RESOLUTION PERMIT FEE SCHEDULE

Similar documents
RESOLUTION # RESOLUTION REGARDING WASHTENAW COUNTY ROAD COMMISSION IMPROVEMENTS (HAYES SUBDIVISION)

BUILDING PERMIT FEE SCHEDULE AMENDED April 9, 2002

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

Commissioners to enact, amend, and enforce technical construction and building codes; and,

ORDINANCE NO: INTRODUCED BY: ADMINISTRATION

There was no further discussion. Secretary Warren presented the following resolution: RESOLUTION NO

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

GRATTAN TOWNSHIP KENT COUNTY, MICHIGAN RESOLUTION NO COWAN LAKE SANITARY SEWER SPECIAL ASSESSMENT DISTRICT

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

THE BOARD OF COUNTY COMMISSIONERS

BUILDING PERMIT FEE SCHEDULE

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Remember, PA One-Call before excavating. Simply dial 811 or

SUPERIOR CHARTER TOWNSHIP Washtenaw County, Michigan

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

RESOLUTION NO. 701 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

PAW PAW TOWNSHIP BOARD REGULAR MEETING AND PUBLIC HEARING April 10, N. GREMPS STREET PAW PAW, MICHIGAN 49079

County of Kane CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

NEWLIN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

ORDINANCE NO. O-5-10

ORDINANCE NO. WHEREAS, the last update to the Chapter 6 Buildings and Building Regulations fees schedule was over a decade ago; and,

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

CITY OF BIRMINGHAM Community Development Building Department 151 Martin Street, Birmingham, MI 48009

RESOLUTION NO

Chapter 806 Fees Zoning Certificate Fee Schedule Refund of Permit Fees

CHARTER TOWNSHIP OF FENTON Ordinance No. 804 Adopted: November 19, 2018

AGENDA REPORT SUMMARY. Resolution No : 2017/18 Community Development Fee Schedule

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

City of Philadelphia

DEMOLITIONS LICENSING REQUIREMENTS APPLICATION PROCESS. 1 of 2

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

Permitting Fee Schedule

STATE OF MICHIGAN COUNTY OF BERRIEN ORONOKO CHARTER TOWNSHIP LAND DIVISION ORDINANCE NO. 90

APPLICATION FOR DRIVEWAY PERMIT

APPENDIX A BUILDING PERMIT AND RELATED FEES

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Claremont House Lot Program

RESOLUTION NO. WHEREAS, on April 8, 2008, the City Council adopted Resolution No to establish parkland fees for secondary units; and

Sheds, Fences, Decks (All Permitted Structures Except New and/or Expansion of Principal Buildings )

Town of Little Compton Town Hall P.O. Box 226 Little Compton, RI 02837

CITY OF WALKER RESOLUTION NO. 04-_

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

9. Public (Federal, State, or local

ORDINANCE NO

CITY OF MADISON HEIGHTS OAKLAND COUNTY, MICHIGAN. RESOLUTION regarding FEE SCHEDULE FOR COMMUNITY DEVELOPMENT DEPARTMENT SERVICES

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

Blaire Meadows Homeowners Association Board of Directors And By Laws And Declarations

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

ORDINANCE NO THE CITY COUNCIL OF THE CITY OF MANHATTAN BEACH DOES HEREBY ORDAIN AS FOLLOWS:

WHEREAS, the direction from the Study is to amend the Land Use Code in the following particulars:

AGENDA CALL THE MEETING TO ORDER SALUTE TO FLAG SUNSHINE LAW STATEMENT. ROLL CALL 1. Township Council 2. Municipal Officials Present

AMENDED DEED RESTRICTION FOR TROPICAL BAY SUBDIVISION

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

TOWNSHIP OF WOOLWICH BOND ORDINANCE NUMBER

Public Hearing Resolution No Mayor Leon Skip Beeler and Members of the City Commission

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new

ALL VIOLATIONS MUST BE CORRECTED WITHIN 30 DAYS FROM ORIGINAL INSPECTION AND PRIOR TO BUSINESS OPENING!!!!

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No.

Office of the Zoning Administrator and Planner. Saugatuck Township Planning and Zoning Applicants. Notice of Information for PC and ZBA Applicants

CHARTER TOWNSHIP OF CALEDONIA COUNTY OF KENT, MICHIGAN

THE CORPORATION OF THE TOWNSHIP OF MUSKOKA LAKES BY-LAW NUMBER

Worcester Township Fee Schedule

ARTICLE SCHEDULE OF REGULATIONS

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

CHARTER TOWNSHIP OF GAINES COUNTY OF KENT, MICHIGAN RESOLUTION TO ESTABLISH WATER SUPPLY AND SEWER RATES AND CHARGES

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

Bonds at their respective maturities, to the extent such principal and interest is not satisfied from the proceeds of the sales and use tax; and

PO Box 7747 PO Box 7747 Urbandale, IA Urbandale, IA RESTRICTIVE COVENANTS FOR WATERCREST L.C. AN OFFICIAL PLAT, ANKENY, IOWA

3 Resolution approving, for purposes of the Internal Revenue Code of 1986, as amended,

CHARTER TOWNSHIP OF SPRINGFIELD NOTICE OF HEARING ON CLINTON OAKLAND SEWAGE DISPOSAL SYSTEM SOFTWATER LAKE EXTENSION SPECIAL ASSESSMENT ROLL

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

ORDINANCE NO

9. STORAGE TANKS No fuel oil or other above ground outside storage tanks shall be erected, maintained or utilized on any lot.

Charter Township of Bedford 115 S. ULDRIKS DRIVE BATTLE CREEK, MICHIGAN 49037

SWIMMING POOL GUIDELINES

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

DELTA COUNTY ROAD COMMISSION ROAD ABANDONMENT POLICY. The following policy shall become effective immediately:

RESOLUTION NO TOWNSHIP OF ALGOMA COUNTY OF KENT, MICHIGAN. At a regular meeting of the Township Board of the Township of Algoma, held at the

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

VILLAGE OF JUSTICE ORDINANCE NO

6 WHEREAS, Hernando County has established development requirement conditions for

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

Township of Moorestown

TOWN OF ROXBURY INSTRUCTIONS FOR FILING A BUILDING PERMIT. Phone/Fax/Message(607) Phone/Fax (607) REVISED 6/2/17

TELLER COUNTY BUILDING CODE As adopted by the Board of County Commissioners EFFECTIVE 1/01/2007 AMENDED 8/22/07 TELLER COUNTY BUILDING CODE

CASCADE CHARTER TOWNSHIP

CITY OF KEEGO HARBOR 2025 Beechmont, Keego Harbor Michigan (248) ORDINANCE NO. 417

Transcription:

RESOLUTION 2003-26 Minutes of a Regular meeting of the Township Board of the Charter Township of Chesterfield, County of Macomb, Michigan, held in the Township Hall in said Township on September 2, 2003 at 7:00 P.M. Eastern Standard Daylight Saving Time. PRESENT: ABSENT: Whereas, the Chesterfield Township Board has elected to be the enforcing agency of various Michigan Construction Codes or other nationally recognized codes, as the case may be; and Whereas, the Township Board desires to establish permit, inspection and review fees pursuant to Section 8 of 1972 PA 230 to defray the cost of such enforcement. NOW THEREFORE, BE IT RESOLVED BY THE TOWNSHIP BOARD OF THE CHARTER TOWNSHIP OF CHESTERFIELD, MACOMB COUNTY, MICHIGAN: PERMIT FEE SCHEDULE The following permit fee schedule has been adopted by the Charter Township of Chesterfield. All fees shall be based on the current Building Official and Code Administrator (B.O.C.A.) square foot construction cost (see table). The total cost of improvement is based on the current Building Official and Code Administrator (B.O.C.A.) square foot construction cost table, which includes all use groups. Pre-manufactured unit fees are based upon fifty percent (50%) of the normal on-site construction permit fee. Bonds The building department shall require a cash deposit (bond) at the time of issuing a building permit for residential additions, miscellaneous items, temporary structures including private garages, single family residential, low and high rise multiple family, public service, business professional office, office commercial service, technical research office, local business, planned business, general industrial uses. Such deposits shall be: Miscellaneous Items: Single Family Residential Multiple Family Residential Commercial $100.00 W/5% retained for Administration. $300.00 W/5% retained for Administration. $300.00 per unit not to exceed $1,000 per building W/5% retained for Administration $1,000.00 per building W/5% retained For Administration.

Industrial $2,000.00 per building W/5% retained For Administration. Temporary Occupancy Bonds under other ordinances of which 5% is retained for Administration. 1. Single Family Residential Value of work Fee Under $10,000.00 $350.00 minimum fee Over $10,000.00 4.50 for each additional $1,000.00 Or part thereof over $10,000.00 2. Multiple Family Residential: Estimated construction cost, divided by number 0f units: Value of work per unit: Under $10,000.00 $350.00 Minimum fee Over $10,000.00 3.50 for each additional$1,000.00 or part thereof over$10,000.00. 3. Residential additions: Value of work: Under $1,000.00 Over $1,000,00 $ 55.00 fee 4.50 for each additional $1,000.00 or Part thereof over $1,000.00 4. Use Group U Fees (miscellaneous and temporary structures, including private garages) Plan review and administration base fee $55.00 Plus $.10 per square foot up to 250 square feet; Plus $.05 per square foot over 250 square feet; (Includes maximum of two inspections) 5. Mobile Homes: fee $125.00 (Includes maximum of two inspections 6. Commercial and Industrial Value of work: Estimated construction cost, divided by number of units: Under $10,000.00 $350.00 Minimum Fee Over $10,000.00 4.50 for each additional $1,000.00 Or part thereof over $10,000.00 7. Miscellaneous Items Fee $65.00

Includes maximum of two inspections-concrete, antennae, awnings, tents, gazebos, decks and porches. 8. Pools Above Ground $ 55.00 in-ground 200.00 9. Signs: Temporary $ 55.00 Permanent wall sign 55.00 Permanent Pylon or Ground Sign. Note: Two sided signs are doubled $55.00 + $.50 sq ft + bond 10. Fence permits residential: $ 35.00 fee 11. Demolition permits: Commercial and Industrial $350.00 Dwelling, garages and barns $125.00 Each additional accessory structure on The same site. $ 25.00 12. Additional and or Re-Inspections: $ 35.00 13. Certificate of Occupancy (City Cert) existing commercial & Industrial (Includes maximum of two inspections $250.00 Residential $125.00 +$500.00 14. Seawall and Boat Hoist & Docks $ 75.00 (Includes maximum of two inspections, tie back and final grade) 15. House Moving: $.75 per mile + $55.00 per hour for inspectors travel time or fraction thereof. (Additional permits may be required per inspection reports.) 16. Waterproofing $ 75.00 + bond 17. Cancellation of Permit 25% of permit fee 18. Contractor (Builder) registration: $15.00 19. Work started prior to permit issuance Double Fees For Administrative costs

20. Any and all resolutions or parts thereof in conflict with the provisions of this resolution are hereby repealed. 21. This resolution shall be published in the Bay Voice, a newspaper of general circulation in the Township of Chesterfield, within thirty (30) days after its adoption. 22. This resolution shall take effect immediately upon publication of a true copy thereof in a newspaper circulating within the township of Chesterfield, as heretofore provided by paragraph 2. AYES: NAYS; RESOLUTION DECLARED ADOPTED. GENERAL REQUIREMENTS: 1. That whenever a building permit is requested for any structure which is designed to be used multi-occupants, then and in that event, the minimum permit fee shall be not less than $300.00 per occupancy area. Occupancy area is hereby defined to be each single habitable unit in a multi-dwelling and each separate and independent use contained within a commercial or industrial structure. 2. Building permits that have expired may be renewed at the original cost provided it is approved by the Building Official. 3. Cancellation of permits: If a permit is canceled, twenty five (25%) percent will be retained for administrative service upon return of the permit fee. 4. Re-inspection fee: Re-inspection fees may be charged, when in the opinion of the inspector the job is not ready when an inspection is requested. (Re-inspection fee is $35.00.) 5. Residential structures When the building and site are ready for final inspections prior to any certificate of occupancy, a certificate of grade verifying that the building and site were developed and constructed according to the permitted plan with respect to elevations, grades, slopes and structures. This document shall be prepared by a register professional engineer and shall bear the engineer s signature and seal. 6. All permits figured by square footage are based on estimated cost of construction. Per the Mich Building Code (IBC) fee schedule. AYES: Copies of building permit blueprints (to be copied by AEW) fees are as followed: $25.00 Administrative Fee $ 2.00 Per page copy fee

NAYS: RESOLUTION DECLARED ADOPTED. Connie Bowles, Clerk Chesterfield Township

CERTIFICATE OF CLERK I hereby certify that the attached constitutes a true and complete copy of a resolution adopted by the Township Board of the Charter Township of Chesterfield, County of Macomb, State of Michigan, at a regular meeting held on September 2, 2003, and that public notice of said meeting was given pursuant to Act 267, Public Acts of Michigan, 1976, including in the case of a special or rescheduled meeting notice by publication or posting at least eighteen (18) hours prior to the time set for the meeting. Connie Bowles Chesterfield Township Clerk