New commission New construction of rehearsal building for Ballett am Rhein, Düsseldorf

Similar documents
von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

Award for new Vietnamese National Assembly building in Hanoi Vietnam relies on German building culture

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

gmp von Gerkan, Marg and Partners Architects Press Release

aac Designs for a New Civic Centre Shaping Public Life on the City s Former Airport Area Press release

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

96 & 98 CHISWICK HIGH ROAD FREEHOLD FOR SALE GUIDE PRICE 1,500,000. Chiswick W4 1SH. Three floor, mid-terrace commercial property 6,565 sq ft GIA

Shanghai Oriental Sports Center, Shanghai (CN) THE LAKESIDE SWIMMING STADIUM

Kunsthalle Mannheim museum of modern and contemporary art: Metal fabric as the interface between the inside and outside world

BYLAW NUMBER 159D2016

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

Steven Davidson FOR LEASE. 101 Hannover Dr. #4 St. Catharines. Office Space. 3,697 sq.ft. $12.00 Sq Ft Net E1 Zoning

CONRAD ENGINEERS Description of Scheme. The disciplines imposed upon the design and grouping of off-site preassembled residential units follow:

DRAFT ZONING BY-LAW AMENDMENT 75 DUBLIN STREET NORTH ZC1612

stein am rhein.projects 5

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Secondary Suites Design Standards & Guidelines for houses built after July 1998

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS

THE SPECTRUM BUILDING BRISTOL

MILL ROAD DEPOT, CAMBRIDGE Design and Access Statement December

Düsseldorf Schauspielhaus Theater

LeBreton Flats Redevelopment Development Summary Chart (First Subdivision)

Architectural Projects Multi-Residential Developments

The moving play of reflections of slightly distorted structures, of shadow and light, superposed by the shiny red ceramic surface and its light

Property. Exciting Retail/ Leisure Opportunity New-Build Bar/ Restaurant Premises. Available TO LET. Victoria Street, Liverpool L1 6BX

Tai Po Complex Tai Po, Hong Kong Building Journal

NORTH PRESTIGE LEASING OPPORTUNITY BY MANSOURI LIVING

Scenario Guide and Reference Sheet

12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential

8.5.1 R1, Single Detached Residential District

FORMER SHAUGHNESSY HOSPITAL

B A LT RASNA MANOR. Welcome Home D UBLIN ROA D, ASHB OUR N E

Fairmount, 3 Lugton Brae. Lugton, by Dalkeith, Midlothian, EH22 1JX

DESIGN, ACCESS & PLANNING STATEMENT

ctbuh.org/papers Greening Office Towers Title: Christoph Ingenhoven, Ingenhoven Overdiek und Partners Architectural/Design Office Sustainability

FOR LEASE Professional Building

Berlin (annex).projects 7

40 Donaldson Street, Greenslopes QLD. Proudly Developed by Mosaic Property Group

q/., S Lt _ _.._--.

Proposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton

PRESENTS AN EXCLUSIVE ADDRESS FOR BUSINESS AT THE BURJ DISTRICT THE BINARY

Building 27E Marine Base Amsterdam

When this two-storey Cape Town (South Africa) property, originally designed by SAOTA a decade ago, was bought by its new owners, they called for a

Density. Central Hill Estate 2016

Requirements for accepted development and assessment benchmarks for assessable development

Multi-unit residential uses code

1. PRESENTATION OF THE PROJECT

Hotel and Multi Storey Cycle Park Two The Square, Station Square, Cambridge

LEASEHOLD LICENSED PREMISES

18. Appendix H Urban Design Panel Presentation

VIEW VISION OVERVIEW HEILBRONNER STR. 190 STUTTGART

Real estate development significant growth driver Company profile and business model High-quality Investment Portfolio

Supreme Sport Village / LAD

The effect of atrium façade design on daylighting in atrium and its adjoining spaces

P r o j e c t C a s e S t u d y

VIEW VISION OVERVIEW HEILBRONNER STR. 190 STUTTGART

National Trust Cottages Access Statement

Key Details Features 4 Front Street, Middleton On The Wolds, Driffield, East Yorkshire YO25 9UA

EMBEDDING BUILDINGS. Marlies Rohmer (architect) THE BUILDING IN THE CITY

Victoria Mill Victoria Mill, Lower Vickers Street, Manchester M40 7LH

LEISURE BROCHURE WA3 6BX. Tel: Tel:

St Johns Road, Isleworth

RM-7, RM-7N and RM-7AN Districts Schedules

dresden.projects 5 Centrum Galerie Dresden S.L.U.B. Dresden Dresden, Germany Ortner & Ortner library Dresden Station Redevelopment

900 ALBERT STREET PLANNING RATIONALE ADDENDUM NO. 2

2/2, 62 Queen s Drive, Queens Park, Glasgow.

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

4 DEVELOPMENT STANDARDS FOR

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen.

JUNE 2008 BLUE MALL ST. MAARTEN

380 Piccadilly Avenue - Wellington Village

Architectural History

Access Statement Cinnamere Cottage, Eastgate, Pickering

2 Bed Semi-detached House to rent, Blacksmiths Avenue, Shepshed, LE12 9SF 600 pcm ( 138 pw), + deposit + admin fees. EPC: C

Emil Møllers Gade 41 Horsens, Denmark

25kV building. Re-use of a former transformer house. client: Ontwikkelingsbedrijf Rotterdam programme: m2 building costs:

Stampley Moss Farm, Thornley Lane, Rowlands Gill, Tyne & Wear

BUILDING SPECIFICATIONS

Elementary Teachers Foundation of Ontario

CityShaping: Draft Official Community Plan Accessory Secondary Suite with Coach House Town Hall Meeting April 15, 2014

108 James St. N. Mixed Use Condo Development ZAR

Hermann Lebherz und Annelie Stumpp present:

Plan Dutch Village Road

EXCALIBUR 27' STYLE C 1280 SQ.FT.

ROYAL BOROUGH OF WINDSOR & MAIDENHEAD PLANNING COMMITTEE

established 200 years Market Place, Chipping Norton

SOUTH CENT RAL. pressure on our roads, the siting of new communities is ever important for the future sustainability of our city.

Sotheron Place, Fulham

BACH HOUSE CORE TOUR. -Interpreters should be familiar with material at each stop, as they will operate on a rotating basis.

Transcription:

The architects von Gerkan, Marg and Partners (gmp) are designing the new rehearsal building for the ballet company of Deutsche Oper am Rhein. In a consortium with HOCHTIEF Solutions, they were commissioned by Düsseldorf City Council in a PPP scheme. The new ballet building will be created on the historic site of the former Rheinbahn depot am Steinberg in Düsseldorf, between the listed tramway depot and the back of the housing development at Kopernikusstrasse. The building will provide the Oper s 50 professional dancers and the ballet school s 55 students with two ballet rooms with full-size stage dimensions, three smaller practice rooms as well as rest rooms, showers, a physiotherapy room and an apartment for guest artists. The new building has been designed as a compact cube and is clearly oriented towards Merowingerstrasse, from where the premises will be accessed in future. The two-storey foyer is located here. Its glazed façade defines the entrance area and stands out distinctly from the fair-faced concrete surface of the building. Towards the south, the building recedes in deference to the neighbouring historic Rheinbahn depot, forming a transition to the 12m high stacked ballet rooms to the north. The two-storey foyer and the canteen welcome the visitor with generous access space, from where circulation areas lead through the building on all floors. The ballet rehearsal rooms are on the ground and second floors, opposite the changing rooms and other supporting facilities. Access is via spacious lobbies from where the rehearsal rooms are entered on the side opposite the mirror wall, i.e. without disturbing ongoing dance practice. The clerestory light bands of the north-facing rehearsal rooms admit daylight throughout the year and large, vertical windows open views to the outside. The position of the ballet building deep inside the site provides maximum tranquillity while, at the same time, giving appropriate prominence to the listed rail depot. As a result, there is optimum tension between technology and poetry, between hard physical work and rehearsal performances in the new Ballett am Rhein building. The architects von Gerkan, Marg und Partners have already designed and completed the State Ballet School in Berlin. The school complex not only provides optimum facilities for contemporary professional stage dance training, but also reflects the uniqueness of the institution in Germany and its international reputation through its dynamic architectural design. PPP scheme gmp Architects von Gerkan, Marg and Partners in cooperation with HOCHTIEF Solutions AG and HMI, BIG and Capatti Staubach Design Volkwin Marg and Hubert Nienhoff with Kristian Spencker Team members Veit Lieneweg, Silvia Schneider, Michael Scholz, Daniel Tome Client The City of Düsseldorf GFA 4,500 m² For further information please contact: PR & Communication Claudia Tiesler T: +49.40.88 151 123 F: +49.40.88 151 184 ctiesler@gmp-architekten.de

Entrance

03 04 Site plan 03 Floor plan second floor Floor plan first floor 04 Floor plan third floor

Longitudinal section Cross section

03 Elevation west Elevation south 03 Elevation north