Cedar Fort AGRICULTURAL Building Approval Checklist/Procedures 26 April 2017 Page 1 of 4

Similar documents
Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

TEMPORARY USE PERMIT APPLICATION TEMPORARY TOWERS

Permitting / Licensing Process for a Junkyard

~ Please Detach and Save This Page ~

City of Coquitlam Board of Variance Application

SHED (UNDER 200 SQ. FT.) PERMIT APPLICATION

APPLICATION FOR A ZONING CERTIFICATE PLEASE PRINT OR TYPE

Cassia County Accessory Dwelling Unit (ADU) Permit Application

:= Information Included

City of Williston Building Department

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

West Earl Township Zoning Hearing Board Appeal Procedure

PLANNING BOARD APPLICATION

Instructions for APPLICATION FOR CONSENT

APP. FEE: $ DATE & TIME LOCATION: 1/4 SECTION SECTION TOWNSHIP RANGE STREET ADDRESS AND GENERAL LOCATION OF PROPERTY CITY, STATE PHONE (DAY):

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

4. Building plans should include top of foundation elevation

APPENDIX E FORMS INDEX OF ZONING FORMS

WEST COCALICO TOWNSHIP P.O. Box 244 Reinholds, PA (717) ZONING/BUILDING PERMIT APPLICATIONS INFORMATION & PROCEDURES

Public Hearing Procedures Of the Township of Mahwah Zoning Board

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

Homeowners Guide to Accessory Dwelling Units

6. Name, address, & daytime telephone # of developer (if different from applicant): 7. Address of subject property:

SUBDIVISION EXEMPTION (SUBX) SUBMITTAL CHECKLIST

And adopted at a regular meeting of the City Council of the City of Pleasanton on May 2, 2017 by the following vote:

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

TOWN OF FREEDOM FREEDOM, NH ZONING-BUILDING PACKET

ACCESSORY USE PERMIT APPLICATION

CANNABIS APPLICATION CHECKLIST

Town/Village of Ludlow Zoning Checklist Application for Permitted Use

Town%of%Virgin%Building%Permit%Application

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

Building Permit Requirements Deck

Fasttrack Permit Service Permit Application Requirements - Decks

TOWN OF OSSIPEE ZONING BOARD OF ADJUSTMENT REQUEST FOR VARIANCE

TOWN OF FAIRPLAY BUILDING PERMIT APPLICATION FOR NEW CONSTRUCTION, ADDITIONS, AND REMODELS

TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT

PLANNING DEPARTMENT Application for a Nonconforming Use Modification

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

Note to the Owner, Applicant & Agent:

Board of Adjustment Variance Process Guide

File Name: Private Provider Requirements and Information

TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT PLANNING BOARD APPLICATION PACKAGE SUBDIVISIONS

MINOR SUBDIVISION INFORMATION

MIAMI SHORES VILLAGE

FERRY COUNTY BUILDING ORDINANCE # UPDATED

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

NOTE TO ALL VARIANCE APPLICANTS:

APPLICATION FUTURE LAND USE MAP AMENDMENT PLANNING AND ZONING DEPARTMENT CITY OF INDIAN ROCKS BEACH

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

Living and Dining Room. House less than 5 yrs. old 10% of room area 5% of room area

Application for Part Lot Control Exemption and/or Deeming By-law

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

City of Shenandoah Development Package

For Office Use Only. Permit No. Fee: $ $ per proposed lot (AN ADDITIONAL 10% CODE COMPLIANCE FEE WILL BE CHARGED)

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

ACCESSORY DWELLING UNITS

DEMOLITION PERMIT APPLICATION & INFORMATION

A Final Plat will be reviewed concurrently with any other development review application(s) that is required.

CITY OF EL CENTRO COMMUNITY DEVELOPMENT DEPARTMENT APPLICATION FOR LOT LINE ADJUSTMENT

INCOMPLETE APPLICATIONS WILL BE RETURNED! GENERAL PROPERTY INFORMATION. Applicant s name Day Phone address Authorized Agent (if applicable)

City of Umatilla 1 South Central Avenue P.O. Box 2286 Umatilla, FL Phone (352) FAX (352) DEMOLITION PERMIT APPLICATION

Sheds / Carports / Garages under 55m² or 592 ft²

CITY OF SALEM, MASSACHUSETTS BOARD OF APPEALS NOTICE TO APPLICANTS

City of Greensburg. Step by Step Guidelines for your Project. Informational Packet for a Compliance Permit

COUNTY OF ALBEMARLE APPLICATION FOR RURAL SUBDIVISION

RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

CITY OF NOVI LAND DIVISION INSTRUCTIONS

COMMERCIAL BUILDING PERMIT APPLICATION

ZONING COMPLIANCE PERMIT APPLICATION

PELICAN RIDGE COMMUNITY ASSOCIATION ARCHITECTURAL CONTROL COMMITTEE APPLICATION

PLAN COMMISSION APPLICATION CITY OF MIDDLETON 7426 HUBBARD AVE. MIDDLETON, WI (608) FAX (608)

Secondary Dwelling Unit

CHAPTER 3 PRELIMINARY PLAT

NAME: PARCEL# and/or ADDRESS:

PERMIT APPLICATION CHECKLIST

LOT LINE ADJUSTMENT GENERAL INFORMATION AND

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

APPLICATION FOR OFFICIAL PLAN AMENDMENT

Building Permit Requirements Back Flow Prevention Device

NELSON TOWNSHIP APPLICATION FOR BUILDING PERMIT

Sign Permit Requirement Checklist

TOWN OF NEW SHOREHAM ZONING BOARD OF REVIEW APPLICATION PROCEDURE

BONNER COUNTY PLANNING DEPARTMENT

Buildings for Lease or Rent

Certified Survey Map (CSM) Submittal Updated: 6/29/18

R e z o n i n g A p p l i c a t i o n S u b m i s s i o n R e q u i r e m e n t s

LAND USE APPLICATION

RESIDENTIAL ACCESSORY BUILDINGS (Detached Garage, Gazebo, Shed serving a Single Detached, Semi-Detached, Duplex Dwellings and Row Houses)

INSTRUCTIONS FOR FILING A PLANNING/ZONING BOARD APPLICATION

APPLICATION FOR SITE PLAN CONTROL

EL DORADO COUNTY BUILDING SERVICES

-EXTERIOR STRUCTURE ALTERATIONSIDING DOORS - WINDOWS

Final Plat Application & Submittal Checklist

FENCE PERMIT APPLICATION

APPLICATION FOR BUSINESS TENANT CHANGE or BUSINESS TENANCY CHANGE OF USE

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

NEW SINGLE FAMILY RESIDENTIAL

Lake County Planning, Building and Development Department

LOT SUBDIVISION LOT BLOCK SIZE

Transcription:

26 April 2017 Page 1 of 4 Applicant Name: Building Approval # Current Address: Building Address: Date of Application: Phone number: Parcel/Serial Number: Zone: The Agricultural Building Approval Form and this Checklist must be TOTALLY COMPLETED before it is placed on the Town agenda for review/approval. NO EXCEPTIONS! Important Note: As Planning and Zoning and the Town Council meet only once a month, applicant must plan accordingly. Planning and Zoning meets on the 2 nd Tuesday and Town Council meets on the 4 th Tuesday. Completed application must be received by 5 PM on the FIRST TUESDAY OF THE MONTH in order for it to be on the agenda for that month. Expect the approval process to take 1-2 months after all of the checklist items are completed and the application has been submitted. NOTE: This checklist is not an exhaustive listing of details regarding issuance of a building permit. If there are any questions, please contact: Vonda Cook, Town Clerk email: cedarfortclerk@outlook.com Phone: 801-518 - 2963 COMPLETED Approval Form, AG Exemption Form and Checklist will be mailed, or hand delivered, to: Town of Cedar Fort, Attn. Town Clerk, PO Box 389, Cedar Fort, UT 84013. The following items are required for the Town to evaluate a request for a Building Approval: 1. ( ) Town of Cedar Fort AG Building Exemption Statement (attached) completed and signed. 2. ( ) Easements - No permanent structure shall be placed within 10 feet of an easement, legal or implied. A release letter from easement holders is required, if closer than 10 feet: a. ( ) Cedar Fort Irrigation Company (irrigation ditches, even if overgrown) Is there an Irrigation Company easement? [ ] Yes [ ] No b. ( ) Are there utility easements not Town owned/controlled? [ ] Yes [ ] No c. ( ) Other easements? [ ] Yes [ ] No 3. ( ) Utilities included - Will the building include: Electrical? Yes ( ) No ( ) Water/Sewer? Yes ( ) No ( ) 4. ( ) Two sets of plot plans (one set if no utilities) Drawn to Scale showing all dimensions and details of the parcel in question as well as any other parcels associated with the structure. Drawing size shall be large enough to show all required details (minimum size 8.5 x 11 ). Location of proposed structures, as well as present structures and all setbacks (see #5 next page), must be shown and dimensioned on the drawings.

26 April 2017 Page 2 of 4 5. ( ) Proper setbacks and height on outbuildings (see examples below): a. ( ) Rear setback from rear of structure to rear property line b. ( ) Rear yard setback from rear of residence to structure c. ( ) Side setback Road and Interior d. ( ) Building height 30 to roof ridge e. ( ) Minimum Lot Width (Fronting on a public street) 6. ( ) Two sets of building plans (one set if no utilities) (proper size, as noted above) showing the plan of the proposed structure and elevation views (minimum front and side). 7. ( ) Building Approval Form completed and signed. NOTE: If utilities are included, a regular Cedar Fort Building permit must be filled out and signed. 8. ( ) Signature - I certify that the above information is true, correct and complete, to the best of my knowledge. Signature of applicant Date Building Permit Exemption associated costs Agricultural buildings (no utilities) -$40 Town filing fee Agricultural buildings utility inspection (if included in permit) per Building Code For Town Use only Checklist Approved ( ) YES, Date By Town Clerk Date received by Town Approval Information - After final approval is given by the Town Council, building permit will be issued after receipt of all fees due to the Town. The applicant will have 180 days in which to begin the building and a total of 720 (24 months) to complete the project; otherwise, the application will become null and void and the permit process must be restarted. It is the responsibility of the applicant to confirm building permit approval by the Town and to obtain the building permit.

26 April 2017 Page 3 of 4 INSPECTION PROCEDURE INFORMATION (if utilities are included or added) After the building permit has been approved, the following procedure will be followed in requesting inspections. 1. Town will notify Building Inspector that a permit has been issued (Name & Number on permit). Inspector maintains a log of inspections for each permit. 2.When an inspection is needed, Applicant will notify Councilman over permits, by email ONLY, who will then arrange inspections by Town Inspector (notify Town 3 days before desired inspection). The email contact is:www.cedarfort.town 3. Pursuant to State Code, no longer than 180 days can transpire without substantial progress being made on building after the permit has been issued - substantial progress being defined as an inspection or partial inspection being called for. 4. Failed inspections will require additional inspection(s) and will require additional payment by the applicant. 5. When FINAL INSPECTION is completed, Inspector will sign APPROVAL Form.

26 April 2017 Page 4 of 4 Agricultural Building Exemption Certificate App # This Exemption Certificate is issued for an agricultural building ONLY (as defined below and in State Code. The Town of Cedar Fort issues a Building Approval Form associated with this exemption for tracking purposes only. This exemption means that no inspections are required, UNLESS utilities are included. If utilities are a part of this application, fees and inspections will be required. If utilities are added in the future, a new building permit will be required along with fees and associated inspections. Certificate of Acknowledgement I, the undersigned property owner, do hereby acknowledge and certify that the proposed building is for agricultural use only (as defined below). The uses for this structure include: Will the building include: Electrical/Mechanical? Yes ( ) No ( ) Water/Sewer? Yes ( ) No ( ) As an agricultural building, this building may not be used for any purpose other than agricultural. As defined in State Code 15A-1-202 Definitions. (1) Agricultural use means a use that relates to the tilling of soil and raising of crops, or keeping or raising domestic animals. (3) Building means a structure used or intended for supporting or sheltering any use or occupancy and any improvements attached to it. (10) Not for human occupancy means use of a structure for purposes other than protection or comfort of human beings, but allows people to enter the structure for: (a) maintenance and repair; and (b) the care of livestock, crops, or equipment intended for agricultural use which are kept there. As defined in State Code 15A-1-204: (11)(a) Except as provided in Subsection (11)(b), a structure used solely in conjunction with agriculture use, and not for human occupancy, is exempt from the permit requirements of the State Construction Code. (b)(i) Unless exempted by a provision other than Subsection (11)(a), a plumbing, electrical, and mechanical permit may be required when that work is included in a structure described in Subsection (11)(a). (ii) Unless located in whole or in part in an agricultural protection area created under Title 17, Chapter 41, Agriculture and Industrial Protection Areas, a structure described in Subsection (11)(a) is not exempt from a permit requirement if the structure is located on land that is: (A) within the boundaries of a city or town, and less than five contiguous acres Signed Print Name Date For Town Use only Approved ( ) YES, Date By Town Council

Procedures 20 December 2016 AGRICULTURAL Building Exemption Approval Procedure The Agricultural building Approval must be TOTALLY COMPLETE before it is placed on the Town agenda for review/approval. NO EXCEPTIONS! Important Note: As Planning and Zoning and the Town Council meet only once a month, applicant must plan accordingly. Planning and Zoning meets on the 2 nd Tuesday and Town Council meets on the 4 th Tuesday. Completed applications must be turned in 72 hours prior to a meeting in order for them to be on the agenda. Expect the approval process to take 1+ month after all of the checklist items are completed and the application has been submitted. 1. Applicant can pick up this Agricultural Building Exemption Checklist (attached) and Exemption Application from the Town Clerk by appointment or from the Town website townofcedarfort.com. 2. COMPLETED Application and ALL checklist information will be mailed or hand delivered to: Town of Cedar Fort, Attn. Town Clerk, PO Box 389, Cedar Fort, UT 84013 3. Town Clerk will review documentation for completeness and enter permit application into permit log. 4. The application is then forwarded to the Planning and Zoning (PZ) Chairman or designee to verify completeness and compliance with Town Ordinances and where it will be placed on the Agenda for the next PZ meeting (held the 2 nd Tuesday of each month). NOTE: Incomplete applications will NOT be placed on the PZ agenda. For Agricultural buildings that have mechanical, electrical or plumbing included in the permit request, the following procedure will be followed (future requests for addition of utilities will require a new building permit and associated inspections): 1. If mechanical, electrical or plumbing is included or planned in the future, PZ Chairman will also forward 2 sets of plans to the Town clerk who will then forward them to the Town building inspector for plan review, approval and fee assessment. 2. Councilman over building permits will receive the PZ-approved building permit package and all supporting information as well as the inspector-reviewed plans and present PZ-approved application package to Town Council at a regular scheduled council meeting for final approval (held 4 th Tuesday of each month). 3. Councilman over permits will calculate fees on approved application and notify applicant of the amount due. 4. After final approval is given by the Town Council, the applicant will have 60 days in which to obtain the permit by paying all required fees. The application will become null and void if the permit has not been obtained within the prescribed 60-day period. It is the responsibility of the applicant to confirm permit approval by the Town and to obtain the permit. 5. Permit will be issued after receipt of all fees due to the Town. 6. For AG buildings that have plumbing/electrical, Building Inspector will be notified that a permit has been issued (Name & Number on permit). Applicant will notify Councilman over permits who will then arrange inspections by Town Inspector (notify Town 3 days before desired inspection is needed). Pursuant to State Code, no longer than 180 days can transpire without substantial progress being made on building after the permit has been issued - substantial progress being defined as an inspection or partial inspection being called for. 7. When FINAL INSPECTION is completed, Inspector will notify Town and sign APPROVAL Form. NOTES: 1. Building construction must allow for Town Council approval at monthly meeting prior to ANY construction. If building construction is commenced prior to approval, a fine will be imposed. 2. Any questions regarding the procedures for building permit application should be directed to the Town Clerk.