Caribbean Naval Base Relocation Project

Similar documents
Scheme of Service. for. Housing Officers

ANALYST INFO PACK. Significant Accounting Policies

BOROUGH OF POOLE BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016

Presenter: Arch. Emma Miloyo President (Architectural Association of Kenya)

Land Consolidation in EU Rural Development Policies in Lithuania

We pursue investments that offer highly attractive returns through Real Estate Developments in large urban areas

PERLAS: PROPOSED PHILIPPINE INTERNATIONAL CRUISE TERMINAL

Royal Pier Waterfront, Southampton. Financial Viability Assessment

Real Estate Strategic Plan: Port Commission Final Presentation

Strengthening Community. Building Opportunity

NAVAL AIR STATION (NAS) PATUXENT RIVER Potential EUL Project Proposed Modernized Work Campus

HEC Sub-committee on Harbour Plan Review. Thirteenth Meeting

Value-added P3 s: two case studies Long Beach Civic Center & Los Angeles Convention Center

Initiatives of Vilnius City Municipality on renovation of Dwelling Houses Programme Renew the house renew the City

Statement of Proposal

Business and Property Committee

HOUSING AUTHORITY. of the City of Beau1nont, Texas

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 );

PPP Project Realization Roadmap for Public Entities. based on the PPP Act and the Act on Concessions for Construction Work or Services

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Harrisonburg Redevelopment and Housing Authority REQUEST FOR PROPOSALS Architectural and Design Services Posted August 1, 2018

URBAN DEVELOPMENT CORPORATION INVESTMENT PACKAGE SEASIDE AT ROSE HALL, MONTEGO BAY, ST. JAMES

FINANCING SUPPORT OF HOUSING CONSTRUCTION IN RURAL AREAS AND DEVELOPMENT OF MORTGAGE CREDITING SYSTEM IN UZBEKISTAN

Project Charter Project Name: Conservation Subdivision Review

SBD 6.2 DECLARATION CERTIFICATE FOR LOCAL PRODUCTION AND CONTENT FOR DESIGNATED SECTORS

PROCUREMENT DEPARTMENT 2 MONTGOMERY STREET, 3 rd FLOOR JERSEY CITY, NJ ADDENDUM # 4, Revised TO PROSPECTIVE RESPONDENTS TO RFQ# 31224

CALL-OFF PROCUREMENT OF SALES AGENT FOR THE DISPOSAL OF THE SITE FORMING THE ROYAL MARINES MUSEUM NEAR EASTNEY BARRACKS, HAMPSHIRE

Sample Procurement Plan

Presentation Material

Gustavo Jorge Labiossière Loyola. Chairman ATTACHMENT CHAPTER I. Of the Lease Practice Agreements

Governor of Lagos State

IAG Conference Accounting Update Emerging issues in the public sector 20 November 2014 Michael Crowe Yannick Maurice

PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008

SOCIAL HOUSING THE WAY FORWARD

DEVELOPMENT OF AMUSEMENT PARK WITH WATER RIDES AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY

Delivering the defence estate

Systematic Land Information Management (SLIM)

Royal Institute of British Architects Report of the RIBA visiting board to Universidad Pontificia Bolivariana

Revised translation by legal affairs Department CIB/CDC

ToR Tender Specifications

TOWN OF MANSFIELD RULES AND REGULATIONS FOR THE EXTENSION OF PUBLIC SEWERS

ANNEX DEFINITION OF THE METHODOLOGY TO BE FOLLOWED BY THE SERVICES OF THE COMMISSION FOR PROSPECTING AND NEGOTIATING FOR BUILDINGS

PROPOSED METRO JOINT DEVELOPMENT PROGRAM: POLICIES AND PROCESS July 2015 ATTACHMENT B

Real Estate and Construction Law investing in Saudi Arabia

The Multipurpose Marine Cadastre A Tool for Planning & Decision Making in the Marine Environment

Understanding Texas TIRZ Statute Chapter 311 Texas Tax Code

Safe Waterfront Access, PID Council Report -2 - May 10, 2016 BACKGROUND

REDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS

Rent Setting and Service Charge Policy (Social and Affordable Properties)

Real Estate Reference Material

Chapter 3: A Framework for a National Land Information Infrastructure

S. SURFSIDE DRIVE - PORT HUENEME, CA

EXHIBIT A. City of Corpus Christi Annexation Guidelines

QLDC Council 30 April Report for Agenda Item: 7

FOR SALE. Two exceptional development sites in the heart of Britain s Ocean City

APPENDIX A BABERGH AND MID SUFFOLK JOINT AFFORDABLE HOMES 3-YEAR ROLLING DEVELOPMENT STRATEGY COMMENCING 2017

CPACE Financing Overview

ARCHITECTS BRIEF (development year to RIBA stage 3 with option to progress to 7)

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

ABSTRACT Land Administration System in Lithuania

Procurement Plan. Prior Review Threshold (US$) 1. ICB and LIB (Goods) USD 3,000,000 All 2. NCB (Goods and Nonconsultant prior review by the bank

Tax Foreclosed Properties. Economic Development Committee October 15, 2012

LIVE STREAMING & AUDIO RECORDING. Now In Progress

DESIGN PUBLIC HEARING FEBRUARY 9, ABIGAIL ADAMS MIDDLE SCHOOL Auditorium WEYMOUTH, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Course Number Course Title Course Description

Transit-Oriented Development Specialized Real Estate Services

ST. TERESA S GARDENS REGENERATION PARTNERSHIP

CURRENT THROUGH PL , APPROVED 11/11/2009

Report No.: ISDSA15389

Rent Setting. Date: March 2015 Version: 1. Document Reference: Document Owner: Bill Henderson. See also: Date last reviewed: March 2015

HERSHEY COMMUNITY CENTER

FOR LEASE Cherry Avenue Long Beach, CA 90807

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 14, 2018

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005.

REPUBLIC OF ALBANIA THE ASSEMBLY. LAW No. 9235, dated ON RESTITUTION AND COMPENSATION OF PROPERTY

Progress on the government estate strategy

Community Wind Project Development

REQUEST FOR PROPOSALS (RFP) SECTION 8 CONTRACT ADMINISTRATION SERVICES

Governing Body 323rd Session, Geneva, March 2015

RHLF WORKSHOP The National Housing Code

Future Canadian Embassy, Current state 130 rue du Faubourg Saint-Honoré, Paris

GOVERNMENT REGULATION OF THE REPUBLIC OF INDONESIA. NUMBER 38 of 2008 REGARDING

NORTHWEST TERRITORIES HOUSING CORPORATION

DISCLOSEABLE AND CONNECTED TRANSACTIONS QIANHAIWAN EQUITY TRANSFER AGREEMENT AND LAND USE RIGHTS CONFIRMATION CONTRACT

Community Occupancy Guidelines

AGENDA STAFF REPORT. CEO CONCUR C. C R C B Concur No Legal Objection Discussion 3 Votes Board Majority

Riigi Kinnisvara AS /Estonian State Real Estate Ltd/

The Berkshire Building

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET REPORT 7 th November 2017

Republika e Kosovës Republika Kosovo-Republic of Kosovo Kuvendi - Skupština - Assembly

CIRCULAR On strategic environmental assessment, environmental impact assessment, and environmental protection plans (*)

Use of data in Ukraine for sustainable economic growth. Oleksandr Maliuk State Service of Ukraine for Geodesy, Cartography and Cadastre

The Characteristics of Land Readjustment Systems in Japan, Thailand, and Mongolia and an Evaluation of the Applicability to Developing Countries

Strathfield Local Environmental Plan 2012

State Highway Revocation: Policy and Guidance

Neighborhood Line Extension Program

Protecting the Government's Interests When Subcontracting With Contractors Debarred, Suspended or Proposed

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT

4/2018 Labour s Green Paper: Housing For The Many

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows:

Transcription:

Caribbean Naval Base Relocation Project

MAIN GOALS Provide to the Colombian Navy with a modern and improved Naval Base Consolidate Cartagena as the cultural and touristic capital of the Caribbean

Agenda 1. Location 2. Procurement Mechanism 3. Timeline 4. Naval Base Features 2.1. Model scheme 2.2. Studies 2.3. Images 4. Real Estate Development 5. The Galleon Museum

LOCATION

LOCATION COLOMBIA NAVAL BASE Current Base Land Area: 32 Ha CARTAGENA

PROCUREMENT MECHANISM

Procurement Mechanism The mechanism established to structure the execution of the project resembles the PPP (public-private partnership) scheme of a private initiative, divided in two phases: PHASE 1 (by invitation): includes development of studies and designs of both, the Naval Base and the real estate development project, in order to define: a) The land where the Base is going to be relocated to: must meet all the technical, environmental, social and economic requirements and include the design of the 60% of the new base. b) Land value of the current Base location: must be based on the real estate potential in accordance to the land uses established in the proposal. c) Financial model: allows to establish budget and financial closure of the project. Ensures that the design, construction and purchase of new land can be funded with the value of the current Naval Base land. PHASE 2 (by invitation): Execution of the New Base Project - relocation and real estate development project * Costs of the studies and designs must be assumed by the originator of the proposal (bidder).

Selection Criteria Bidders must certify the following enabling requirements : 1. Juridical ability The foreign legal persons must accredit its existence and legal representation with the suitable document issue by the competent authority in the country of its legal domicile not older than three (3) months from the date of filing of the Offer, in which it is evidenced that the legal representative does not have limitations to contract obligations in name of the legal person, or provide the authorization from the Board of Directors or similar competent body that authorizes it. 2. Experience The Bidder must accredit experience fulfilling the totality of the following requirements: 1. Contracts for design of military bases or high security installations for armed forces and national defense. 2. Contracts for urban renewal with cultural and entertainment developments and emphasis in creation of public space. 3. Contracts for design of Cruise ports or terminals. 4. Contracts for management of construction programmes of buildings for military use. 5. At least a contract for design or construction of urban routes. 6. To have obtained at least two (2) environmental licenses approved in projects of marine impact. 7. Contracts aimed to the juridical structuring of infrastructure for port or maritime or real-estate projects. 8. Contracts for the financial structuring in at least three (3) projects that have obtained a successful financial closing.

SELECTION CRITERIA 3. Minimum technical team PROJECT MANAGER (20 years of experience) ENVIRONMENTAL DIRECTOR (15 years of experience) TECHNICAL DIRECTOR (15 years of experience) FINANCIAL AND ECONOMIC DIRECTOR (15 years of experience) LEGAL DIRECTOR (15 years of experience) SOCIAL DIRECTOR (15 years of experience) In addition, a professional with postgraduate degree and 8 years of professional experience related to the following activities: - Real Estate - Geology - Oceanography - Military Engineer - Public spaces - Public services - LEED Consulting - Aeronautics - Hydrology - Ports - Electricity - Landscaper - Topography - Risks

SELECTION CRITERIA INDICATOR FORMULA REQUESTED RESULT 3. Financial Capability Will define whether the proposal is ENABLED or NOT ENABLED. Equity Liquidity Official Budget (PO) / Total Equity (PtT) Current Asset (ACC) / Current Liabilities (PaC) >=50%PO ENABLED / NOT ENABLED >= 1,0 ENABLED / NOT ENABLED Won t receive any score or points The participant must present his Financial Statements (as of December 31 st of 2016), duly certified, through which the following indicators will be verified: -Balance sheet -Income Statement Indebtedness Working Capital Total Liabilities (PaT) / Total Assets (TDA) Official Budget (PO) / (Current Asset (ACC) - Current Liabilities (PaC)) <70% ENABLED / NOT ENABLED =40%PO ENABLED / NOT ENABLED

PHASE 1 FORMULATION AND STRUCTURING PHASE 2 EXECUTION Identify and value potential real estate development Establish residual value of real estate development (in the land where the Base is currently located) CURRENT LOCATION Identify and value land for relocation GOAL Elaborate relocation feasibility studies. EXECUTION RIGHT OF PREFERENCE TO IMPROVE THE PROPOSAL Requirements to locate the New Naval Base Preliminary project designs (60% advance) Minimum specifications of the New Naval Base NEW NAVAL BASE EVALUATION COSTS PAYMENT Closed invitation: Firms with experience in construction of naval bases. + Firms with experience in real estate developments (convention centers, amusement parks, casinos, aquariums, marinas, etc). Agency s TRUST $ NAVAL BASE LOT Bidding documents establish technical and financial capability requirements to participate, as well as the evaluation criteria. Vo.Bo. EVALUATION (THIRD)

AGREEMENT INTERINSTITUTIONAL AGREEMENT SIGNED BETWEEN THE NATIONAL MINISTRY OF DEFENSE NATIONAL NAVY (MND) AND THE NATIONAL REAL ESTATE AGENCY VIRGILIO BARCO VARGAS (ANIM), FOR THE IMPLEMENTATION OF THE INTERADMINISTRATIVE AGREEMENT 17 of 2017 PHASE 1 AGREEMENT MND - ANIM PROCESS OPPENING (CLOSED BIDDING) SELECTION PROCESS 1ST PHASE TECHNICAL -OCEANOGRAPHICS -PRELIMINARY PROJECT DESIGN -BUDGET FINANCIAL CLOSURE TECHNICAL AND FINANCIAL VIABILITY CONCEPT Pledge of land transfer Agreements Government to Government (MND ) Feasibility, Technical, Financial and Legal FINANCIAL LAND VALUATION REAL ESTATE POTENTIAL END NO VIABILITY YES

AGREEMENT PHASE 2 END NO VIABILITY YES CONSTRUCTION AWARD CONTRACTOR SELECTION PROCESS PUBLISHING OF VIABILITY ASSESSMENT COMPLIED TERMS LOT TRANSFER TECHNICAL ASSESSMENT Responsible of structuring: Preferential right option If the preference right is rejected: studies must be paid by the developer Agreements (signed March 2, 2017): MND, District of Cartagena and ANIM: Naval Base relocation, as well as formulation, structuring and development of a real estate project in Bocagrande. District of Cartagena, ANI and ANIM: Technical support in viability of infrastructure and real estate management projects related to transport and urban development.

TIMELINE Budget Closure Agreement Conditions to transfer land ownership to Agency s Trust land ownership transfer to trust Proposal Handover Award June July August Sept October Nov. Dic. Jan Feb March April May June July 2017 2018 CONPES Studies and Design, Technical and Financial Feasibility Phase 2 Invitation to participate Phase 1: Studies and Designs

NAVAL BASE

MODEL SCHEME Identify Colombian Navy (Naval Base ARC Bolívar) needs New Base location and design High Level Requirements Must be located in the center zone of the Caribbean coast. Design conceived from the needs of the army fleet Infrastructure capacities tailored to army's forces structure 2030. Logistics services platform must be thought as a cost reduction-oriented asset management process. Should represent an improvement of the conditions and quality of life of officers, crew and officials Minimization of environmental impact.

NAVAL BASE Urban approach overview New Naval Base Approximate land Area. 134 Ha

STUDIES PHASE 1 pre-feasibility Goal: 3 location options + Preliminary coastal and oceanic study of the zone + Navigation and maneuverability assessment + Terrestrial conditions assessment PHASE 3 Goal: design and formulation + Design the Technical, Architecture and Urban Project for the New Caribbean Naval Base PHASE 2 feasibility Goal: choose 1 location Zoning and asses site conditions: PHASE 4 Goal: structuring + Estimated budget + Environmental + Social + Land regulation and use (normative) + Economic - strategic + Risks assessment

NAVAL BASE ACCOMMODATION FOR SUBOFFICIALS View from the courts

NAVAL BASE - TRAINING SCHOOL View to the swimming pools

NAVAL BASE ACCOMMODATIONS FOR SENIOR NAVAL OFFICERS

NAVAL BASE SERVICES View to the Shopping Center

NAVAL BASE - SERVICES School View

NAVAL BASE HOUSING FOR JUNIOR NAVAL OFFICERS Aerial view

NAVAL BASE HOUSING Housing view

NAVAL BASE HOUSING ADMIRALS AND BASE COMMANDER 3D view

REAL STATE DEVELOPMENT

Potential Development Proposal HOTEL 111.838 Meters DOCK 60.630 Meters AMUSEMENT PARK 85.738 Meters Public space: 136.913 m2 44% of the property + Free area: 108.646 m2 20% - 41 % of the property MUSEUM GALLEON 22.878 meters built HOTEL, OFFICES, CASINO 75.458 Metres CRUISE PORT 111.838 Meters CONVENTION CENTER 20.210 Meters ARENA (events) 69.561 Meters AQUARIUM 22.878 Meters

Potential Development Proposal PROYECTO BASE NAVAL DE CARTAGENA

Potential Development Proposal

Potential Development Proposal

LAND REGULATORY AMENDMENTS TREATMENT AND LAND USE Consolidation Treatment with Institutional Use (Naval Base) Development Treatment: incorporating allowed uses in the zone where the Base is located Cartographic imprecision It is amended through Urbanization License which establishes the development treatment of the lot (land). According to the Cartagena s POT (Territorial Ordering Plan), naval base footprint 5/5 Urban ground USE: Institutional TRADE ACTIVITY: 2 AND 3 SECTOR: historical and urban and architectural preservation ARTICLE 252 OF THE POT: INSTITUTIONAL NAVAL BASE 3. NAVAL BASE : It is located within the institutional activity number 3: great environmental and urbanistic impact. Requires large-scale specialized buildings, special public services infrastructure and covers the entire territory of the district, including neighboring municipalities. MINIMUM DEVELOPMENT TREATMENT: 40% CESSION OVER THE LOT (LAND) Source: National Real State Agency Virgilio Barco TOTAL LOT AREA 311.207,45 100% CESSION 40% 124.482,98 40% 60% green and public zones 74,368,02 24% 20% communal equipment 24,789,34 8% 20% roads 24,789,34 8% NET URBAN AREA 185,920,04 60%

Goals - Expected Impacts The annual number of international tourists in Cartagena could exceed 2.4 million Could generates about 16.800 direct jobs and more than 50 thousand indirect jobs (1.7 times the number of unemployed in the city) Project s investment is been estimated around USD $2,700 million More than 650 new annual cruisers could be arriving to the city of Cartagena. Around 1'300,000 passengers embarking from project s dock Could generates demand for more than 800 hotel rooms in the sector of Boca Grande. Could generates about 9,700 new additional hotel rooms demand all over Cartagena New hotel offer could generates about 39,000 jobs (equivalent to the current number of unemployed in Cartagena) Investment in new hotel offer, outside the project, is been estimated around US $ 1.2 billion Cartagena s could generates around the third part of the foreign currency coming in to the country s economy (USD $ 1.5 billion per year) Current account deficit could be reduced by 12% (full operation project) Foreign currency coming in to into the country as exports (personal travel), could increase by 32%

THE GALLEON MUSEUM

TRIPARTITE AGREEMENT: THE GALLEON MUSEUM (ANIM-MDF-MINCULTURA) GOAL TO JOIN EFFORTS TO LOCATE THE GALLEON MUSEUM IN THE AREA OF THE REAL ESTATE PROJECT THAT WILL BE DEVELOPED IN THE AREA CURRENTLY OCCUPIED BY THE NAVAL BASE ARCO BOLIVAR. Agreement state: signing process

IMAGE OF THE GALEON MUSEUM