods on delivery and shall within 3 days of delivery notify the Seller of any alleged defect, shortage in quantity, damage or failure to comply with description or sample. The Buyer shall afford the Seller an opportunity to inspect the goods within a reasonable time following delivery and before any use is made of them. If the Buyer shall fail to comply with these provisions the goods shall Page 27 of 29

be conclusively presumed to be in accordance with the contract and free from any defect or damage which would be apparent on a reasonable examination of the goods and the Buyer shall be deemed to have accepted the goods. 9.4 If the goods are not in accordance with the contract for any reason, the Buyer s sole remedy shall be limited to the Seller making good any defect or shortage by repairing or replacing such goods or if the Seller shall elect by refunding a proportionate part of the price. 9.5 The Seller shall be under no liability whatever to the Buyer for any indirect loss and or expense (including loss of profit) suffered by the Buyer arising out of a breach by the Seller of the contract or any of these Conditions. 9.6 In the event of any breach of the contract or these Conditions by the Seller the remedies of the Buyer shall be limited to damages. Under no circumstances shall the liability of the Seller exceed the price of the goods. 9.7 All warranties and conditions whether implied by statute or otherwise are excluded from the contract and these Conditions provided that this shall not restrict or exclude liability for death or personal injury caused by the negligence of the Seller. 10. CLAIMS FOR DAMAGE, SHORTAGE OR LOSS No claim for damage in transit, shortage of delivery or loss of goods in transit can be accepted unless, in the case of damage in transit or shortage of delivery, a separate notice in writing is given to the carrier concerned and to the Seller within three days of the receipt of goods, followed by a complete claim in writing within five days of receipt of goods, and in the case of loss of goods, notice in writing is given to the carrier concerned and to the Seller, and a complete claim in writing made within twenty one days of the date of the consignment. Where goods are accepted from the carrier concerned without being checked, the delivery book of the carrier concerned must be signed "not examined". 11. FORCE MAJEURE 11.1 The Seller shall not be liable to the Buyer or be deemed to be in breach of the contract or these Conditions by reason of any delay in performing or any failure to perform any of the Seller's obligations in relation to the goods if the delay or failure was due to any cause beyond the Seller's reasonable control. Without prejudice to the generality of the foregoing the following shall be regarded as causes beyond the Seller's reasonable control:11.1.1 Act of God, explosion, flood, tempest, fire or accident. 11.1.2 War or threat of war, sabotage, insurrection, civil disturbance or requisition. 11.1.3 Acts, restrictions, regulations, bye-laws, prohibitions or measures of any kind on the part of any governmental parliamentary or local authority. 11.1.4 Import or export regulations or embargoes. 11.1.5 Strikes, lock-outs or other industrial actions or trade disputes (whether involving employees of the Seller or of a third party). 11.1.6 Difficulties in obtaining raw materials, labour, fuel, parts or machinery. 11.1.7 Power failure or breakdown in machinery. 12. NOTICE OF TERMINATION OR PARTIAL DELIVERY In the event of an outbreak of hostilities (whether war is declared or not) in which Great Britain is involved, or in the event of national emergency, or if the Sellers works should become wither directly or indirectly so engaged on the Government orders or orders under priority directions as to prevent or delay work on other orders, the Seller shall be entitled at any time, on notice to the Buyer, to make partial deliveries only or to determine the contract, without prejudice in any case to rights accrued in respect of deliveries already made. 13. DETERMINATION OF CONTRACT Without prejudice to any other right or remedy available to the Seller, the Seller shall be entitled to cancel the contract or suspend any further deliveries under the contract without any liability to the Buyer and if the goods have been delivered but not paid for, the price shall become immediately due and payable notwithstanding any previous agreement or arrangement to the contrary if:13.1 The Buyer fails to make any payment of the purchase price on the due date or commits any other breach of the terms of the contract or 13.2 The Buyer makes any voluntary arrangement with its creditors or (being an individual or firm) becomes bankrupt or (being a company) becomes subject to an Administration Order or goes into liquidation (otherwise than for the purposes of amalgamation or reconstruction) or 13.3 An encumbrance takes possession or a Receiver is appointed of any of the property or assets of the Buyer or 13.4 The Buyer ceases or threatens to cease to carry on business or the Seller reasonably apprehends that any of the events mentioned above is about to occur in relation to the Buyer and notifies the Buyer accordingly. 14. INDEMNITY The Buyer will indemnify the Seller against all damages, penalties, costs and expenses to which the Seller may become liable as a result of work done in accordance with the Buyer's specification which involves the infringement of any letters patent or registered design or copyright. 15. PRICE VARIATION Prices at which orders are accepted by the Seller will remain firm except only as follows:15.1 Raw Materials Where a quantity (whether all or part of an order) specified for delivery at one time has a nominal weight totalling over 150kg and is accepted for delivery longer than six months from the date of acceptance of the order, the price will be based on raw material prices ruling six months before delivery is due and raw material prices will be held firm for this period. In the event that the Buyer subsequently defers delivery beyond the prescribed six months' period, the Seller reserves the right to charge interest at a rate up to 1.5 times the official U.K. clearing banks base lending rate on the value of the raw material outstanding. 15.2 Costs Other Than Raw Materials If orders are accepted for delivery longer than three months from the date of acceptance thereof the price will be subject to variation for costs (other than raw material prices) in accordance with such variations. Page 28 of 29

16. RISK AND TITLE 16.1 Risk shall pass to the Buyer so that the Buyer is responsible for all loss. damage or deterioration to the goods:- 16.1.1 If the Seller delivers the goods by its own transport at the time when the goods or a relevant part thereof arrive at the place of delivery or, 16.1.2 In all other circumstances at the time when the goods or a relevant part thereof leave the premises of the Seller whether or not the Seller arranges transport and where the goods are delivered by carrier any claims for loss or damage in transit must be made by the Buyer against the carrier in accordance with the carriers conditions. 16.2 In spite of delivery having been made, property in the goods shall not pass from the Seller until:- 16.2.1 The Buyer shall have paid the purchase price for the goods plus VAT in full and 16.2.2 No other sums whatever shall be due from the Buyer to the Seller. 16.3 Until property in the goods passes to the Buyer in accordance with Clause 16.2, the Buyer shall hold the goods and each of them on a fiduciary basis as bailee for the Seller. The Buyer shall store the goods (at no cost to the Seller) separately from all other goods in its possession and marked in such a way that they are clearly identified as the Sellers property. 16.4 Seller. The Seller shall be entitled to recover the price (plus VAT) notwithstanding that property in any of the goods has not passed from the 16.5 Until such time as property in the goods passes from the Seller, the Buyer shall upon request deliver up such of the goods as have not ceased to be in existence or resold, to the Seller. If the Buyer fails to do so, the Seller may enter upon any premises owned occupied or controlled by the Buyer where the goods are situated and repossess the goods. 16.5 Until such time as the property in the goods passes to the Buyer, the Buyer shall keep the goods separate from those of the Buyer and third parties and properly stored protected and insured and identified as the Seller s property, but the Buyer shall be entitled to resell or use the goods in the ordinary course of its business. 17. CANCELLATION No order or contract may be cancelled by the Buyer except with the agreement in writing of the Seller and on terms that the Buyer shall indemnify the Seller in full against all loss (including loss of profit) costs, including the costs of all labour and materials used, damages charges and expenses incurred by the Seller as a result of cancellation. 18. PAYMENT OF ACCOUNTS The Seller reserves the right to charge interest at a rate (both before and after any judgment) of up to 4% above Barclays Bank plc Base Lending Rate ruling at the time payment is due if payment is not made in accordance with the terms agreed at the time the order is accepted. 19. ERRORS OR OMISSIONS Errors or omissions in any sales literature quotation price list acceptance of offer invoice or other document or information issued by the Seller shall be subject to correction without any liability on the part of the Seller. 20. V.A.T The prices quoted are exclusive of VAT which will be added to the invoice at the rate then current and appropriate to the transaction. 21. LAW APPLICABLE All contracts shall be deemed as subject to the Law of England, and the parties hereto hereby submit to the jurisdiction of the English Courts. 22. NOTICES Any notice required or permitted to be given by either party to the other under these conditions shall be in writing addressed to the other party at its registered office or principal place of business or such other address as may at the relevant time have been notified pursuant to this provision to the party giving the notice. Page 29 of 29