Information Needed for a Building Permit

Similar documents
ACCESSORY STRUCTURE DEVELOPMENT ORDER APPLICATION (WITH RESTROOM PLUMBING)

STEP 1: SOIL EVALUATION

BUCKINGHAM COUNTY BUILDING PERMIT CHECKLIST

MOBILE HOME APPLICATION INFORMATION (REVISED )

Zoning Permit Application Cover Page

~ Please Detach and Save This Page ~

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

9. Public (Federal, State, or local

LAND USE PERMIT INFORMATION PACKET

Collin County Development Services OSSF CONSTRUCTION INFORMATION SHEET

Remember, PA One-Call before excavating. Simply dial 811 or

APPLICATION PROCEDURE

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

BUILDING PERMIT APPLICATION

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

RESIDENTIAL DEVELOPMENT ORDER APPLICATION Application Fee $ PLEASE READ THE FOLLOWING INFORMATION CAREFULLY

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

Before I can issue a permit, I need the following items:

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

Application for a Building/Zoning Permit

City of Casselberry Public Works Department

Location in Code Subject Fees

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

MANUFACTURED (MOBILE) HOME Instructions for Building Permit Application & Inspections

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

Madison County Health Department Environmental Health 493 Medical Park Drive, Marshall, NC Telephone: Fax:

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

APPLICATION FOR A BUILDING PERMIT

Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240

CHECKLIST FOR DEVELOPMENT REVIEW

FENCE and or POOL BARRIER CHECKLIST

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

BOROUGH OF BANGOR ZONING PERMIT APPLICATION PACKET. Submission Checklist

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

CITY OF EMILY VARIANCE APPLICATION

Septic Tank / Drainfield / Holding Tank Permit Application

PROCEDURE GUIDE AND APPLICATION FOR A DEVELOPMENT PERMIT TO CLEAR AND GRADE A PARCEL OF LAND

APPLICATION FOR A ZONING CERTIFICATE PLEASE PRINT OR TYPE

Planning&Development Fee Standards

The City of Daytona Beach Fee Schedule

the conditions contained in their respective Orders until January 1, 2025, at the discretion of the Director of Planning, Property and Development.

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

Waterford Owners Association Construction Guidelines

Zoning Permit Application

City of Sand Springs, Oklahoma Planning and Development Department Neighborhood Services Office

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

City of Wausau Building, Housing and Zoning Fee Schedule 2019

City of Wausau Building, Housing and Zoning Fee Schedule

Schedule of City Fees & Charges

Huntington Building Inspection

Marion County Board of County Commissioners

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

CONDOMINIUM REGULATIONS

City of High Point Development Fee Schedule

City of Midland Application for Site Plan Review

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application. Other: APPLICANT: Name:

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

RESIDENTIAL FERRY COUNTY BUILDING PERMIT CHECKLIST

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

NOTICE APPLICATION MUST BE FILLED OUT COMPLETELY.

ARCHITECTURAL CONTROL COMMITTEE SUBMITTAL REQUIREMENTS Submit to Teri Edwards at (O)

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Worcester Township Fee Schedule

BECKER COUNTY HIGHWAY DEPARTMENT 200 EAST STATE STREET DETROIT LAKES, MN 56051

Note to the Owner, Applicant & Agent:

MAGNOLIA SPRINGS SUBDIVISION, PHASE ONE

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

ARTICLE 7 UTILITIES AND EASEMENTS

TEMPORARY OUTDOOR SALES/SEASONAL EVENT PACKET

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

Mobile Homes on Private Property Permits Licence and Inspection Services

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

HOMEOWNER S PROCEDURES FOR FILING A BUILDING PERMIT APPLICATION FOR WASHINGTON COUNTY, MARYLAND

CITY OF TARPON SPRINGS, FLORIDA

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

ZONING BOARD OF ADJUSTMENT BOROUGH OF MOUNTAIN LAKES, NEW JERSEY. CHECKLIST Section 40-22

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

Appeals to the Board of County Commissioners Code standard as part of a project review Code standard without a project submittal $725.

Directions For Filling Out A CAMA MINOR Permit

SITE CONDOMINIUMS OR CONDOMINIUM SUBDIVISIONS

MEDICAL HARDSHIP. TEMPORARY USE PERMIT APPLICATION For a Mobile Home

MENARD COUNTY ZONING PERMIT APPLICATION (PLEASE READ BEFORE PROCEEDING WITH APPLICATION)

LOCATION AND EXTENT REVIEW FOR DEVELOPMENT OF PUBLIC FACILITIES (Revised 3/1/2017)

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

Plat/Site Plan Application

THE CITY OF RAYMORE, MISSOURI Single-Family Residential Zoning Districts

NOTE: FEES ARE PAYABLE BY CASH OR CHECK ONLY TO THE CITY OF FREDERICK

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

Hamilton County Building Department County Court House Room NE First Street Jasper, FL Phone (386) Fax (386)

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

This Ordinance is adopted under the authority and provisions of the General Statutes of North Carolina, Article 6, Chapter 153A 121.

Transcription:

Information Needed for a Building Permit To purchase a building permit for New Construction in Stephens County the following items are required: 1. A copy of a recorded plat of the property on which you intend to build, or if in a recorded subdivision the street name and lot #. 2. A copy of the recorded easement if the property does not front a county road. 3. A sketch or drawing indicating the approximate location of the proposed structure including the distance from property lines, creek, stream, branch or any body of water located on the property. 4. A basic floor plan layout with rooms, windows, doors, decks, etc (does not have to be scaled). 5. A copy of the approved septic tank permit, or if on sewer, a copy of the paid receipt or a letter indicating approval to tap on. 6. If driveway or any work abuts a State road or State right of way, a copy of the State issued permit prior to issuance of a County building permit. (contact Steve Kelly at GDOT 770-532- 5563). 7. A copy of the approved culvert permit, if required from the Road Department. To obtain a Commercial Building Permit Contact the Building Department. To obtain a building permit for exterior appurtenances connected to or attached to such building or structure the following items are required: 1. A sketch or drawing indicating the approximate square footage of the construction and the location of the proposed structure to the dwelling including the location from the property line. 2. A copy of the approved septic tank permit, or if on sewer a copy of the paid receipt or a letter indicating approval to tap on (if applicable). To obtain a mobile home permit: 1. A copy of the recorded plat of the property on which the home is to be set, or if in a subdivision, the street name and lot number 2. A sketch or drawing indicating the approximate location of the proposed structure including setbacks from the property line. 3. A copy of the recorded easement if the property does not front a County Road.

4. A copy of the approved septic tank permit, or if on sewer, a copy of the paid receipt or a letter indicating approval to tap on. 5. A copy of the location and relocation permit from the Tax Commissioner s office. Note: 1. No permit shall be issued for any lot not meeting the minimum lot ordinance. 2. 911 addresses will not be issued until the permanent driveway is in place. The driveway does not have to be paved or graveled but must be in its final permanent place at the time E911 Mapping office comes to assign the address. Electric, Gas, Mechanical or Plumbing Upgrades. 1. Letter noting scope of work to be performed. 2. Make and model of any new equipment. 3. Any and all requirements associated with upgraded system. Building: PERMIT FEES Stephens County uses a one-permit building system. This means the builder/owner pays all of the fees associated with the residential construction at the time the building permit is purchased. Residential Building Permit 1,000 sq. ft. or less $300.00 1,001 sq.ft. to 2,000 $450.00 2,001 sq.ft. to 3,000 $550.00 3,001 sq.ft. to 4,000 $800.00 4,001 and over $900.00 plus $0.20 per sq. ft. Plus: Decks / Porches 1,000 sq. ft. or less $50.00 1,001 and over $100.00

Building permit for exterior appurtenances, Mobile Home and Upgrades: Exterior Appurtenances - Unfinished garages, carports, swimming pools,etc. 600 sq. ft. or less $75.00 601 sq. ft. and over $150.00 Mobile Home Single Wide $75.00, Double Wide $150.00 Plus: Decks / Porches 1,000 sq. ft. or less $50.00 1,001 and over $100.00 Upgrades including: Electrical, mechanical, gas, plumbing. One Time Only $35.00 Commercial Construction Permit Fees Stephens County uses a one-permit building system. This means the contractor/owner pays all of the fees associated with the construction at the time the permit is issued. 1,000 sq. ft. or less $350.00 1,001 sq.ft. to 2,000 $500.00 2,001 sq.ft. to 3,000 $600.00 3,001 sq.ft. to 4,000 $850.00 4,001 and over $1000.00 plus $0.35 per sq. ft.

Agricultural/Farm Structure Permit Buildings 200 to 1000 $25.00 Buildings 1001 to 5000 $25.00 plus $.015 per square foot over 1000 Buildings Over 5000 $85.00 plus $.02 per square foot over 5000 Warehouse 1,000 sq. ft. or less $350.00 1,001 sq. ft. to 2,000 $500.00 2,001 sq. ft. to 3,000 $600.00 3,001 sq. ft. to 4,000 $850.00 4,001 and over $1000.00 plus $0.035 per sq. ft.

Re-inspection Fees: These fees are associated with re-inspections influenced by non-compliance of the requested inspection, not being ready for called in inspection, or other reasons for re-inspection: First re-inspection $25.00 (no charge if items on first inspection report are corrected at time of first reinspect) Second re-inspection $25.00 Third re-inspection $50.00 Fourth or more re-inspection $100.00 Replacement Permit Fees Renewal or Expired $100.00 To obtain a Certificate of Occupancy the following is required: 1. Satisfactory completion of all required inspections. 2. Payment of any outstanding fees. 3. A copy of the final septic permit from the Health Department. (It is the responsibility of the builder/owner to obtain the approved copy and provide it to the Building department). 4. Permanent and proper address numbers displayed in accordance with E-911. 5. A copy of the termite treatment affidavit. All building permit fees must be paid in cash or check at time of issuance and any re-inspection fees for any reason must be paid before any Certificate of Occupancy, Certificate of Completion, or Temporary Certificate is issued. The fees listed above are the current fees and may be adjusted by the Board of Commissioners or the Construction Board of adjustments from year to year.