Welcome! Webinar #17: Total Plant Cost in Thermoflex 21 Nov Agenda:

Similar documents
(3) 30 percent of the qualified fuel cell property expenditures made by the taxpayer during such year,

Sustainable Asset Valuation Tool (SAVi) Case Study

DO NOT FILE THIS FORM IN 2019 WITH YOUR TAX RETURN

Boiler Design Documents Appraisal Procedure

Internal Revenue Code Section 25D Residential energy efficient property.

Residential Energy Credits

Shoreview Corporate Center

Residential Energy Credits

PACE is transforming energy and water performance

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

Three Oaks TWP. (269) FAX THREE OAKS, MICHIGAN MECHANICAL PERMIT APPLICATION

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

William Howard Taft High School

EX file5.htm BILL OF SALE AND TRANSFER BILL OF SALE AND TRANSFER

Rental Assistance Demonstration (RAD) Conversion of Moderate Rehabilitation Contracts Presented Tuesday, January 30th, 2018, 2:00 p.m.

Information Memorandum FOR SALE FOR REMOVAL (as a total package or parts thereof)

340 Storke Rd. Goleta, CA 93117

This fee structure applies to applications submitted on or after January 1, 2018.

340 Storke Rd. Goleta, CA 93117

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Internal Revenue Service

Oil-Free Centrifugal Chiller

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

CHARLESTON PLACE TENANT CALCULATION CHECK/DATA TABULATION SHEET(S) Forms must be completed by the Tenant's Mechanical or Electrical Engineer.

1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

MADISON AVENUE FEATURES LEASING INFORMATION. 18-foot ceiling heights (slab-to-slab) New building construction

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

Charles Kozminski Elementary Community Academy

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Boondocks Auction. Wednesday NOV 28, 10AM. Truck Stop Restaurant 30 Unit Hotel/Motel. Exit 144 Interstate 35 Hamilton County, Ia. Offered in 1 Tract

Articles Written by Thielsch Engineering Personnel:

Financing Solar Projects for Public and Affordable Housing. February 15, 2018

GREEN CORRIDOR PROPERTY ASSESSMENT CLEAN ENERGY (PACE) DISTRICT PROGRAM GUIDELINES. November 17, Version 1.2

CHAPTER 1321 Permit and Inspection Fees

FY 2018 FEE SCHEDULE (Effective )

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

CONSTRUCTION PERMIT FEE SUMMARY

Financing options and cost analysis

Innovations in Solar Financing for Non-Profits and Affordable Housing CESA Workshop on Deploying Solar in Public and Affordable Housing

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

Submission Procedures

Frequently Asked Questions. Property Assessed Clean Energy (PACE) Sept. 20, 2011

Research challenges for offshore HVDC grids and its components

HEIRS PROPERTY AND SUCCESSION PLANNING FOR FARMERS, LANDOWNERS, AND FORESTERS

No Surprises: What You Need to Know About the TPRs and Cost Segregation. Trent Baeckl, CPA Tax Senior Manager

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

OREA Standard Forms & Clauses Revisions Update 2016

A/C PERMIT APPLICATION 2017 FLORIDA BUILDING CODE

KIRKLAND ALERT. IRS Unveils Start of Construction Rules for Solar, Other ITC-Eligible Technologies. Attorney Advertising

CORPORATE SQUARE. Sector - 127, Noida

Reg. Section 1.263(a)-3T(h)(3)(iii)(A) Amounts paid to improve tangible property (temporary).

Peters Township Sanitary Authority Information Workshop No. 3 September 21, 2011

Divestiture of Generation Assets

FAIRFAX COUNTY LUNCH + LEARN. Commercial Property Assessed Clean Energy Financing

Be it enacted by the People of the State of Illinois,

AGENDA REPORT. Meeting Date: January 9, 2018 Item Number: D 10 To: From:

Developer Evaluation(1)

CAM Reconciliations LEARNING WORKSHOPS Cowboys World HQ 5 Cowboys Way, Frisco, TX 75034

Design Excellence, identity and sustainability for every project

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 277

POZOS DULCES CITY APARTMENTS IN MALAGA

Government Operations/ Courts Relocation Opportunities Analysis Advisory Services Update

Overview of the RAD Closing Process for Public Housing Agencies

GREENWORKS LENDING. Our mission is to make clean energy smart business

Basics of Commercial Real Estate Transactions Day Two

Introduction to PACE Slides (General Audience)

Interconnection Agreement For Customer-owned Renewable Generation Systems (1 1,000 kw)

Glenn C. Walker, ASA Appraiser/Consultant

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

FERRY COUNTY BUILDING ORDINANCE # UPDATED

BUI L DIN G A ND E L E V A T O R F E ES

9. Public (Federal, State, or local

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 1/2/2017

DAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1

International Gas Union Research Conference 2014 Development of New Model Residential PEMFC micro-chp Systems

SCOTIA PLAZA Building Specifications

Max Diameter M (mm) Flange Driling. 50 PN 10:16, 2.5" BS10 Table ADE, 60 PN 10:16, 65 PN10:16, 80 PN10:16, 3" BS10 Table ADE, 2.

12325 EMMET STREET. $9.50 psf NNN 17,754 SF OFFICE FOR LEASE Emmet Street Omaha, Nebraska * * CERTIFIED *


Carrots and sticks - improving energy efficiency of non-domestic buildings

Explanation of the Analysis Format

Report Topical Peer Review 2017 Ageing Management Technical Specification for the National Assessment Reports -

Interconnection Checklist For Customer-owned Renewable Generation Systems (RGS)

Part B - Health Facility Briefing and Planning. PLANNING Functional Areas Functional Relationships

SITE DEVELOPMENT PLAN FOR WIND FARM LEASE

Financial Modeling Workshop Using Excel

The Willows Edge RESIDENTIAL LEASE AGREEMENT FOR SINGLE-FAMILY DWELLING

Estonian energy policy and EPBD: Deep integrated renovation with KredEx renovation grant programme

Appendix E: C-PACE FINANCING FOR SOLAR PV SYSTEMS AND FUEL CELLS

NZE Lease Excerpts. Lease excerpt from the Bullitt Center pertaining to its energy budget:

BEFORE THE WASHINGTON UTILITIES AND TRANSPORTATION COMMISSION

PACE Customer Agreement

Oppor nit is Knocking in Historic Mt. Ver on

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

Common Property & Private Property

Transcription:

Welcome! Webinar #17: Total Plant Cost in Thermoflex 21 Nov 2017 Agenda: * Introduction - PEACE Components in Thermoflex - Cost estimation in TFX, traditional approach - Plant Assembly and Total Plant Cost - Economic & Financial Assumptions - Non Flowsheet components - Results and Techno Economic Optimization * Q & A Session Presenter: IGNACIO MARTIN (SPAIN) Support: Meritt Elmasri (U.S. HQ)

Thermoflow Training and Support - Standard Training - On site training course - Advanced Workshop - Webinars when new version is released - Help, Tutorials, PPT, Videos - Technical Support Feature Awareness Webinars Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 2

Feature Awareness Webinars 1- Assemblies in TFX 2- Scripts in Thermoflow programs, GTP-GTM-TFX 3- Multi Point Design in GTP-GTM 4- Reciprocating Engines in TFX 5- TIME in GTM 6- Matching ST Perfromance in STP 7- Modeling Solar Systems in TFX 8- Combining THERMOFLEX & Application-Specific Programs 9- Methods & Methodology in GT PRO & STEAM PRO 10- Supplementary Firing & Control Loops in GT PRO & GT MASTER 11- The Wind Turbine Feature in Thermoflex 12- Modelling GT s in Thermoflow programas-1 13- Thermoflex for on line and off line performance monitoring 14- Tflow 27, what s new 15- Modelling GT s in Thermoflow programas-2 16- Multi Point Design in GTP-GTM 17- Total Plant Cost in Thermoflex 3 Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 3

Thermoflex PEACE & no PEACE Components THERMOFLEX Version 21.0 Rev ision 1 Nacho Thermof low Training psia F lb/s BTU/lb Water Cooled Condenser Pipe 1 2 5 6 Economizer Absorption Chiller 7 C Steam 8 Coolant Chilled 3 4 H 999 File = C:\Users\Nacho\Documents\Thermof low 21\Curso COBRA\Equipos PEACE-no PEACE.tf x 12-12-2011 08:27:45 Sheet 1 Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 4

Thermoflex PEACE & no PEACE Components No PEACE Components TD Mode OD Mode (Defined Performance) PEACE Components TD Mode ED Mode OD Mode Physical Design & Cost Estimation Hardware Controls Perf. Method Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 5

Thermoflex PEACE & no PEACE Components No PEACE PEACE Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 6

Thermoflex PEACE & no PEACE Components No PEACE PEACE Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 7

Example 1P CC Cost Estimation in Thermoflex Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 8

Example 1P CC Cost Estimation in Thermoflex (Reference: File imported from GT Pro) 1. TD Mode No Cost 2. ED Mode, no Assemblies 3. ED Mode, ST and HRSG Assemblies 4. ED Mode, Plant Assembly, no Non-Flowsheets components 5. ED Mode, Plant Asembly & Non-Flowsheet components from GTP 6. ED Mode, Plant Asembly & Non-Flowsheet components from GTP, Economics from GTP Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 9

Cost Estimation in Thermoflex Pipe Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 10

WC Condenser Cost Estimation in Thermoflex Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 11

Cost Estimation in Thermoflex ST Assembly Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 12

HRSG Assembly Cost Estimation in Thermoflex Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 13

Cost Estimation in Thermoflex Traditional Approach Sum of Cost of Components Cost Breakdown Unit CostCost Adj. Factor Ref. Cost Est. Cost Sum of Costs for Equipment and PEACE Components 132.248.800 139.140.900 EUR Deaerator 533.892 560.587 EUR Deaerator [42] 533.892 1 HRSG Assembly [1] 1 30.794.840 32.474.380 EUR Duct - GT to Horizontal HRSG [19] Economiser (PCE) [28] Economiser (PCE) [31] Economiser (PCE) [33] Economiser (PCE) [37] Evaporator (PCE) [25] Evaporator (PCE) [32] Evaporator (PCE) [35] Steel Stack [38] Superheater (PCE) [20] Superheater (PCE) [21] Superheater (PCE) [22] Superheater (PCE) [23] Superheater (PCE) [24] Superheater (PCE) [27] Superheater (PCE) [29] Superheater (PCE) [30] ST Assembly [1] 1 31.969.250 33.609.320 EUR ST Group [6] ST Group [7] ST Group [8] Fuel Compressor 2.645.182 2.782.417 EUR Fuel Compressor [3] 2.645.182 1 Gas Turbine (GT PRO) 54.082.080 56.786.180 EUR Gas Turbine (GT PRO) [2] 54.082.080 1 Pump (PCE) 2.441.266 2.569.944 EUR Pump (PCE) [15] - Condenser C.W. Pump 623.870 1 Pump (PCE) [18] - Condensate Forwarding Pump 182.264 1 Pump (PCE) [39] - HP Feedwater Pump 1.057.000 1 Pump (PCE) [40] - IP Feedwater Pump 578.133 1 Water-cooled Condenser (PCE) 2.444.783 2.580.655 EUR Water-cooled Condenser (PCE) [13] 2.444.783 1 Pipe (PCE) 7.337.467 7.777.418 EUR Pipe (PCE) [5] - HPB to HPT 1.171.253 1 Pipe (PCE) [9] - Cold Reheat 316.745 1 Pipe (PCE) [10] - Hot Reheat 1.150.284 1 Pipe (PCE) [12] - LPB to LPT 387.891 1 Pipe (PCE) [14] - Main Circulating Water 4.311.293 1 Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 14

Cost Estimation in Thermoflex Traditional Approach Sum of Cost of Components Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 15

Plant Assembly in Thermoflex 1. PEACE Method = Simplified Sum of Costs, traditional method = Comprehensive Total Plant Cost 2. Select Site Plant Groups : GT+HRSG, ST+Condenser, GT+HRSG+ST (Single Shaft), 3. Add main components to Site Plant Groups 4. Add other components / Include all 5. Include Generators 6. Include Non-Flowsheets components (pipes, pumps, tanks, ) and other PEACE inputs 7. Regional Costs and Economic Assumptions Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 16

Plant Assembly in Thermoflex Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 17

Plant Assembly in Thermoflex, Non-Flowsheet Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 18

Plant Assembly in Thermoflex, Economics Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 19

Plant Assembly in Thermoflex, Equipment Data Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 20

Plant Assembly in Thermoflex, Cost Report Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 21

Plant Assembly in Thermoflex, Financial Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 22

Cost estimation in TFX. Comparison 1 2 3 4 5 6 Mode TD ED ED ED ED ED ST-HRSG Ass no no yes yes yes yes Plant Ass no no no yes yes yes Non Flowsheets no no no no yes yes Economics TFX TFX TFX TFX TFX =GTP Gross Power MW 65,5 65,4 65,8 65,8 65,8 65,8 Net Power MW 64,1 64,0 64,3 64,1 64,0 64,0 Net Elect. Eff % 50,86 50,86 51,12 50,93 50,9 50,9 Auxiliary Power MW 1,4 1,4 1,5 1,7 1,8 1,8 Contractor's Internal Cost M No Cost 19,7 31,3 46,3 49,1 49,1 Contractor's Price M 22,8 37,0 55,2 59,3 62,1 Total Owner's Cost M 24,6 39,8 60,1 64,6 67,7 /kw 384 619 938 1.009 1.058 % 36% 59% 89% 95% 100% ROI % 12,5 NPV M 27,8 LCOE /MWh 49,8 Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 23

Techno Economic Optimization Steam mf Net Power Net Eff Evap Surface Area Specific Cost Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 24

Techno Economic Optimization ROI Calculation Fuel = 5,1 /GJ Fuel = 4,0 /GJ Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 25

Q & A Session - Please forward your questions on the WebEx Chat - Further questions by email to: info@thermoflow.com - PP Presentation will be available on the Website / Tutorials - Video will be available on the Service Center Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 26

Thank you! IGNACIO MARTIN Málaga SPAIN martin@thermoflow.com Thermoflow Inc. 2017 Webinar 17: Total Plant Cost in THERMOFLEX, 21 Nov, 2017 by IGNACIO MARTIN 27