INCORPORATED VILLAGE OF GARDEN CITY

Similar documents
Location in Code Subject Fees

APPENDIX A 2018 FEE SCHEDULE

Town Code Section Department Fee Type Parking Permits (pro-rated fees)

Replacement and/or Lost Permit or Tag Replacement and/or Lost Permit or Tag, including replacement for new license plates, $10.

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

CITY OF BEL AIRE Schedule of Service, License and Permit Fees 2016

Appendix G Fee Schedule

BOROUGH OF BRIDGEPORT FEE SCHEDULE 2018

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

SPRING GARDEN FEES SCHEDULE

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Town of Walworth Fee Schedule 2019

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Village of Baxter Estates Fee Schedule

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

Worcester Township Fee Schedule

4. Building plans should include top of foundation elevation

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Village of Kenilworth 2018 Annual Fee Schedule

MASTER FEE SCHEDULE Amended June 12, 2018

City of Sand Springs, Oklahoma Planning and Development Department Neighborhood Services Office

CITY OF BEACON SCHEDULE OF FEES

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

ORDINANCE NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COMMERCE, TEXAS, THAT:

TOWN OF PERINTON FEE SCHEDULE 2019 DEPARTMENT OF PUBLIC WORKS PERMIT & INSPECTION FEES. $60 per inspection / $150 per re-inspection

APPLICATION FOR A BUILDING PERMIT

TOWN OF BLOOMSBURG COLUMBIA COUNTY, PENNSYLVANIA RESOLUTION NO SETTING VARIOUS FEES

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

City of Pleasant Hill. Master Fee Schedule

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

Planning&Development Fee Standards

CITY OF HARKER HEIGHTS FEE SCHEDULE October 1, 2008 to September 30, 2009

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

5755 Country Club Road * Shorewood, MN * / City of Shorewood MASTER FEE SCHEDULE

CITY OF FORT CALHOUN LOCAL FEES SCHEDULE

City of High Point Development Fee Schedule

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

APPENDIX B - SCHEDULE OF FEES * Code Section CHAPTER 6 ADVERTISING. Description

RESOLUTION NO. 701 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

EXHIBIT A to Ordinance No PART 1

Planning, Zoning and Building Fee Schedule

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

FEE SCHEDULE Construction Services and Permitting

TOWN OF HILLSBOROUGH SCHEDULE OF FEES AND CHARGES SPECIAL TAX, SERVICE CHARGES & OTHER CITYWIDE FEES

VILLAGE OF ALLOUEZ SCHEDULE OF FEES AND CHARGES

ORDINANCE NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COMMERCE, TEXAS, THAT:

City of Pine City Resolution #: 18-01

City of Washburn 2018 FEE SCHEDULE

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

~ CITY OF WISCONSIN DELLS ~ 2018 SCHEDULE OF FEES

City of Roswell - Fee Schedule

Land Use Permit Fee Residential Commercial/Industrial Cost per $1, $ 6.00 $ 6.00

DEMOLITIONS LICENSING REQUIREMENTS APPLICATION PROCESS. 1 of 2

CITY OF HARKER HEIGHTS FEE SCHEDULE October 1, 2012 to September 30, 2013

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING STANDARD FEE LIST (Effective July 1, 2017)

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

ORDINANCE NO (revised by Ordinance )

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

2018 FEE SCHEDULE. Chapter 8 Animals, Article ll Dog License Dog at Large $75.00

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

City of Hobart Municipal Code Fee Schedule Page 1

City of Wasco MASTER FEE SCHEDULE EXHIBIT A. City Clerk. Community Development

New Hanover Township

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

RESOLUTION NUMBER

FEES. Facility Rental/Damage Deposit $ Inspection, review, examine, search for, etc. of a public document

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

BUILDING PERMIT FEE SCHEDULE

2018 Fee Schedule DESCRIPTION. As of January 1, 2018 BUILDING DEPARTMENT

Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required.

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

FORKS TOWNSHIP FEE SCHEDULE AS AMENDED 11/2017

Certificate of Occupancy Application Guidelines

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

Peters Township Planning Department Fee Schedule

Fee Resolution

ASTON TOWNSHIP 2018 FEE SCHEDULE FOR CODE ENFORCEMENT

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

City of Lake Dallas Master Fee Schedule Fiscal Year 2017

2 Janesville - Index

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

Permit Expiration and Permit Renewal Fees. General Administration Fees

MUNICIPALITY OF PENN HILLS. Ordinance No of 2012

2018 FEE SCHEDULE Effective 01/01/18

APPENDIX C CITY OF OVERTON - SCHEDULE OF FEES

CITY OF GALION OHIO CONSOLIDATED FEE SCHEDULE

Town of Palm Beach Building Division CONSTRUCTION PERMIT APPLICATION

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

Transcription:

VILLAGE WIDE FEE SCHEDULE REV 5/18/2017 Page 1 of 11

CONTENTS CLERK S FEE SCHEDULE... 3 BUSINESS LICENSES FEE SCHEDULE... 4 POLICE DEPARTMENT S FEE SCHEDULE... 4 FIRE DEPARTMENT S FEE SCHEDULE... 4 RECREATION AND PARKS FEE SCHEDULE... 5 PUBLIC WORK S FEE SCHEDULE... 5 BUILDING DEPARTMENT FEE SCHEDULE... 6 BUILDING S... 6 PLUMBING PERMITS FEES... 8 ELECTRIC PERMITS FEES... 8 MECHANICAL PERMITS FEES... 9 VARIANCES... 9 INSPECTIONS FEES... 10 BUILDING ADMINISTRATIVE FEES... 11 REV 5/18/2017 Page 2 of 11

ALARM REGISTRATION FEE - COMMERCIAL ALARM REGISTRATION FEE - RESIDENTIAL BLOCK PARTY CLERK S FEE SCHEDULE $0 PER YEAR $0 PER YEAR $75 PER YEAR CERTIFICATE ISSUANCE - BIRTH $10 AS PER NYS REGULATIONS - DEATH $10 AS PER NYS REGULATIONS DISHONORED CHECKS $20 AS PER GENERAL OBLIGATIONS LAW DOG LICENSE - SPAYED/NEUTERED $20-1 YEAR: $60-3 YEARS - UNSPAYED/UNNEUTERED $27-1 YEAR; $81-3 YEARS DOG REDEMPTION FEE FILMING PERMIT PARKING PERMIT - FAIR COURT PARKING AREA PARKING PERMIT - MEDICAL CENTER PARKING PARKING PERMIT - PARKING FIELD NO. 6 $70 PER OCCURRENCE PER DAY PLUS EXPENSES $200 PER YEAR $200 PER YEAR $200 PER YEAR PARKING PERMIT - RAILROAD-RESIDENT $150 PER YEAR $400 PER YEAR (STEWART MANOR/NASSAU PARKING PERMIT - RAILROAD-NON-RESIDENT BLVD.) PARKING PERMIT ADELPHI NASSAU BLVD. $200 PER YEAR 50% OF THE COMBINED TOTAL EXPENSE PARADE/SPECIAL EVENT FEE INCURRED BY THE VILLAGE UP TO A MAX FEE OF $5,000 PER PARADE/EVENT $0.25 PER PAGE FOR VILLAGE RECORDS (FOIL) REPRODUCTIONS, ACTUAL COST OF REPRODUCTION FOR ALL OTHER RECORDS REFUSE PERMIT $15 SALE OF VILLAGE MAPS $20 SHOPPING CART REDEMPTION $50 $200 FOR SALE/LEASE IN A RESIDENTIAL SIGN PERMITS (TEMPORARY SIGNS) UNPAID TAX NOTICE ZONE FOR 60 DAYS $25 FOR OPEN HOUSE. SPECIAL EVENT - FREE FOR 10 DAYS $1 AS PER NYS REGULATIONS VILLAGE CODE BOOK (INCLUDING SUPPLEMENTS) $250 REV 5/18/2017 Page 3 of 11

BUSINESS LICENSES FEE SCHEDULE ARCADES/GAMES/PLACES OF AMUSEMENT $500 AUCTIONER $750, EACH DAY OF AUCTION CLOSE-OUT AND DISTRESS SALES $500, THIRTY DAYS $500, SPECIFIC SHOW WITH APPROPRIATE FIREWORKS DISCHARGE INSURANCE $30, FOR 3 DAYS-EXCLUDING SUNDAY AND GARAGE AND/OR A SIMILAR SALE HOLIDAYS JUNK CART (JUNK DEALER) $500 OUTDOOR DINING PERMIT $200 PEDDLER SANITATION - SPECIAL COLLECTION $250, ANNUAL NO CHARGE SECOND HAND DEALER $150 SOLICITORS (CONTRIBUTIONS) $250, ANNUAL TAXICAB LICENSE $50 TAXICAB DRIVERS LICENSE $30 THEATRE $1000 CASE REPORT REQUESTED BY INS. COMPANY AUTOMOTIVE IMPOUNDMENT FEE NON-PAYMENT OF TICKET/IMPOUNDMENT POLICE DEPARTMENT S FEE SCHEDULE $5, PLUS A SELF-ADDRESSED STAMPED ENVELOPE $100, PLUS TOWING AND STORAGE, PER OCCURRENCE $100, PLUS TOWING AND STORAGE, PER OCCURRENCE FIRE DEPARTMENT S FEE SCHEDULE $500 PER INCIDENT, $125 PER HALF HOUR EMERGENCY RESPONSE IN EXCESS OF THE FIRST HOUR STANDPIPE TEST $1,500 REV 5/18/2017 Page 4 of 11

RECREATION AND PARKS FEE SCHEDULE TREE REMOVAL $30 DUMPSTER PERMITS - ROLL OFF CONTAINERS MOVING BUILDINGS OVER PUBLIC HIGHWAYS PAVING PLACING MATERIAL IN STREET/PUBLIC AREA SANITATION FEE - COMMERCIAL PUBLIC WORK S FEE SCHEDULE SIDEWALK / APRON AND DROP CURB REPLACEMENT No fee shall be charged for the issuance of a permit for the repair or replacement of a sidewalk pursuant to a notice to correct issued pursuant to Chapter 178 of the Village code. RIGHT OF WAY PERMIT GAS/ELECTRIC/COMMUNICATIONS AND OTHER $100 FEE, PER 30 DAYS. DEPOSIT OF $500, PLUS APPROPRIATE INSURANCE. DEPOSIT IS RETURNED ONCE STREET INSPECTION IS COMPLETE. $115, PLUS APPROPRIATE INSURANCE. $115 /FIRST 100 FT. PLUS $115 FOR EACH ADD'L. 100 FT. PLUS $115 EACH ADD'L 100 FT. OR PART THEREOF $100 FEE, DEPOSIT OF $500 PLUS APPROPRIATE INS. $5 PER EXCESS PICK-UP $150 /FIRST, PLUS $15 FOR EACH ADDITIONAL BELLHOLE: UP TO 25 SQ.FT.: $12.50 PER SQ.FT. OPENINGS OVER 25 SQ. FT.: $750 FLAT FEE (INCLUDES OPENINGS IN ROAD/SIDEWALK AND UTILITY AREA) TRENCHING: $1 PER L.F DEPOSIT: CHECK OR BOND REQUIRED ( SEE OFFICE) RIGHT OF WAY PERMIT WATER AND SEWER SERVICE REPLACEMENT AND REPAIR $150/FIRST PLUS $15 FOR EACH ADD L$1000 THEREAFTER & $300 DEPOSIT/FIRST PLUS $15 FOR EACH ADD L $1000 THEREAFTER REV 5/18/2017 Page 5 of 11

BUILDING DEPARTMENT FEE SCHEDULE BUILDING S BUILDING PERMITS - RESIDENTIAL $ 400* FOR THE FIRST (NEW CONSTRUCTION & ALL ALTERATIONS TYPES - INCLUDING ALL REMODELING TYPES) * TOTAL FEES INCLUDE APPLICATION & CERTIFICATE FEES Applies to 3 Families or less & Res. Structures BUILDING PERMITS - RESIDENTIAL DEPOSIT DEPOSIT IS RETURNED BACK TO THE OWNER AT THE END WHEN THE PERMIT IS CLOSED Applies to 3 Families or less & Res. Structures BUILDING PERMITS - COMMERCIAL (NEW CONSTRUCTION & ALL ALTERATIONS TYPES - INCLUDING ALL REMODELING TYPES) * TOTAL FEES INCLUDE APPLICATION & CERTIFICATE FEES Applies to 4 Families or more & Com. Structures. BUILDING PERMITS - COMMERCIAL DEPOSIT DEPOSIT IS RETURNED BACK TO THE OWNER AT THE END OF THE PROJECT Applies to 4 Families or more & Com. Structures. BUILDING PERMITS - COMMERCIAL - * FAST TRACK * - FAST TRACK FEE* (THIS FEE IS IN ADDITION TO THE INITIAL BUILDING PERMIT COMMERCIAL FEE ABOVE) Amendments Administrative ( All Types ) ADMINISTRATIVE CHANGES (CONTRACTOR, OWNERS) MINOR CHANGES WHICH DO NOT REQUIRE AMENDING APPROVED PLANS. Amendments Post Approval Amendments (PAA) - All Types PLAN REVIEW (ADDING, SUBTRACTING SCOPE OF WORK) REQUIRES PLAN REVIEW AND APPROVALS TO AMEND AN EXISTING PERMIT ISSUED. BUILDING PERMITS - MAINTAIN & LEGALIZATION - RESIDENTIAL MAINTAIN EXISTING CONSTRUCTION (AS BUILT) RESIDENTIAL - CONSTRUCTION ONLY Applies to 3 Families or less & Res. Structures BUILDING PERMITS - MAINTAIN & LEGALIZATION - COMMERCIAL MAINTAIN EXISTING CONSTRUCTION (AS BUILT) Applies to 4 Families or more & Com. Structures. $ 300 FOR THE FIRST $ 500* FOR THE FIRST $ 500 FOR THE FIRST $ 150 FOR THE FIRST $25 per submission / request $ 125 FOR THE FIRST PER SUBMISSION / REQUEST BUILDING PERMITS FEE(S) BUILDING PERMITS FEE(S) REV 5/18/2017 Page 6 of 11

WORK WITHOUT PERMITS ( RES & COM ) ( NOT COMPLETED, FOUND DOING WORK WITHOUT A PERMIT, OR STILL IN PROGRESS ) DEMOLITION PERMITS RESIDENTIAL * TOTAL FEES INCLUDE APPLICATION & CERTIFICATE FEES Applies to 3 Families or less & Res. Structures DEMOLITION PERMIT DEPOSIT RESIDENTIAL DEPOSIT IS RETURNED BACK TO THE OWNER AT THE END OF THE PROJECT Applies to 3 Families or less & Res. Structures DEMOLITION PERMIT COMMERCIAL * TOTAL FEES INCLUDE APPLICATION & CERTIFICATE FEES Applies to 4 Families or more & Com. Structures. DEMOLITION PERMIT DEPOSIT COMMERCIAL DEPOSIT IS RETURNED BACK TO THE OWNER AT THE END OF THE PROJECT Applies to 4 Families or more & Com. Structures. SWIMMING POOLS / HOT TUBS PERMIT REQUIRES ZBA APPROVAL, ZONING CALCULATIONS AND UPDATED SURVEYS * TOTAL FEES INCLUDE APPLICATION & CERTIFICATE FEES TEMP PERMIT APPLICATIONS ** 180 DAYS OR LESS ** (TENTS, TEMP STRUCTURES, ETC.) TEMP PERMIT APPLICATIONS ** 180 DAYS OR LESS ** (TENTS, TEMP STRUCTURES, ETC.) PAVEMENT WORK PERMIT - RESIDENTIAL (E.G... FRONT YARDS / DRIVEWAY) PAVEMENT WORK PERMIT - COMMERCIAL (E.G... FRONT YARDS / DRIVEWAY, PARKING LOTS) * TOTAL FEES INCLUDE APPLICATION & CERTIFICATE FEES Applies to 4 Families or more & Com. Structures. FENCE PERMITS SIGN PERMIT AWNING / CANOPY PERMIT STANDARD BACKBOARD (BASKETBALL IN REAR ) BUILDING PERMITS FEE(S) $ 400* FOR THE FIRST Total Cost of Demolition $ 500* FOR THE FIRST Total Cost of Demolition $ 400 FOR THE FIRST $150 RESIDENTIAL FLAT FEE $300 COMMERCIAL FLAT FEE $150 FLAT FEE $ 500 FOR THE FIRST $150 FLAT FEE $150 FLAT FEE $ 150 FLAT FEE $25 REV 5/18/2017 Page 7 of 11

PLUMBING PERMITS FEES PLUMBING APPLICATIONS RESIDENTIAL* * TOTAL FEES INCLUDE CERTIFICATE FEE Applies to 3 Families or less & Res. Structures PLUMBING APPLICATIONS COMMERCIAL* * TOTAL FEES INCLUDE CERTIFICATE FEE Applies to 4 Families or more & Com. Structures. PLUMBING APPLICATIONS MAINTAIN & LEGALIZATION - RESIDENTIAL MAINTAIN EXISTING CONSTRUCTION (AS BUILT) Applies to 3 Families or less & Res. Structures PLUMBING APPLICATIONS MAINTAIN & LEGALIZATION - COMMERCIAL MAINTAIN EXISTING CONSTRUCTION (AS BUILT) Applies to 4 Families or more & Com. Structures. $ 275 FOR THE FIRST $ 375 FOR THE FIRST BUILDING PERMITS FEE(S) BUILDING PERMITS FEE(S) ELECTRIC PERMITS FEES ELECTRICAL APPLICATIONS - RESIDENTIAL Applies to 3 Families or less & Res. Structures CONSULTANT CERTIFICATE SERVES AS FINAL CERTIFICATION ELECTRICAL INSPECTION FEE PAID DIRECTLY TO VILLAGE CONSULTANT * SEPARATE FEE SCHEDULE FROM CONSULTANT ELECTRICAL APPLICATIONS - COMMERCIAL Applies to 4 Families or more & Com. Structures. CONSULTANT CERTIFICATE SERVES AS FINAL CERTIFICATION ELECTRICAL INSPECTION FEE PAID DIRECTLY TO VILLAGE CONSULTANT * SEPARATE FEE SCHEDULE FROM CONSULTANT ELECTRICAL APPLICATIONS - MAINTAIN & LEGALIZATION - RESIDENTIAL MAINTAIN EXISTING CONSTRUCTION (AS BUILT) Applies to 3 Families or less & Res. Structures ELECTRICAL APPLICATIONS - MAINTAIN & LEGALIZATION - COMMERCIAL MAINTAIN EXISTING CONSTRUCTION (AS BUILT) Applies to 4 Families or more & Com. Structures. $ 200 FLAT FEE ELECTRICAL INSPECTION FEE PAID DIRECTLY TO APPOINTMENT VILLAGE CONSULTANT * $ 300 FLAT FEE ELECTRICAL INSPECTION FEE PAID DIRECTLY TO APPOINTMENT VILLAGE CONSULTANT * ELECTRICAL PERMITS FEE(S) ELECTRICAL PERMITS FEE(S) REV 5/18/2017 Page 8 of 11

MECHANICAL PERMITS FEES MECHANICAL APPLICATIONS - RESIDENTIAL* * TOTAL FEES INCLUDE CERTIFICATE FEE Applies to 3 Families or less & Res. Structures MECHANICAL APPLICATIONS - COMMERCIAL* * TOTAL FEES INCLUDE CERTIFICATE FEE Applies to 4 Families or more & Com. Structures. MECHANICAL APPLICATIONS - MAINTAIN & LEGALIZATION - RESIDENTIAL MAINTAIN EXISTING CONSTRUCTION (AS BUILT) Applies to 3 Families or less & Res. Structures MECHANICAL APPLICATIONS - MAINTAIN & LEGALIZATION - COMMERCIAL MAINTAIN EXISTING CONSTRUCTION (AS BUILT) Applies to 4 Families or more & Com. Structures. $ 275 FOR THE FIRST $ 375 FOR THE FIRST MECHANICAL PERMITS FEE(S) MECHANICAL PERMITS FEE(S) BOARD OF ZONING APPEALS (ZBA) RESIDENTIAL FEE* VARIANCES CONSTRUCTION COST UNDER $20,000 $425 CONSTRUCTION COST OVER $20,000 $725 * TOTAL FEES INCLUDE CERTIFICATE FEE Applies to 3 Families or less & Res. Structures BOARD OF ZONING APPEALS (ZBA) COMMERCIAL FEE* CONSTRUCTION COST UNDER $20,000 $725 CONSTRUCTION COST OVER $20,000 $2,625 * TOTAL FEES INCLUDE APPLICATION FEE Applies to 4 Families or more & Com. Structures. 15% EXTENSION OF ANY BUILDING PERMITS RESIDENTIAL OF ORIGINAL PERMIT TOTAL FEES FROM BOARD OF TRUSTEES, ZBA, ADRB, PC, DOB Applies to 3 Families or less & Res. Structures BUT NO LESS THAN 1 YEAR ONLY $125 15% EXTENSION OF ANY BUILDING PERMITS COMMERCIAL FROM BOARD OF TRUSTEES, ZBA, ADRB, PC, DOB Applies to 4 Families or more & Com. Structures. 1 YEAR ONLY ARCHITECTURAL DESIGN REVIEW BOARD (ADRB) RESIDENTIAL FEE* OF ORIGINAL PERMIT TOTAL FEES BUT NO LESS THAN $500 CONSTRUCTION COST UNDER $20,000 $425 CONSTRUCTION COST OVER $20,000 $725 NEW BUILDING / STRUCTURE $1,625 * TOTAL FEES INCLUDE APPLICATION FEE Applies to 3 Families or less & Res. Structures REV 5/18/2017 Page 9 of 11

ARCHITECTURAL DESIGN REVIEW BOARD (ADRB) COMMERCIAL FEE* CONSTRUCTION COST UNDER $20,000 $525 CONSTRUCTION COST OVER $20,000 $925 NEW BUILDING / STRUCTURE $2,625 * TOTAL FEES INCLUDE APPLICATION FEE Applies to 4 Families or more & Com. Structures. ARCHITECTURAL DESIGN REVIEW BOARD SIGN/ AWNING REVIEW* * TOTAL FEES INCLUDE APPLICATION FEE $425 ZONING CHANGE REVIEW COMMITTEE (ZCRC) * * TOTAL FEES INCLUDE APPLICATION FEE $2,625 PLANNING COMMISSION (PC) RESIDENTIAL FEE* CONSTRUCTION COST UNDER $20,000 $625 CONSTRUCTION COST OVER $20,000* $1,125 200-82.9 ADDITIONAL FEES PER 200-82.9 * TOTAL FEES INCLUDE APPLICATION FEE Applies to 3 Families or less & Res. Structures PLANNING COMMISSION (PC) COMMERCIAL FEE * CONSTRUCTION COST UNDER $20,000 $1,125 CONSTRUCTION COST OVER $20,000* $2,125 200-82.9 * TOTAL FEES INCLUDE APPLICATION FEE Applies to 4 Families or more & Com. Structures. PLANNING COMMISSION SUB DIVISION REVIEW FEE ADDITIONAL FEES PER 200-82.9 $1,125 100 PER UNIT INSPECTIONS FEES BUILDING INSPECTIONS ADDITIONAL INSPECTIONS FOR FAILED INSPECTIONS OR PHASED WORK Applies to All Residential & Commercial PLUMBING INSPECTIONS ADDITIONAL INSPECTIONS FOR FAILED INSPECTIONS OR PHASED WORK Applies to All Residential & Commercial ELECTRICAL INSPECTIONS ADDITIONAL INSPECTIONS FOR FAILED INSPECTIONS PERFORMED OR PHASED WORK Applies to All Residential & Commercial MECHANICAL INSPECTIONS ADDITIONAL INSPECTIONS FOR FAILED INSPECTIONS OR PHASED WORK Applies to All Residential & Commercial $150 EACH ADDITIONAL INSPECTION $150 EACH ADDITIONAL INSPECTION $150 EACH ADDITIONAL INSPECTION $150 EACH ADDITIONAL INSPECTION REV 5/18/2017 Page 10 of 11

TEMPORARY CERTIFICATE OF OCCUPANCY IF REQUIRED FOR OCCUPANCY WHEN FILE IS NOT COMPLETED BUILDING ADMINISTRATIVE FEES COPIES OF CERTIFICATES (UNSEALED) CERTIFICATE OF OCCUPANCY SEARCH TITLE SEARCH $100 RESIDENTIAL $200 COMMERCIAL $10 EACH $ 100 PER LEGAL ADDRESS/ FOLDER WITH UP TO 10 CERTIFICATES. ADDITIONAL CERTIFICATES AFTER 10, @$10 EACH FOIL REQUESTS $ 0 COPIES BUSINESS DOCUMENTS UP TO 11X17 B&W ONLY COLOR & OTHER SIZES SENT OUT FOR REPRODUCTION $0.25 PER COPY COPY CENTER FEE PLEASE NOTE THE FOLLOWING: (VILLAGE WIDE) ALL FEES ARE DUE AT TIME OF FILING AND ARE NONREFUNDABLE AS PER 68-5: FEES (BUILDING DEPT.) ALL STRUCTURES ARE TO BE FILED SEPARATELY RESIDENTIAL ( 3 FAMILIES OR LESS & RESIDENTIAL TYPE STRUCTURES) COMMERCIAL ( 4 FAMILIES OR MORE & COMMERCIAL TYPE STRUCTURES) ALL MAINTAIN AND LEGALIZATION APPLICATIONS ARE TO BE FILED SEPARATELY FROM ALL NEW WORK. END OF DOCUMENT REV 5/18/2017 Page 11 of 11