Section I General Information

Similar documents
California-Specific Professional Land Surveyor Examination Test Plan

ARKANSAS DEPARTMENT OF TRANSPORTATION REQUEST FOR LETTERS OF INTEREST

MnDOT Contract No Exhibit B. Scope of Work. Scope of Work

Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the


General Instructions For Surveys and Plans Outside the Provincial Survey System

250 CMR: BOARD OF REGISTRATION OF PROFESSIONAL ENGINEERS AND LAND SURVEYORS DRAFT FOR DISCUSSION PURPOSES ONLY

Standards of Practice for Surveying in the State of Alabama

Rule 21 STANDARDS OF PRACTICE FOR SURVEYING

UTAH COUNCIL OF LAND SURVEYORS STANDARDS OF PRACTICE FOR BOUNDARY SURVEYS

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 1 HOUSE BILL 454* Short Title: Surveying and Plat Recording Changes. (Public)

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

VIRGINIA DEPARTMENT OF TRANSPORTATION SURVEY SUBCOMMITTEE WHITE PAPER SURVEY IMPLEMENTATION PLAN MAY 15, 2009

R/W PREQUALIFICATION ODOT, 3/14/2018

201 KAR 18:150. Standards of practice.

SECTION SITE SURVEYS

Senate Bill 297 Ordered by the Senate March 2 Including Senate Amendments dated March 2

78th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. Senate Bill 297

Charter: Surveyor. Objectives and Standards

The Boundary and the Effects of Cadastral Surveying in Cyprus

2401 S. E. Monterey Road, Stuart, FL Plat Application Martin County Growth Management Department

Work Type Definition and Submittal Requirements Work Type: Right-of-Way Surveys / Land Surveys

Cadastral Framework Standards

Escrow Basics. Chapter 6. Learning Objectives

Our policy of providing clients a personal service has been rewarded by a wide and diverse client base with high-level repeat commissions.

8726. Land surveying defined

Field surveying inspection using tablets

Board Session Agenda Review Form

Rules for Cadastral Survey 2010

FIG-WB Forum on Land Administration and reform in Sub-Sahara Africa

2001, A GIS SJ,'ATIALODDESSY. James G. Donahue, L.S. PBS&J,Inc Alton Parkway Irvine, CA 92714

Refinement of Cadastral Maps

New Mexico Board of Licensure for Professional Engineers and Professional Surveyors

PROPERTY MANAGEMENT OFFICER 1 PROPERTY MANAGEMENT OFFICER 2

FINAL PLAT APPLICATION

Part 901 Chapter 19: REINSTATEMENT OF LICENSURE OR CERTIFICATION AFTER REVOCATION

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

OFFICE OF REAL ESTATE

Land Surveys and Real Property Boundaries

BOUNDARY LINE ADJUSTMENT APPLICATION GUIDE

GENERAL. All authors of conveyance instruments are encouraged to contact the County Auditor s Office well in advance of transfer.

SKETCH OF BOUNDARY SURVEY ALTA / ACSM LAND TITLE SURVEY

New Jersey Administrative Code Title 13, Chapter 40 State Board of Professional Engineers and Land Surveyors

Ⅱ-2. The Resurvey Project

Ordinance on Official Cadastral Surveying

Conducts informal meetings with property owners during appeal season in reviewing property assessments and information in property file.

PRELMINARY PLAT CHECKLIST

STONE COUNTY PRELIMINARY PLAT CHECKLIST. Note: Applications need to be in the office by 2 p.m. on the cutoff day.

GPS For Land Surveyors By Jan Van Sickle

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005

A Geocoded Cadastral Fabric as a Precondition for a Sustainable Land Management System

SUBDIVISION APPLICATION

Volume Three Appendix 7. Scheme Plan and other subdivision requirements

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

Phase I Environmental Site Assessments for Corridors

PERPETUATION OF SURVEY MONUMENTS FOR ALL PUBLIC IMPROVEMENT AND LAND DEVELOPMENT PROJECTS

Criteria for Appeals of Flood Insurance Rate Maps. November 30, 201 1

Waseca County Planning and Zoning Office

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

Map Modernization State Business Plan for Ohio January 2004 Attachment #2

PROJECT AMENDMENT TO THE AGREEMENT DRAFT

Anatomy Of An Appraisal

M-43 CORRIDOR OVERLAY ZONE

7. EASEMENTS Label Established Lines Affecting Tract and/or Mentioned in its Legal Description:

of Professional Surveyors

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

Application for Preliminary Plat Checklist

Analytical Cadastre in Israel: Restoring Land Boundaries Based on Photogrammetric Tools

FGDC SUBCOMMITTEE FOR CADASTRAL DATA. October 2004 Albuquerque, New Mexico Meeting

REQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties

Minimum Requirements. In Carroll County, Ohio

PROPERTY ASSESSMENT KNOWLEDGE

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY

DWR REAL ESTATE COORDINATION PLAN

I. Requirements for All Applications. C D W

MINOR SUBDIVISION APPLICATION

Presented by: Stewart Information International, Inc. Jack McKenna

Request for Proposals For Village Assessment Services

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY IN DARKE COUNTY, OHIO

ASPECTS OF A 3D CADASTRE IN THE NEW CITY OF MODI IN, ISRAEL

REQUEST FOR PROPOSAL RFP # TOC17-001

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

Packet Contents: Page #

PERMIT AND SUBMITTAL REQUIREMENTS (PR)

Section 821. PRESERVATION OF LAND MONUMENTS, CONTROL POINTS, AND PROPERTY CORNERS

ALEXANDRIA TOWNSHIP METES & BOUNDS SUBDIVISION APPLICATION. Name of Applicant Phone. Property Address (E911#) Mailing Address Local Phone

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

Appendix I Definitions of Inspections and Surveys of Buildings (CIC Explanatory Leaflet)

Request for Action form is also defined as an application to be considered by the Planning Commission.

Aspect of preliminary activities in the function of supporting NSDI

Delaware County Transfer Standards

Scheme of Service. for. Housing Officers

COUNTY GOVERNMENT OF LAMU Department of Land, Physical Planning, Infrastructure & Urban Development

A Radical Solution for the Cadastre Problem in Egypt Using Integrated GPS-GIS System

City of Suwanee Development Regulations ARTICLE 10 PLAN AND PLAT SPECIFICATIONS

MAP. METHODS AND ASSISTANCE PROGRAM 2015 REPORT El Paso Central Appraisal District. Glenn Hegar Texas Comptroller of Public Accounts

Franklin County REQUEST FOR QUALIFICATIONS. Engineering and Real Estate Acquisition Services for

Establishing Efficient Cadastral Surveying Plan in Accordance with Introducing World Geodetic Reference System in Korea

THE PURPOSE OF MEASUREMENTS IN BOUNDARY SURVEYS. (THE ETERNAL SUVRVEY QUESTION: HOW CLOSE IS CLOSE ENGOUGH?) By. Norman Bowers, P.S. & P.E.

REGISTRATION OF PROPERTIES IN STRATA

Transcription:

General Information Table of Contents A. Introduction... I-2 1. Purpose... I-2 2. Scope... I-2 3. Maintenance... I-3 4. Units... I-3 B. Public Relations... I-3 1. General Public... I-3 2. Property Owners... I-3 C. Surveying... I-4 1. Definition... I-4 2. Importance of Surveys... I-6 3. Surveying Classifications... I-6 a. Control Surveys... I-6 b. Photogrammetric Surveys... I-6 c. Planimetric and Topographic Surveys... I-6 d. Land Surveys... I-6 e. Construction Surveys... I-6 f. As-Built surveys... I-7 D. Surveying within WYDOT... I-7 1. Responsibility... I-7 2. Preliminary Surveys... I-7 3. Construction Surveys... I-7

General Information I. General Information A. Introduction This version of the Survey Manual has resulted in significant format and content revisions to each section. These revisions are the result of equipment upgrades and procedural changes within the Photogrammetry & Surveys Section (P&S). The construction and land surveying operations are also no longer discussed in this manual. For information on construction surveys or land surveys consult the Construction Manual or the Right-of-Way Program. 1. Purpose The primary goal of this manual is to establish uniform surveying procedures and to define accuracy standards. By standardizing the tasks and procedures involved in data collection, the overall efficiency of the survey process is greatly increased. The main tasks involved in the creation of project mapping files include: Establishing project control monuments Collecting preliminary and supplemental surveys Editing and adjusting survey data Collecting photogrammetric data Merging collected data This manual is intended to be used as a reference in the implementation and administration of surveying projects. In the case of conflict between the requirements of this manual and the requirements of contract documents, the contract documents shall take precedence. 2. Scope The Survey Manual provides general instructions for the many activities involved in a typical WYDOT project. The activities are defined in the survey meeting and are assigned to programs or sections within WYDOT or private consulting firms. These activities include but are not limited to: Creating land ownerships and control (LOCO) maps Obtaining permission to survey Setting project control monuments Placing photo control targets Establishing project control coordinates Collecting natural and man-made features Creating planimetric maps and digital terrain models (DTM s) More detailed instructions concerning the use and operation of survey equipment are discussed in the Data Collection Manual. For other specific questions involving the preliminary survey process, contact P&S. I-2 Revised November, 2011

3. Maintenance It is requested that all users of the Survey Manual review the content and submit recommendations for improvement. Suggestions may consist of illustrations and/or notes to be considered for future revisions of the manual. Any suggestions should be submitted to the State Photogrammetry & Surveys Engineer. 4. Units Whenever possible, dual units are included in this manual. English units are followed by the metric equivalent in parentheses. It is important to note that all WYDOT surveys use the U.S. survey foot and not the international foot. Refer to Appendix G for more information on English and metric system units and their conversions. B. Public Relations 1. General Public The Wyoming Department of Transportation (WYDOT) is a public service organization and each employee is a representative of the Department. WYDOT s relationship with the general public, property owners, utility and railroad companies, and other governmental agencies can have a major impact on each project. Because the survey crew often works within the highway right-of-way, they are one of the most visible groups representing WYDOT. Their conduct on the job and their involvement with the general public are extremely important in maintaining a positive public opinion. 2. Property Owners When the collection of survey data occurs outside of the right-of-way, permission to survey will be required. The Photogrammetry & Surveys Section will typically initiate contact with property owners to obtain the permission to survey. However, this activity may be delegated to the Resident Engineer s Office or a consultant. During the course of daily survey activities, the survey crew may also have contact with landowners. It is the survey crew s responsibility to assure that the landowner (or the landowner s agent) is notified prior to each entry onto their property (if requested). It is also the survey crew s responsibility to maintain the best working relationship possible with these individuals. Prior to arriving at the jobsite, every survey crew member should be briefed on the location, scope, and preliminary schedule of the project. All of this information can be obtained from the final survey meeting report, which is made available to all involved personnel. A copy of the survey meeting report, LOCO map, and permit to survey forms should be kept in the project folder and taken to the jobsite. Specific requests or requirements made by the land owner are written in the remarks section of the E-48 form. These requests should be strictly followed to maintain a good working relationship. Refer to Section VI, Preliminary Surveys, in this manual for more information on the survey meeting report and permission to survey forms. Occasionally, a landowner or a member of the general public will inquire about the nature of a project. Most of the questions can be anticipated and discussed beforehand with the entire crew. The answers should always be as concise as possible without speculation or guesswork. Occasionally, requests will be made for information about which the surveyor Revised November, 2011 I-3

General Information has not been informed or does not have the authority to answer. In these situations, the surveyor should contact the Resident Engineer or the State Photogrammetry & Surveys Engineer to obtain an appropriate answer. The information should then be relayed to the questioner as soon as practical. C. Surveying 1. Definition In general, surveying is the technique of accurately determining the relative location of points on or near the surface of the Earth. More specifically, surveying is the science of making measurements, relative to a known datum or datums. The measurements are used to establish horizontal and vertical positions of survey monuments, legal boundaries, topographical features, etc. Surveyors often use elements of geometry, engineering, trigonometry, mathematics, physics, and law to accomplish their tasks. There are two general types of surveys, geodetic and plane. Geodetic surveys are performed on an ellipsoid to make precise measurements over large areas. The ellipsoid is a theoretical curved surface approximating the size and shape of the Earth. GPS equipment and methods are generally used when performing this type of survey by measuring radio signals emitted from orbiting satellites to determine relative positions. Typically, vertical positions are measured relative to mean sea level by differential leveling methods. Figure I-1. GPS receiver and antenna. Plane surveys are performed on an assumed plane to compute horizontal positions. For small areas, the surface of the Earth can be approximated by a flat plane. However, plane surveys performed on larger areas require a correction factor to account for the Earth s curvature. Conventional (or optical) surveying equipment is generally used to measure distances and angles to determine relative positions. As with geodetic surveys, vertical positions are determined relative to mean sea level. I-4 Revised November, 2011

Figure I-2. Digital level. Figure I-3. Optical total station. Revised November, 2011 I-5

General Information 2. Importance of Surveys Surveying provides the basic framework for the mapping, designing, and constructing activities inherent to transportation facilities. With each surveying project, the surveyor must be aware of the associated accuracy requirements. They must also understand how to achieve those requirements through methodology and instrumentation. To a great degree, the quality and cost effectiveness of the completed project depends upon properly performed surveys. 3. Surveying Classifications The nature of each survey will determine the accuracy requirements, which in turn will dictate the selection of surveying instruments and procedures. Refer to Section VIII, Survey Standards, for accuracy requirements concerning the collection of specific mapping features. WYDOT surveys may include but are not limited to the following types of surveys: a. Control Surveys Control surveys are performed to establish horizontal and vertical coordinates for a network of monuments. The project control provides the basis for all surveys from preliminary collection to construction staking. Because of this, accuracy is extremely critical when performing these surveys. b. Photogrammetric Surveys Photogrammetric surveys use aerial photographs to locate features on the surface of the Earth. The position of each feature is assigned horizontal and vertical coordinates and included in the project mapping. c. Planimetric and Topographic Surveys These surveys provide measurements that define the position and elevation of natural and man-made features within the project corridor. The collected data is plotted at a specific scale in the development of computer generated planimetric maps and three dimensional (3-D) terrain models. The design of roadway elements is based on the mapping files created by P&S. d. Land Surveys Land surveys, also known as cadastral surveys, are used to locate original land boundary corners, verify their positions, and re-establish if necessary. The first stage in a land survey is to research relevant documentation. These records include land titles (or deeds), easements, survey monuments, and any public or private records. Land surveys are required to be performed by or under the supervision of a Professional Land Surveyor registered in the State of Wyoming. The Right-of-Way Program should be consulted for additional requirements of the land survey. e. Construction Surveys A construction survey is used to locate and then stake the positions of various roadway elements. These items include alignments, bridges, drainage structures, signs and other objects for subsequent installation or construction. Construction surveys also provide the means to measure or compute various pay items. For more information on construction surveys consult the WYDOT Construction Manual. I-6 Revised November, 2011

f. As-Built surveys As-built or as-constructed surveys are performed after the construction project has been completed. The survey is used to verify that the project was built to the plan specifications or to locate modifications made during construction. D. Surveying within WYDOT 1. Responsibility Per Operating Policies 18-8 and 18-16, The State Photogrammetry & Surveys Engineer is responsible for the timely and accurate collection of all preliminary surveys. Also defined in this policy, the District Construction Engineers and the Construction Program will determine and develop their own construction surveying methods and procedures. The Photogrammetry & Surveys Section is responsible for defining procedures used for collecting preliminary survey data. P&S is also responsible for developing a set of survey codes that define natural and man-made features. All preliminary survey data is analyzed, edited, and adjusted before it is included in the planimetric mapping files and terrain models. 2. Preliminary Surveys During the reconnaissance meeting, the type of preliminary survey (aerial or field collected) and mapping limits are determined. The specifics of each surveying activity are then covered in detail during the survey meeting. Once the surveying tasks have been assigned and a completion schedule for each task has been determined, the preliminary survey phase can begin. As mentioned earlier, survey data collected during the preliminary phase is used to create mapping files that initiate the roadway design process. Refer to Section VI, Preliminary Surveys, for a more detailed description of the preliminary survey process. 3. Construction Surveys After the final design has been completed and the project contract has been awarded, construction surveys establish lines, grades, and elevations. All construction surveys are based on the project control previously established by P&S. The construction staking surveys delineate work areas and provide a guide for the contractor during construction activities. Construction staking also enables WYDOT personnel to compute quantities of pay items and determine compliance with the design and contract specifications. Revised November, 2011 I-7