Total Cost of the Building Permit. Total Valuation*

Similar documents
10% of Building Permit in addition to the full Building Permit Fee

Site Plan Review Waivers

Building Permit & Plan Check Fees

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

Town%of%Virgin%Building%Permit%Application

WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

Commissioners to enact, amend, and enforce technical construction and building codes; and,

RESOLUTION NUMBER

BUILDING PERMIT FEE SCHEDULE

DEVELOPMENT SERVICES DEPARMENT Andrew Malik, Director

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

Planning & Development Services Application Fee Changes - Effective January 1, 2017

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

New Hanover Township

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

Town of Walworth Fee Schedule 2019

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

FEE SCHEDULE ADMINISTRATION FEES OF 35% ARE CHARGED TO THE PROPERTY OWNER IN ADDITION TO ALL OTHER APPLICABLE FEES AND COSTS. SEE NO. 13.

PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

THE BOARD OF COUNTY COMMISSIONERS

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

~ Please Detach and Save This Page ~

Land Use Application Fees

MENARD COUNTY ZONING PERMIT APPLICATION (PLEASE READ BEFORE PROCEEDING WITH APPLICATION)

AGENDA REPORT SUMMARY. Resolution No : 2017/18 Community Development Fee Schedule

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

"Advertisement" means a commercial message in any medium that aids, promotes, or assists, directly or indirectly, a lease- purchase agreement.

SCOPE All fees associated with and referenced in the 2016 Building Code of the City and County of Denver ( Code ) are as set forth in this policy.

Community Development Fees (as of March 2015)

MUNICIPALITY OF THE DISTRICT OF CLARE BUILDING BY-LAW NO. 25 AMENDMENT NO

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

BUILDING PERMIT APPLICATION

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

KAMAS CITY FEE & RATE RESOLUTION NO

Planning&Development Fee Standards

County of Kane CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

Permitting Fee Schedule

NEW SINGLE FAMILY RESIDENTIAL

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

Chapter CONSTRUCTION CODES

CITY OF CLAREMONT DEVELOPMENT REVIEW FEE SCHEDULE

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

FORKS TOWNSHIP FEE SCHEDULE AS AMENDED 11/2017

Greenbrier County Building Code Administrative Policy Manual

MASTER FEE SCHEDULE Amended June 12, 2018

Chapter Fees (d) OFFICIAL ZONING MAP UPDATE (EXCLUDING FINAL PLATS) $10.00, PER LOT (e) HOME OFFICE PERMIT

Community Development Fees Revised October 2018

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

Article 26 MOBILE/MANUFACTURED /MODULAR HOME AND RECREATIONAL VEHICLE REGULATIONS ADOPTED: FEBRUARY 19, 2008 CASE NUMBER: TA ORDINANCE NO.

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

City of Wausau Building, Housing and Zoning Fee Schedule

ARTICLE VII. NONCONFORMITIES. Section 700. Purpose.

Meeting Date: December 3, 2018 Agenda Item No:

Chapter YAKIMA COUNTY FEE SCHEDULE

RESOLUTION NO

Residential Permits R-2, R-3, R-4, and U Occupancies 2019 Building Permit Valuation/Fee Schedule

ARLINGTON COUNTY, VIRGINIA

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

PUTNAM TOWNSHIP. Schedule of Development Review Fees. As adopted by the Putnam Township Board August 16, 1995 Effective September 22, 1995

CITY OF SARATOGA FEE SCHEDULE

TELLER COUNTY BUILDING CODE As adopted by the Board of County Commissioners EFFECTIVE 1/01/2007 AMENDED 8/22/07 TELLER COUNTY BUILDING CODE

RESOLUTION NO AMENDING RESOLUTION NO TOWN OF BEL AIR S FEE SCHEDULE

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

Meeting Date: February 26, 2018 Agenda Item No:

Appeals to the Board of County Commissioners Code standard as part of a project review Code standard without a project submittal $200.

ORDINANCE NO. ORD ORDINANCE OF THE COUNCIL OF THE CITY OF SANTA ROSA AMENDING TITLE 20

Planning Division Fee Schedule

BUILDING PERMIT FEE SCHEDULE AMENDED April 9, 2002

City of Lake Dallas Master Fee Schedule Fiscal Year 2019 Fee Fee Amount Code Reference

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

city of Zeeland ARTICLE IX. RENTAL REGISTRATION AND INSPECTION* Sec Purpose and intent. Sec Definitions.

2018 FEE SCHEDULE. Chapter 8 Animals, Article ll Dog License Dog at Large $75.00

4. Building plans should include top of foundation elevation

OTERO COUNTY ELECTRIC COOPERATIVE, INC FOURTH REVISED RULE NO. 15 CANCELING THIRD REVISED RULE NO. 15 EXTENSION POLICY.

TOWN OF LINWOOD ANOKA COUNTY STATE OF MINNESOTA ORDINANCE NO. 169

and ORDINANCE NO. ----

TOWNSHIP OF WEST EARL LANCASTER COUNTY, PENNSYLVANIA RESOLUTION

SPECIAL EXCEPTION GUIDELINES *PLEASE READ THESE GUIDELINES BEFORE COMPLETING YOUR APPLICATION*

RESIDENTIAL FERRY COUNTY BUILDING PERMIT CHECKLIST

BILL JOHNSON & ASSOCIATES REAL ESTATE COMPANY WILL CO-BROKER IF BUYER IS ACCOMPANIED BY HIS OR HER AGENT AT ALL PROPERTY SHOWINGS

The Surveyor of Clinton County has presented a proposed schedule of user fees for

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

FERRY COUNTY BUILDING ORDINANCE # UPDATED

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

Fees--Residential Development (1 or 2 units) Effective January 1, 2014

City of High Point Development Fee Schedule

Fee Schedule Last Updated: November 21, 2017

Appeals to the Board of County Commissioners Code standard as part of a project review Code standard without a project submittal $725.

SECTION 5: ACCESSORY USES

ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DALY CITY REPEALING AND REPLACING CHAPTER RE: INCLUSIONARY HOUSING

Building and Planning Fee Study Overview. March 19, 2019

Residential Certificate of Occupancy and Temporary Certificate of Occupancy

BUILDING PERMIT FEE SCHEDULE

RESOLUTION PERMIT FEE SCHEDULE

Transcription:

Boulder County Building Permit Fees Boulder County Building Permit Fees effective February 9, 2017. Boulder County Land Use Department Publications Boulder County Building Permit Fees Land Use Department Courthouse Annex Building 2045 13th Street PO Box 471 Boulder, CO 80302 Building Safety & Inspection Services: Phone: 303-441-3926 Email: building_official@bouldercounty.org Website: www.bouldercounty.org/lu Office Hours: 8 a.m.-4:30 p.m. Mon., Wed., Thurs., Fri. 10 a.m.-4:30 p.m. Tuesday Total Cost of the Building Permit Add the following numbered fees 1-5 for the total cost of the building permit (plus any applicable Defensible Space, Grading Permit, or Other Fees). 1. Building Permit Fee 2. Plan Check Fee 3. Use Taxes 4. Zoning and Public Health Permit Review Fees 5. Technology Fee 1. Building Permit Fees Valuation Table 1-A Total Valuation* of Project $1.00 to $800.00 $38.95. More than $800.00, $2,000.00 More than $2,000.00, $25,000.00 More than $25,000.00, $50,000.00 More than $50,000.00, $100,000.00 More than $100,000.00, $200,000.00 More than $200,000.00, $500,000.00 More than $500,000.00, $1,000,000.00 More than $1,000,000.00 Building Permit Fee $38.95 for the first $800.00, plus $4.19 for each additional $100.00 or fraction thereof, up to and including $2,000.00. $89.24 for the first $2,000.00, plus $15.35 for each additional $1,000.00 or fraction thereof, up to and including $25,000.00. $442.20 for the first $25,000.00, plus $11.61 for each additional $1,000.00, or fraction thereof, up to and including $50,000.00. $732.35 for the first $50,000.00, plus $10.25 for each additional $1,000.00, or fraction thereof, up to and including $100,000.00. $1,245.08 for the first $100,000.00, plus $13.34 for and including $200.000.00. $2,579.71 for the first $200,000.00, plus $9.29 for and including $500,000.00. $5,365.24 for the first $500,000.00, plus $7.99 for and including $1,000,000.00. $9,362.89 for the first $1,000,000.00, plus $5.16 for each additional $1,000.00, or fraction thereof. * Valuation shall be determined in accordance with Section 109.3 of the Boulder County Building Code. Where the valuation that is calculated based upon standard building valuation data and the actual total contract construction cost differ, the higher of the two valuation figures shall be used to determine the building permit fee. The County may require information to verify valuation estimates and collect any additional money owed. Building Permits can be applied for and issued until 4 p.m. Form: B/33 Rev. 02.09.17 g:/publications/building/b33buildingpermitfees.pdf 1

Residential Building Valuation Data Type of Structure Cost Per Sq. Ft. Dwellings: Type VB Wood Frame $180.00 Basement: Unfinished $34.48 Basement: Finished $45.19 Private Garages: Wood Frame $47.33 Misc. Structures: Carports, Pole Barns, Decks, Loafing Sheds, Covers $32.34 2. Plan Check Fee The plan review fee is determined by multiplying the building permit fee by 65%. 3. Use Taxes 1994 Open Space Use Tax ½ of the valuation X.0035 Boulder County Transportation Sales and Use Tax ½ of the valuation X.0010 Non Profit Human Services Tax ½ of the valuation X.0005 Jail Improvement & Operation Tax ½ of the valuation X.0005 2005 Open Space Tax ½ of the valuation X.0010 2011 Open Space Tax ½ of the valuation X.0015 Flood Recovery Tax ½ of the valuation X.00185 4. Zoning and Public Health Permit Review Fees (does not apply to EZBP permits) Residential No Land Use Code Process required Land Use Code process required (SPR, SPRW, LU, SU, etc.) Total project valuation <= $25,000 $25.00 $31.25 Valuation >$25,000-<=$100,000 $80.00 $100.00 Valuation >$100,00-<=$500,000 $225.00 $292.50 Valuation >$500,000 $600.00 $780.00 Commercial, Institutional Change in Use (no structural alteration) $100.00 or based on valuation of project, whichever is greater. $125.00 Total project valuation <= $25,000 $40.00 $50.00 Valuation >$25,000-<=$100,000 $130.00 $162.50 Valuation >$100,00-<=$500,000 $275.00 $357.50 Valuation >$500,000 $750.00 $975.00 Grading Permit 50-500 cubic yards N/A $50.00 >500 cubic yards N/A $105.00 5. Technology Fee EZBP $8.00 Permit valuation less than $25,000 $10.00 Permit valuation equal to or greater than $25,000 $50.00 2 Form: B/33 Rev. 02.09.17 g:/publications/building/b33buildingpermitfees.pdf

Application Deposit Fees The application deposit is based on the stated valuation shown on the building permit application in accordance with the following schedule: Project Valuation Deposit $0.00 $25,000.00 $25.00 $25,001.00 $50,000.00 $100.00 $50,001.00 $200,000.00 $200.00 $200,001.00 and up $500.00 Defensible Space Fees The Defensible Space Fee is applicable to Building Permits issued in mountainous portions of Boulder County, for new and additions to residence, commercial, building, institutional, and utility building. Wildfire Partners $100.00 Regulatory Wildfire Mitigation $350.00 Regulatory Wildfire Mitigation - Deck Only $250.00 Other Fees Calculated fees are to be rounded to the nearest whole dollar figure, with amounts of $0.50 or less rounded down and amounts of $0.51 or more to be rounded up. Manufactured Home Setup Permit Fee $131.00 Manufactured homes installed upon permanent foundations use the Building Permit Fees Valuation Table 1-A with valuation of foundation and other associated work performed on the site. See Valuation Table (Page 1) Inspections outside of normal business hours $77.00 per hour Appeals to the Board of Review $298.00 Temporary Certificate of Occupancy $160.00 Oil and gas Development Plan Review Construction Permit $857.00 Additional plan review required due to plan changes, additions or revisions For use of outside consultants for plan checking and inspections, or both $77.00 per hour Actual costs Grading Fees See Grading Permit Fee Table (Page 4) Renewable Energy Permit $400.00 plus tax (based on materials only at $3.50 per watt) Returned Check Fee $25.00 Credit/Debit Card Convenience Fee 2.5% applied to all credit card or debit card charges Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Actual costs include administrative and overhead costs. Note: Building materials purchased in Boulder County are tax-exempt for County Taxes when you present your building permit to the materials vendor at time of purchase. Zoning Enforcement Fees For projects constructed without permits, land use application fees and building permit fees may be doubled as a means to recover the cost incurred to retroactively process and permit the violation. Form: B/33 Rev. 02.09.17 g:/publications/building/b33buildingpermitfees.pdf 3

Grading Permit Fees For grading less than 50 cubic yards, no permit required. Total Earthwork in Cubic Yards Permit Fee Plan Review Fee Total Fee Agricultural Pond (minimum building permit fee) $38.95 $25.31 $64.27 50-100 $62.55 $40.66 $103.21 101-200 $92.98 $60.44 $153.43 201-300 $123.41 $80.22 $203.63 301-400 $152.15 $98.90 $251.05 401-500 $182.58 $118.68 $301.27 501-600 $211.33 $137.37 $348.69 601-400 $241.76 $157.14 $398.90 701-800 $270.50 $175.82 $446.32 801-900 $300.93 $195.61 $496.53 901-1,000 $329.67 $214.29 $543.96 1,001-2,000 $353.34 $229.66 $583.00 2,001-3,000 $378.69 $246.15 $624.85 3,000-4,000 $402.36 $261.54 $663.90 4,001-5,000 $427.72 $278.02 $705.74 5,001-6,000 $451.39 $293.40 $744.79 6,001-7,000 $476.75 $309.88 $786.63 7,001-8,000 $500.42 $325.27 $825.69 8,001-9,000 $525.78 $341.76 $867.53 9,001-10,000 $549.45 $357.14 $906.59 10,001-20,000 $661.02 $429.67 $1,090.69 20,001-30,000 $772.60 $502.19 $1,274.80 30,001-40,000 $884.18 $574.72 $1,458.90 40,001-50,000 $995.76 $647.25 $1,643.01 50,001-60,000 $1,107.34 $719.78 $1,827.12 60,001-70,000 $1,218.92 $792.30 $2,011.23 70,001-80,000 $1,330.50 $864.83 $2,195.33 80,001-90,000 $1,442.08 $937.35 $2,379.43 90,001-100,000 $1,553.66 $1,009.88 $2,563.54 Note: Taxes are not associated with grading permits, as there are no taxable materials. 4 Form: B/33 Rev. 02.09.17 g:/publications/building/b33buildingpermitfees.pdf

Reduced Building Permit Fee Program for Disasters Building permits for structures undergoing major repair work or being rebuilt after receiving verified damage from a declared disaster may have the building permit fee calculated in accordance with Table 1-A reduced by 25% if all of the following conditions are met: 1. The structures are the same size or smaller than the structures that existed prior to the disaster, and; 2. The total floor area is not larger than 2,500 sq. ft. in floor area for dwellings or not larger than 530 sq. ft. in floor area for accessory buildings, and; 3. The property owner benefiting from the fee reduction must be the property owner of record at the time that the disaster occurred, and; 4. The fee reduction applies only to structures damaged or destroyed in the declared local disaster. Proof that the damage or loss is a result of the disaster, including such items as photographs, insurance claims, etc., must be submitted to the Chief Building Official for verification. Under the local disaster declaration for the flood and rain events beginning on September 11, 2013, the reduced fees, along with the waiver of application deposit fees and rebates for third party inspections as further described below, may be applied to building permit applications completed and accepted on or before September 11, 2016. Building permit applicants for structures being rebuilt after being severely damaged or destroyed in a declared disaster are not required to pay an application deposit at the time of building permit application. Where structures are being rebuilt after being severely damaged or destroyed by a declared local disaster, and qualified third party inspectors satisfactorily perform required inspections that would otherwise need to be performed by county building inspectors, rebates of $150.00 per such required inspection may be paid to the holder of the building permit. Form: B/33 Rev. 02.09.17 g:/publications/building/b33buildingpermitfees.pdf 5