Establishing a Wetland Bank in Minnesota

Similar documents
Establishing an Individual Wetland Bank Site in Minnesota

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

For more information on how to compile and submit project documentation see our website and the User Manual.

WETLAND MITIGATION BANKING OUTREACH SESSIONS

Minnesota Board of Water and Soil Resources Wetland Conservation Act 2017 Annual Reporting Form

Project Name: Project Documentation Checklist for First-Time and Renewal June 2017 Page 1 of 6

TARGETED VERIFICATION DOCUMENTS

Land and Easement Donation Process and Requirements Summary

Cecil County, Maryland Purchase of Development Rights Program APPLICATION TO SELL AN EASEMENT

Guide to Combined Preliminary and Final Plats

Changes to the SFIA Program:

Farmland Preservation Agreements INSTRUCTIONS

Guide to Minor Developments

Land Transaction Procedures Approved July 17, 2012

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS

Update Land Use Regulations For the Town of Copake, NY

VOLUNTARY SALES ASSISTANCE PROGRAM CONSISTING OF TWO OPTIONS:

LAKE OF THE WOODS COUNTY WETLAND CONSERVATION ORDINANCE OF 2002

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005

BUREAU OF RECLAMATION PROCESS FOR ABANDONMENT AND RELOCATION OF IRRIGATION LATERALS

Conservation Easement Stewardship

2015 WETLAND CONSERVATION ACT STATUTE CHANGES

Guide to Preliminary Plans

ALEXANDRIA TOWNSHIP METES & BOUNDS SUBDIVISION APPLICATION. Name of Applicant Phone. Property Address (E911#) Mailing Address Local Phone

PARCEL MAP/FINAL MAP APPLICATION INFORMATION SHEET

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Regulation No May 2015

Chapter 11. Competitive Negotiation: Procedure

engineering planning environmental construction

Yolo Habitat Conservancy County of Yolo City of Davis City of Winters City of West Sacramento City of Woodland University of California, Davis

Town of Bristol Rhode Island

DELAWARE STATE HOUSING AUTHORITY LOW INCOME HOUSING TAX CREDIT QUALIFIED CONTRACT GUIDE

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND, AND WATER FINAL FINDING AND DECISION

Part Lot Control Exemption Manual

LAND ACQUISITION PROCEDURES

Administrative Penalty Order (APO) Plan for Buffer Law Implementation

Section 4.1 LAND TITLE

SURFACE AND SUBSURFACE RIGHTS MANAGEMENT

Conservation Easement Best Management Practices

Marin County Agricultural Land Conservation Program March 1, 2014

APRIL 30, ILL. ADM. CODE 2580 CH. I, SEC. 2580

RIM 201. BWSR Academy 2013

Lawrenceville Housing Corporation

MINOR LAND DIVISIONS APPLICATION

CITY OF ALTAMONTE SPRINGS

Easement Program Conservation Easement Monitoring Guidelines

ADMINISTRATIVE GUIDANCE

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

A Final Plat will be reviewed concurrently with any other development review application(s) that is required.

MODEL CONSERVATION RESTRICTION AMENDMENT POLICY GUIDELINES Massachusetts Easement Defense Subcommittee March 6, 2007 PREAMBLE

Validation Checklist. Date submitted: How to use this check-list. Ecosystem Credit Accounting System. Version 1.1&2. Project Information

Guidelines for applying for an artisanal mining licence

Planning Department Filing Fee of $ up to 3 lots $75.00 per each additional lot (subject to change) payable to Archuleta County.

MIDWAY CITY Municipal Code

Operating Standards Attachment to Development Application

Chapter HABITAT CONSERVATION PLAN / NATURAL COMMUNITY CONSERVATION PLAN IMPLEMENTATION ORDINANCE

Voluntary standard; accepted by USEPA to comply with AAI rule. 2. Regulatory/Developmental History

Request for Qualifications (RFQ) # On-Call Land Surveying Services November 21, 2018

CONTRACT FOR SALE AND PURCHASE

FINAL PLAT AMENDMENT APPLICATION Minor / Major / Administrative (Revised 3/1/2017)

THE GENESEO FOUNDATION, INC. REAL PROPERTY GIFT INQUIRY FORM

The University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2.

DWR REAL ESTATE COORDINATION PLAN

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for

What You Can Plan For

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS

Department of Energy

Request for Proposals HQS Inspection Services May 21,

Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM

FINAL APPLICATION. N.J.A.C. 7: (Minor disposals or diversions of parkland)

BIDDING INSTRUCTIONS FOR SALE

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

VARIANCE APPLICATION PACKET

Okaloosa County BCC. Okaloosa County BCC. MSBU / MSTU Policy. Municipal Service Benefit Units Municipal Service Taxing Units.

PRELIMINARY AND FINAL PLAT APPLICATION AND REVIEW PROCESS

Public Lands Formal Disposition Application Process

REQUEST FOR PROPOSAL RFP # TOC17-001

Frequently Asked Questions

DEED RESTRICTION INFORMATION PACKET

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

PROPERTY TAX IS A PRINCIPAL REVENUE SOURCE

VILLAGE OF MUNDELEIN NORTH LAKE STREET FAÇADE IMPROVEMENT PROGRAM ARCHITECTURAL DESIGN SERVICES

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

MHDC s Transfer of Physical Assets (TPA) Process and Policy

Development Approvals Process (Development Permits)

City-Owned Property Purchase Application

Final Plat Approval of a Major Subdivision Application Packet

Telecommunications Development Permit Application Package

2018 Requirements Manual An In-Depth Look at Changes to the Requirements

Sample Renewal Additional Information Request

Public Improvement District (PID) Policy

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

LCRA BOARD POLICY 401 LAND RESOURCES. Sept. 21, 2016

(Continued on back of page)

Ingham County Land Bank Fast Track Authority RESIDENTIAL REAL ESTATE PROFESSIONALS

Environmental Audit Standards

File Name: Private Provider Requirements and Information

Capital Improvement Program

Issue Date: Friday, January 26, Submission Deadline: Friday, March 9, 2018 at 5:00 p.m. CST OVERVIEW:

METRO BROKERS Checklist for Commercial Real Estate Professionals

Transcription:

Establishing a Wetland Bank in Minnesota Updated February 1, 2018 This document provides a general summary of the key steps in establishing an individual wetland bank site within the state wetland banking system. Wetland Conservation Act (WCA) Rules 8420.0700 to 8420.0755 provide the standards for wetland bank establishment and administration. The wetland banking system is administered by the Board of Water and Soil Resources (BWSR). A Local Government Unit (LGU) is responsible for approving wetland bank plan applications. A local Technical Evaluation Panel (TEP) provides technical recommendations to the LGU. A Conservation Easement is required for all wetland banks in Minnesota. The following table identifies key steps in the wetland bank site establishment process along with the responsible reviewing entity and typical processing time. The estimated review timelines do not include the time it takes for the applicant to complete the information required for review. Actual processing times vary depending on the complexity of the project as well as the nature of legal encumbrances on the property. Incomplete or poor quality submittals will lengthen review times. Key Step Reviewer Typical Review Time Bank Plan Application Draft Prospectus (Scoping), Prospectus (Concept Plan), Mitigation Plan (Full Application) Legal Boundary Survey Title Insurance Commitment Recorded Conservation Easement & Final Title Insurance Policy Project Construction/Implementation Construction Certification Application to Deposit Credits LGU, TEP, BWSR BWSR BWSR BWSR None LGU LGU, TEP 120 240 days 10 15 days 30 60 days 15 30 days Applicant Determines 15 30 days 15 30 days The steps identified in the above table can be and are often overlapping. For example, project construction can occur concurrent with title insurance review and conservation easement recording. Construction certification and the application to deposit credits are often processed simultaneously by the LGU. Page 1 of 6

Bank Plan Application To establish a wetland bank in Minnesota, approval of the Mitigation Plan must first be obtained. BWSR recommends that project sponsors follow the three-phase application process described below, which generally aligns with the first three phases of the review process followed by the U.S. Army Corps of Engineers (Corps) in accordance with the Federal Mitigation Rule. The three phases are as follows: 1. Draft Prospectus (Scoping) Optional under WCA 2. Prospectus (Concept Plan) Optional under WCA 3. Mitigation Plan (Full Application) Required under WCA Applicants must utilize the applicable form or outline for each phase of the review process. The forms and outline are available on the BWSR website. Draft Prospectus (Scoping) Bank sponsors may first submit a draft prospectus to the LGU to initiate the review process. This preliminary review will help the project sponsor identify opportunities, issues, and potential problems and will result in findings and recommendations regarding overall suitability of the project site for wetland banking. Early agency review and input allows a bank sponsor to make an informed decision on the suitability of the site and whether to continue with the application process prior to a substantial investment of time and resources. LGU staff and other TEP members can provide assistance in completing this form and compiling the necessary information. This phase of the process can be initiated by a sponsor without the assistance of professional consultants. The sponsor will receive a copy of the agency findings and recommendations upon review of the draft prospectus. Agency review of this document typically takes 30-60 days. Prospectus (Concept Plan) The prospectus provides the reviewing agencies with a conceptual overview of the proposed wetland bank. LGU and TEP review of this document will help identify any potential issues with the project design, proposed easement boundary, credit amount, credit criteria, credit release schedule, and any other issues prior to investing the time and expense necessary to complete a mitigation plan. This step in the process generally requires the assistance of professional consultants and/or others with expertise in wetland science, engineering, and vegetation restoration depending on the nature of the project. The project sponsor will receive a copy of agency findings and recommendations at the conclusion of the review process. Agency review of this document typically takes 30-60 days. The applicant may wish to obtain a title opinion at this time to assess potential risks or hurdles they may encounter by participating in the wetland bank program. A title opinion involves hiring a qualified party to search the property s abstract to determine ownership, status of taxes, and any encumbrances (i.e. a burden or claim) that may be on the title of the property. There may or may not be matters of record against the property that a landowner may have to resolve to obtain marketable title to the property as determined by the program. A title opinion is one valuable tool in helping to illuminate those potential issues. Note that a title opinion is a preliminary search. A detailed title insurance commitment and policy must be obtained at a later date as described below in the Easement Acquisition section of this document. Mitigation Plan (Full Application) Following prospectus review, submittal of the mitigation plan to the LGU will initiate the formal review and approval process under WCA rules. Only the approval of the mitigation plan by the LGU constitutes approval of a wetland bank plan for WCA purposes. Much of the same information required in the prospectus phase is also required for the full application, but with more detail. Upon receipt of a complete mitigation plan, there will be a formal notice of application issued by the LGU with a comment period specified in the notice. For most projects, preparation of the mitigation plan requires the assistance of Page 2 of 6

professional consultants and/or others with expertise in wetland science, engineering, and vegetation restoration depending on the nature of the project. Agency review of this document typically takes 60-120 days and may require the bank sponsor to respond to review comments, participate in meetings, and, in certain cases, submit additional information or provide a revised mitigation plan. Please note that the Corps has additional requirements beyond submittal of the mitigation plan. These requirements are not included in this document but are referenced on the BWSR and Corps websites. Easement Acquisition Acquiring a conservation easement can be a complex and time consuming process that has the potential to result in unforeseen project delays and expenses. The entire acquisition process typically takes 4-8+ months due to the various required steps and levels of coordination between the applicant, land surveyor, title agent, and BWSR staff. The five major easement acquisition milestones are outlined below and followed by a Step by Step Wetland Bank Easement Acquisition Guide which summarizes the required order and estimated timeline for each step of the process. Applicants must complete the entire easement acquisition process before credits can be deposited into the State Wetland Bank. 1. Preliminary Ownership Review To initiate easement acquisition, applicants must submit a specific set of BWSR forms and ownership documentation (Section 1 documents), as described on the BWSR website under the Wetland Banking section. Applicants must also submit the initial easement acquisition fee of $1,000 at this time. See the 2017 Wetland Mitigation Fee Policy on the BWSR website for additional details regarding easement acquisition fees. 2. Legal Boundary Survey A legal boundary survey is required to locate and describe the boundary of the wetland bank area on which the required conservation easement will be recorded. This requires the services of a registered land surveyor whom the applicant is responsible for hiring. If the conservation easement is not adjacent to a public road, then a legal access easement from a public road for the State to monitor the easement must also be conveyed and recorded. The surveyor must also prepare a certificate of survey in the specific format required by BWSR (see Legal Survey and Signage Requirements document on the BWSR website). BWSR easement staff will review the submitted certificate of survey, request revisions as needed, and incorporate the final approved version into the easement document, which BWSR will prepare for the landowner to sign. 3. Title Insurance Commitment A title insurance policy naming the State of Minnesota as the insured is required for all conservation easements. Title insurance is purchased by the State to ensure that the property being proposed for a conservation easement has marketable title. The company issuing the policy defends and/or compensates the State if any title problem not excepted from coverage arises that affects the State s ability to enforce the terms of the easement. It is the responsibility of the landowner to hire a title agent and obtain a title insurance policy acceptable to the State. Note that the applicant must wait to obtain title insurance until after BWSR gives explicit instructions to do so. The insured amount ($) of the policy is based on the number of anticipated credits identified in the approved bank plan and will be provided by BWSR. A title agent representing the landowner will need to provide the following services: A. Update the property abstract to the current date of request B. Prepare a title commitment that includes the BWSR approved certificate of survey and identifies all exceptions (i.e. items that are too great a risk for the company to insure) C. Work with BWSR to tailor the title commitment to meet State requirements (this task typically requires back and forth coordination between the title agent and BWSR easement staff) Page 3 of 6

D. Perform a gap check to confirm no changes to the title between the commitment date and the date the easement is to be recorded E. Record the easement document with the county in which the easement is located F. Issue a final title insurance policy (ALTA Owners Policy 1987 (6-17-06)) BWSR will send out an instructional letter and Specimen Title Insurance Policy to help guide the title agent when they begin to draft the title commitment (see Wetland Banking Title Insurance Requirements document on the BWSR website). This will help to ensure that the State s required format is followed, although agents may still need additional guidance from BWSR. Prior to recording the easement, the applicant is responsible for clearing certain property encumbrances that appear on the title commitment, if any. Inability or unwillingness to clear encumbrances could prohibit the State from accepting the easement and prevent establishment of a wetland bank. The following are examples of potential encumbrances and the typical actions required by BWSR: Existing Mortgages: Mortgage holders must sign a mortgage consent form (prepared by BWSR) to be recorded with the county in conjunction with the easement. Certain lenders or mortgage holders may not be willing to consent to the conservation easement and the landowner may be required to refinance with a lender that is willing to consent. Utility Easements: Landowners must request confinement of blanket utility easements (gas, electric, telephone, wind, etc.) that conflict with the approved bank plan or easement language. Tax Liens: All property taxes must be paid to date. Severed Mineral Rights: Landowners must attempt to purchase severed mineral rights (i.e. another party s right to mine) if they are currently under different private ownership. If purchase is not possible the landowner must obtain a non-disturbance agreement with the current mineral right owner. 4. Easement Execution Once the title is cleared to the State s satisfaction and the title commitment has been received, reviewed and approved by BWSR and the State Attorney General office (AG), BWSR will prepare the conservation easement and send it to the landowner for signature. The landowner then returns the signed easement to BWSR in conjunction with the balance of the easement acquisition fee ($2,400). 5. Easement Recording & Final Title Insurance Policy Upon receipt of the signed easement and $2,400 fee, BWSR will countersign the easement and send the fully executed document to the title agent to check for any new encumbrances (gap check), record the easement, and prepare the final title insurance policy. BWSR and the AG will review and approve all final documents. Note that the language of the conservation easement is standardized and cannot be altered or adapted to fit an individual project. If the landowner has special site/project circumstances, they may be addressed through the mitigation plan referenced in the easement. The following page contains a step by step description of the typical easement acquisition process. The remaining items required beyond easement acquisition are outlined on page 6. Page 4 of 6

Step by Step Wetland Bank Easement Acquisition Guide Step Applicant Responsibilities BWSR Responsibilities 1. Preliminary Ownership Review (2 weeks)* 2. Legal Boundary Survey (1-2 months)* 3. Title Commitment (1-2+ months)* 4. Easement Execution (1 month)* 5. Easement Recording & Title Insurance (1-2 months)* A. Submit initial $1,000 Easement Acquisition Fee B. Submit Section 1 Documents: Acquisition Checklist Initiation Form Assessment Form Aerial photo with preliminary easement boundary, section corners, road labels, etc. Deed(s) and other ownership documents as needed A. Complete and return the Contact Information Form B. Hire a surveyor to prepare a certificate of survey (map & legal description) that meets BWSR format requirements C. Send certificate of survey and GIS shapefile of boundary to BWSR for review and comment A. Provide Title Agent with approved certificate of survey & BWSR instructions for title commitment B. Title agent to prepare commitment in requested format and send to BWSR for review and comment A. Landowner to execute easement document and credit acknowledgment form (both must be notarized) and mail original copies to BWSR B. Submit remaining $2,400 Easement Acquisition Fee A. Title Agent to perform gap check to ensure no changes to title, record easement with the county, and prepare final title policy in requested format B. Title Agent to mail original hard copies of each to BWSR *Timeframes are estimates for a typical easement. There are a variety of extenuating circumstances that could delay this process. Page 5 of 6 C. Confirm receipt of $1,000 Easement Acquisition Fee D. Review Section 1 Documents for completeness; request additional information as needed E. Assign Easement ID Number F. Provide applicant with Contact Information Form G. Notify applicant to obtain a legal survey of the easement boundary to be documented on a certificate of survey in accordance with BWSR survey format requirements D. Review certificate of survey & shapefile; request revisions as needed E. Confirm easement boundary with BWSR Wetland Section F. Provide applicant with instructions for obtaining a title commitment C. Review title commitment and request revisions as needed (When applicable, landowner is responsible for clearing title as directed by BWSR, prior to recording the Easement) D. Prepare easement document & credit acknowledgment form E. Provide title commitment and easement to State Attorney General office (AG) for review, comment, and approval F. Mail easement document & credit acknowledgement form to landowner for signature and notarization C. Confirm receipt of $2,400 Easement Acquisition Fee D. Obtain BWSR signature on easement document E. Send original executed easement to title agent with instructions for performing a gap check, recording the Easement, and preparing the final title policy C. Review recorded easement and title policy for completeness D. Provide documents to AG for final review and approval E. Notify BWSR Wetland Section that easement process is complete F. Email copy of recorded easement to applicant with instructions for next steps

Construction Certification For projects involving construction and/or vegetation establishment/manipulation, the applicant must provide evidence that initial construction activities were completed per the approved mitigation plan. This typically involves an as-built survey of construction features (berms, control structures, etc.) and seed tags or receipts confirming that seeding and planting was accomplished as specified in the mitigation plan. The LGU provides notification to the bank sponsor when they determine the construction and vegetation establishment activities are in conformance with the plan. Request to Deposit Wetland Credits Establishment of a wetland bank account occurs with a request to deposit wetland credits. Construction certification typically provides the basis for the first deposit of up to 15% of the anticipated credits (this may vary). A Transaction Form to Deposit Credits is completed by the sponsor and provided to the LGU for approval. Once the required signatures are obtained, the form is sent to the BWSR wetland bank coordinator to establish a wetland bank account and complete the deposit of credits. Bank Deposit Fees At the time of the first deposit of credits, the sponsor will be charged an account establishment fee. The establishment fee is assessed at 6.5% of the value of the credits deposited, not to exceed $1,000. Credit values are updated annually by BWSR based on land value data from the Minnesota Department of Revenue and provided on wetland bank transaction forms. Subsequent deposits into the account are subject to deposit fees also assessed at 6.5% of the value of the credits deposited, not to exceed $1,000. An annual account maintenance fee may also be assessed at the time of the deposit if not paid previously during the calendar year. There are other fees associated with the withdrawal of deposited wetland credits (withdrawal and stewardship fees), but these are assessed at the time of withdrawal and are typically passed on to the user of the credits. A complete description of the fees applicable to wetland banking is provided on the BWSR website under the Wetland Banking section. Costs and Timelines The following table summarizes typical costs with the administrative processes discussed in this document. Actual costs vary depending on the size and complexity of the project as well as the number and nature of legal encumbrances on the property. Administrative Requirement Legal Boundary Survey Registered Land Surveyor Fee Title Insurance Title Agent Fee Easement Preparation and Recording Recording Fees Bank Fees 1 Typical Cost $3000 - $6000 $1500 - $3000 $50 - $100 $4400 1 Easement Acquisition and Account Establishment Fees BWSR Guidance February 1, 2018. This document is available on the BWSR website and may be revised periodically. Check the BWSR website for the most current version (http://www.bwsr.state.mn.us/wetlands). Page 6 of 6