Lunetten 4D Utrecht, The Netherlands,

Similar documents
Berkenkamp Enschede, The Netherlands, 1988.

REPORT ON THE SOLIDS / Amsterdam June 2013 Stephen Kendall / Infill Systems US LLC

We are building future. Kodumaja.

Urban Planning and Architectural Standards for Social Housing Architectural Design

KIMBELL ART MUSEUM - LOUIS KAHN Forth Worth, Texas THE UNPROGRAMMED Gijs Loomans

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Missing Middle Housing in Practice

POLITECNICO DI TORINO Repository ISTITUZIONALE

Renovating older apartment buildings A multi-disciplinary international project. Architectural design & construction

The Pelgromhof Zevenaar, the Netherlands,

APPENDIX E PAGE 1 of 25 NOTE: ITALICS INDICATE ADDITIONS OR ALTERATIONS RM-9, RM-9A, RM-9N AND RM-9AN GUIDELINES DRAFT

CONVERTING OFFICE SPACE. using modular prefab architecture to convert vacant office buildings

Henk Reijenga URBAN DESIGN AND ARCHITECTURAL SUPERVISION. Westpolder Bolwerk project

An in depth analysis of all aspects of pipe work restoration. Part 2

Construction information

Kieran Boughan. San Francisco Architect RESIDENTIAL

Redevelopment Daalseplein Utrecht

Renovation Toolbox. Introduction

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

Better Housing by Design - Proposed Draft Summary

house review The House Review design team presents five 2011 House Review Themes cutting-edge plans for urban, townhouse living.

Edinburgh Research Explorer

Liberation Tiny Homes TINY HOMES

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950, 209 SEMINARY STREET, KENANSVILLE, NC (910) FAX: (910)

Puttenweg 130 in Ysselsteyn

Emil Møllers Gade 41 Horsens, Denmark

The Carpenter Center for Visual Arts, Harvard University Analysis 4 th and 5 th Floor Studio Spaces

Baakhoverweg 6 in Susteren

INRODUCTION STATISTIC DATE OF DWELLINGS STOCKS IN POLAND.

INVESTMENT OFFER Office space Mircea Vasilescu

ACCESSIBLE BUILDING (F1) HOUSING DESIGN (G1)

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

Seniors House. The building and the architectural ideas behind Denmark s first homes for the elderly designed for people with autism

Model Home 3 La Palma Bonaire

Sr. No This option is applicable for Options Remarks / Details required

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017

Factors Affecting Open Building Implementation in High Density Mass Housing Design in Hong Kong

PROJECT WADDINXVEEN THE NETHERLANDS

Venrayseweg 35a te Wanssum

Real Estate Development 46th Annual Basic Economic Development Course

Section 9.5. Design of Areas, Spaces and Doorways

There are three types of ownership and involvement with the management company:

B Application example

Roggelseweg 138 te Egchel

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

UMass Amherst Design Building Leading the Way with Mass Timber Solutions

Housing conditions in the slum 3. Problem with ergonomics 5. Concept 7. Ergonomic modification, materials. 8. Logical reasoning.. 9. Site plan...

1,134,000 inc. of agency fees

MUNICIPAL ORPHANAGE ( ) Aldo van Eyck Formal Strategies EVDA 621 M.McFeeters

Apartment building in Albertslund, DK

FLOOR AND ROOM NUMBERING GUIDELINES

OPERABLE ALL-GLASS BALCONY GLAZING SYSTEMS. NanaGlass SL25

De Dichterlijke Vrijheid Poetic Freedom

Detached Detached means the dwelling has no common walls with another.

Town of Niagara-on-the-Lake Official Plan Review. Discussion Paper: Second Residential Units. Prepared for: The Town of Niagara-on-the-Lake

Property condition survey for the Ewa Silo building located in the premises of the Port of Szczecin

At the same time, this very simple strategy imposed maybe one of the most radical impacts on the structure of the building. By expanding the square

apply sustainability principles to all residential developments in Ardee;

Imperial Court. Sector 128, Noida INFOPACK MARKETED BY

ARTICLE III: LAND USE DISTRICTS 304 R 9 DISTRICT

Problems of residential building facilities in the Czech Republic

510 MAIN STREET WINNIPEG CITY HALL Green Blankstein Russell and Associates (Bernard Brown and David Thordarson, principal designers),

REPORT ON BOYS SHELTER RENOVATION

Category: 8 Best Building Project GC (Under $10M) Contractor: W.E. O Neil Construction. Project Name: 1000 Grant The Burnsley

ACCESSORY DWELLING UNITS

INFO-PACK. Knight s Court Info Pack Page 1

NEW TYPOLOGIES OF SKYSCRAPERS: THE CONTRAST OF CONCEPTS. Ufuk Uğurlar

NOTE: HEIGHT WIDTH OF UNOBSTRUCTED OPENING MUST EQUAL AT LEAST 5.7 SQ. FT.

646 Wascana Street - Semi Detached Home

STYLE AND ARCHITECTURAL PHILOSOPHY

EMBEDDING BUILDINGS. Marlies Rohmer (architect) THE BUILDING IN THE CITY

BUILDING AN ADU GUIDE TO ACCESSORY DWELLING UNITS PLANNING DIVISION

The Old Stables, Whiting Bay

The first stone building in Žvėrynas and the first street paved with cobblestones: Birutės Street 18. Authentic historical heritage of Vilnius

722 WILLIAMSON STREET

Andraus high-rise, Sao Paulo, Brazil, February 1972

NIEUWERSLUIS k.k. Rijksstraatweg 30* AC. Gerwig Makelaardij. Dannestraat AE Breukelen

Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies.

Single-Family Residence District. Center Residence Apartment District. Townhouse Residence District. Age-Restricted District (Overlay)

KINGSLAND MUNICIPAL UTILITY DISTRICT Schedule of Wastewater Rates, Fees and Charges and Service Policies Effective January 1, 2018

ACCESSIBLE BUILDING (F1) HOUSING DESIGN (G1)

A.2 MOTION. 2. RM-8 and RM-8N Guidelines. MOVER: Councillor. SECONDER: Councillor

APPENDIX D: DEFINITIONS

Machine for Living. A live-work complex in Zurich, designed by Müller Sigrist Architekten, is a city in itself.

DAYLIGHTING / COURTYARD

WINTERTUINWONINGEN NIEUW ZUID, ANTWERPEN / BE (2016)

KING RICHARD DEVELOPMENT

Energy efficient renovation of building stock of Jugla

Phone: (707) Fax: (707) Web:

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

IT TAKES A BLOCK BLOCK LAYERS THE BUILDINGS THE ROOFSCAPE THE URBAN ARBORETUM THE GALLERIES GREENHOUSE AND MEETING PLACE ROOF TOP FARM

RIBA Tender Brief RIBA Core CPD 2018 programme

3M Proptic High-Capacity Optical Distribution Frames

RM-8 and RM-8N Districts Schedule

HOUSING ISSUES ACCESSORY DWELLING UNITS

RM-7, RM-7N and RM-7AN Districts Schedules

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Residential Stairway Redesign & Reconstruction. Phoenix, AZ Category: Residential Interior Element over $30,000 Project Cost: $40,414

AFFORDABLE WORKFORCE HOUSING REPORT OF THE WORKING GROUP Recommendations for our Region Approved February 22, 2006

THE OPPORTUNITY BACKGROUND HIGH ST MONTREAL ST ROYAL FREMANTLE GOLF CLUB STEVENS ST CARRINGTON ST HOPE ST YALGOO AVE NANNIE AVE WATKINS ST SOUTH ST

Transcription:

Lunetten 4D Utrecht, The Netherlands, 1981-82 Flexible facades of row houses, Flats and duplexes around a half entrance courtyard.

Urban Tissue This Open Building project has been built in the center area of Lunetten, a new district in the south-west of the city of Utrecht, the Netherlands. It includes 262 dwellings, 173 rooms and 360m2 office space. The urban tissue of the project was a follow up of the Molenvliet tissue model in Papendrecht: a high density low-rise fabric around front and back courtyards. But Here in Utrecht the model has been applied in new way: not on one area, but on different locations, mixed with other projects: a shopping center, a community center, a school and a housing center for elderly. Access galleries of the last link directly with our housing blocs B and C so that elevators of the elderly can be used by disabled occupants of our project. Different architects worked together to realize this urban fabric. A B School E Elderly Center Shopping center C Community Center D Five locations of the support structure in the urban tissue, mixed with other housing projects and facilities

The project areas in the district Lunetten of the city of Utrecht.

Support Structure shops C school B A Backcourt Front court Backcourt community center elderly center Blocs A, B, C mixed with othet functions. Groundfloor Bloc B with garages. Second floor with terrasses. The low rise high density base building of the Lunetten project include flats, duplexes and row houses in 15 dwelling types: for students, young workers, small and larges families, elderly, disabled and little companies. Private storages (bikes, etc.) are located in the corners of front courts while small parking gareges, accessable from streets, are intergrated in the corners of the backside courts. The high of north facades of rowhouses mesure 3m to allow enough sunshine in the gardens. The support structure can be applied in high density urban areas, especially in case of city renovation or a filling up of open city holes. elderly B school A Blocs A and B. To the right: a school and housing for elderly

Model of Bloc A: Row houses, flats, duplexes and parking garages in the north corners of the garden court. From left to right: Public and private gardens, parking garage, roof terraces, access galleries and stairs. Most dwellings upstairs are provided with spacious roof terraces (ca. 25m2) and accessible by galleries, staircases and exceptionally by a public elevator.

Parcellation Bloc B: Parcellation of the ground level. Bloc B: Parcellation of the second floor. Bloc B: Parcellation of the third floor. Bloc B: Parcellation and of the fourth floor. The square grid of 540 x 540cm of the support structure resulted from a sector analyse of a divers housing program and other fonctions like parking garage and small offices. A sector is a free infilliable space of the support structure, provided with a façade and a shaft. Two sectors units are built by a simple tunnel formwork of 540 x 1080cm. Dwellings of more than 2 sectors got extra by wall openings or stair holes in the floors. See also drawing dwelling types. In the support structure 262 row houses, flats and the duplexes are subdivided in 15 different types. Compared to the Molenvliet project 67 dwelling types - this limitation symplified the project management for the architect, the building company, and the housing association during the infill procedure. The architect decided the location of the dwelling types, the entrance, the basic dimensions and the private outdoor space.

The 173 rooms for students and young workers have been designed in dwellings for groups of 6 to 7. The student homes are located above parking garages while young workers live in duplexes on the third floor. Both larger units might be reparcelled lateron in smaller ones. The main topic of the project has not been the flexibility of parcellation but the mixture of different dwellings types, appropriate to different types of households, and of course the free infill of the 262 dwellings with the users as explained hereafter. P P North façade of bloc B along the canal: duplexes and flats, parking garages, stairs and a public elevator. South façade of bloc B: Row houses, flats and duplexes downstairs and upstairs. Experimental Although the project was a kind of follow-up project of the official Molenvliet Experiment tissue-support-infill and user participation - the Dutch Ministry of Housing granted the Lunetten project again Experimental, and admitted an extra subsidy plus the free lay-out of each unit. They endorsed the many-sidedness of the support-infill practice, and judged it impossible test the principles in only one project. Moreover they designated the following characteristics as innovative: - integration of a support structure in a larger urban tissue, based on spatial agreements; - consistent integration of diverse building types in one urban tissue; - a more efficient and cost saving support structure, offering still a diversity of dwelling types and sizes, and allowing later changes; - integration of homes for students and young workers following different programs, allowing a transformation into smaller dwellings; - integration of small parking garages in a housing structure. Besides those characteristics the project has also some other improvements: - long uninterrupted access galleries on the third floor that saved stairs and allowed one public elevator for disabled people; - the positioning near the entrance doors of the cabinets for meters and central heaters facilitates the control and liberates infill connections in four directions to the shafts. The meters are related to the shaft by fixed pipes in the floors. Other pipes in the floors relate the heaters with radiators. Electra floor pipes related the meters to connection points in the support walls near floors and the ceilings to the shaft.

Infill As compared to the Molenvliet project the infill procedure of 262 row houses and duplexes became more professional. Beforehand we had to design a fictional infill lay-out of each dwelling type in accordance to the housing regulations in order to know their capacity, infill price, subsidy and basic rent. Those fictional lay-outs served also in case a potential renter withdrew. As architect of the support we had no role to play in the infill sessions with the users. The housing association Lunetten BV, wanted to manage the whole infill procedure by themselves. They appointed a user-consultant, architect Piet Priems, MSc. who selected five students in housing ecology of the Wageningen University. The students followed an intensive training in user participation and in possible layouts and fit-outs of the different dwelling types of the project. 4 steps of infill process: 1. Information evening and presentation of Molenvliet film. 2. Explanation of dwelling types, allocation of the parcels and payment of deposit by users.. 3. First private consultation of 1,5 hour. 4. Tryout in the flexible full size model in the Eindhoven university 5. Second consultation and agreement on lay-out and fit-out and façade infill. Infill designing with users and the 1 : 1 model at Eindhoven University with the design grid on floor and ceiling. The infill consultants used the 30cm design grid of the SAR65. This grid, sub-devised 30 cm in 10 and 20cm bands, regulates the placement of partitions and load bearing walls, both ending in the 10cm bands. All piping lay in the free 20cm bands. Those rules have been formalized in a norm, the NEN 2883, as a base of modular coordination. The infill of 67% of the 262 duplexes and row houses have been designed with the users, 33% got the fictional lay-out.

Infill sketches around the shafts after infill consultation with users. All partitions in the 10cm bands. Central shaft Infill connections of gas, water, electric, sewage and ventilation can be connected in four directions. The main collective vertical support pipes for sewage, water, heating, phone and TV are placed in a space of 50 x 50cm and fixed on a metal framework of 20 x 50cm. The main, vertical ventilation, pipe is located in a corner. This allows all horizontal infill connections in 4 directions, following the layout of a unit.

Dwelling types with different infill examples. roofterrace Living room 8 sector dwelling for students, above parking garage, 4+4 sector group-dwelling for young workers

Infill system Housing association Lunetten B.V. chose the Bruynzeel Inbouwpakket, an infill system developed and manufactured by the Dutch industry for kitchens and doors Bruynzeel. Contractor Wilma-Oost had to accept Bruynzeel as infill subcontractor to assure the important transition and connection of support and infill. Bruynzeel special trailer with infill components on the building side. Infill components around still open shaft in the center, waiting to be assembled Assemblage of partitions clamped between floor and ceiling

linking partition wall and bathroom floor (left) Users did choose out of a range of bathroom floors. The 10cm raised fiber floors allowed a ring drain out of view. An non-practical solution because local raised floors are difficult for wheelchair users. Façade system. The Swedish subcontractor Mireshö delivered a flexible wooden façade system of 1,5m large units in which the users could choose doors, windows, glass and panels of different dimensions. The frames could be chosen in 5 different colors. During the consultation meetings we discovered that most occupants approach the subdivision of their façades from indoor activities, view and daylight, thus from inside out contrary to how we are used to. The Mireshö Façade system: 3 times 1,5 m frames with windows, doors, glace, panels, ventilation, etc. Two different entrance facades.

Flexible façade system of row houses. References REFERENCES to Lunetten in English J.C. Carp and M. Monroy, A world of experience, Open House, Vol. 8, no 1, 1983 P. Lukez, New Concepts in Housing: Supports in The Netherlands, MIT N52-465, Cambridge (1986), 17-19 REFERENCES to Lunetten in Dutch Helm, Rien van der, Lunetten te Utrecht, ba Bouwadviseur 11( 1978 ), 48-50 C. Zwinkels, Drager-inbouwproject Lunetten (Support-infill project Lunetten), De Architect (September 1982), 56-65. Debets, Carla Scheiding drager-inbouw basis voor flexibele woningen (Separation support-infill, base for flexible dwellings), Bouwwereld 79, No. 16 (august 1983), 22-25 Werf, Frans van der, Thematiek van stedelijke ruimten (Thematic of urban spaces), Plan 11 (1980), 39 Werf, F. van der, 1993, Open Ontwerpen (Open Design), 010 Publishers, Rotterdam, 39-42, 79-82, 92-93, 96-106 and 115-118, 123, 128-151 REFERENCE to Lunetten in German Werf, Frans J. van der, Konstruktive Voraussetzungen für individuelle Bewohnerbeteiligung, Stadt Magazin 1. 6/82 (1982) 11. www.vdwerf.nl architect@vdwerf.nl