City of Orange Development Fees

Similar documents
City of Orange Development Fees

City of Folsom Community Development Department. DEVELOPMENT IMPACT AND PERMIT FEES Effective through June 30 th 2018

FY 18/19 DEVELOPMENT IMPACT FEES

AN ORDINANCE PRESCRIBING THE CONNECTION FEE RATE AND MEAN LOADINGS PER UNIT OF USAGE FOR COUNTY SANITATION DISTRICT NO. 4 OF LOS ANGELES COUNTY

DEVELOPMENT IMPACT FEE SCHEDULE (Revised 7/12)

SEWER AUTHORITY OF THE CITY OF NORWICH NOTICE OF ADOPTION OF SEWER CAPITAL CONNECTION FEE

Development Impact & Capacity Fees

CHARTER TOWNSHIP OF OSHTEMO KALAMAZOO COUNTY, MICHIGAN AMENDED AND RESTATED WATER CONNECTION FEES EFFECTIVE: JANUARY 1, 2019 CONNECTION FEES

Subchapter 5 Zoning Districts and Limitations

CHARTER TOWNSHIP OF OSHTEMO KALAMAZOO COUNTY, MICHIGAN AMENDED AND RESTATED WATER CONNECTION FEES EFFECTIVE: JANUARY 1, 2016 CONNECTION FEES

CITY OF PETALUMA, CALIFORNIA ANNUAL DEVELOPMENT IMPACT FEE REPORT FISCAL YEAR

Farming & Livestock related activities Y Y Y Y Y Y. Commercial Type Animal Facility Y Y Y

Equivalent User Table

Permit Application Procedures

PUBLIC FACILITIES FEE CALCULATION WORK SHEET FY Revised 07/01/2017 Available on the City s web site at

CHARTER TOWNSHIP OF OSHTEMO KALAMAZOO COUNTY, MICHIGAN AMENDED AND RESTATED SEWER MAIN CONNECTION CHARGES EFFECTIVE: JANUARY 1, 2016

FEES AND CHARGES WORKSHEET

Column 1 Column 2 Column 3 USE OR USE CATEGORY SPACES REQUIRED PER BASIC ADDITIONAL MEASURING UNIT. 2 per dwelling unit

City of Humble 114 W. Higgins, Humble, Texas ( 281 ) ( 281 )

Building Classification City of New York

CITY OF EDGEWOOD SEWER Developer Extension Agreement Application

Outline of Plan Check Submittal and Required Fees for New Residential Construction

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

FILED: BRONX COUNTY CLERK 06/13/2014 INDEX NO /2013E NYSCEF DOC. NO. 24 RECEIVED NYSCEF: 06/13/2014. Exhibit A

Administrative Regulations

CITY OF HANFORD APPLICATION, FILING, AND PROCESSING FEES

ARTICLE 535. PD 535. C.F. Hawn Special Purpose District No. 3

Developer Extension Agreement Application

FIXED ASSET ADVISORY SERVICES. Green Energy Tax Services and Cost Segregation Services

CHARTER TOWNSHIP OF NORTHVILLE WATER AND SEWER DIVISION FEE SCHEDULE

CITY OF HARKER HEIGHTS FEE SCHEDULE October 1, 2008 to September 30, 2009

Residential-1 District

BUILDING DIVISION FEE SCHEDULE Fiscal Year

A Building Area: 489,616 gross SF apartments, with 214,768 SF garage

GC General Commercial District

13. Automobile maintenance service, but not commercial truck maintenance service

Administrative Procedures for the collection of Development Impact Fees

THE CITY OF RAYMORE, MISSOURI Single-Family Residential Zoning Districts

ALBEMARLE COUNTY CODE CHAPTER 18 ZONING SECTION 15 RESIDENTIAL - R-4

Commercial Property with Great Visibility for Sale or Lease. For Sale at $1,500, or For Lease at $12.00/SF NNN

STORM SEWER RATE CALCULATION

STORM SEWER RATE CALCULATION

STORM SEWER RATE CALCULATION

ARTICLE III Section BUSINESS A GENERAL BUSINESS DISTRICT

HOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS

DRAFT ZONING BY-LAW AMENDMENT 75 DUBLIN STREET NORTH ZC1612

NOTICE OF PUBLIC HEARINGS CITY OF LIVE OAK, CALIFORNIA

Van Buren Township Water & Sewer Department Schedule of Rates - Effective January 1, 2019 Resolution

Broadway Corridor Woodcliff Lake, NJ

ALBEMARLE COUNTY CODE CHAPTER 18 ZONING SECTION 16 RESIDENTIAL - R-6

RIVER DANCE RV PARK ANNEXATION AND DEVELOPMENT IMPACT REPORT TOWN OF GYPSUM - SEPTEMBER RPI Consulting LLC.

City of Casselberry Public Works Department

Bishop Real Estate Courtesy Rental List

New residential dwelling. Multifamily. X X X X X Mitigation Fee Program Drainage fee* X* X X X X X Sewer fee X X X X X School fee X X X X X

Unified Development Ordinance. Chamblee Chamber of Commerce Meeting May 21, 2015

ARTICLE 533. PD 533. C.F. Hawn Special Purpose District No. 1

Water. Water Major Facilities

( ) 1. By-law , as amended, is hereby further amended: (1) by adding to Section the following zone:

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Suburban Commercial Center ( CE-S ) Permitted Principal Uses and Structures

CASE SUMMARY Conditional District Zoning Modification Planning Commission January 9, 2013 CD M1212

CODE VALUE ERU Fee/Month Fee per Year

Schedule of City Fees & Charges

THE ATRIUM CONDOMINUM ROGER BACON DRIVE - UNIT 10, RESTON, VA 20190

RESOLUTION AMENDMENT TO USER CHARGE ORDINANCE NUMBER 3

Daniel Fitzpatrick

Bishop Real Estate Courtesy Rental List

Commercial Building for Lease. For Lease at $10.00/SF Gross + Expenses

No person shall within any General Commercial (C3) Zone use any lot or erect, alter or use any building or structure except as specified hereunder:

SECTION 11 - GENERAL COMMERCIAL ZONE (C3) REGULATIONS

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

SQUAW VALLEY PUBLIC SERVICE DISTRICT

R-40 RESIDENTIAL ZONE. [Amended by Ord. No ; by Ord. No ]

CITY OF HARKER HEIGHTS FEE SCHEDULE October 1, 2012 to September 30, 2013

Residential Permits R-2, R-3, R-4, and U Occupancies 2019 Building Permit Valuation/Fee Schedule

RESOLUTION NUMBER

CHAPTER COMMERCIAL ZONING DISTRICTS

PROPOSED AMENDMENTS TO THE DERBY ZONING REGULATIONS AUGUST 12, 2008

III. HOUSING CONSTRAINTS

Requests Conditional Use Permits (Craft Brewery & Open-Air Market) Staff Recommendations Approval of Craft Brewery Denial of Open-Air Market

TOD - Transition Subdistrict Summary of Allowable Uses

SCHEDULE C. Application 1 The provisions of this Schedule apply to all zones except:

Land use regulations (4SRC, CSMU, HO, 2/3 MUE, 2/3 MUW, WEV, 5/M R/O). Type of Land Use 4SRC HO CSMU

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

YOUR HOME AT THE CENTRE OF THE NEW DUBAI

UDO Advisory Committee Meeting #3 August 18, 2011

SECTION 6. RESIDENTIAL DISTRICTS

The Bristol ELEVATION C & D

Industrial Space For Sale or Lease

COMMERCIAL ZONING DISTRICTS (Amended 11/13/14) Part I. C-1 Restricted Commercial District

ZONING. 145 Attachment 1

PP Course # Instructor Information. Patrick Vandergriff 35 Cottonwood Canyon Road La Luz, NM

Impact Fees Charged on Development in Unincorporated Sarasota County

Summary of City of Oakland Impact Fees Effective September 1, 2016

Prepared for the Rauch Foundation

OFF-STREET PARKING ORDINANCE

UrbanFootprint Place Types. Urban Mixed Use. Urban Residential. Urban Commercial. Residential 1% SF Large Lot 0%

BASEMENT BAR SPACE AVAILABLE FOR LEASE

Request Conditional Use Permits (Craft Brewery & Open-Air Market) Staff Recommendation Approval. Staff Planner Robert Davis

THE CORPORATION OF THE DISTRICT OF SUMMERLAND BYLAW NUMBER A BYLAW TO IMPOSE DEVELOPMENT COST CHARGES

Transcription:

City of Orange Development Fees The following fees, if applicable, will be collected by the Building Division at building permit issuance. Transportation System Improvement Program (TSIP) Effective 09/09/2008 See attached map for area identification For further information please contact Doug Keys, Transportation Analyst at (714) 744-5540 or dkeys@cityoforange.org Area A Area B Area C Single-Family; Condo & Townhome Residential (per unit) $ 817.00 $ 1,445.00 $ 804.00 Residential Apartments (per unit) 712.00 1015.00 564.00 Hotel /Motel (per room /r unit) 817.00 1,234.00 686.00 General Office (per sq. ft) 1.17 1.66 0.93 Medical Office (per sq. ft.) 3.83 5.46 3.04 Industrial (per sq. ft.) 0.74 1.05 0.59 Retail /Commercial (per sq. ft.) 4.55 6.03 3.34 Church /Synagogue (per sq. ft.) 0.97 1.38 0.77 Hospital (per bed.) 1,252.00 1,783.00 992.00 School (per student) 137.00 195.00 108.00 Child Care (per sq. ft.) 8.10 11.97 6.66 Atypical Uses (per trip end-daily) 106.00 151.00 84.00 Foothill / Eastern Transportation Corridor Agency Fee (TCA) Effective 07/01/2017-06/30/18 Zone B 55 to Weir Canyon Road Single Family Dwelling Multi-Family, Apts. /Condos Non-Residential $ 4,037.00 per unit $ 2,354.00 per unit $ 4.57 per Sq. Ft. N:/CDD/BUILDING/FrontCounterSection/DevelopmentFees/OrangeDevelopmentFeesHandout effective 07-01-17.docx Page 1 of 5

Orange County - Sanitation District Fee Effective 07/01/17 06/30/2018 TABLE A CAPITAL FACILITIES CAPACITY CHARGES (CFCC) Use Category Rate Basis Base Charge Commercial - Industrial Per 1,000 square feet 1 Low Demand 2 Per 1,000 square feet $ 321.00 1 Average Demand 4 Per 1,000 square feet $2,000.00 1 High Demand 3 Per 1,000 square feet $4,751.00 1 Single Family Residential (SFR) 5 Base Charge 5+ Bedrooms $5,356.00 4 Bedrooms $4,586.00 3 Bedrooms $3,855.00 2 Bedrooms $3,121.00 1 Bedroom $2,387.00 Multi-Family Residential (MFR) 6 Base Charge 4+ Bedrooms $4,164.00 3 Bedrooms $3,429.00 2 Bedrooms $2,695.00 1 Bedroom $1,926.00 Studio 7 $1,238.00 Supplemental CFCC for Permit Users, includes 5% cost of funds. Flow, gallons per day BOD, pounds per day SS, pounds per day $0.001936 $0.415100 $0.222610 1 Provided that the minimum Capital Facilities Capacity Charge for such new construction shall be $3,855; and all calculations shall be on a 1,000 square foot, or portion thereof, basis. 2 Low Demand connections are the following categories of users: Nurseries; Warehouses; Churches; Truck Terminals; RV Parks, RV Storage Yards, Lumber/Construction Yards, Public Storage Buildings; and other facilities with restrooms, offices, lobbies and/or areas whose flows are similar in volume to these listed categories. Parking Structures not connected to the sewer will not be charged. 3 High Demand connections are the following categories of users: Restaurants (including patios used for additional seating capacity); Supermarkets; Car Washes; Coin Laundries; Amusement Parks; Shopping Centers with one or more Restaurants, or Food Court; Food Processing Facilities; Textile Manufacturers; and other dischargers whose flow is similar in volume to these listed categories. 4 AII other connections are Average Demand users including: Hotels, Strip Malls without restaurants; Music Halls without food facilities; Office buildings; Senior Housing with individual living units without kitchens but with a common kitchen, and wash pads. 5 Bedroom additions are considered a change of use and a CFCC must be paid. Bedrooms includeenclosed loft additions, bonus rooms that may be used as offices, workout rooms, media rooms, or libraries, or any other additions, which could potentially be used as a bedroom. The classification of these additions will be reviewed and determined by staff. Any detached building such as an addition over an existing garage or a new building with the same designation as mentioned above will be considered a separate living residence (SFR). 6 MFR units consist of multiple units that receive one secured property tax bill such as apartments. Senior housing with individual living units that include a kitchen are considered MFR units. 7 Studio - one single room with no separating doors or openings leading to another part of the room (except for a bathroom). N:/CDD/BUILDING/FrontCounterSection/DevelopmentFees/OrangeDevelopmentFeesHandout effective 07-01-17.docx Page 2 of 5

Park Dedication and In Lieu Fee (Quimby) (Park Acquisition Fee) 511 Residential Subdivision Developments Only (See Park Infill for New Residential Housing Units (Not a Part of a Subdivision) District 1 District 2 < 6 (DU/GA) $ 7,994.00/per unit < 6 (DU/GA) $ 8,894.00/per unit > 6 - < 15 (DU/GA) $ 9,434.00/per unit > 6 - < 15 (DU/GA) $ 10,469.00/per unit >15 (DU/GA) $ 9,506.00/per unit >15 (DU/GA) $ 10,546.00/per unit Park and Recreational Facilities Development Impact Fee (Park Infill Fee) 510 Residential Projects Only Applies to Newly Created Housing Units (Not a Part of a New Subdivision) (See Park Acquisition (Quimby) for Subdivision Developments) District 1 District 2 < 6 (DU/GA) $ 7,994.00/per unit < 6 (DU/GA) $ 8,894.00/per unit > 6 - < 15 (DU/GA) $ 9,434.00/per unit > 6 - < 15 (DU/GA) $ 10,469.00/per unit >15 (DU/GA) $ 9,506.00/per unit >15 (DU/GA) $ 10,546.00/per unit Library Facilities Development Impact Fee Residential Projects Only Applies to All Newly Created Housing Units Less than 6 (DU/GA) From 6 to 15 (DU/GA) More than 15 (DU/GA) Citywide $ 742.52 per unit $ 769.30 per unit $ 642.71 per unit N:/CDD/BUILDING/FrontCounterSection/DevelopmentFees/OrangeDevelopmentFeesHandout effective 07-01-17.docx Page 3 of 5

Fire Protection Facility Fee Land Use Detached Residential Attached Residential College/University Dorm Group/Congregate Units Commercial Lodging Commercial/Office Use Industrial Manufacturing Use Private Hospital Use Fee $ 1200.00 per unit $ 601.00 per unit $ 971.00 per unit $ 2,306.00 per unit $ 955.00 per unit $.595 per sq. ft $.570 per sq. ft. $2.562 per sq. ft. Police Facility Fee Single Family Dwelling Non-Residential $ 354.89 per unit $ 0.206 per Sq. Ft. School Development Fee (Collected by the Orange Unified School District) 1401 N. Handy Street, Orange, CA 92867 For additional information, call (714) 628-5369 N:/CDD/BUILDING/FrontCounterSection/DevelopmentFees/OrangeDevelopmentFeesHandout effective 07-01-17.docx Page 4 of 5

Building Permit and Plan Check Fee A fee for each building permit and plan check fee 1 shall be determined based on the following fee schedule, which is based on the building valuation. The building valuation shall be determined by the Building Official and is the total value of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical plumbing, heating, air conditioning, elevators, fire extinguishing systems and any other permanent equipment. Building Valuation Building Permit Fee Basic Fee Add Per $ 0.00 to $ 500.00 $ 22.82 $ 0.00 $ 100 2 over $ 501.00 to $ 2,000.00 $ 22.82 $ 3.05 $ 1,000 2 over $ 500.00 $ 2,001.00 to $ 25,000.00 $ 68.52 $ 13.69 $ 1,000 2 over $ 2,000.00 $ 25,001.00 to $ 50,000.00 $ 383.38 $ 9.88 $ 1,000 2 over $ 25,000.00 $ 50,001.00 to $ 100,000.00 $ 630.26 $ 6.84 $ 1,000 2 over $ 50,000.00 $ 100,001.00 to $ 500,000.00 $ 972.02 $ 5.32 $ 1,000 2 over $100,000.00 $ 500,001.00 to $ 1,000,000.00 $ 3,099.38 $ 4.56 $ 1,000 2 over $ 500,000.00 $ 1,000,001.00 to $ 1,000,000,000.00 $ 5,380.98 $ 3.05 $ 1,000 2 over $1,000,000.0 0 Mechanical, Electrical, and Plumbing fees are calculated separately and are generally based on unit costs (see permit applications for these unit costs). 1 The plan check fee shall be 65% of the building permit fee and will be collected at the time of permit application. 2 or fraction thereof N:/CDD/BUILDING/FrontCounterSection/DevelopmentFees/OrangeDevelopmentFeesHandout effective 07-01-17.docx Page 5 of 5