Construction & Earthwork Request Form (CERF)

Similar documents
LAKE OF THE WOODS COUNTY WETLAND CONSERVATION ORDINANCE OF 2002

Instructions to the Applicant

CHECKLIST INFORMATION NECESSARY FOR ZONING PERMITS

APPLICATION PROCEDURE

PERMIT FEES Within the shore impact zone (Includes Rip-Rap and Sand Blankets) $ Over 51 cubic yards $100.00

WALWORTH COUNTY RESOURCE MANAGEMENT/CONSERVATION (262) Land Disturbance/Erosion Control Fay Amerson, Urban Program Specialist

{{t:t;r:n;o:"signer 2";l:"Date";}}

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

Incorporated Village of Port Jefferson 88 North Country Road, Port Jefferson, NY Telephone: (631) Fax: (631)

Paper copies & an electronic copy (pdf) of the following drawings or plans: 1 full size scalable certified survey and 1 (11 x 17) copy

LAND USE PERMIT APPLICATION INSTRUCTION SHEET

Interim Use Permit Application

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

Waseca County Planning and Zoning Office

STAFF REPORT. Arthur and Kathleen Quiggle 4(b)

Shoreline Management Guidelines GEORGIA POWER LAKES

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

CHAPTER 6 CHESAPEAKE BAY PRESERVATION AREAS AND STREAM PROTECTION AREAS

K. All adjoining lots under common deed, for use as a single residence, are considered to be one lot.

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

Lake of the Woods County Land Use Permit Instruction Sheet

Preliminary Subdivision Application (Major) (Four (4) lots or more)

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

Tentative Map Application Review Procedures

Lake of the Woods County Land Use Permit Instruction Sheet

CHAPTER 3 PRELIMINARY PLAT

206 8 th Ave SE Suite #290 Baudette, MN Phone: Fax: Instructions to Applicant

ARTICLE 24 SITE PLAN REVIEW

Door County Shoreland Zoning. Door County Land Use Services Department June 26, 2018

Deb Grube Walworth County Land Use and Resource Management

ORDINANCE NO WHEREAS, the Town of Jupiter ( Town ) has adopted a Comprehensive Plan

ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE

APPLICATION PROCEDURE

TOWNSHIP OF GEORGIAN BLUFFS APPLICATION FOR AMENDMENT TO THE ZONING BY-LAW

BRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit)

City of Chilton Ch. 24 Shoreland-Wetland Zoning CHAPTER 24 SHORELAND-WETLAND ZONING. (Ord. #1106 6/17/2014, Ord. #667 8/4/87)

Division 2 Section to are to be renumbered as follows; deletions (strikes) and additions (underlines). DIVISION 1. Introduction.

City Of Attleboro Conservation Commission

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

I. General. 1 Property managed by Cube includes the land below waters of the reservoirs and the generating facilities.

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

SECTION 4: PRELIMINARY PLAT

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by:

ARTICLE 6 PRELIMINARY PLAT

Legal Description Part of the Western Half of the Eastern Half of the Northwest Quarter of Section 30, Le Ray Township

CHARLES CITY COUNTY SITE PLAN ORDINANCE. This Ordinance shall be known as the Charles City County Site Plan Ordinance.

Residential Major Subdivision Review Checklist

LAKE COUNTY INTERIM USE APPLICATION VACATION RENTAL HOME

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

ZONING & LAND USE APPLICATION

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

SUBDIVISION APPLICATION

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

Easement Program Guidelines for Water Resources and Stream Work

To: Stillwater Town Board Reference: Horst Variance Request Stillwater Township, Minnesota Copies To: Town Board Kathy Schmoekel, Town Clerk

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

SWIMMING POOL PERMIT APPLICATION PACKET

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

APPENDIX B. SUBMISSION REQUIREMENTS

ARTICLE 4 MAJOR SUBDIVISION/LAND DEVELOPMENT PLAN REQUIREMENTS

CHECKLIST FOR DEVELOPMENT REVIEW

VILLAGE OF WILMETTE Grading and Tree Protection Notice Forms

First Name Last Name. Company Name (if applicable) Street Address City State Zip. Owner Phone. . First Name Last Name

Town of Middleborough Conservation Commission 2014 Policy

Charter Township of Garfield Grand Traverse County

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION

Please complete each entry and check off each item. An incomplete application will be returned.

County of Henrico, Virginia. Buffer Management Plan. Cobbs Creek Regional Water Supply Reservoir. Task 2.1. August 21, 2013.

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

Request to Advertise: Chesapeake Bay Preservation Area (CBPA) Map Update. June 20, 2017

Chesapeake Bay Preservation Area (CBPA) Map Update. Presentation to the County Board July 15, 2017

Whitewater Point & Barber Acres

Residential Minor Subdivision Review Checklist

Article III. Erosion and Sedimentation Control

Local units of government control the use of private

FINAL PLAT APPLICATION

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

M.S.B.A. Real Property Form No. 8 (1997, 2017) Addendum to Purchase Agreement: Wetlands, Shoreland and Flood Plain Disclosure PAGE 1

Planning Commission Land Disturbance Permit Application

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE

AGENDA STATEMENT NO BUSINESS OF THE PLANNING COMMISSION City of Victoria, Minnesota STAFF REPORT. Casco Ventures (Developer)

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT)

TOWN OF BRISTOL. Ontario County, New York APPLICATION FOR LOT LINE ADJUSTMENT

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

Septic Tank / Drainfield / Holding Tank Permit Application

Major Subdivision Application Packet. Revised June 2018

SINGLE-FAMILY WETLAND CERTIFICATION PROCESS

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

Sullivan, Maine Selected Ordinances

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

CHAPTER 21 SHORELAND-WETLAND ZONING CODE (Cr. Ord. #764)

Transcription:

ShoreLand Traditions Construction & Earthwork Request Form (CERF) SECTION 1 SECTION 2 SECTION 3 Definitions and Points to Remember Requirements and Process Site Sketch Requirements and Sample If you have questions regarding the Construction & Earthwork Request Form, please contact Dave Marciniak Land Management Specialist at ShoreLand Traditions 218.393.8511 dmarciniak@allete.com Printed on 100% recycled paper

Your project requires a Construction & Earthwork Request Form Does it require a permit? Your Construction or Earthwork request is governed by the terms of your Lease with. This form and process do not change or amend your Lease. In the event that grants approval for your Construction or Earthwork project, the responsibility remains with you to obtain local, state and federal authorizations or permits as required by law and to comply with all applicable laws, including building codes and ordinances. complies with all local, state and federal ordinances and follows zoning and planning permit processes. ALL shoreline and earth-disturbing work, structures and utilities on lands require completion of a Construction & Earthwork Request Form (CERF), AND, when applicable, governmental (federal, state, city, township, or other agency) permit applications and approval before the project begins. It is your responsibility to determine which governmental permits and approvals are needed for your project. Some of the most common construction projects that require governmental permits include: Aquatic vegetation removal Driveway Saunas Boathouse Excavation Septic Boat landing Garage Shoreline restoration/riprap Bunkhouse Gazebo/screen house Storage/fish cleaning buildings Decks House Tree/shrub removal Docks Land alteration Walkways Dredge Road Well The leaseholder CANNOT rely on the contractor to obtain approval and governmental permits if permits are required. It is the leaseholder s responsibility to ensure that the necessary permits are obtained, completed and provided to. Check with your township board, county planning commission, Department of Natural Resources or other appropriate agency to determine what permits you will need. Important information to understand The role of FERC: s hydro electric projects are licensed by the Federal Energy Regulatory Commission (FERC), an independent federal agency that regulates and oversees energy industries in the economic, environmental and safety interests of the American public. As a licensee, must follow FERC regulations regarding the lands and waters within its projects. FERC gives the authority to grant permission for certain types of use and occupancy of hydroelectric project lands and waters and to transfer interests in those lands and waters for certain other types of use and occupancy without prior approval from FERC. But can only grant permission if the proposed use and occupancy is consistent with the overriding purposes of protecting and enhancing the scenic, recreational and other environmental values of the hydroelectric project. is also responsible for supervising and controlling the use and occupancies for which it grants permission and to ensure compliance with leases, easements or other legal property documents. 1

Important information to understand From your lease paragraph 15(c). Construction (abridged): No vegetation removal, earthwork, construction, relocation, repair, replacement or exterior remodeling of permitted buildings or fences nor construction, repair, or replacement of septic systems or privies will be permitted without written approval of all jurisdictional governmental authorities and. Requests for approval of construction shall be detailed on forms supplied by and must be approved prior to commencement of work. Penalties: Construction or earthwork that occurs on property without a completed CERF and the proper governmental permits, shall be considered a default of the lease and may be subject to any or all of the following (above and beyond any penalties incurred by governmental agencies having jurisdiction over the construction and earthwork project): the cost of structure removal, restoration of land and wetland contours and features, penalty fees and lease termination. The Ordinary High Water Level (OHWL): In order to complete lakeshore setback measurements for CERF site drawings and governmental permits, it is critical to properly identify the Ordinary High Water Level (OHWL) on your lease lot. The OHWL is commonly considered the point where the natural vegetation changes from predominately aquatic to predominantly terrestrial. On reservoirs, government agencies often consider the OHWL as the operating pool elevation. Construction or earthwork projects on either side of the OHWL require approval (at a minimum) and may require local zoning and/or additional governmental agency permits. For example, the Minnesota DNR regulates activities that could change the current, crosssection, or contour of a public waterway, including the shoreline. Any work below the OHWL requires consultation with the DNR area hydrologist. Storm Water Best Management Practices (BMP): Disturbance of any soil can lead to erosion and sedimentation into wetlands, streams, rivers, and lakes. Erosion control on projects, using Best Management Practices (BMP), will help save lake lot property, stabilize plant and tree species and will limit the risk of sedimentation flowing into wetlands, streams, rivers and lakes. Depending on the amount of area disturbed, development of a Storm Water Pollution Prevention Plan (SWPPP) and a construction storm water permit may be needed, which would require BMPs along with monitoring of the site. There may be lower thresholds with different local or governmental agencies; therefore requires that you plan BMPs for every project and ask the necessary local governmental agencies whether any additional permits are needed. The leaseholder will need written (or email) confirmation from the governmental agencies having jurisdiction on storm water control activities that indicates whether a permit is needed. For more information see the included Contact List. Wetlands: It can be difficult to determine if wetlands exist on your lease lot since there are multiple types of agency-classified wetlands. When in doubt, a wetland delineator should be consulted to mark (delineate) the edges of any wetlands in the vicinity of proposed projects. Wetland plants provide habitat for aquatic species, slow water runoff, help control erosion, and can provide a natural water filter. If wetland impacts are unavoidable, a combined local, state, and federal permit application must be submitted and approved before work begins and any wetlands are impacted. In addition, wetland mitigation through the purchase of wetland banking credits may be required. The leaseholder will need written (or email) confirmation from the governmental agencies having jurisdiction on wetland impacts that indicates whether a permit is needed. See Contact List (included) for wetland agencies and delineators. 2

Requirements and Process Requirements Complete the process as indicated below. Include all current contact information. Incomplete or inaccurate information will result in the form being returned to you. It is very important that measurements of all structure, septic and drinking water well setbacks and dimensions be recorded accurately. Include an accurate drawing showing existing structures (including power poles and overhead power lines) and the proposed construction/earthwork in relation to the lease lot boundaries, roads, driveways, wells, septic system and Ordinary High Water Level (OHWL) of the flowage, lake, reservoir or river. Process 1. Identify property setbacks, lot dimensions, parcel limitations and other restrictions before preparing application and drawing your sketch. 2. Fill out page 2 of form; write clearly and concisely; provide complete information. 3. Discuss your CERF with staff prior to submission if you have any questions. 4. Mail your completed CERF to: ShoreLand Traditions 30 W. Superior St. Duluth, MN 55802. 5. All requests will be reviewed by the Land and Real Estate Department. A preliminary field inspection of the building site may be scheduled to meet you onsite for review. 6. If you receive preliminary approval for construction from, please follow the steps outlined below. If your request is not approved, you will be informed of the reasons. a. Apply for applicable governmental permits through the appropriate agencies, which may include: Works in the water (DNR), land alteration (county/township), building (county/township), well and septic (health department/county environmental services); see contact page. 7. After you have received permission for your project from all applicable governmental agencies, you must send the original permits or evidence of such permits to along with the signed CERF. a. If you receive permits back from any governmental agency and the Final Approval section of the CERF is not signed please send all paperwork to so copies can be made for your lease file. 8. Upon satisfactorily completing all prior steps outlined above, will review all governmental permits to ensure consistency and accuracy to the CERF application. If the CERF is approved by, a copy of the form together with all necessary permits will be returned to you. 9. Completion of construction or earthwork requires a follow-up inspection by to close each CERF file. Call 218-393-8511 for final inspection. If projects are not closed out, future construction requests will be rejected. 3

and responsibilities Before you start the project Request a Construction & Earthwork Request Form (CERF). ShoreLand office 218-723-3981 1-888-526-3648 (toll-free) landinfo@mpland.com Provide CERF upon request and start internal processes. Meet with leaseholder and contractor. may provide information and guidance on requirements for your project. Re-identify lot lines for correct layout on CERF sketch (as needed). Submit completed CERF to for pre-approval. Get the proper permits If pre-approval is granted, return CERF to leaseholder. Fill out and finalize required governmental permit applications before project begins. CANNOT rely on the contractor to get necessary permits (see page 1). Ensure completed CERF and copies of governmental agency approved permits are sent to ShoreLand Traditions office for review and processing. Get MP written approval to begin project Review completed CERF and governmental agency approved permits. If deemed satisfactory, mail forms to or otherwise contact leaseholder. Project completion When the project is completed, contact for final inspection. Dave Marciniak Land Management Specialist I 218-393-8511 If a CERF is not on file at ShoreLand Traditions, leaseholder won t be allowed to pursue any future projects. Projects completed without permits are considered a lease violation and may be subject to additional fees or removal at leaseholder s expense. Inspect completed project. Close project file. 4

Site sketch requirements Purpose, description and dimensions of project Describe whether your project will involve any of the following: Construction of structure(s), dumping, filling or removing of earthen material, drilling, draining, excavating, install or repair. Excavating, dredging or discharging (placing fill/dump material) into a wetland or other water body (including the temporary placement of material). If so, explain the specific purpose of the placement of the material (such as erosion control) and indicate how it will be done (such as with a backhoe or dragline). If dredged material is to be discharged on an upland site, identify the location of the site. Construction of an access path, bridge, culvert, dam, ditch, dock, driveway, riprap, road, sand blanket, or shore protection. If requesting permission for pole building construction, please include height and color of building, in addition to the length and width dimensions. Construction and/or earthwork occurring near any power poles or underneath any overhead power lines. Include the following in a sketch of project 1. Draw lot boundaries with all dimensions 2. Draw roads with names and any lakes/rivers etc. 3. Draw and identify existing structures and structure dimensions (if any) 4. Draw and identify location of proposed construction including dimensions 5. Draw and identify driveways and all property accesses 6. Identify distances of existing and proposed construction/structures from the shoreline, side yard far, side yard near, and road center line 7. Draw and identify existing or proposed septic location and future expansion area 8. Draw and name any drinking water well locations and dimensions from any septic systems (including neighbors) 9. Identify existing power poles, overhead power lines and the name of the utility provider that said power poles and lines belong to 10. Identify existing and proposed fencing, berms or other natural barriers 11. Identify setbacks for all structures (sides, rear and shore) 12. Show erosion/sediment control measures (if any) 5

Site sketch EXAMPLE ONLY Project setbacks Side yard near Side yard far Name John Doe New garage 62' 100' Rear yard/road center line Shoreline/OHWL Date 110' 58' mm/dd/yy 1 inch = 50 feet Project Scale (Example: 1 inch = 100 feet) I N ST RUC T I ON S 6

ShoreLand Traditions Construction & Earthwork Request Form (CERF) TIPS GENERAL COMMENTS Discuss your CERF with staff before submitting. Research governmental permits needed, property setbacks, lot dimensions and parcel limitations before preparing your CERF and site sketch. Know your property dimensions and site boundaries. It s your responsibility to ensure that you don t trespass on your neighbor s property. Write clearly. Provide complete information when describing your project. Topography such as bluffs or wetlands can alter setback standards. staff is not responsible for providing critical information that may be missing from the CERF or governmental permit applications. CERFs may be returned to applicants if the forms are incomplete, the site sketch is difficult to understand or handwriting is illegible. is unable to accelerate the permit review process of governmental agencies. Weather and contractors schedules are unpredictable, so start the CERF and permitting process early. GENERAL DISCLAIMER s approval of your project DOES NOT determine whether the project complies with applicable laws and regulations. You must work with local, state and federal governmental agencies to obtain any necessary permits and to fulfill any requirements related to your project. 12801 04/07/2016 1:06 PM