A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017.

Similar documents
A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017 with a targeted completion in 2019.

The redevelopment began in March 2016 and is slated to complete in phases from

A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017 with a targeted completion in 2019.

The redevelopment began in March 2016 and is slated to complete in phases from

A complete renovation and modernization of the 5-story, 75,000 sf building.

Ariel Property Advisors Presents. The Revitalization of the

PRE-DESIGN STUDY 2401 COLE PLACE. Mixed Use Development. 10 Attached Residential Units Parking Garage. and Retail Space

Midtown Detroit, Inc. Efforts in the North & South Cass Neighborhoods (updated February 2016)

PRE-DESIGN STUDY 6/26/ COLE PLACE ARSHIA ARCHITECTS 550 N LARCHMONT BLVD #100 LOS ANGELES, CA

VISION PARK 128 VISION PARK DR. SHENANDOAH, TX

MICRO LIVING: DESIGN CONSIDERATIONS FOR SMALL SPACES

Studio $3875 $3875 $7, bedroom single $4125 $4125 $ bedroom double $3200 $3200 $6400

DRAFT 1. GENERAL INFORMATION 2. APPLICATION INSTRUCTIONS

DRAFT For Discussion Only

Procedure for an Permit Application For a Park Model Home or Mobile Home

VeloCity An Active Community. History

Site Modification Process for Alcova Reservoir and Pathfinder Reservoir, Natrona County, Wyoming Leaseholders Revised October 6, 2016

AGBH, 1 Lochside View Space planning & Atrium options

ACCESSORY DWELLING UNIT ORDINANCE

Orion Park, Northfield Avenue, Northfields, Ealing, London W13 9SJ

MOTION NO. M Beacon Hill Station TOD Property Final Transaction Agreements PROPOSED ACTION

PROPOSAL Architectural Services

404 South M Street. 2 Units at 404 South M Street, Lake Worth FL, Martin Goldstein Russell Goldstein

Downtown J Street Apartments

Board of Regents Meeting November 30-December 1, 2006 Agenda Item #32 Arizona State University EXECTIVE SUMMARY Page 1 of 8

1309 N J St Apartments

1309 N J St Apartments

SAMPLE SELLER PROPERTY QUESTIONNAIRE ADDENDUM

Beecher Neighborhood Stabilization Plan

Strategic Planning for RAD Conversions. Thursday, April 6, 2017

HISTORIC PRESERVATION FINANCIAL INCENTIVES

HAMILTON STREET CORRIDOR

HISTORIC PRESERVATION FINANCIAL INCENTIVES

Single Drawer Accountability (SDA) (NON POS) R2 and R4 Hour Offices Conversion Guide Instructions

MacroHomes Design Competition - Call for Submissions. Prize: $10,000 & potential collaboration on a large scale multifamily project

I n v. e s t m e n t. i l d i n g. 3 - B u. Downtown Mixed-Use. o i. S a l. e P

Myra / Manzanita Neighborhood Coalition 939 Manzanita Street Los Angeles, California

DES PLAINES ZONING BOARD MEETING SEPTEMBER 29, 2015 MINUTES

US Route 15 & Monocacy Boulevard Northeast Bypass Interchange

Las Casitas 30-Units 801 S. 17 th Ave. Phoenix, AZ 85007

REQUEST FOR PROPOSALS

YEAR IN REVIEW High Street Boston, MA

DEVERON APARTMENTS N. 45 th Place Phoenix, AZ PRICE: $1,890,000 COVERED RESERVED PARKING CENTRAL ARCADIA LOCATION

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Room Selection FAQ s

Ben Moberg ~

City of Richmond Rent Control and Just Cause for Eviction. Fact Sheet

FY18 DCS Grant Round Announced

Keystone Preservation Group

TOWN OF BASHAW. Bylaw A bylaw to regulate the development and use of land and buildings

< UJ. strong and welcome statement of federal pur pose in a place that will always figure in our

City of Surrey ADDITIONAL PLANNING COMMENTS File:

CITY OF NANAI MO BYLAW NO A BYLAW TO AMEND THE CITY OF NANAIMO "ZONING BYLAW 2011 NO. 4500"

COUNTY OF SANTA BARBARA

MULBERRY APARTMENTS 16-UNITS

Alabama AGC Presentation. August 15, 2017 COME BUILD WITH US.

Palmaire 12-Units 7602/7606 W Palmaire Ave. Glendale, AZ 85303

How to Make Auctions of Public Land

Residence Hall Room Lease & Board Contract,

TO LET. Town Centre Retail Premises. Shop Unit 10, Manchester Chambers, Oldham OL1 1LF.

VILLAGE OF STURTEVANT TH STREET STURTEVANT, WI 'OWNER: LOCATION ADDRESS: 'OWNER'S PHONE CONTRACTOR CONTRACTOR ADDRESS: CONTRACTOR PHONE:

MAP REFERENCE HANDBOOK

MEMORANDUM. To meet the goal established in the Amendment to the Resolution to provide 10% workforce housing, we offer the following:

48,72;9,3$1$0(5,&$1$5&+,7(&785(%,(11$/( %$4 ³)((//$7,1$0(5,&$1$5&+,7(&785( WR1RYHPEHURI

Access Statement for Bovey Castle

407 Walmer Road PH me: See my website:

Now That We re Poor: The New Economics of Land Use

STAFF REPORT. Yin Smith, Director of Planning and Building. Accessory Dwelling Unit Regulations

APPLICATION. Fee Simple Subdivision Bare Land Strata Conversion of Existing Building into Strata Units

Staff Initiated Discretionary Review Full Analysis HEARING DATE NOVEMBER 29TH, 2012

City of Surrey PLANNING & DEVELOPMENT REPORT File:

94 Crescent Road Townhouse 7

Planning Rationale in Support of an Application for:

Contents. 15 Stout Street, Wellington 6011 w: Tel: PO Box 1473, Wellington 6140, New Zealand

Sea House Apartments 601 S Ocean Drive, Hutchinson Island, FL. Martin Goldstein Russell Goldstein

University of Colorado Design Review Board Meeting Notes

Barnstable Municipal Airpolt Commission. Barnstable Municipal Airport Improvements Project Barnstable Municipal Airport

Reclaimed Land A guide for developers applying for an interest in reclaimed land under the Marine and Coastal Area Act 2011

MULBERRY APARTMENTS 16-Units 1820 W. Mulberry Dr. Phoenix, AZ 85015

Approval to Sell Property at Glenmont Station to Montgomery County

GRADUATE HOUSING CONTRACTS

BOUNDARY LINE ADJUSTMENT

TO LET. Town Centre Offices Flexible Terms. First & Second Floor Offices, Manchester Chambers, Oldham OL1 1LF.

Accessory Dwelling Unit (ADU) Permanent Regulations (Revisions to TMC and 13.06)

2018 Awards of Excellence

DDD Commission Meeting September 13, 2016, 8:00 a.m. St. James Episcopal, Parish Hall, 208 N. Fourth Street

DES PLAINES PLAN COMMISSION MEETING AUGUST 31, 2015 MINUTES PLAN COMMISSION

27 THURLOE SQUARE KNIGHTSBRIDGE

SITE 03 SITE 04 SITE 02 SITE 01. City U Bentonville, Arkansas 9.08 ACRES TOTAL PROJECT MULTIFAMILY (42 UNITS/ACRE) PRD SITE ACRES MULTIFAMILY

Introduction. Student Comments. Welcome to Sedley Court. High quality student accommodation

Screening of Residential Land: Questions and Answers

STAFF REPORT - SUMMATION. South Park Estates 9 th Filing Final Plat Process. CASE NUMBER(s): UDC SUBDIVISION CODE: SPKE 09

19 Whitney Avenue ~ Rosedale ~

Welcome to Riverfront Residence Hall!

CITY COUNCIL STUDY SESSION MEMORANDUM

LEGAL BRIEF FORECLOSURE ON RENTAL PROPERTY JANUARY 2016

Strategies for Funding Farmland Preservation

Module Three - Application of the Method The Seven-Step Method Detail of Measurement Key Points to Remember...

Uptown Medical Office for Lease 8010 Mountain Road NE Suite 300, Albuquerque, NM 87110

Vietnam Property Market Brief. JLL Research 4Q16

Transcription:

Dwntwn Develpment Fact Sheet Cmpiled by the Dwntwn Bstn BID Updated Nvember 2017 Under Cnstructin Inside The BID: 399 Washingtn Street Renvatin: A cmplete renvatin f the 5-stry, 75,000 sf building. Internal demlitin began in summer 2017. One Milk Street Renvatin: Cmplete renvatin f this 6-stry, 36,500 sq.-ft. building launched in Octber 2017, with a targeted cmpletin date f August 2018. Cngress Square Develpment (54-82 Devnshire St.): A transfrmative $105 millin, 458,300 sq.-ft. redevelpment f the frmer Fidelity Investments-wned blck that includes 92,700 sq.-ft. f prpsed new develpment. The preexisting buildings t be renvated/readapted include: Residential: 15-19 Cngress Street (51,350 sq.-ft., 13 flrs, 35 units) Htel: 54-68 Devnshire Street (85,700 sq.-ft., 13 flrs, 165 rms) Office/Retail: 40 Water Street (286,400 sq.-ft., 14 flrs) The redevelpment began in March 2016 and is slated t cmplete in phases frm 2018-2019. The Exchange At 100 Federal Street: This 10,000 sq.-ft. transparent glass atrium, lcated n the Cngress Street Plaza side f 100 Federal St., is set t include 6,000 sq.-ft. f retail space and 4,000 sq.-ft. f cmmn area. Cnstructin began in December 2016 and is slated t cmplete in early 2018. Develpment Prpsals Pending Inside The BID: 30 Winter Street Renvatin: A partial, street-level renvatin f the 12-stry, 87,900 sf building. The majrity f the renvatin will cnsist f sheathing in glass the area currently cvered by the verhang. Cnstructin slated t begin in late 2017/early 2018. One Brmfield Street Develpment (1 Brmfield St.): Prpsal calls fr a 683-ft, 59-stry mixed-use twer including 30,000 sq.-ft. f retail. The prpsed 419 residential units include 300 apartments (54 f them affrdable)

and 119 cnd units. The prject is currently being redesigned fllwing the initial rund f cmmunity review. 115 Winthrp Square (Winthrp Square Garage redevelpment): Millennium Partners current prpsal calls fr a 702-ft, 58-flr, 1.2 millin sq.-ft., mixed-use twer including 477,000 sq.-ft. f ffice space, a 12,800 sq.-ft. Great Hall cultural center/pavilin, 14,600 sq.-ft. f tech/start-up incubatr space, and 300 residential units. Prject is underging BPDA Article 80 (large-prject) review, with demlitin f the preexisting parking garage slated fr Octber. Develpment Prpsals Pending Adjacent T The BID: 41 LaGrange Street: Prpsal calls fr a 19-stry, 134,000 sq.-ft., 126-unit residential twer including a substantial affrdable husing cmpnent. Letter f intent filed with the BPDA in Octber 2017. Apprved Fr Cnstructin Adjacent T The BID: 48 Bylstn Street renvatin: The renvatin f the 40,500 sq.-ft. frmer BYMCU building int an affrdable husing cmplex is slated t include the fllwing: 46 affrdable husing apartment units; 11,000 sq.-ft. f ffice space; and 3,800 sq.-ft. f retail space. The prject was apprved by the BPDA. 47 LaGrange Street: Prpsal calls fr a 21-stry, 240-ft, 157,000 sq.-ft. residential twer featuring 260 units, including studis, ne-bedrm, and tw-bedrm units. The twer wuld be built n the 8,800 sq.-ft. parking lt that is behind 48 Bylstn St. Under Cnstructin Adjacent T The BID: Bulfinch Crssing (Gvernment Center Garage): This six-building, 2.9 millin sq.-ft. redevelpment f the preexisting Gvernment Center Garage is set t include 812 residential units, 196 htel rms, 1.15 millin sq.-ft. f ffice space, and 85,000 sq.-ft. f retail. Wrk began in January 2017 with cnstructin f the 45-stry, 486-unit apartment twer cmpnent f the mixed-use develpment. The prject is slated t cmplete in September 2019. Emersn Cllege Little Building Renvatin (80 Bylstn St.): This renvatin f the preexisting student drmitry cmplex at 80 Bylstn St. will add an additinal 294 student beds t the current stck f 750 student beds. In additin, renvatins are being made t flrs 2-12 f the building and a new 13 th flr is being cnstructed, t be screened-back behind the preexisting parapet. Cnstructin began in spring 2017 and is slated t cmplete in summer 2019 in time fr students t mve in fr the fall semester.

Marritt Mxy Htel (240 Tremnt St.): This 23-stry, 125,000 sq.-ft. htel prject is set t include 346 micr-htel rms. Cnstructin began in December 2016 and is slated t cmplete in late 2018. PBX Residences (8 Harrisn Ave.): This 8-stry, 43,400 sq.-ft. renvatin prject is renvating a preexisting 143,000 sq.-ft. ffice building t cnvert it int 46 apartment units, f which 6 will be designated as affrdable. The mix f units includes 18 studis, 20 ne-bedrm units, and 8 twbedrm units. Cnstructin began in March 2017 and is slated t cmplete in Octber 2017. Cmpleted Prjects/Inside The Dwntwn Bstn BID: 2017: 35-41 Winter Street Renvatin: 2016: Cmplete renvatin f this 8-stry, 29,300 sq.-ft. building. Renvatin cmpleted in Octber 2017. The Cnrad (6 Hamiltn Pl.): A renvatin f 17-33 Winter St. int a 27-unit, 29,000-sq.-ft. apartment building. The Cnrad includes: nine 2-bedrm apartments; six 3-bedrm apartments; and twelve 4-bedrm apartments. The Gdfrey Htel (505 Washingtn St.): An $83 millin renvatin f the frmer 59 Temple Pl. ffice twer int a 243-rm, 135,000 square-ft butique htel with grund-flr restaurant & cffee shp. Opened January 2016. Millennium Twer Develpment (1 Franklin St.): 2015: A landmark $495 millin redevelpment f the frmer Filene s int a 650-ft, 442-unit mixed-use residential twer with 95,000 sq.-ft. f retail. The twer pened fr residents in July 2016. The restaurant/retail cmpnent (including PABU sushi restaurant and Old Navy anchr department stre) is slated t pen in the fall. Burnham Building Restratin (10 Summer St.): A $120 millin restratin f the histric Burnham Building int a 285,000 sq.-ft. ffice/retail space. Building timeline: August 2014: lead ffice tenants Havas/Arnld Wrldwide and AOL mve int upper levels, ccupying apprx. 125,000 sq.-ft. May 2015: a flagship Rche Brs. supermarket pened n the Burnham Building s street level and n the Dwntwn Crssing subway cncurse, ccupying apprx. 25,000 sq.-ft.

September 2015: the first Nrth American Primark department stre pened n the first fur flrs f the Burnham Building, ccupying apprx. 112,000 sq.-ft. 44 Winter Street Residences: 2014: A $3 millin residential cnversin f an ffice building int a 14-unit apartment building, cnsisting f a mix f eight 4-bedrm (1,300 sq.-ft.), three 3-bedrm (1,200 sq.-ft.), and 3 micr (400 sq.-ft.) units. Opened July 2015. Fx Residences (407 Washingtn St.): Renvatin f upper stries int 14 apartments ranging frm 700-1,000 sq. ft. Full restratin f histric façade/street-level retail space. Opened spring 2014. Lafayette City Center (2 Ave. de Lafayette): A $5 millin lbby renvatin, including new security desk, tuchdwn area, lunge seating, and elevatr area. Cnstructin began in June 2013; cmpleted spring 2014. Winter Place Residences (1-3 Winter Pl.): 2013: A $6 millin renvatin f upper stries abve frmer Lcke-Ober restaurant int six cnds, ranging in size frm 2,000-3,300 sq. ft. Opened fr residents in spring 2014. Millennium Place III (580 Washingtn St.): A $220 millin, 15-stry, 265-unit, 390,705-square-ft mixed-use residential twer with apprx. 12,000-square-feet f grund-flr retail pened fr residents in fall 2013. Fidi Dwntwn 103 Residences (103 Arch St.): A $4 millin, 5-stry, 18-unit renvatin, pened Nvember 2013. Hamiltn Crssing (8 Winter St.): A $8.5 millin renvatin f a 12-stry, 50,000-square-ft building int 48 apartments. Opened fr residents in July 2013. Hyatt Regency (1 Ave. de Lafayette): A $13 millin renvatin f htel public areas, meeting rms, lbby & bar, frnt entrance, and guest rms. Cmpleted February 2013. Old Suth Meeting Huse (310 Washingtn St.): An $800,000 restratin f the histric museum s windws, exterir wdwrk, and steeple. Cmpleted December 2013.

2010-2012: Mdern Theatre (525 Washingtn St.): A $45 millin restratin includes 190-bed drmitry, 2,400 square-ft, 185-seat black bx theater; 800-square-ft art gallery/functin space. Opened Octber 2010. Paramunt Center (559 Washingtn St.): An $80 millin, 145,000-sq. ft. renvatin including tw theaters (ne 550-seat, ther 140-seat), 180-seat screening rm, 150-seat restaurant, 262-bed drm. Opened January 2010. 29 Temple Place: A $4 millin [estimated] renvatin f building int 44 rental units, with 6,500-squarefeet f grund-flr retail. Opened in winter 2010. 25 Temple Place: A $1 millin renvatin f building int retail, ffice, and 6 apartments. Opened in summer 2010. One Bstn Place (201 Washingtn St.): A $2 millin renvatin f the grund flr fr cnversin int retail space. 37 Temple Place: 2000-2009: An $8 millin renvatin f building int 20 rental units. Cmpleted 2012. Ritz-Carltn Htel & Residences (1-10 Avery St.): The $600 millin, 1.9 millin sq.-ft. develpment includes: Ritz-Carltn Bstn; Ritz- Carltn Residences (368 cnd units); AMC Lews Bstn Cmmn. Opened in 2000. 45 Prvince Street: A $120 millin, 31-stry, 337,098-square-ft, 137-unit cnd twer with street-level retail, student center, health club, 8-level parking facility. Opened June 2009. Ames Htel (1 Curt St.): A $58 millin redevelpment/renvatin f 1 Curt St. int a 125-rm butique htel featuring Wdward at Ames restaurant/bar. Opened December 2009. Bstn Opera Huse (539 Washingtn St.): A $55 millin restratin f the 2,500-seat theater. The theater debuted in July 2004.

Nine Zer Htel (90 Tremnt St.): A $59 millin develpment f an upscale/butique 189-rm htel. Opened in June 2002. Sld in 2006 fr $71 millin t Kimptn Htels grup, the current peratr. 10 West Street: A $25 millin, 274-bed drmitry with 6,500-square-ft grund-flr retail space (ccupied by Back Deck restaurant in July 2012). Opened in 2008. Cmpleted Prjects/Adjacent T The Dwntwn Bstn BID: Archstne Bstn Cmmn (660 Washingtn St.): The $150 millin, 28-stry, 420 unit residential twer pened March 2007. AVA Theater District (45 Stuart St.): $125 millin, 29-stry, 384,000-sq.-ft., 404-unit residential twer pened March 2015. Emersn Cllege Drmitry (1-3 Bylstn Pl.): This 18-stry, 90,000 sq.-ft. student drmitry twer is set t include 380 student beds. Cnstructin began in May 2015 and cmpleted in August 2017. The Kensingtn (665 Washingtn St.): $170 millin, 385-unit, 27-stry, 457,000-sq. ft. residential twer pened Octber 2013. Liberty Tree Lfts (630 Washingtn St.): $15 millin, 40-unit, 5-stry, 52,000-sq. ft. residential building pened September 2015. Radian (120 Kingstn St.): A $130 millin, 26-stry, 228,865-square-ft residential twer with 240 residential units and 5,300-square-feet f grund-flr retail space, pened summer 2014.