DEFINITIONS STANDARDS. Abandoned Dock: A dock that (1) is adrift; or (2) owner cannot be located within a reasonable amount of time.

Similar documents
DEFINITIONS. STANDARDS - GRDA Board Approval Date: June 7, 2006

GBRA USE ONLY Date Application Submitted: Received by: Receipt No. Permit No.

Sabine River Authority, State of Louisiana

Should you have any additional questions, you may contact Appalachian s Shoreline Management staff at

STONEWALL RESORT MARINA 2018 BOAT SLIP LEASE AGREEMENT

GUEST BOAT SLIP LEASE

K. All adjoining lots under common deed, for use as a single residence, are considered to be one lot.

INFORMATION REQUIRED FOR ALABAMA GENERAL PERMITS - BW&T LAKES

Dear Smith Mountain and Leesville Lake Property Owners:

Slip Rental Agreement

I. General. 1 Property managed by Cube includes the land below waters of the reservoirs and the generating facilities.

MARINA RULES AND REGULATIONS FOR BOAT DOCK AND DOCK SLIPS OF HARBOUR POINTE, A CONDOMINIUM

BAYSHORE GARDENS MARINA RULES BAYSHORE GARDENS PARK AND RECREATION DISTRICT TH Street West, Bradenton, Fl (941)

U. S. Army Corps of Engineers, Kansas City District Stockton Lake Project Shoreline Management Plan

KYC, INC. BOAT STORAGE RULES (Revised MAY 15, 2012)

Please allow a minimum of two business days for processing, provided the application is complete and payment received.

APPLICATION TO CONSTRUCT A DOCK

Ministry of Natural Resources and Forestry

ONLINE BIDDER REGISTRATION FORM INSTRUCTIONS. 1. Read the Terms & Conditions of the auction on page 4 6.

DIPA Boat Landing New Membership Agreement

ORDINANCE NO WHEREAS, the Town of Jupiter ( Town ) has adopted a Comprehensive Plan

Ministry of Forest, Lands and Natural Resource Operations

WISCONSIN RIVER POWER COMPANY DOCK MANAGEMENT POLICY FOR EXISTING DOCKS UPDATED: May 9, 2018

IMPERIAL OAKS PARK PROPERTY OWNERS ASSOCIATION, INC. RENTAL AGREEMENT FOR PRIVATE PARTIES

NEWBERRY PLAZA CONDOMINIUM ASSOCIATION SALES PACKET CHECKLIST

APPLICATION TO CONSTRUCT A DOCK

IC Chapter 1.7. Abandoned Manufactured Homes in Mobile Home Communities

Shoreline Use Permits

UTILITY EASEMENT AGREEMENT

CITY OF MARCO ISLAND ORDINANCE NO. 14-

(voice) (fax) (voice) (fax) Site Plan Review

AIRCRAFT TIE-DOWN LEASE AGREEMENT

Crystal View Estates Association Rules July 2016

OW109 Page 2 of 3 Jk A

Please allow a minimum of two business days for processing, provided the application is complete and payment received.

Mansions East Lease Application Check List

GENERAL GUIDELINES FOR RESIDENTIAL SHORELINE PERMITTING & PERMIT TERMS AND CONDITIONS

Storm Water Management BMP Maintenance Agreement City of St. George, Utah

ARCHITECTURAL PROJECT APPLICATION

Rules for Use of Submerged Lands-Permitting, Dredging, Construction

Encroachment Permit Application Instructions

MANUFACTURED HOME COMMUNITY RIGHTS ACT

ARCHITECTURAL PROJECT APPLICATION

DECLARATION OF RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS made this day of, 200_, by ( Declarant ). RECITALS

GUIDE FOR APPLICANTS APPLYING FOR A PERMIT FOR DOCKING AND MOORING. Completed application form

Purchasing Division Finance Department 44 E. Downer Place Aurora, Illinois (630) FAX (630)

LOT LINE ADJUSTMENT GENERAL INFORMATION AND

Residential Management Agreement

Credit Card Authorization Form

TRANSFER OF DEVELOPMENT RIGHTS CONSERVATION EASEMENT

Pier, Dock or Wharf Registration Form

Fax #: (707)

ARCHITECTURAL REVIEW BOARD ARB APPLICATION for Exterior Modifications / Alterations

OSSF Permit Application

GENERAL GUIDELINES FOR RESIDENTIAL SHORELINE PERMITTING & PERMIT TERMS AND CONDITIONS

EXHIBIT "A" THE PRESERVE AT WILDERNESS LAKE COMMUNITY DEVELOPMENT DISTRICT 5844 Old Pasco Road, Suite 100, Wesley Chapel, Florida 33544

GRANT OF TRAIL ACCESS EASEMENT, COVENANTS AND RESTRICTIONS

Welcome to Carter Storage Facility, LLC We are happy to have you as a new storage customer.

OLIVENHAIN MUNICIPAL WATER DISTRICT PRIVATE ENCROACHMENT PERMIT NO. R-E-C-I-T-A-L-S

TOWNSHIP OF VERGENNES COUNTY OF KENT, MICHIGAN. Murray Lake Dock and Boat Ordinance. Ordinance

PUBLIC UTILITY. The rates listed herein shall apply to the following periods of use:

Shoreline Management Plan

For $ including insurance paid to Lessor, Lessee upon and subject to

CHAPTER County of Alameda Onsite Wastewater Treatment Systems Ordinance

CARITAS MANAGEMENT CORPORATION RESIDENTIAL LEASE - TAX CREDIT PROGRAM

Public Notice. Invitation to Bid 2017 PRECAST CONCRETE BOX CULVERTS

INSTRUCTIONS FOR COMPLETING THE BAREFOOT BEACH RESORT BOAT SLIP ASSIGNMENT FORMS:

BOAT LIFT GUIDELINES AND REQUIRED PRACTICES

Interconnection Checklist For Customer-owned Renewable Generation Systems (RGS)

Projects Unlimited, Inc. PURCHASE ORDER TERMS AND CONDITIONS September 15, 2013

BYRON TOWNSHIP ZONING APPLICATION

Planning Department Permit Application

LAND USE APPLICATION

Dallas Sloan General Manager Barron Area Phone: (715) Toll Free: Fax: (715) NEW SERVICE PROCESS

SPINNLER POINT COLONY ASSOCIATION Dock and Slip Management Regulations

Greater Central Louisiana REALTORS Association, Inc. Multiple Listing Service EXCLUSIVE RIGHT TO REPRESENT OWNERS/SELLERS

SOUTH BROWARD BOARD OF REALTORS IDX Vendor License Agreement

Boat slips are being sold on renewable 99 year long-term leases that can be re-sold or sublet. Five Easy Steps To Secure Your Slip:

Form of Easement and Right of Way Agreement For Gas Pipeline

Amenities Rental/Reservation Agreement

ARTICLE 1 GENERAL PROVISIONS

Shoreline Management Guidelines GEORGIA POWER LAKES

TEMPORARY ACCESS AND EASEMENT AGREEMENT

LAND USE PERMIT APPLICATION

Special Land Use Permit Application Economic Development License Planning Division. Form will not be processed until it is completely filled out.

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS

TOWNSHIP OF EDENVILLE COUNTY OF MIDLAND STATE OF MICHIGAN ORDINANCE NO. 178 LAND DIVISION ORDINANCE TOWNSHIP OF EDENVILLE

Mail to: Pike Place Market PDA c/o Zack Cook 85 Pike Street, Room 500 Seattle, WA Sincerely, Zack Cook Farm Program Manager Pike Place Market

TRANSFER OF DEVELOPMENT RIGHTS CONSERVATION EASEMENT

4. Building plans should include top of foundation elevation

PROPERTY LEASE AGREEMENT

13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded

TRANSBAY JOINT POWERS AUTHORITY

NEW YORK MONTH-TO-MONTH LEASE AGREEMENT

LAND INSTALLMENT CONTRACT

Public Notice. Invitation to Bid Precast Concrete Box Culvert Purchase

CITY OF ELK GROVE PLANNING APPLICATION AND AGREEMENT

SPECIAL USE PERMIT APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

DECLARATION OF PROTECTIVE COVENANTS ROSITA HILLS, LTD

USE AGREEMENT AMONG <OWNER>, <LESSEE>, AND ORANGE COUNTY. THIS USE AGREEMENT (the Agreement ) is entered into by and among

Transcription:

Safety and Construction Standards for New and Existing Residential Docks Located on Grand River Dam Authority Lakes GRDA Board of Directors Approved: April 18, 2017 PURPOSE AND PREFACE These standards of the Grand River Dam Authority (GRDA) apply to all residential docks on lakes, rivers and tributaries under the control of the GRDA. These standards are adopted pursuant to the authority of the GRDA as provided by law and are intended to provide minimum requirements to protect public safety, access and water quality. DEFINITIONS Abandoned Dock: A dock that (1) is adrift; or (2) owner cannot be located within a reasonable amount of time. Approved Flotation: All flotation materials, which are commercially manufactured for marine use shall be fabricated so as not to become waterlogged, crack, peel, fragment or be subject to loss of beads, or in the case of snap together, sectional rotomolded polyethylene docks (i.e. included but not limited to E-Z Dock, or Connect-a-Dock). Styrofoam flotation must be fully encased of solid polyethylene or similar materials. All flotation materials must float the dock s frame above the surface of the water. Dilapidated Dock: A dock that (1) has any structural members, roofing, decking, flotation or walkways that are not securely attached and could pose an immediate safety or navigation hazard, (2) is submerged, (3) is not floating upright, (4) has deck or floors that are broken, missing and/or below water level, (5) is in a state of disrepair, (6) has vegetation, or (7) is otherwise not in full compliance with these minimum standards. Dock: A non-commercial floating structure on GRDA waters which is attached to the shoreline. A dock includes, but is not limited to, an enclosed floating structure, a floating platform, a wharf, and/ or a boat house. A dock may or may not include watercraft slips. Encapsulated Flotation: Expanded polystyrene fully encased high density, high molecular weight polyethylene with a minimum thickness of.150 on the bottom and.125 on the top. Existing Residential Dock: A non-commercial residential dock that is already properly permited on or before the effective date of these standards constructed and located on the water surface of GRDA lakes and waterways. GRDA Lakes: Grand Lake, Lake Hudson, W. R. Holway Lake and all rivers, creeks or other tributaries in the Grand River system or under the statutory purview of the Grand River Dam Authority. Habitable Structure: Refers to living quarters constructed in conjunction with new or existing residential docks, pier, and floats. These structures generally resemble cabins and/or homes, placed on floating structures such as covered or enclosed docks, over boathouses and other similar structures where a building is or may be occupied by people overnight or for extended periods. Generally, these structures may contain water supply and/or waste disposal facilities such as sinks, showers, toilets, kitchen facilities, food preparation areas, etc. Modification: Any change, addition or alteration of a residential dock; or any change, addition or alteration in the location, configuration, or structure of a residential dock. A modification does not include routine maintenance and repairs, or repairs required by GRDA to bring a residential dock that is dilapidated or abandoned into compliance with these standards. Residential Dock: A noncommercial dock accommodating 10 or less watercraft associated with a single-family residence for which no compensation is/will be received by the owner of the dock for its use. This definition also includes swim platforms. STANDARDS A. No dock shall be installed until such time as the applicant receives a letter from GRDA approving such installation. Upon installation, it is the applicant's responsibility to notify GRDA of the completed installation. B. There shall be a permit issued by the GRDA Ecosystems Management for each residential dock located on the waterways controlled by GRDA. A permit may be obtained only after the submission of an application by the applicant. Said application shall have attached: 1. Scaled Drawings, including length and width of walkway. 2. Driving directions by land and water. 3. If the proposed dock or modification to an Existing Residential Dock has more than one level, engineered drawings are required. 4. Landowner Permission Form if applicant is not the owner of the land upon which the dock will be anchored. 5. A Survey must be provided to verify 1) the applicant s property line, and 2) GRDA s taking line. A survey may be required to show the proposed dock in relation to the 1/3 contour. The contour shall be depicted on the survey by measuring the perpendicular distance where the walkway intersects the 745' Pensaola Datum (PD) elevation to the nearest shoreline's 745' PD elevation for Grand Lake and then dividing that distance by 1/3. For Lake Hudson, the measurement shall be perpendicular from where the walkway intersects the 622' mean sea level to the nearest shoreline's 622 MSL (Hudson) and then dividing that distance by 1/3. Survey must be an original stamped and signed by an Oklahoma licensed land surveyor. Page 1

6. If a dock is wired for electricity, the Electrical Certification Form must be provided and signed by an Oklahoma Licensed Electrical contractor before a final permit may be approved. 7. Dock Permit fees paid current. 8. A warranty deed or bill of sale showing applicant is the adjacent owner to GRDA. C. No dock shall extend more than one third (1/3) of the cove measured perpendicular from where the walkway intersects the 745' Pensacola Datum (PD) elevation to the nearest shoreline's 745' PD elevation for Grand Lake. For Lake Hudson, the measurement shall be perpendicular from where the walkway intersects the 622' mean sea level (msl) elevation to the nearest shoreline's 622' msl elevation in figuring the one third (1/3) of the cove. Additionally, no dock shall extend further than necessary to obtain appropriate water depth as determined by GRDA. D. A dock: 1) shall maintain a minimum of 5 feet between the edge of the dock and the applicant s property line; 2) shall only be anchored to GRDA property with a sleeve near ground level anchor or saddled anchor; 3) shall not be anchored to trees on GRDA property; and, 4) shall not be connected to another dock with a walkway that restricts access to the shoreline. E. If a dock is located parallel with the shoreline, the open end, from the edge of the dock to the property line, must be one and one half (1½) times the length of the slip. For example, a thirty (30) foot slip would require forty five (45) feet from the edge of the dock to the adjacent property line. F. Any newly constructed, significantly modified, or relocated dock must be lit from sunset to sunrise and during periods of low light conditions. Lights are required to be white or amber and must be installed on the outermost corners at the furthest extension of the dock from the shoreline. Solar or electrical lights are acceptable. G. All docks shall have an electrical disconnect clearly identified and located above the high water mark. Any residential dock that has electrical service shall strictly adhere to the regulations set forth in the National Electric Code. No submersible pump shall be allowed in the water. All docks constructed or modified, relocated or transferred shall be required to provide to GRDA, a certificate signed by an Oklahoma licensed electrical contractor, evidencing compliance with all laws, regulations and codes regarding electrical systems and wiring. If transferring a dock, the Electrical Certification Form must be submitted. H. A dock will not have any permanent electrical supply installed without first obtaining written approval from GRDA. No temporary electrical supply shall be used. I. At the time a new or significantly modified dock is installed, a sign shall be prominently displayed stating the installers name and the year the dock was installed. J. Permit holder agrees to promptly pay the annual permit fee as set forth in the Schedule of Fees in the Rules & Regulations Governing the Use of Shorelands and Waters of the Grand River Dam Authority. A colored dock permit sticker will be returned to permit holder. This sticker must be prominently displayed on dock and indicates that the annual permit fee has been paid. K. The GRDA Ecosystems Management reserves the right to authorize representatives to enter the property of the permit holder as necessary to make inspections and/or other activities under the permit. L. No attempt shall be made by any permit holder to forbid the use of all public access land and/or water, at/or adjacent to a permitted facility. M. The permit holder agrees not to lease, rent, sublet or provide to others, by any means of engaging in a commercial activity, the permitted facility. This will not preclude the permit holder from selling total ownership of the dock. N. The permit holder agrees to operate and maintain any permitted facility in a manner so as to provide safety, minimize an adverse impact on fish and wildlife habitat, natural environment or cultural resources values and in a manner so as to minimize the degradation of water quality. O. Ownership, construction, operation, use and maintenance of a permitted facility and/or activity are subject to all federal, state and local laws, as well as all rules and regulations now in effect; or those promulgated in the future by the Board of Directors of the Grand River Dam Authority. Failure to abide by these laws, rules or regulations may be cause for revocation of the permit. P. The permit holder agrees to save and hold harmless the Grand River Dam Authority, its officers and/or directors from any and all causes of action, suits at law or equity, claims or demands, or from any liability of any nature for, or on account of, any damages to persons or property, including a permitted facility, growing out of the ownership construction, operation or maintenance by the permit holder of the permitted facility and/or activities. Q. If the permit holder fails to comply with applicable laws, rules or regulations or ceases to use, operate or maintain a permitted facility, the GRDA may revoke the permit and cause the facility to be removed by contract or otherwise and the permit holder agrees to pay all costs incurred thereof. R. Nothing in these standards shall prevent the GRDA from seeking injunctive relief or any other remedy in law or equity at any time against any person allegedly violating these standards. S. Whenever regulations or restrictions imposed by these standards are either more or less restrictive than regulations or restrictions imposed by any governmental authority or other entity that might have authority to regulate residential docks, the regulations, rules or restrictions that are more restrictive or impose higher standards shall govern. T. GRDA written statements, agreements, or approvals signed by authorized personnel shall be considered the official statement, agreement, or acknowledgement of GRDA. U. Any vessel moored at a private dock for more than 72 hours must be kept in a slip. V. GRDA has the right to request additional information, such as engineered drawings, before processing applications. Page 2

V. The Board, upon written application and after hearing subject to the procedural and substantive standards hereinafter set forth may grant waivers to the application of these rules and regulations: (1) Waivers of these rules and regulations may be granted by the Board of Directors of GRDA upon application. In approving waivers of these rules and regulations the Board of Directors shall consider the Shoreline Management Plan (SMP) and all positive and negative impacts to the following: Characteristics, of existing permitted and recreational uses within a half-mile radius of the proposed activity. Shoreline topography and geometry. Safety and navigation. Environment. Potential economic development and tourism benefits. Recreational use. Statutory mandates (820.S.861 et seq.) (2) The applicant shall be required to give notice and the GRDA shall accept public comments before acting on any request for a waiver of these rules. Public notice of the waiver request shall be given in accordance with guidelines established by the GRDA staff and shall include: (a) Publication in newspapers of general circulation, including the county in which the property is location. (b) Mailing of written notice via certified mail, return receipt requested, to all owners of property within 150 feet from the outer edge of the proposed dock(s). (Please note: This is the applicant s responsibility. Certified mail receipts are required as proof of mailing.) GRDA will not post in newspapers or website until receipts are received. (c) Posting on GRDA s website for a period of thirty (30) days. (d) And such other notice as directed by GRDA staff. A request for a waiver shall be initiated by the filing of a written application and shall be set for public hearing as prescribed by these rules. A waiver, which has not been utilized within two (2) years from the date it was granted by the GRDA Board of Directors is void. Page 3

Grand River Dam Authority Ecosystems Management, 918-256-0852, P.O. Box 70, Langley, OK 74350. Email: lakepermits@grda.com Application for Private Dock Permit Standards are attached or can be found online at www.grda.com or by calling 918-256-0852. FOR GRDA USE ONLY: Shoreline Management Plan (SMP) Classification: Reservoir GRDA Map & Tract Number x UTM Coordinate y Permit Number NAME: MAILING ADDRESS: NAME(S) OF SPOUSE OR CO-OWNER: MAILING ADDRESS OF SPOUSE OR CO-OWNER: PHONE: Home Work Cell EMAIL ADDRESS: LAKE ADDRESS: Lake Phone: City State Zip LOCATION OF PROPERTY: Lake Arm/Cove/Area LEGAL DESCRIPTION of PROPERTY: County Gate Code (If applicable) Sec, T N, R E or Subdivision Blk Lot APPLICATION IS MADE FOR THE FOLLOWING: Construction of a new dock. No non-encapsulated white styrofoam may be used. Dock builder s name, address and phone number: Replacement, modification or an addition to a dock, for which permit number has previously been issued by GRDA. Dock builder s name, address and phone number: Relocation of a dock from number Transfer of dock permit number (location) to has previously been issued by GRDA. from (NAME): (location) for which permit PHONE: ADDRESS: Permit #: Permit #: Previous dock owner had a raw water permit? Yes No Previous owner had a License to Encroach? Yes No LANDOWNER: Applicant states that he is the owner of the land to which the dock will be located. Applicant states that he is NOT the owner of the land to which the dock will be located and that the following person is the landowner: (also attach written permission). NAME: MAILING ADDRESS: PHONE: Electric and/or Enclosed Dock? YES YES NO NO Is dock wired for electric? Is dock enclosed? Detail drawing is required to show if enclosed dock has any water lines, appliances, sinks and toilets. City State Zip TERMS AND CONDITIONS: In consideration of the Grand River Dam Authority granting a Private Dock Permit to the applicant hereby consents and agrees to the following: Applicant agrees to abide by the Rules and Regulations Governing the Use of Shorelands and Waters of GRDA, which are incorporated and made a part of this agreement, and that a Permit issued upon this application may be revoked at any time by GRDA. If GRDA does, in fact, revoke said permit of applicant shall be wholly responsible for all costs, including, but not limited to, court costs and attorney fees, incurred by the Authority for removal of the dock from GRDA s waters or property. Applicant grants permission to GRDA, through its authorized employees, to physically inspect Applicant s dock when necessary and reasonable. Applicant agrees to promptly pay the annual fee imposed by GRDA for the privilege of placing and maintaining a dock. Applicant agrees to PROMINENTLY DISPLAY private dock permit number on the dock. Applicant consents to personal jurisidiction in Oklahoma. Applicant agrees to update GRDA with all address changes and acknowledges that GRDA will serve all notices and invoices related to the permit to the last address on file with GRDA. Preparer: Date Signature GRDA Application for Private Dock Permit Board Approved: April 18, 2017 Applicant, his agent, representatives or assigns, agree that said dock shall be operated at his own risk, and GRDA is hereby released from any and all claims for injuries or damages incurred while on GRDA s premises. Applicant, his hiers/ representative or assigns agree that they will indemnify and save harmless GRDA against any and all claims for damages to property, or injuries received by anyone, as a direct or indirect result from the operation of said dock upon GRDA s waters, arising either from alleged or in fact negligence of applicant, his agents, representatives, servants or guests; and applicant further agrees to defend any and all suits filed or prosecuted against GRDA, and to pay any and all judgments, together with court costs, attorney fees and all other expenses of defending such suits. I UNDERSTAND AND AGREE THAT IN THE EVENT THE PERMIT IS CANCELLED, MY PERSONAL PROPERTY ON OR IN THE DOCK WILL BE REMOVED AND DISPOSED OF BY GRDA AT MY EXPENSE AT THE TIME THE DOCK IS REMOVED IF I HAVE FAILED TO REMOVE THE PERSONAL PROPERTY PRIOR TO DOCK REMOVAL. IN SUCH EVENT I HEREBY RELEASE GRDA FROM ANY LIABILITY RELATED TO REMOVAL AND DISPOSAL OF THE PERSONAL PROPERTY. The undersigned hereby certifies that he: (i) has read the Regulations, (ii) agrees to be bound by the terms expressed above, and (iii) all information contained herein is true and accurate. 21 O.S. Section 463. Signature of Applicant: Date: Contact Info Page 4

Grand River Dam Authority Ecosystems Management, 918-256-0852, P.O. Box 70, Langley, OK 74350. Email: lakepermits@grda.com Private Dock Application Checklist Name of Applicant: Last First Middle Initial Please check all that apply: New construction; Replacement; Modification Addition; Transfer of Ownership; Relocation Dock Permit Number: All applications submitted must include all of the following or they will be returned to the applicant to be resubmitted with the necessary paperwork. It is the responsibility of the applicant to furnish this paperwork. No dock application can be processed without the following information: Need On File or N/A Scaled drawings of dock. Include length and width of walkway. Written driving directions by land and water. Landowner Permission Form if applicant is not the owner of the land upon which the dock will be anchored. Survey must be provided to verify 1) the applicant s property line, 2) GRDA's taking line Survey must be an original stamped and signed, by an Oklahoma licensed land surveyor. A survey may be required to show the proposed dock in relation to the 1/3 contour. The contour shall be depicted on the survey by measuring the perpendicular distance where the walkway intersects the 745' Pensaola Datum (PD) elevation to the nearest shoreline's 745' PD elevation for Grand Lake and then dividing that distance by 1/3. For Lake Hudson, the measurement shall be perpendicular from where the walkway intersects the 622' mean sea level to the nearest shoreline's 622 MSL (Hudson) and then dividing that distance by 1/3. If a dock is wired for electricity, the Electrical Certification Form must be provided and signed by an Oklahoma Licensed Electrical Contractor before a final permit will be approved. Dock Permit fees paid current. Domestic Raw Water permit exists or is being requested by this applicant; If yes, please see Domestic Raw Water application. Engineered drawings, if applicable. GRDA Application for Private Dock Permit Board Approved: April 18, 2017 Page 5

Grand River Dam Authority Ecosystems Management, 918-256-0852, P.O. Box 70, Langley, OK 74350. Email: lake permits@grda.com Electrical Certification Form CURRENT OWNER: DOCK LOCATION: PHONE NUMBER: DOCK PERMIT NUMBER: Any residential dock that has electrical service shall strictly adhere to the regulations set forth in the National Electrical Code for structures. At the time of application a certificate of electrical inspection from a Oklahoma licensed electrical contractor shall be attached before the permit will be issued. YES NO 1. Does dock electrical service meet current National Electric Codes? YES NO 2. Does dock have electrical service disconnect? YES NO 3. Does electrical service for the lake pump meet current National Electric Codes? a. Company Name (Printed) b. Contractor Name (Printed) Signature Contractor Phone Number Contractor Mailing Address Date of Inspection Email c. Contractor OKLAHOMA License Number License Expiration Date GRDA Application for Private Dock Permit Board Approved: April 18, 2017 Page 6