H. M. Associates (Pvt.) Ltd.

Similar documents
ISLAMABAD/ RAWALPINDI DEALERS AND SCRATCH CARDS SALES POINTS

NIB Bank Limited LIST OF DESIGNATED BRANCHES OPEN ON SATURDAYS

CONTACT US: The Crown of. Gulberg Greens. Gulberg Greens.

A project of Deans Group. Experience true luxury living starmarketingonline.com PESHAWAR:

Multi Residencia & Farm Housing Project

2. Apartment No: 3. Name: 4. Father s Name: 5. CNIC No / NICOP: 6. Correspondence Address: PTCL Mobile # 2

ASSESSMENT OF MARKET PRICE FOR PIA OWN PROPERTIES

RESEARCH & FORECAST REPORT LAHORE RETAIL MARKET OVERVIEW - Q2, Accelerating success.

NOC ISSUED BY TMA / GOVERNMENT A PROJECT OF MULTI-PROFESSIONALS CO-OPERATIVE HOUSING SOCIETY (MPCHS) ISLAMABAD

starmarketingonline.com Islamabad.

Appendix B Faculty Details (soft copy required)

a joint venture between dha lahore & brdb malaysia

Your abode, in the evergreen Murree Hills

PRESENTATION ON DIRECTORATE GENERAL KATCHI ABADIS, PUNJAB

International Complex Projects Limited

Brief Overview Diamir Bhasha Dam and Mohmand Dam

CURRICULUM VITAE. Name: GUL RAHIM KHAN Father s Name: IBRAHIM KHAN

SAMIR SHAIKH AIIA, IGBC TM AP ARCHITECT & URBAN DESIGNER

COMSATS Institute of Information Technology, Islamabad


November ARCASIA. 36 th ANNUAL COUNCIL MEETING Ayutthaya, Thailand. Institute of Architects, Pakistan, Annual Country Report

1/2/3 BHK APARTMENTS & SUPER LUXURY VILLA S AT JAYPEE SPORTS CITY YAMUNA EXPRESSWAY

COMPANY PROFILE. Private Limited Islamabad Pakistan

Commercial Contract SALE DEED. Small and Medium Enterprises Development Authority Ministry of Industries & Production. Government of Pakistan

KARAKORAM GREENS ISLAMABAD

PINE HEIGHTS PINE HEIGHTS. Luxury Apartments

Information of Unit available for Sale

Table of Contents. Property Description... 3 Contact Details... 3 Property Features... 4 Image Gallery... 6

Integrated Township namely Mohali Hills at Sectors 98, 99, 105, 106, 108, 109 and 110, SAS Nagar, Mohali, Punjab by M/s. Emaar MGF Land Ltd.

THE PILLAR THAT HOLDS THE ROOF

Personal Information: Use CAPITAL letters and leave spaces between words.

RASHEEDA ENTER PR IS E S

A Personal Approach to Intervening in Post Colonial As Found Spaces in Karachi,

PROF. DR. ANIS AHMAD SIDDIQI CURRICULUM VITAE

Table of Contents. Property Description... 3 Contact Details... 3 Property Features... 4 Image Gallery... 6

A company set up under Section 42 of the Companies Ordinance, 1984 MEMORANDUM OF ASSOCIATION ENERGY LAWYERS ASSOCIATION OF PAKISTAN

REAL ESTATE. FINANCIAL DATA PKR (mln) ANALYSTS. Sana Khan Adnan Dilawar

CURRICULUM VITAE. Board/University Degree 1. F.Sc Peshawar Board. 2. B.Sc Peshawar University

Sr. # Name Scheme Location / Mouza. Sr. # Name Scheme Location / Mouza

PROPINSIGHT A Detailed Property Analysis Report

APPOINTMENT OF MR SABIR KHAN SADOZAI AS ADVISOR (TECHNICAL) IN MDA FROM TO

Realtor Builder Developer Solutions Provider

CURRICULUM VITAE: Dr. Suneela Ahmed. Doctor of Philosophy (PhD), Urban Design, Oxford Brookes University Oxford, UK October August 2016

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Vastu-friendly layout of township and villas Around 52 % open and green area Aesthetically & spaciously designed villas with modern elevation

Qatar Real Estate Market Overview. Cityscape, March 2017

6.11 Zone-wise Urban Residential Land Price in Delhi: Zone-wise Growth Rates of Urban Residential Land Price in Delhi:

Jcash Branchless Banking. 01 January to 30 June 2017 Schedule of Charges

Chittagong Customs Clearing & Forwarding Agents Association General Members (I)

NAVAL ANCHORAGE GWADAR

Project Surveillance & Market Study. Name of presentation. Company name. For

ACE Newsletter. October - December 2011 ASSOCIATED CONSULTING ENGINEERS - ACE (PVT) LTD. 2 Project News. Corporate News. 3-8 Foreign Operations

BERMUDA 9 BEACHES (DANIEL S HEAD, SANDY S PARISH) ORDER 2010 GN 1099 / 2010

Islamabad and the Politics of International Development in Pakistan

Wellington Housing Accord Monitoring Report 4

GOLF VILLAGE 1, 2 & 3 BHK Apartments

SOCIAL FRAGMENTATION AND THE GATED HOUSING COMMUNITIES: DEMISE OF LAHORE; THE CITY OF GARDENS AND COLLEGES

Developing Urban Infrastructure on PPP Model

PROPERTY MANAGEMENT REPORT

IIT, Roorkee RECENT ARRIVALS Date : 16/02/2016. S No. Issue Details Spl/Proc Copies Recvd On

CHAPTER 1321 Permit and Inspection Fees

PROPINSIGHT A Detailed Property Analysis Report

New Hope-Solebury School District Campus Revitalization Plan

forwarddallas! Development Code Amendments Approach Quality of Life Committee Briefing June 11, 2007

Moyness Park, Blairgowrie PH10 6FH

SALE OF LAND FORM. 8. This Form does not constitute any basis of marketing/land transaction of any kind.

SVS Properties India Pvt Ltd - An Overview

SFR Condo Residential Lot Sales Inventory Sales Inventory Sales Inventory. Month YTD Month Month YTD Month Month YTD Month

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan Baseline

COMMUNITY DEVELOPMENT DEPARTMENT. DEVELOPMENT SUMMARY January Building Division. Summary of building permits by year

Housing and emergence of slums in Asian Cities

PLANNING FOR NEW TRANSIT NODES IN BELLEVUE

Without a vision to guide our path, and without ambition that knows no limits, we can never build a bright future for generations to come.

2018 Abu Dhabi Real Estate Market

TOP PLANNED MEGA PROJECTS IN THE GCC

INDIAN INSTITUTE OF TECHNOLOGY BOMBAY OFFICE OF DEAN (INFRASTRUCTURE PLANNING SUPPORT)

Concepts, Strategies and Proposals for the development of Urban Communities *

International Covenant on Economic, Social and Cultural Rights Article 11 (1)

QF-MKT-07 SEL SEL. Plot # 48, Road # 18, Sector # 7, Uttara

1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System

90% Nature. 10% Supertech. Premium high rise apartments that signifiy an elevated lifestyle.

Professional Offices at Tiffany Plaza

PROPOSAL FOR DEVELOPING A HOUSING ESTATE CONSISTING OF 42 UNITS OF 3 BEDROOMED SELF-CONTAINED VILLAS CLIENT:

Invitation to Bid. Provision of Liveries

Property. Mashreq. Economic Overview. Wealth Gauge.

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st

Amravati Apartments, Baddi

A N I K A E N C L A V E

Annexure 1.7 Land donation agreement between Mr. Vanlala and Project Director SIPMIU, Aizawl witnessed by Dy Project Director SIPMIU, Concerned Local

August 14, Tucson s Investment Grade

On Site Sewage Facility Information Sheet PROPERTY OWNER INFORMATION

July 2012 was $162,256. ($153,956). was $314,607. was $172,488. ($164,426). Kansas City Region Average Sales Price - Existing Homes

MOU SIGNING CEREMONEY BETWEEN BANGLADESH AIR FORCE WELFARE TRUST & PURBACHAL AMERICAN CITY BANGLADESH AIR FORCE WELFARE TRUST

Table of Contents. Property Description... 3 Contact Details... 3 Property Features... 4 Image Gallery... 5

MVWD Financial Dashboard

Athi River Investment Opportunity

COOPERATIVE DEPARTMENT DAMAN

Victor P. Leginsky, Chartered Arbitrator

PROPINSIGHT A Detailed Property Analysis Report

New Construction Retail Spaces

Transcription:

1 2 3 4 5 Punjab University Employees Housing Scheme Town-2 Infrastructure Works for Allama Iqbal Town Muzaffargarh. Construction of Civil Work at United Sugar Mills Mills Ltd. Construction of B-Type Banglows at JDW Sugar Mills Ltd. RYK, Saddiqabad Construction of Civil Works at Deharki Sugar Mills Ltd. Goth Machi, Saddiqabad Punjab University, Quaid-e-Azam Campus Kimse Yok Mu, Turky (NGO) JDW Group - JDW Sugar Mills Ltd. Distt. Rahim Yar Khan. JDW Group - JDW Sugar Mills Ltd. Saddiqabad, Distt. Rahim Yar Khan. JDW Group - Deharki Sugar Mills Ltd. Saddiqabad. Construction of Pre-Engineered Light 6 1.3, 1.5,1.6, 1.7-ADB-EDU/AJK/EEAGuage Cold Steel Fabricated Middle Schools in AJ&K (ADB sponsered) 7 JDW Sugar Mills Ltd. Unit-II, Machi Construction of Waste Water Goth, Saddiqabad, Distt. Rahim Yar Treatment Plant at Unit-II Khan. Waste Water Treatment Plant 8 Punjab University Employees Housing Punjab University, Quaid-e-Azam Campus Scheme Town-1 9 Medical Town, Near Sharif Medical Pakistan Medical Co-operative Housing Complex Raiwind, Society Telecom Engineers Housing Scheme- Telecom Engineers Cooperative Housing 10 Phase-III & (Extension Area) Society Construction of Commercial Centre in Telecom Engineers Cooperative Housing 11 TECH Town Society Construction of Jamia Mosque in Telecom Engineers Cooperative Housing 12 TECH Town Society Construction of Office Complex in Telecom Engineers Cooperative Housing 13 TECH Town Society e Sy Asian Consulting Engineers Arif Associates, New Garden Town Project Cost 352.00 74.17 20-12-2012 Akbar&Associates Karachi 12.00 September 2012 Akbar&Associates Karachi 18.00 September 2012 Akbar&Associates Karachi 12.00 September 2012 NESPAK ERP Division Consultant Name 2.4 Billion Jun-13 Akbar&Associates Karachi 19.00 September 2011 Asian Consulting Engineers Jers Consulting Engineers Telecom Engineers Cooperative Housing Society M. Hafeez & Associates M. Hafeez & Associates Telecom Engineers Cooperative Housing Society 135.00 52.94 Completed on July 2013 January 2010 June, 2010 110.09 Aug-10 60.00 List of Completed Projects 1/4

Consultant Name Project Cost Completed on 14 DHA Ph-VIII Development Works Defence Housing Authority Cantt. DHA, 220.00 15 16 Avicena City Housing Scheme Pakistan Medical Co-operative Housing Society Iqbal Aveneue Housing Scheme Iqbal Avenue Employees Co-operative Housing Society Jers Consulting Engineers Iqbal Avenue Employees Cooperative Housing Society 320.00 42.00 17 Haidri Homes Haidri Developers Haidri Developers 85.00 Giardino Farm Housing Scheme Sahir Associates (Pvt,) Limited Sahir Associates (Pvt,) Limited 18 40.00 Telecom Engineers Housing Scheme- Telecom Engineers Cooperative Housing 19 NESPAK 115.00 Phase-II Society M/s Sahir Associate (Pvt.) Ltd. 20 Khayabn-e-Amin Sahir Associates 120.00 T-86 Phase-II, DHA Govt. Superior Services Housing Govt. Superior Services of Pakistan Progressive Consultants. 21 Housing Society 50.00 Scheme 22 Royal Garden Royal Garden Cantt. Royal Garden Cantt. 15.00 July, 2008 December, May, 23 24 25 26 27 Al - Amin Housing Scheme Phase-III Sahir Associates (Pvt,) Limited Sahir Associates (Pvt,) Limited 15.00 DHA Villas & Leftover Works Defence Housing Authority Cantt. Ph-VIII DHA, 20.00 Alhamra Residency Appartments - Raiwind Road M/s Habib Rafique Pvt. Limited M/s Habib Rafique Pvt. Limited 10.50 Park View Housing Scheme Park View Co-operative Housing Society Extension Area Limited/DHA NESPAK 89.00 Wapda Town Wapda Employees Co-operative NESPAK 390.39 August, 2006 2006 December, 2001 List of Completed Projects 2/4

Consultant Name Project Cost Completed on Commercial Market Wapda Town Wapda Employees Co-operative 28 NESPAK 10.05 August, 2004 29 Bahria Town - Sector-B In Association with M/S Dadex Ltd. Bahria Town 5.00 2003 30 Air Avenue Housing Scheme Urban Developers Asian Consulting Engineers 70.00 Islamic Reserch Scholars Housing 31 Scheme Defence Hosing Authority - Phase-V 32 Govt. Employees Housing Scheme 33 Bahawalpur 34 Soan Town Islamic Research Scholars Co-operative Multi Dimensional. 13.75 Housing Society Ltd. Consultants Defence Housing Authority Cantt. DHA, 60.00 September, 2003 2002 June, 2001 Govt. Employees Co-operative Housing NESPAK 150.00 1997 Society Bahawalpur Civilion Employees Co-operative Housing Unique Consulting. Society Engineers, 150.00 1996 1995 35 Zahra Town Khyban-e-Zahra Housing Society Zahra Housing Society Lhr. 8.00 New City Housing Scheme New Society Housing Bahawalpur 36 Bahawalpur University of Engineering & UET Employees Co-operative Housing 37 Society Technology Housing Scheme Korang Town Housing Scheme Federal Employees Co-operative Housing 38 Society Simly Housing Resorts Armani Land Development Concepts (Pvt.) 39 Limited. New Society Housing Bahawalpur 100.00 UET Employees Co-operative Housing Society 10.00 Unique Consulting. Engineers, Armani Land Development Concepts (Pvt.) Limited. 25.00 10.00 1995 1993 May, 1992 1992 List of Completed Projects 3/4

40 41 42 Consultant Name Project Cost Completed on KekeZai Housing Scheme Kekezai Co-operative Housing Society Kekezai Co-operative Housing Society 250.00 1990 Agrics Town Phase - II, Agrics Co-operative Housing Society. Agrics Town Phase - I, Agrics Co-operative Housing Society. Agrics Co-operative Housing 22.00 Society. Agrics Co-operative Housing Society. 20.00 1990 May, 1988 43 44 Water Treatment Plant for Dakhni Oil Fields Water Treatment Plant Haj Complex Oil & Gas Development Corporation. OGDC Capital Development Authority Structures for clarifiers & Filters Reserviors office / Storage Buildin Inter-Connecting Pipe work Chemical Dosins Equipments Instrumentation& Control Pumping Stations Oil & Gas Development Corporation. OGDC Capital Development Authority - CDA 12.00 15.00 1989 1986 45 Sewage Treatment Plant for Govt. Govt. Employees Housing Society Employees Housing Scheme Bahawalpur. Bahawalpur. Inlet / Outlet Chembers / Scree Structures for BOD Removal P Inter-Connecting Pipe work Chemical Dosing Equipment Instrumentation& Control Pumping Stations NESPAK 15.00 1996 List of Completed Projects 4/4

PROJECTS IN HAND List of Projects in Hand H. M. ASSOCIATES (PVT.) LTD. Sr. No. Project Cost PKR : Completion Date (Est.) Status 1 River Edge Housing Scheme Phase-II, Park View Villas, Multan Road 2 Development of low cost Bahria Orcharad at Raiwind Road LCO-1, LCO-II, F, OHT 3 Construction of Infrastructure works in Zone-1 Qurtaba City, Chakri Rawalpindi Vision Developers 85.00 Turn Key 10% Bahria Town (Pvt) Ltd. 125.00 Turn Key 40% Madinatul-Ilm Guarantee Ltd. Flat No.4, 1st Floor, Khyber Plaza, Blue Area, Tel: 051-2206380 Contact Person: Engr. Baber Ikram (Project 260.00 Jul-14 96% Development of Telecom Engineers Coop. Telecom Engineers Cooperative 4 220.00 Dec. 2013 Housing Scheme Phase-IV, Faislabad Housing Society Ltd. 82% List of Projects in Hand 1/1