Phase I Environmental Site Assessments for Corridors

Similar documents
Voluntary standard; accepted by USEPA to comply with AAI rule. 2. Regulatory/Developmental History

Change is in the air with regard. feature

ENVIRONMENTAL SITE ASSESSMENT (AAI COMPLIANT PHASE I)

Hazardous Materials in Project Development Additional Guidance

Due Diligence & Environmental Compliance Issues for Tribal Energy Projects: Hazardous Waste

Environmental. Due Diligence 9 Steps Companies Should Take to Effectively Manage. Environmental. Risks in Commercial Real Estate Deals

Environmental Audit Standards

BROWNFIELDS Connecticut All Grantee Meeting July Getting the most out of All Appropriate Inquiries (AAI)

Phase I ESAs and the USEPA's All Appropriate Inquiry Final Rule

DUE DILIGENCE. Presented at. Lydia Work, Senior Chemist Licensed Remediation Specialist Triad Engineering, Inc.

The University of Texas System Systemwide Policy. Policy: UTS Title. Environmental Review for Acquisition of Real Property. 2.

New Environmental Diligence Standards for All Appropriate Inquiries (AAI)

Technical Information Paper No

EPA s All Appropriate Inquiry Rule: When is Enough, Enough?

Different Levels of Environmental Site Assessment and the Benefits to M&A Due Diligence

ENVIRONMENTAL DUE DILIGENCE

ASTM Phase I Changes and AAI Webinar

Phase I Environmental Site Assessment Update Memorandum Vacant Property 1585 Santa Clara Avenue Santa Ana, California 92507

Phase I Environmental Site Assessment Standard Practice Update. West Virginia Brownfields Conference September 2013

New Phase I Requirements for Real Estate Transactions: Implications of the New All Appropriate Inquiries Rule

PHASE I ENVIRONMENTAL ENGINEERING PHASE I REPORT 3264 PREPARED FOR: Mark Hopkins. Liberty Real Estate, LLC. 741 North State Road.

Highlights of USEPA All Appropriate Inquiries (AAI) Final Rule and Revised ASTM Phase I Environmental Site Assessment

In previous editions of Environment and the

Credit Risk. 72 March 2013 The RMA Journal Copyright 2013 by RMA

Environmental Due Diligence

Assessment. Guidance CLEANUP. Liability Release. Petroleum Brownfields Eligibility Letter Remediation Oversight. Project Endorsement

Managing Environmental Risks

PHASE I ENVIRONMENTAL SITE ASSESSMENT

Mitigating Risk Through Environmental Due Diligence in California Real Estate Deals

DRAFT - Subject to Change. Cathedral Building 212 North Ash Street Crookston, Minnesota. Prepared For. Project FA June 29, 2011

October 29, 2013 Florida Brownfields Association Conference, Orlando

1976 Fargo, ND City Directory - R.L. Polk & Co.

ADDENDUM #1 TO THE INVITATION TO BID PHASE 1 ENVIROMENTAL SITE ASSESSMENTS

The Strategic Plan can be viewed by clicking this link.

Environmental Due Diligence and Risk Allocation

MARCH GUIDE TO BUILDING CONDITION ASSESSMENTS and RESERVE FUND STUDIES

CERCLA AMENDMENT CREATES NEW EXEMPTIONS AND DEFENSES

Tools for Managing Potential Liabilities Associated with Contaminated Port Land. David Ashton Assistant General Counsel Port of Portland 02/13/07

USEPA Brownfield Assessment Grant Application for Financial Assistance

INFORMATIONAL HANDOUT

Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process 1

EPA Issues Guidance On New CERCLA Landowner Defenses

HSEQ Regulatory Inspections

Section I General Information

ENVIRONMENTAL DUE DILIGENCE AND DEFECT PROCEDURE

Vapor Intrusion - ASTM E2600 Overview

Preparing for Negotiations: The Environmental Lawyer s Checklist In Oil and Gas Transactions

Condemnation Summit XIX

REQUEST FOR EXPRESSIONS OF INTEREST Environmental Assessment Services

ACT 381 WORK PLAN INSTRUCTIONS July 2018 TO CONDUCT ELIGIBLE DEQ ENVIRONMENTAL AND/OR MSF NON-ENVIRONMENTAL ACTIVITIES

City of Brandon Brownfield Strategy

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: Acquisition of Real Property located at 182 E. 9th Street, Reno NV

ASTM E : Applying the New Phase I Site Assessment Standard

SUBJECT: Report Number PDC Acquisition of 20 Single Family Residences from the Housing Authority of Portland EXECUTIVE SUMMARY

ADMINISTRATIVE GUIDANCE

Due Diligence for Property Acquisitions

Update Land Use Regulations For the Town of Copake, NY

REDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ;

Environmental due diligence has been an integral

VOLUNTARY CLEAN UP PROGRAMS IN GEORGIA

Land Acquisition and Development Finance Part II

APPRAISAL MANAGEMENT COMPANY

Due Diligence April 10, 2018

REVISED REQUEST FOR REDEVELOPMENT PROPOSALS (RFP) 62 nd STREET INDUSTRIAL PARK IN THE UPPER LAWRENCEVILLE NEIGHBORHOOD OF THE CITY OF PITTSBURGH

Speaker 10: Matthew Joy of Jorden Bischoff & Hiser PLC Page 1 TWO RECENT DEVELOPMENTS POTENTIALLY AFFECTING REAL ESTATE TRANSACTIONS

Chapter XII BROWNFIELDS & BUSINESS TRANSACTIONS. A. Business Transactions

Map Modernization Modernization Program

Appendix C Tips for Making an Inspection a Cooperative Rather Than an Adversarial Experience

ENFORCEMENT POLICY INCLUDING INDUSTRIAL AND COMMERCIAL ACTIVITIES DISCHARGE MANAGEMENT

SHERMAN COLLEGE OF STRAIGHT CHIROPRACTIC REAL ESTATE GIFT ACCEPTANCE

BROWNFIELD CLEANUP PROGRAM (BCP) APPLICATION FORM

WORK PHASE I ENVIRONMENTAL SITE ASSESSMENT

2016 LANDU Course Descriptions. Agricultural Land Brokerage and Marketing

HOME Application Template Guidance

Appraisal and Market Analysis of Indoor Waterpark Resorts

CITY OF TACOMA HOUSING & COMMUNITY DEVELOPMENT 2012 APPLICATION SUPPLEMENTAL FORM

Establishing a Wetland Bank in Minnesota

How Many Brownfields Does California Have? by Corynn Brodsky. Where are all the brownfields? This question is posed frequently by environmental

PHASE I ENVIRONMENTAL SITE ASSESSMENT

BUILD-OUT ANALYSIS GRANTHAM, NEW HAMPSHIRE

This edition of Environment and the Appraiser

Implementation Guidance for The Sustainable Growth and Agricultural Preservation Act of 2012 Senate Bill 236

CERCLA Amendments Will Impact How Due Diligence is Conducted. By Larry Schnapf

Phase I Environmental Site Assessment Phase I Environmental Site Assessment. Siena Lakes Site Naples, Collier County, Florida

University of Houston Law Center. Environmental Issues in Real Estate Course #7297 SYLLABUS. Scott A. Sherman Adjunct Professor

Sustainable development for the future of Arkansas

Securing a Site for a Publicly Owned Industrial Park

Request for Proposals For Village Assessment Services

Volume Three Appendix 7. Scheme Plan and other subdivision requirements

DTSC BROWNFIELDS Services

GENERAL INFORMATION AND NOTICE TO BUYERS AND SELLERS

Allocating Environmental Risks and Liabilities

Environmental Due Diligence in the Wake of the EPA s New All Appropriate Inquiry Rule

REQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties

PART ONE - GENERAL INFORMATION

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT 3.3-ACRE ECKENRODE PROPERTY WARWICK TOWNSHIP, TUSCARAWAS COUNTY, OHIO. Prepared for: OHIOLAND, LLC

Lycoming County Brownfield Assessment Grant Program. Final/Summary Report

HOME Homeownership Production Application Template Guidance

Due Diligence. Jeffrey C. O Brien Mansfield, Tanick & Cohen, PA. Presented by: 2007 Mansfield Tanick & Cohen, P.A.

Transcription:

Phase I Environmental Site Assessments for Corridors Prepared by: Kimberly Perkins and Jill Biesma 1 Environmental Advisors and Engineers 19211 W. 64 th Terrace, Shawnee, KS 66218 (913) 599-4326

Goal Of Presentation Provide Introduction to Phase I ESAs and Share Special Approaches and Insights for Environmental Assessments on Infrastructure Corridors 2

Outline Introduction to Phase I ESAs, EPA s AAI Rule and the Current ASTM Phase I ESA Standard Unique Goals for Assessment of Infrastructure Corridors Project Scoping and Budgeting Considerations Project Phasing and Other Insights for Project Execution Special Approaches to Maximize Efficiency 3

What is Included in a Typical Phase I ESA? Phase I ESA - visual screening and records research Site inspection Interviews of owners, tenants, and regulatory agencies Regulatory database research- state and federal checks Historical research for site and site vicinity (neighborhood) City Directories Sanborn Fire Insurance Maps Aerial Photographs May include optional (supplemental) checks for other non-cercla items, such as asbestos, wetlands, mold, etc. Report with recommendations 4

What is included in Phases I, II and III? Phase I - nonintrusive screening of site and nearby properties- No soil or groundwater samples are included. Phase II - focused sampling of media and areas of concern. Phase I ESA findings are used to design Phase II subsurface soil and groundwater sampling, if applicable. Phase III - If contamination is found in Phase II, expanded sampling is conducted to assess the nature and extent, horizontal and vertical boundaries of contamination by media, migration pathways, and risk assessment considerations. 5

Typical Goals of a Phase I ESA in a Commercial Transaction 6 To assess the environmental condition of a property within time and cost constraints prior to a real estate purchase for negotiation purposes To assess suspected or actual contamination that may result in cleanup liabilities or reduce the value of the property To meet lender requirements for property acquisition The ESA typically supplements an appraisal, title research, property condition reports/inspections, and assists in valuation of the property prior to a sale

Brownfield Amendments and EPA s AAI Rule Small Business Liability Relief and Brownfields Revitalization Act - signed and effective January 11, 2002 7 EPA issued Final Rule on November 1, 2005 and it became effective on November 1, 2006 EPA s All Appropriate Inquiry (AAI) Rule established new protocol for Phase Is conducted for CERCLA liability protections Final Rule-Code of Federal Regulations 40 CFR Part 312

Primary Industry Standard for Conducting Phase I ESAs Standard Practice for ESAs: Phase I ESA Process (E 1527-05) was issued in response to EPA s final AAI rule Intended to permit a User (buyer) to satisfy one of the requirements to qualify for the Innocent Landowner, Contiguous Property Owner, or Bona Fide Prospective Purchaser Defenses to CERCLA CLEANUP Liability 8

What s Different about ASTM E 1527-05? 9 More subjective, performance-based approach The Consultant must demonstrate that they used all historical sources that were publicly available, obtainable from sources within reasonable time and cost constraints, and which could practicably be reviewed (Actual Language from Standard) to meet the new ASTM standard. Scope of work more comprehensive, especially historical research, interviews, title work Less conducive to check-list or formulaic approach

What Is the Impact of ASTM E 1527-05? Emphasis on data gaps and consultant s opinions Longer schedule needed in most cases Higher costs due to increased scope 10

What Constitutes a Corridor Project? A corridor is applicable to sites that encompass a large area. May be spread across many properties with various owners, including private citizens. May apply to land planned to be included in an acquisition or an easement. 11

Examples of Corridor Projects 12 Easement or roadway corridor for a public utility Transportation corridor (such as light rail or tram) Public park/green space/trail or other municipal use that extends over a large area Siting of a new pump station, water or wastewater treatment plant, or expansion of an existing facility

Example Corridor for a Water Line Expansion with an Easement

The Importance of the Client's Goals in Selecting the Scope of Work 14 The scope of work and associated costs for the Phase I ESA depend upon the client s relationship to the property and the goals of the assessment. Purchaser? Current Owner? Operator / Tenant? Easement-Holder (Municipal Agency)?

Purchaser Scope of Work If the client is purchasing property, CERCLA liability should be considered carefully. A Phase I, according to ASTM E1527-05, is required prior to taking title to provide CERCLA liability protection. Supplemental lender requirements should also be considered, if applicable. 15

Unique Goals of a Phase I ESA in a Corridor Infrastructure Project To assess the environmental condition of a property within time and cost constraints to optimize route selection prior to finalizing engineering design plans To identify suspected or actual contamination that may result in health and safety risks to construction workers 16 To identify potential hazardous material management volumes for contractor bidding purposes

Unique Goals of a Phase I ESA in a Corridor Infrastructure Project (continued) To identify other potential regulatory requirements, such as asbestos surveys for building demolition, wetlands evaluations for permit requirements, etc. Often the client is a municipal agency that is planning new construction or an expansion in a utility easement without property purchase and no lender financing. 17

Non-Purchaser Scope of Work 18 Other standards (besides ASTM E 1527-05) may be selected, depending on the goals, budget, and available schedule of the client. An example in which another Scope of Work may be selected is when a utility will occupy an easement, without property purchase. The primary goal for this scenario is to identify potential areas of contamination that may be encountered during construction activities, rather than CERCLA liability protection.

Non-Purchaser Scope of Work (continued) Lower Cost, Non-Purchaser Scope of Work Options: ASTM E1527 00 Phase I ESA Summary Report with selective and reduced scope Database report and interpretations only Multiple levels of possible scope options based on property type, client s needs and goals for the property 19

Project Scoping Considerations Because of the size, and magnitude of data to collect and review, corridor projects generally take much longer to complete (minimum 90 days) and cost much more. The schedule, scope, and budget must be outlined early with the client to allow sufficient funds and time to complete the project. 20

Project Scoping Considerations (continued) 21 The following items may be useful in assessing the anticipated effort level for budgeting purposes: An early corridor EDR database order The number of alignment options Neighborhood land uses in each alignment (the more industrial and the longer development has been present, the more complex the assessment) The number and type of property owners along the corridor For safety purposes, two-person teams should be employed for all reconnaissance activities.

Planning Early for Potential Regulatory File Reviews For corridors that pass through heavily contaminated areas, regulatory file reviews may be needed. Such files may be voluminous, expensive and require many hours of effort to review. EAE can obtain the database report early to determine which sites are of concern, and use the preliminary data for budgeting file review tasks. It is important to determine this early in the process! 22

Scoping Budget Considerations Site Visit and Owner/Tenant Interviews The following questions should be considered in the budget: Will detailed to-scale base maps and aerial photographs be provided electronically in a readilyuseable format? How much editing will be required for use in the Phase I ESA? Will the client provide lists of names/contact information tied to parcel maps, including current addresses and phone numbers? 23

Scoping Budget Considerations Site Visit and Owner/Tenant Interviews (continued) The following questions should be considered in the budget: Will advance Introduction Letters be sent to all property owners in the corridor prior to Phase I reconnaissance activities and interviews? Will the client provide a script for answering property owner questions in a manner that is preferred by the client? 24

Project Staging In some cases, several corridor pathway options may be under consideration. For such projects, a staged approach may be very helpful. For example, the project may begin with a generalized assessment of an entire area encompassing all of the possible options (First Stage), with the entire area evaluated in general terms for environmental conditions. 25

Project Staging (continued) Areas with high environmental risks can be identified early, so that initial alignment options can be selected through areas of lower environmental risk. Use of GIS data and techniques can be especially helpful in this step. 26 Once a specific alignment is selected, a more detailed, targeted Phase I ESA can be conducted on that area only (Second Stage).

Benefits of Staging on Corridor Projects Cost effective reduces detail level when several alignment options are considered, to prevent unnecessary collection of data. Time effective allows for faster evaluation of a given area, and helps target effort. Extra value allows high risk alignments to be eliminated early in the selection process, and focuses resources on the most critical components. 27

Other Considerations Public Relations 28 Most ASTM Scope options require interviews with site owners and tenants. Public relations issues are the owners and tenants of private property crossed known? And, if so, do they know about the planned corridor? If the owners don t yet know that an easement is going to be passing through their property, it is critical that first notice be given in a sensitive manner and prior to the site reconnaissance. Two-person crew should be budgeted for site reconnaissance and interviews.

Other Considerations Site Reconnaissance and Owner Interviews 29 Clients can do several things to assist the Site reconnaissance and owner interview process: Provide detailed to-scale electronic base maps on CDs and access to all corridor areas Provide lists of current names/contact information, including phone numbers and addresses Send advance Introduction Letters to all property owners in the corridor prior to reconnaissance activities and interviews with a name and phone number of the client for any questions

Other Considerations Site Reconnaissance and Owner Interviews (continued) 30 Clients can do several things to assist the Site reconnaissance and owner interview process: Provide a script for answering property owner questions in a manner that is preferred by the client A client representative may accompany the consultant when accessing private property Meet with property owners that voice concerns, do not cooperate, or request an alternate alignment Provide vehicle placards for assessment personnel

Other Considerations Changes in the Alignment Sometimes, due to unforeseen circumstances, an alignment changes while the Phase I ESA is in progress. Confirmation of the final alignment should be made prior to data review and interpretation if possible. If a change in alignment is a possibility, contingent time and funds should be built in to the project schedule and budget to accommodate additional work required to assess new areas and revise the report. Change order planning should be included; extra time for rework due to client changes should be tracked and communicated early. 31

Special Approaches to Maximize Efficiency Site reconnaissance approaches Historical data gathering approaches GIS for data management, for data analysis, and for multi-layered figures and drawings Specially targeted Environmental Database Reports 32

Special Approaches to Maximize Efficiency (continued) Segmentation of the corridor project Inclusion of Regulatory File reviews for alignments that pass through areas with known contamination Special Mapping Presentations and Figure/Drawing Presentation 33

Site Reconnaissance Approaches 34 EAE has developed customized methodologies with specialized field forms and other data gathering tools for conducting corridor field reconnaissance tasks. Corridor projects often cover a narrow, but geographically large, area. GIS can be used for custom maps, including data layering (parcel, zoning, and land use/land cover information with aerial photography, etc.).

Site Reconnaissance Approaches (continued) 35 Early planning is needed to prepare for interviews, site reconnaissance and historical research. A very effective tool for several tasks, including site reconnaissance of a corridor is a site/area base map that is overlaid upon an recent aerial photograph. Key features, street names and addresses of structures are noted on this map. This allows personnel to quickly gain bearings on their location, and make field markings.

Site Reconnaissance Approaches (continued) 36 Available engineering drawings combined with aerial photographs and with edits to remove extraneous data and the addition of addresses are very helpful and will increase efficiencies. A good base map can serve many purposes, including presentation of data in client meetings, presentation of report findings and later phase II planning, if needed. The scale of the maps should be considered based on all anticipated end uses.

Historical Data Gathering Approaches 39 Because Corridors often encompass an area crossing numerous streets and a large area, special data gathering approaches are needed to manage the large amounts of data. EAE has developed specialized work patterns and field forms to organize historical data for maximum efficiency and manageability.

Historical Data Gathering Approaches (continued) Example specialized forms: Multiple spreadsheets tabs used to organize data by street name and date Color coding to organize by the type of concern Use of Excel spreadsheets to allow for data sorting to quickly assess data by date, location, topographic gradient relative to site location, and type of concern 40

Historical Data Gathering Approaches (continued) Data Is Sorted by Sheet Tabs (note: Segment 1 and Segment 2) 41

Specially Targeted Environmental Database Reports A typical Environmental Database Report utilizes a point from which a radius is extended and facilities of concern are plotted within that radius. For Corridor Projects, EAE consults directly with their subcontractor to develop the most cost-effective approach for the project area, based on the area boundaries and neighborhood types. 42

Typical Database Report, single commercial property

Specially Targeted Environmental Database Reports (continued) For long corridors that follow a fairly straight line or roadway alignment, one or more traditional database reports with a center point and extended radius search may be the most cost effective approach. 44 For corridors that cover a wide swath of land as well as being over an extended distance, Area Studies are useful, as they encompass large regions and include large amounts of data sorted into Focus Maps.

Environmental Database Report Area Studies 45 Area Studies encompass a large area and require a different approach compared to a a typical radius report. Sites are defined within a large geographic area, with nearby properties of concern plotted from a radius extending from the Area Study boundary. This approach is very useful for large corridor areas with complicated site histories and a large number of properties of concern.

Environmental Database Report Area Studies (continued) Area Studies include a vast amount of data. On a recent project in heavily developed corridor, the Area Study regulatory report included over 14,000 pages of data to be reviewed and condensed. 46

Environmental Database Report Area Studies (continued) Overview Map Example from Corridor Database Report Each grid/block correlates to a Database Focus Map (11) 47 Dotted line = Area Study Boundary

Use of Focus Maps to Increase Data Review and Reporting Efficiency Gridded Focus Maps (by subarea) help streamline and organize data review Proximity to site is considered - whether area: encompasses the site is up gradient or down gradient from the site distance from the site Focus Blocks that include the site or adjacent properties are emphasized through the block by block review Serious known contamination sites are identified in each block and reviewed for potential migration impacts A separate database report is provided for each Focus Area 48

Focus Map 11 detail from Overview Map on previous slide

Segmentation of the Corridor Project It is useful to divide a corridor Phase I ESA project into segments to increase efficiency in data gathering and reporting Segmentation also provides an easier format for interpreting and presenting the final product Segments can be determined by: by geographic area/location neighborhood type or by simply dividing the corridor evenly based on data availability and presentation. 50

Example Base Map divided into segments for data interpretations

Special Mapping and Figure/Drawing Presentation 52 EAE has developed special mapping methods for presenting large amounts of data for complicated sites. GIS provides multi-layered figures and drawings EAE has developed base maps with symbols to quickly assess suspect areas and alignment options keyed for the types of properties of concern indicated whether the concern was current or historic indicated the relative priority of the concerns.

Special Mapping and Figure/Drawing Presentation (continued)

Concerns Summary Summary of Environmental Concerns 1. Former Oil Properties Leaking Underground Storage Tank, XXX North X Street 2. Historic, Long Term Dry Cleaners Facility, XXX North X Street 3. Historic, Long Term Gasoline Service Stations, Car Dealerships, and Auto Service Facilities 4. Numerous Historic Facilities Suspected of Storage, Use and Disposal of Hazardous Materials and Petroleum Products 5. Numerous Historic Facilities Suspected of Storage, Use and Disposal of Hazardous Materials and Petroleum Products in Small Quantities 6. Numerous Historical Facilities Suspected of Storage, Use and Disposal of Hazardous Materials and Petroleum Products 7. Adjacent Facilities of Concern Identified in Regulatory Database Listings 8. Current Facilities of Concern Identified During Site Reconnaissance 9. Adjacent Historic Facility of Concern Identified in Regulatory Database Listings and Historical Research 10. Adjacent Current Facility of Concern Identified in Regulatory Database Listings and Historical Research 11. Adjacent Current Facility of Concern Identified in Environmental Database Listings, Historical research and Site Reconnaissance 12. Adjacent Current Facility of Concern Identified in Environmental Database Listings, Historical research and Site Reconnaissance

EAE s Capability and Experience 55 EAE s staff members have extensive experience with corridor projects for a variety of client types and objectives. EAE s staff members have Engineering Design experience to understand Municipal Client Objectives. We have specialized tools (field forms, data gathering tools, staff organization tools, special mapping tools), to efficiently manage corridor projects. EAE staff are sensitive to potential public relations and safety issues. We are skilled at customizing services and products to our client s needs.