Academic Projects Emergency Evacuation Plan The Pennsylvania State University

Similar documents
Bentonville Office Building Guidelines February 2017

Campus Tornado Shelters. Weather Department Environmental Health & Safety Northern Illinois University

CENTRAL PLAZA. 337 SW Alder Street, Portland, OR BUILDING INFORMATION FOR TENANTS

THEATER EVACUATION AND EMERGENCY SITUATION GUIDELINES THEATER EVACUATION

Campus Building IP Sites/ Readers Inputs Outputs Controller # (Doors) (Alarms) (Relays)

Tidewater Community College Crisis and Emergency Management Plan Appendix F Emergency Operations Plan. Annex 4 Tornado/Severe Weather

Hotel Accessibility Pack

Governors State University Tornado & Severe Weather Shelter Plan March 18, 2016

POR Orientation Handbook rev. 7/27/17

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016

Equality and Access Plan The Abbey School, Reading

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures

Purpose. Scope. Stairway Identification Signs. Emergency Evacuation and Stairwell Signage Requirements

ADDENDUM #2. Date: April 29, Prospective Bidders. Re: Addendum #2 - Request for Proposal #29-14

TEMPORARY REFUGE AREAS & EVAC CHAIR LOCATIONS

Wicomico County Purchasing Rick D. Konrad Purchasing Agent 125 N. Division St. Room B3 Salisbury, MD Ph Fax

Name/Group Name. Address. Local Contact Phone: Day Evening. Address

Site Visit Hosted by. Green Bay Press Gazette. 435 E Walnut Street Green Bay, Wisconsin Telephone:

AED Tracking List & Locations

WELCOME TO GRADUATE HOUSING! Podiatry Residence Hall. 801 Cherry Street Philadelphia, PA 19107

University of Central Arkansas Department of Housing and Residence Life. Residence Hall Greek Chapter Room Agreement

FGH Community Resident Guide

CHECK IN TIME: Check in time is 4:00 pm. CHECK-OUT TIME is 11 a.m.

RIVER PLACE NORTH HOUSING CORPORATION RULES AND REGULATIONS PLEASE READ THE ENTIRE

UNC Pembroke Building Evacuation Maps

Address. FACILITIES REQUESTED: Name of Facility or Recreation Area Specific part(s) of the Facility or Recreation Area

THOMAS CENTER PHYSICAL IMPROVEMENTS

2018 Building Season. From the Supervisor. A reminder to change your clocks back one hour on Sunday November 5 th!

Department of Residence Life Tips for a Successful Stay

Emergency Evacuation and Stairwell Signage

2017 EMERGENCY PREPAREDNESS. Pre & Post Event Tenant Protocol

Horizon Apartments 70 West State Street Coldwater, Michigan 49036

BARLOW CENTER (2520 L Street NW)

101 Montgomery Street. Tenant Handbook

London Hilton on Park Lane: Accessibility Pack

ABERDEEN COMMUNITY CENTER RENTAL AGREEMENT PLEASE NOTE...

KINDERTON VILLAGE CLUBHOUSE RENTAL AGREEMENT TERMS AND CONDITIONS

ADMINISTRATION BUILDING

City of South Portland Office of the City Clerk 25 Cottage Road South Portland, ME Registration of Short-Term Rental Checklist

Project overview. Golden Sand Hotel DOHA QATAR

ADMINISTRATION BUILDING

Preferred Housing Provider and Landlord Commitment

Place of Assembly. A Guide to the New York City Place of Assembly Process. Department of Buildings. New York City Fire Department

Land. For further information, please contact: M (360) (800) FAX (360)

Fenwick Homeowners Association (HOA) Fenwick Blvd, Edmond OK 73012

STUDENT RESIDENT GUIDE Lawrenceville, NJ 1 Nexus Properties 1 Glassboro, NJ

Community Center RENTAL INFORMATION

MOUNT GRAVATT- CAPALABA ROAD

Let Only deposit held with Landlord SAMPLE Page 1 of 5

Discuss the history of fires that resulted in much of the development of codes related to means of egress. Review mean of egress terminology

TABLE OF CONTENTS WELCOME LETTER 1 MAINTENANCE REQUEST FORMS 2 DIRECTORY 3 BUILDING POLICIES 5 EMERGENCY PROCEDURES 8 FLOOR ACCESS PLAN 11

Hampden Township Recreation and Parks Department Picnic Pavilion Reservation Request

UNIVERSITY OF CINCINNATI HOUSING AGREEMENT TERMS AND CONDITIONS

Tenant Handbook AT&T Tower

FLOOR AND ROOM NUMBERING GUIDELINES

Facilities providing accommodation for the public (e.g. Hotels, hostels, guesthouses, self catering apartments).

1. Please make sure that your friends and family are aware of your contact details including your room number and your mobile number.

EXHIBIT - "D" HABERSHAM POINTE CONDOMINIUMS RULES AND REGULATIONS

Facility Information for CareConnect Classrooms

HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL

1. All registered guests of Mantra Circle on Cavill agree to abide by the Mantra Circle on Cavill House Rules;

Employee and Student Resource Guide. A guide with helpful information for employees and students at the White Stag Block

Central Arizona College. AED Locations

SHANNAMARA HOMEOWNERS ASSOCIATION Clubhouse/Pool Rental Agreement

Frequently Asked Questions!

Minnesota Church Center Tenant Handbook. Revised October 2017

EXHIBIT B RULES AND REGULATIONS & Operation Policies 1. Sub lessee shall not place anything, or allow anything to be placed near the glass of any

14 May 9, 2012 Public Hearing APPLICANT: JAMES KENNEDY VI

Special Meeting Genosha Development Project Accessibility Plan. Committee Meeting Room City Hall - 2nd Floor

The Care and Keeping of Inventory and Fixed Assets

SALVATION ARMY: HARBOR LIGHT CENTER EXISTING PROPOSED SALVATION ARMY: HARBOR LIGHT CENTER

College Of Dupage-Police Dept 2/7/2019 thru 2/7/ /07/2019 3:50 NO PARKING 2-6 AM overnight parking enforcement

Thompson Library, Stoke An accessible guide

Snow Meadows Cabin Rental Agreement

Guide to Taking a Rent Arrears Case to VCAT

(WETUMPKA CIVIC CENTER)

Hill Court Area Handbook

CEME Building Emergency Directors

USER COORDINATED SIGN TEXT

2019 SUMMER CONSTRUCTION PROGRAM 4/16/19

Barren Hill Volunteer Fire Company Hall Rental Committee 647 Germantown Pike

University Policy UNIVERSITY PROPERTY AND EQUIPMENT INVENTORY

TWO LOGAN SQUARE 100 NORTH 18TH STREET PHILADELPHIA, PA

FAIR OAKS GENERAL INFORMATION

House Rules. Hilton Surfers Paradise. Dear Guest, We look forward to welcoming you to Hilton Surfers Paradise.

BAYSHORE GARDENS MARINA RULES BAYSHORE GARDENS PARK AND RECREATION DISTRICT TH Street West, Bradenton, Fl (941)

Real Estate Assessment Checklist. 1. This assessment checklist has most of the essential features to look for in a house,

Element Z General Design Requirements Owner Standards and Other Requirements

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

AVAILABLE. 2nd Floor - 7,460 SF 3rd Floor - 1,630 SF DEAL POINTS. Asking Rent Term TI Allowance Building Square Footage

Peel Standard Condominium Corporation No. 713

HALLOWAY HOMEOWNERS ASSOCIATION

Agreement CozzyStay Accommodation

Marywood University. Off-Campus Resource Guide for Commuter Students

WATER TOWER SW Macadam Avenue Portland, OR 97239

BERKELEY APARTMENTS CORP. HOUSE RULES

PB 7/10/18 - Page 1 CHILI PLANNING BOARD July 10, 2018 A meeting of the Chili Planning Board was held on July 10, 2018 at the Chili Town Hall, 3333 Ch

NFPA (2012). In a high-rise building, stairwell pressurization systems typically utilize multiple fans distributed over the height of the stair, a duc

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

Hotel Accessibility Pack

Transcription:

Academic Projects Emergency Evacuation Plan The Pennsylvania State University Emergency Phone Numbers EMERGENCY (Police-Fire-Ambulance) 911 University Police 814-863-1111 University Health Services 814-865-6556 Environmental Health and Safety (814) 865-6391 Physical Plant Work Reception Center 814-865-4731 Updated 11/7/16

Building and Personnel Information Building Name: Academic Projects Building Name(s) of Departments: EMS Energy Institute, EHS, Aeronautical Eng., Mech. Eng.. Position Name Area of Responsibility Phone Office/Cell Office Address Building/Department Ronnie Wasco CUL 863-5384 218 Academic Projects Emergency Coordinator Alternate Kelly Rhoades CUL 863-5984 203 Coal Utilization Lab Building/Department Emergency Coordinator Unit Safety Officer Rhonda Stoner EMS 865-5709 248 Deike Unit Alternate Safety Officer Diane Ault EMS 865-1091 248 Deike Safety Monitors Gary Mitchell 1 st Floor and 865-6543 104B Academic Projects Basement Ronnie Wasco 2 nd Floor 863-5384 218 Academic Projects Designated Meeting Site for Building is: Sidewalk across Bigler near the Day Care playground. If inclement weather, move to 3 rd floor lobby, AAB. Assisted Evacuation Staging Areas for the Building are: The top of the east stairwell (Z202), the top of the west stairwell (Z201), west 1 st floor foyer west (F101), and the first floor foyer east (F102). Copies of this Evacuation Plan are kept in the following locations: Outside 218 and in the stainless steel desk in 106. Barbara Robuck to be stationed in Main Lobby RE to ensure no reentry through east APB entrance. Liz Wood to be stationed in C110 CUL to ensure no reentry through APB south entrance. Gary Mitchell to be stationed in 005 Receiving RE to ensure no reentry through APB basement entrance. Derek Hall to be stationed in 2 nd floor atrium of RE to ensure no reentry through APB/RE breezeway. 9/15/16 Signature of Plan Preparer Date Prepared

EMS EI APB EVACUATION PROCEDURES Objectives There are six objectives to be attained during an APB evacuation. They are: 1) Clear 1 st, 2 nd, and Basement floors of all personnel. 2) Identify missing EMS EI personnel. 3) Secure the two floors and the basement. 4) Ensure no one reenters AAB from 416 and CUL. 5) Transfer information to Ronnie Wasco and First Responders. 6) Transfer monitor duties to First Responders. To accomplish this quickly, APB will be divided into two sections. Those sections are: 1) The entire 2 nd floor. 2) The entire 1 st floor and basement floor. EMS EI APB personnel are assigned a particular section to clear and secure. Areas of Refuge The areas of refuge on the 1st floor are the bottoms of the stairwells in APB. If safe to do so, egress the person to the outside. The areas of refuge on the 2nd floor are the tops of the stairwells. If safe to do so, egress the person through the breezeway into Research East and evacuate to the outside. The area of refuge in the basement is at the bottom of the stairwell. If possible, egress the person through Research to the outside. General Procedures If the fire alarm goes off, or you are ordered to evacuate APB, follow these general procedures: Evacuate your office leaving the lights on and the door closed and unlocked. Monitors and back-up monitors: Meet quickly on the 1st floor and confirm specific duties. Remind personnel to grab their Keys, Coats, and Cash!

Take note of anything unusual during your egress (e.g., smoke, smells, etc.). Sweep your assigned floor. 1st Floor and Basement Monitor: Grab the Evacuation Binder from 106. Sweep the areas and report to the collection area. 2 nd Floor Monitor: Grab the Evacuation Binder from outside 218. Sweep the areas and report to the collection area. Assemble across Bigler Ave. at the day care center near the playground. Determine if anyone is missing. Share what you observed with everyone. Fill out checklists and make notes on observations. Report what you have observed to Ronnie Wasco. If the weather is bad, those without other responsibilities shall relocate to the main Entrance Lobby in Academic Activities. Those with responsibilities will relocate to the main Entrance Lobby in Academic Activities when relieved by First Responders. Communicate to First Responders that the RE basement, RE lobby, APB atrium, and RE Breezeway Exit Monitors need to be relieved by their personnel. Do not return to APB until given the all clear by the EMS EI Safety Officer, EHS personnel, or First Responders. There are five ways to enter APB: INGRESS TO APB 1) To the 1 st floor from the south by the main entrance, including from CUL. 2) From the east at the Plaza level by Research East. 3) From the east through the 2 nd floor breezeway. 4) From the basement from Research East. 5) From the north through the OPP Mechanical Room. We do not need to monitor that door. Four Door Monitors will be assigned to cover these entries. They will take up positions in the following locations: 1) The basement of RE where RE and APB connect. 2) The breezeway area of RE by the elevator. 3) The main lobby of RE. 4) The south parking lot by the main entrance.

APB Personnel Specific Procedures If for any reason the following personnel cannot fulfill their duties (e.g., they re across campus, out sick, etc.), all EMS EI AAB personnel should be prepared to carry out another person s duties. Communicate to others the duties you will perform. DO NOT PERFORM THESE DUTIES IF BY DOING SO YOU PUT YOURSELF AT RISK! Gary Mitchell: Grab the Evacuation Binder from 104. Sweep the first floor from west (Main entrance) to east (towards RE). Check to see if the RE 1 st Floor Door Monitor is in position. If not, order someone to that position. Proceed to the basement using the east stairwell. Sweep the basement. Wait in the basement until the Basement Door Monitor arrives. Egress the build and proceed to the collection area and report. Ron Nargi: Back-up Sweeper to Gary Mitchell. Ronnie Wasco: 2 nd Floor Monitor. Grab the EMS EI APB Evacuation Binder. Sweep the 2 nd floor. Ensure someone is monitoring the breezeway from RE. If not, order someone to be the RE Breezeway Monitor. Ensure someone is going to the basement to relieve Gary Mitchell. Exit the building by the west stairwell. Ensure someone is monitoring the main entrance. Proceed to the collection area and report. Derek Hall: Back-up 2 nd Floor Sweeper to Ronnie Wasco. Gary Mitchell: Basement Door Monitor, positioned in basement of Research East. Barbara Robuck: 1 st floor East Door Monitor, positioned in Research East main lobby. Derek Hall: 2 nd floor East Breezeway Corridor Monitor, positioned in Research East on the breezeway level. Elizabeth Wood: 1 st floor West Door Monitor, positioned by the high bay door of the CUL loading dock.

APB EVACUATION PERSONNEL CHECKLIST UPDATED 26APR16 Are these personnel present? (Yes = Y, No = X) Gary Mitchell (EMS EI) Joe Abrahamson (EMS EI) Ron Nargi (EMS EI) Derek Hall (EMS EI) Joel Morrison (EMS EI) Arup Sengupta (EMS EI) Elizabeth Wood (EMS EI) Cheng Guan (EMS EI) Barbara Robuck (EMS EI) Weidong Pan (EMS EI) P. Pitakjakpipop (EMS EI) Caroline Clifford (EMS EI) Rui Zhang (EMS EI) Shimin Liu (EMS EI) Xu Zhao (EMS EI) Ronnie Wasco (EMS EI) Edward Brand (EMS EI) Aron Lupinski (EMS EI) Justin Beck (EMS EI) Long Fan (EMS EI) Liang Wang (EMS EI) Jinxia Zhou (EMS EI) Lin Zhang (EMS EI) Junying Tian (EMS EI) Balaji Raman (EMS EI) Hafsa Abboud (EMS EI) Antonio Cuesta (EMS EI) Xiao Jiang (EMS EI) Wenying Quan (EMS EI) Wenjia Wang) (EMS EI) Jeff Leavey (EHS) Dave Bertocchi (EHS) Greg Herman (EHS) Yuanqing Guo (EHS) Mark Fedkin (ME)

APB EVACUATION AREA CHECKLIST DOES ANYBODY NEED RESCUED? HOW MANY PEOPLE? WHERE ARE THEY? DOES ANYONE NEED MEDICAL TREATMENT? Have the following areas been swept? (Yes = Y, No = X, Unsure =?) Entry Foyer West West Stairwell 101 (Reactor office) 201 (Leavey Office) 102 & 117 (Wind Tunnel) 202 (EI Student Office) 103 (Reactor lab) 203,203A (EHS Office) 104, 104A, 104B (Gary, etc.) 204, 204A (EHS Office) 105, 105A, 105B (Joel, etc.) 205 (Lvov Lab) 106, 106A (Labs) 206, 206A, 206B (EI Office) 107, 107A (Labs) 207 (Lvov Lab) 108 (Reactor) 208 (Song Lab) 109 Men s Room) 209A (Mailroom) 110 (Janitor Closet) 209 (EI Office) 111(Ladies Room) 210 (EI Office) 112 (Computer Lab) 211 (Janitor Break Room) 113 (IT Shop) 212 (Corridor to RE) 114 (Lvov Lab) 213 (Electrical Room) 115 (Computer Lab) 214 (Ladies Room) 116 (Mechanical Engr.) 215 (Janitor Closet) East Stairwell (to basement) 216 (Men s Room) 1, 2, &3 (OPP) 217 (Lvov Lab) 4F (Sample Bank) 218 (Wasco Office) 4C (Empty Lab) 219 (Fedkin Office) 4B (EHS Storage) 220 (Beck Office) East Stairwell, to 2 nd Floor 221 (EI Office) 229 (EHS Lab) 222 (EI Office) 228 (Herman Office) 223 (EI Office) 227 (Guo Office) 224 (Clifford Office) 226 (Bertocchi Office) 225 (Liu Office)

Critical Operations Shut Down Procedures and Personnel Assigned These Responsibilities Provide the following information: Critical Operation: No critical shut downs for the building Required Shutdown: Name: Job Title: EMS EI faculty Work Area: EMS EI Listing of Individuals Requiring Evacuation Assistance None

Building Evacuation Floor Plan Academic Projects 1 st Floor

Academic Projects 2 nd Floor

Evacuation Quick Reference Card Emergency Contacts: 911 (Police- Fire Ambulance) University Police: 863-1111 Environmental Health and Safety: 865-6391 OPP Work Reception Center: 865-4731 Evacuation Contacts: Bldg / Dept Emergency Coordinator: Ron Wasco Safety Monitor: Gary Mitchell, Ron Wasco Work Unit Name Evacuation Quick Reference - Quickly exit in a calm manner. - Close doors Do Not lock - Assist visitors to evacuate - Do Not use elevators - Report to designated meeting site - Do Not reenter the building until advised by emergency personnel or safety monitor Building Name designated meeting site: Across Bigler Road on sidewalk near Day Care Center