Landowner's rights. When the Crown requires your land for a public work. April 2010

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005

Report April 2001 File: CFO/22/1/1. Review of the Public Works Act Background. 3. Proposed Action

Public Works Act 1981 Overview on Acquisition and Compensation for Public Works. Workshop : N Pointon, A Roberts and J Haynes

C4: LAND ACQUISITION AND DISPOSAL

Minister s Function under the Public Works Act 1981

QLDC Council 30 April Report for Agenda Item: 5. Land Transfer to facilitate replacement Kawarau Falls Bridge

Southern Links Designation (A106)

How effectively does it work?

Restitution of State Land in New Zealand Offer Back of Public Works Land and Return of Land to Indigenous People through Treaty Claim Settlements

State Highway Revocation: Policy and Guidance

Vote Lands. APPROPRIATION ADMINISTRATOR: Land Information New Zealand

Promoter s Introduction to Land Compensation. Colin Smith FRICS

From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director

Rating Valuations Rules 2008

Draft Voluntary Land Acquisition and Mitigation Policy

SECTION B - GUIDELINES

GOLD LINE FINAL ENVIRONMENTAL IMPACT STATEMENT

Land Rights For Connection Customers

Craig HARRIS and Trevor KNOWLES

Hutt River City Centre Upgrade Project Preliminary Integrated Design

A Guide to the Municipal Planning Process in Saskatchewan

IFA submission to the Law Reform Commission of Ireland s review of the current law on compulsory acquisition of land.

State and Public Sector Land Management in New Zealand

ROTORUA LAKES COUNCIL

C6: DISPOSAL OF SURPLUS LAND

F.18 New Zealand. Railways Corporation HALF-YEARLY REPORT 1 JULY DECEMBER 2015

Community Occupancy Guidelines

Draft Property Support Scheme and Voluntary Local Mitigation Scheme

EXHIBIT LIST No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47

F.18. New Zealand. Railways Corporation STATEMENT OF CORPORATE INTENT

Compulsory Land Acquisition Delegations

Chapter 8 Transportation

Treaty Claims Settlement Acts General Guideline

APPLICATION FOR A PUBLIC PATH DIVERSION ORDER FOR FOOTPATHS, BRIDLEWAYS & RESTRICTED BYWAYS HIGHWAYS ACT 1980 SECTION 119

HS2 Phase Two - Land & Property - preparation of Hybrid Bill activities privacy notice

F.18. New Zealand. Railways Corporation ANNUAL R E PO RT

PUBLIC RIGHTS OF WAY. Guidance for Planners and Developers

Independent Connection Providers Legal Process and Statutory Consents

ATTACHMENT 2: CONSULTATION UPDATE NO. 3 PART 3 LANDOWNER ENGAGEMENT

City of Regina Underutilized Land Study External Stakeholder Report

SPICe Briefing Compulsory Purchase and the Planning System

H ALF-Y EA RL Y RE P O RT

GUIDANCE FOR LANDOWNERS AND OCCUPIERS ON CONTRIBUTIONS TOWARDS PROFESSIONAL COSTS

This is a conditional use permit request to establish a commercial wind energy conversion system.

CROSSRAIL INFORMATION PAPER C10 - LAND DISPOSAL POLICY

Property CT and Legal. Section to s438 Maori Affairs Act Act repealed. Previously allowed Court to vest Maori land in Trustees. 1.

Changing a planning condition for delivery times January 2016

SURFACE AND SUBSURFACE RIGHTS MANAGEMENT

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM

Guide for pastoral leaseholders. November 2010

Barratt Metropolitan Limited Liability Partnership

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

RENT REVIEWS OF MĀORI RESERVED LANDS. Prepared by Te Puni Kōkiri for the Māori Affairs Committee. 18 May 2011

Groundsure HS2 and Crossrail

Resettlement Policy Framework

Heathrow Expansion. Land Acquisition and Compensation Policies. Interim Property Hardship Scheme. Policy Terms

PROPERTY DISPOSAL POLICY

Section 12A Purpose of Subdivision Provisions

RHLF WORKSHOP The National Housing Code

Ngati Toa Rangatira Claims Settlement Act 2014 registration guideline LINZG20742

Resource Consent Application Form

Application for Outline Plan / Outline Plan Waiver Section 176A, Resource Management Act

RESIDENTIAL DEVELOPMENT SITE. Land off North Road, South Kilworth, LEICESTERSHIRE

NSW Travelling Stock Reserves Review Public consultation paper

North Ayrshire Council

Registrar-General of Land e-dealing Compliance Review

TOTTENHAM SECONDARY PLAN

NFU Consultation Response

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS

Why Uganda should be cautious about amending ARTICLE 26 of the Constitution

Historic Environment Scotland Àrainneachd Eachdraidheil Alba

City of Grande Prairie Development Services Department

Guidance about Land Rights for connections involving Independent Connection Providers (ICP s) and Independent Distribution Network Operators (IDNO s)

6. REPORT BY THE CHAIRPERSON OF THE FENDALTON/WAIMAIRI COMMUNITY BOARD - 4 NOVEMBER 2009

SP Energy Networks Fee Scale

DEED OF SETTLEMENT SCHEDULE: LEGISLATIVE MATTERS

Date: 9 February East Walworth. Deputy Chief Executive

Section 9 after Pattle

Offer-back under the Public Works Act - a re-appraisal?

FOR SALE BY TENDER / CONDITIONAL OFFER

To: Andrew Clark Your Ref: Our Ref: From: Louise Staples & Hannah Burden Date: 14 June 2010 Location: NFU HQ, Stoneleigh

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Module Seven. Student Learning Objectives. After completing this module you should be able to

Report to COUNCIL for decision

PLANNING & BUILDING REGULATIONS

International Accounting Standard 17. Leases

GO Rail Network Electrification Transit Project Assessment Process

SCHEDULE 3 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ3 QUARRY HILLS PRECINCT STRUCTURE PLAN. 1.0 The Plan

5 TRANSFER OF PROPERTY RIGHTS TO TTC TORONTO YORK SPADINA SUBWAY EXTENSION, PROJECT 90996

ASSET TRANSFER REQUESTS Community Empowerment (Scotland) Act 2015 Guidance Notes

Lochinvar Section 94 Contributions Plan 2014 VERSION 1 ADOPTED 26/08/14

Performance Information for Appropriations

Te Atiawa Claims Settlement Act 2016 registration guideline

Compulsory Purchase Reform : Temporary Use of Land Valuation and practical issues.

The entity that obtains control of the acquiree. The business or businesses that the acquirer obtains control of in a business combination.

TRANSFER OF DEVELOPMENT RIGHTS

PRACTICAL APPLICATION OF LEASING RESERVE LAND

Conservation Covenants Executive Summary

Voluntary Land Acquisition and Mitigation Policy For State Significant Mining, Petroleum and Extractive Industry Developments 15 DECEMBER 2014

Transcription:

Chapter 29 Part G VOLUME 2 Land Acquisition and Property Page 336

Overview The main property effects of the Project can be separated into three broad categories of property: Property with land that is directly required (either in whole or in part) for the Project; Land with an easement or other property right (including rights of way and water rights) that is directly affected by the Project; and Properties within close proximity to the Project. The land holdings range from Crown land, KCDC-owned land (including road, rail and reserves, private land) Māori land and private land. The largest land requirement is for land held in private ownership which must be acquired for the Project for road purposes. There are some properties where part acquisition will be required. There are some examples of properties that will be required for construction of the Project, but that will not be purchased. Examples include properties that are required for temporary occupation during construction work, but are not required in the long term for occupation of the road. The effects on these properties can also be managed through the PWA process. In some cases alternative arrangements can be made with landowners (such as land entry agreements or license to occupy). There are a number of instances where the Project will affect other property rights such as physical access to a property or a water supply arrangement. It is considered that effects on other property rights have been well identified through the design and investigation phase and the various mitigation measures will be adopted in consultation with the affected parties. Properties within close proximity to the route that have been identified as being subject to or particularly sensitive to effects have been identified through the Technical Reports (Volume 3 of the AEE report). Actual and potential effects on these properties have been identified in relation to specific technical areas and appropriate mitigation has been devised. Actual and potential (including perceived) effects on property values is not considered to be a relevant consideration under the RMA. Effects on amenity values are a relevant consideration, and those that are affected by the Project are considered through assessment of other actual and potential effects including noise, landscape and access. 29 Land Acquisition and Property 29.1 Introduction The main property effects of the Project can be separated into three broad categories: Properties with land that is directly required (either in whole or in part) for the Project; Land with an easement or other property right (including rights of way and water rights, for example) that is directly affected by the Project; and Properties within close proximity to the Project. Land parcels that will be directly affected to a greater or lesser degree by 'land take' requirements to accommodate the Project are shown in the Land Requirement Plans (LR01-18) contained in Volume 5 of the AEE report, and in the accompanying schedule. 117 land interests have been identified as being directly affected. The land holdings range from Crown land, KCDC-owned land (including road and reserves) land in Māori general or freehold title (which will be subject to the Māori Land Court's decision to approve any alienation) and private land which is primarily large rural holdings, Page 337

but also includes some rural-residential lifestyle blocks, and urban rural land and business land. Most of the land required for the Project is in private ownership. At this time, only a relatively small amount of land has been acquired for the Project, but all property owners whose land is directly affected have been contacted and consulted. All land is within the Wellington Region, and the land required is within the jurisdiction of KCDC. 29.2 Land Acquisition and Occupation As the NZTA and KiwiRail are requiring authorities under the RMA, they are also classified as network utility operators for the purposes of the PWA, so may apply to the Minister of Lands to acquire lands on their behalf. The PWA acquisition process is usefully described in a guide produced by LINZ where as background 55 : "Public works often cannot be carried out without affecting private landowners and their interests in land. For these reasons many governments throughout the world, including New Zealand, provide themselves with legislative powers to compulsorily acquire land for public works so that public works proposals are not unreasonably delayed. A basic principle of our system of government is that no person shall be deprived of land by the Crown without receiving fair compensation. In New Zealand the Public Works Act 1981 provides the power to acquire land for public works and to pay compensation. LINZ, on behalf of the Crown, is responsible for administering this Act. A large number of decisions made by the courts in both the United Kingdom and in New Zealand aid interpretation of the compensation provisions of the Public Works Act. Entitlements to compensation are therefore well settled." The following describes landowners' rights 56. "The Public Works Act provides the Crown with the statutory authority to acquire land for a public work. The Crown has the power to acquire or take land for a wide variety of purposes and may negotiate for the land in the same way as a private purchaser. While the Crown's powers are wide, it can only acquire land, whether by negotiation or compulsorily, in accordance with the Act. The acquisition process generally takes place after all required consents for the use of the land have been granted, or a designation has been provided for by the territorial authority." The LINZ guide also outlines guidance on compensation and other landowner rights under the PWA. As mentioned in the guide, property acquisition generally takes place later on in the process. To date, however, the NZTA's property accredited suppliers, through LINZ have completed property agreements with landowners to purchase land in advance of the designation process, where owners were in exceptional circumstances (including hardship cases). There are some properties where part-acquisition will be required. This could result in severance of land, or a reduction in the area of land remaining that means that the previous potential of the property can no longer be realised. For example, a property may be reduced in size so that it no longer meets district plan rules for subdivision. The property valuation and acquisition process under the PWA will take into account any 55 http://www.linz.govt.nz/crown-property/public-works/guide/background 56 http://www.linz.govt.nz/crown-property/public-works/guide/public-works-acquisition Page 338

adverse effects on the value of properties arising from part-purchase, and appropriate compensation will be arranged with the land owner. There are some examples of properties that will be required for construction of the Project, but that will not be purchased. Examples include properties that are required for construction purposes, but which are not required in the long-term for occupation by the Project. Construction land requirements that may not be required in the long-term include: Construction yards containing, for example, Project offices, workers' conveniences, and machinery and equipment storage; Laydown areas such as for the storage of precast concrete components; Mitigation measures such as noise barriers; Fill sites; and Construction access routes alongside the alignment, which are required in many locations where there is difficult topography, or there are existing tracks. An example of a property within the proposed designation that will be affected is the Ōtaki Railway Station and the adjacent operative NIMT alignment. As discussed in previous chapters of this AEE report, the Ōtaki Railway Station will be retained and reoriented to accommodate the realignment of the rail line. All affected properties are shown in the Land Information Plans (refer Volume 5 of the AEE) (and eventually in the relevant district plans should the NoRs be confirmed) as required for roading or rail purposes (as the case may be) in the same way as the land that will be purchased. Upon confirmation of the NoRs, land will be identified for temporary occupation, lease or land necessary to be acquired. On completion of the construction of the Project, the NZTA and KiwiRail will review the designation boundaries, and uplift those parts that are no longer required for roading or rail purposes. Where a property lease/rental arrangement through the PWA process is undertaken, the NZTA/KiwiRail will undertake to return the land as near as practicable to its original state or as otherwise agreed with the landowner. It is considered that the effects on property have been well acknowledged through consultation, and will be properly compensated for through the PWA processes. 29.3 Access, Easements and Other Property Rights There are a number of instances where the Project will affect other property rights such as physical access to a property, or farm management or a water supply arrangement. To address this: Where such rights are affected, alternative arrangements for movement or replacement are proposed, and either have been or will be developed in close consultation with the landowner. It is considered that effects on other property rights have been well identified through the consultation processes. 29.4 Properties Within Close Proximity Properties within close proximity to the Project that have been identified as being subject to or particularly sensitive to effects have been identified through the Technical Reports summarised in this AEE report. Actual and potential effects on these properties have been identified in relation to specific technical areas and appropriate mitigation has been devised. While discussed during consultation, actual and potential (including perceived) effects on property values are not considered to be relevant considerations under the RMA. Effects Page 339

on amenity values are relevant considerations, and those that are affected by the Project are considered through assessment of other actual and potential effects including examples such as noise, landscape, and access. Page 340