The Importance of Performing Route Surveys in the State of Indiana. Presented to: March 6 th, 2013

Similar documents
The Right Approach to Right of Way Engineering

Land Surveys and Real Property Boundaries

Residential Major Subdivision Review Checklist

Residential Minor Subdivision Review Checklist

R/W PREQUALIFICATION ODOT, 3/14/2018

Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the

Presented by: Michael G. Geier, PLS Snyder & Associates, Inc.

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat

COUNTY OF ALBEMARLE APPLICATION FOR RURAL SUBDIVISION

Cross Reference: Instrument No. A State Parcel No Parcel: TEMPORARY CONSTRUCTION EASEMENT AGREEMENT

EASEMENT BASICS. Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations.

RULES OF THE GEORGIA STATE BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS CHAPTER APPLICATIONS TABLE OF CONTENTS

VIRGINIA DEPARTMENT OF TRANSPORTATION SURVEY SUBCOMMITTEE WHITE PAPER SURVEY IMPLEMENTATION PLAN MAY 15, 2009

PLANNING COMMISSION SUBDIVISION PLAT APPLICATION

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

CITY OF STRONGSVILLE PLANNING COMMISSION APPLICATION. PARCEL SPLIT and/or ADJOINMENTS

TOWN OF ROXBURY PLANNING BOARD

Preliminary Subdivision Application (Major) (Four (4) lots or more)

Standards for All Instruments of Conveyance

APPLICATION PROCEDURES FOR A PLAT AMENDMENT OR REVISION

Minimum Requirements. In Carroll County, Ohio

STONE COUNTY PRELIMINARY PLAT CHECKLIST. Note: Applications need to be in the office by 2 p.m. on the cutoff day.

Boundary Line Adjustment Application

Application for Preliminary Plat Checklist

Plat Checklist PLAT TYPES AND DESCRIPTIONS

SUBDIVISION APPLICATION

Lake County Planning, Building and Development Department

Sketch Plan 2018 Bargersville Plan Commission Application Kit

R/W PREQUALIFICATION ODOT, 3/14/2018 PROPERTY MAP SHEET

Auditor's Office Tuscarawas County

Secret and Forgotten Elements of Rule 12

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY IN SENECA COUNTY OHIO

SUBDIVISION APPLICATION

Kyle Eichhorn, PE, PS Project Manager

Easements, Establishments, Abandonments and Vacations

GENESEE VALLEY LAND SURVEYORS ASSOCIATION MINIMUM STANDARDS FOR A MAP OF A SURVEY. Effective Date: February 15, 2017

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

WASTEWATER BACKFLOW RELEASE PROCEDURES

Change In The Name Of Owner (s) Of Land.

Department of Development Services Engineering; Survey Plat Review Group SPRG

Township of Collier 2418 Hilltop Road Presto, PA 15142

BOUNDARY ADJUSTMENT APPLICATION

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

FINAL PLAN CHECKLIST

MINNESOTA ASSOCIATION OF COUNTYSURVEYORS MANUAL OF MINIMUM GUIDELINES FOR THE PREPARATION OF COUNTY HIGHWAY RIGHT-OF-WAY PLATS

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

OHIO ADMINISTRATIVE CODE CHAPTER Minimum Standards for Boundary Surveys in the State of Ohio

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

APPLICATION FOR FINAL PLAT APPROVAL

250 CMR: BOARD OF REGISTRATION OF PROFESSIONAL ENGINEERS AND LAND SURVEYORS DRAFT FOR DISCUSSION PURPOSES ONLY

DALLAS WATER UTILITIES WATER/WASTEWATER COVENANT

Gates County Planning and Zoning

Standards of Practice for Surveying in the State of Alabama

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

MnDOT Contract No Exhibit B. Scope of Work. Scope of Work

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY IN DARKE COUNTY, OHIO

PETITION FOR VOLUNTARY ANNEXATION Town of Apex, North Carolina

MINOR SUBDIVISION PLAT

SECTION 6 - APPROVAL OF PLATS. Whenever any subdivision of land is proposed, and before any permit for the

FINAL PLAT APPLICATION

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 1 HOUSE BILL 454* Short Title: Surveying and Plat Recording Changes. (Public)

RESCINDING A BINDING LOT AGREEMENT

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

CITY OF NOVI LAND DIVISION INSTRUCTIONS

WESTON COUNTY FINAL PLAT APPLICATION

Map Filing Law. 46: Effective date This act shall take effect January first, one thousand nine hundred and fiftyfour.

CHAPTER FINAL AND PARCEL MAPS

APPLICATION FOR FINAL PLAT APPROVAL (Major Subdivision)

COUNTY OF ALBEMARLE APPLICATION FOR FAMILY DIVISION. Family Division = $742 (Provide 5 copies of plat)

Easements, Establishments, Abandonments and Vacations

RE: File No. LD 1516 Certified Survey Map Tradewinds Parkway (B-R Enterprises of Madison, LLC)

REQUIREMENTS FOR ALL INSTRUMENTS OF CONVEYANCE IN HARDIN COUNTY, OHIO

Final Plat Approval of a Minor Subdivision Application Packet

The Filing Fee for a Minor Plat is $ PLUS $20.00 per lot created

Minor Subdivision Application

CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

LAND DEVELOPMENT CHECKLIST GREEN TREE BOROUGH Green Tree Planning Commission 10 West Manilla Avenue Pittsburgh, PA

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

DAWSON COUNTY MINOR PLAT REVIEW CHECKLIST $50.00 FEE PER PLAT REVIEW, $5.00 FEE FOR SCAN & CD FOR RECORDING

Conveyance Standards. Boundary Survey Requirements. Adams County, Ohio

COMMUNITY DEVELOPMENT DEPARTMENT

Instructions for Maps to Accompany Proof of Appropriation and Beneficial Use of Ground Water

GETTING YOUR ROW PROJECT STARTED RIGHT A WAY Best Practices. October 11, 2017 Best Practices October 11, 2017

SECTION SITE SURVEYS

ARTICLE 3 DEFINITIONS

Application for a Deminimus Development

Requirements for All Instruments of Conveyance in Logan County, Ohio

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

IC Chapter 12. County Surveyor

LAND PARCEL IDENTIFICATION FOR AUTOMATED LAND INFORMATION SYSTEMS

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

A Final Plat will be reviewed concurrently with any other development review application(s) that is required.

Administrative Application Duplex Subdivisions

BOROUGH OF HELLERTOWN 685 Main St., Hellertown PA Phone: Fax:

CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA 57701

Subdivisions. CITY OF OAK HARBOR Development Services Department

Certified Survey Review Instructions

Transcription:

The Importance of Performing Route Surveys in the State of Indiana Presented to: March 6 th, 2013 Parsons Cunningham & Shartle Engineers 317-837-9900 www.pcsengineers.com

Presented By: Chet Parsons, PE 35 Years of Experience chet@pcsengineers.com Grant Niemeyer, PLS 27 Years of Experience grant@pcsengineers.com Rodney Kelly, PLS 16 Years of Experience rkelly@pcsengineers.com

Questions What is a Route Survey? When is a Route Survey Mandated? What are the Advantages of a Non-Mandated Route Survey? What are the Minimum Standards of a Route Survey? What is Included in a Route Survey? What Types of Projects May Require a Route Survey? What Does a LCRS Look Like?

LCRS LOCATION CONTROL ROUTE SURVEY

What is a Route Survey? A Location Control Route Survey refers to surveys executed for the purpose of acquiring an interest along a linear corridor.

When is a Route Survey Mandated? INDOT & Local Public Agency (LPA) projects that require new Right of Way (with exception) *Exception - the term does not include surveys executed for acquisition parcels that are of even width and immediately adjacent to an existing title, easement, or right-of-way line and do not require a property survey in order to prepare an accurate legal description for the parcel.

What are the Advantages of a Route Survey? Current ownership and parcel identification of potentially affected owners Recreate control alignments from original project plans Cross references recorded LCRS with individual plats Common project coordinates for future Construction/ Right of Way layout Graphically shows relationship between route survey control alignment and section lines Establishes reference ties to recreate all alignments at a later date Limits client liability

What are the Minimum Standards of a Route Survey? Comply with Indiana Administrative Code Title 865, Rule 12 adopted June 12, 1988 Governs: Research Required Fieldwork Procedures Measurement Requirements Recording Monumentation

What is Included in a Route Survey? A Plat & Report Showing: Route Survey Control Line or Lines Apparent Boundary, Right of Way and Occupation Lines Current Deed of Record Section Lines Surveyor s Report

What Types of Projects May Require a Route Survey? Railroads Highways Waterways Electric Lines Pipelines Linear Transportation or Utility Routes

What Does a LCRS Look Like?

What Does a LCRS Plat Look Like? Known Easements Section Corner Information Control Line and Alignment Point Set Property Ownership Information Apparent Right-of-Way General Notes Control Line Reference Ties For Control Points and Section Corners Control Table with Coordinates in State Plane Values

What Does a LCRS Surveyors Report Look Like? CITY OF INDIANAPOLISCITY OF INDIANAPOLIS DEPARTMENT OF PUBLIC WORKS SURVEYOR'S REPORT SV-45 DEPARTMENT OF PUBLIC WORKS SURVEYOR'S REPORT SV-45

What are the Next Steps? Construction Plans Additional Right of Way Required Parcel Plat and Legal Description Appraisal / Buying Process Construction Completed Project

Construction Plans Typical Plan and Profile Sheet (Provided by Engineer)

Parcel Plat and Legal Description Instrument Number of the recorded LCRS The location of the parcel. Acreage of the proposed Instrument number of the Acquisition. affected parcel Instrument no. of of the the affected parcel Location of the Acreage Proposed Acquisition Parcel Parcel taking Alignment Points referenced in the LCRS Alignment from the LCRS Alignment from the LCRS Parcel taking Location of the Parcel Instrument number of the affected parcel Alignment Points referenced in the LCRS

Summary and Questions What is a Route Survey? When is a Route Survey Mandated? What are the Advantages of a Non-Mandated Route Survey? What are the Minimum Standards of a Route Survey? What is Included in a Route Survey? What Types of Projects May Require a Route Survey? What Does a LCRS Look Like? Chet Parsons, PE chet@pcsengineers.com Grant Niemeyer, PLS grant@pcsengineers.com Rodney Kelly, PLS rkelly@pcsengineers.com