SLUMS IN DELHI ISSUES AND POLICY PERSPECTIVES

Similar documents
Tamil Nadu Slum Clearance Board was established in September and has been implementing various Housing, Slum Development and

DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG)

View of Slums in the First Master Plan of Delhi

2. VISION:-To make Delhi Slum free, Clean, Green and Environmental Friendly.

Presented by: K.Vidyadhar AMD MEPMA

Ministry of Housing & Urban Poverty Alleviation. Ministry of Housing & Urban Poverty Alleviation Government of India. JnNURM & RAY

Day 1 Session 1 'Rajiv Awas Yojana - Slum Free India Mission' by P.K.Mohanty (Joint Secretary and Mission Director JNNURM, MoHUPA)

LAND REFORM IN MALAWI

No.F.1 (10)/2011/ Dir. (Plg.) MPR &TC/ Dt:

DELHI DEVELOPMENT AUTHORITY NOTIFICATION

Government of Uttar Pradesh. Workshop for Housing for All Date - 09/08/2016. State Urban Development Agency

TDR - Lessons from Mumbai

S L U M R E H A B I L I T A T I O N A U T H O R I T Y M U M B A I M A H A R A S H T R A I N D I A M A R C H 2 1 ST

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows:

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

Land Tenure Issues and Improvement of Urban Low Income Settlements Experiences of Colombo, Sri Lanka

Sustainable Slum Development Converting the Slum as Housing Stock: A Case study of Surat, Gujarat, India

HOUSING ELEMENT. 3. group and foster home construction. 1. increase the supply of new affordable housing with: a regional housing trust fund;

RHLF WORKSHOP The National Housing Code

UN-HABITAT: Philippines - Overview of the Current Housing Rights Situation and Related Activities

How Swaziland Is Upgrading Its Slums

SLUM UPGRADATION. By Kanchan Joneja, Sonal Takkar, Sukriti Thukral

MASTER PLAN PROVISIONS (1st, 2nd & 3rd MASTER PLANS)

JHARKHAND AFFORDABLE URBAN HOUSING POLICY. Resolution

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Support Programme for Urban Reforms in Bihar (SPUR) Urban Development and Housing Department Government of Bihar STATE SLUM POLICY

6.11 Zone-wise Urban Residential Land Price in Delhi: Zone-wise Growth Rates of Urban Residential Land Price in Delhi:

Land Pooling Policy of DDA

MODEL DPR FOR INTEGRATED HOUSING AND SLUM DEVELOPMENT PROGRAMMES (IHSDP)

KATHPUTLI COLONY AND EWS HOUSING AKANKSHA S.RAO MRINALINI VERMA PRATYUSHA HALDER

HOUSING ELEMENT OF THE CITY OF PEMBROKE PINES COMPREHENSIVE PLAN ADOPTION DOCUMENT

H-POLICY 1: Preserve and improve existing neighborhoods. Ensure that Prince William County achieves new neighborhoods with a high quality of life.

An Overview of Slum Conditions in India

Role of Government for Housing The Urban Poor in Amritsar: Pitfalls and Consequences

INSTRUCTIONS TO PRIVATE DEVELOPERS

R E Q U E S T F O R P R O P O S A L S

Implementing Agency Department of Housing, Ministry of Local Government, Urban Development, Housing and Environment

EXTRAORDINARY PUBLISHED BY AUTHORITY. No. 1241, CUTTACK, SATURDAY, AUGUST 22, 2015/ SRAVAN 31, 1937

NATIONAL DEPARTMENT OF HOUSING NATIONAL HOUSING PROGRAMME: UPGRADING OF INFORMAL SETTLEMENTS. October 2004 (Final version)

HOUSING FOR ALL (URBAN) MISSION

11.1 BACKGROUND 11.2 ISSUES

Urbanization. Urbanization in Chindia -- India Struggles with the Next 500 Million. Asian Experience with Compact Growth

CTBUH Copyright. The Remaking of Mumbai in the Sustainable Age. Mr. Ratnakar Gaikwad

HOUSING ELEMENT GOALS, OBJECTIVES, & POLICIES

Barbados. Land. Governance. Assessment A N A L Y S I S

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

FROM RESIDENTIAL LICENSES TO FULL TITLE IN TANZANIA

PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008

City of St. Petersburg, Florida Consolidated Plan. Priority Needs

South African Council for Town and Regional Planners

Kaantabay sa Kauswagan - An Urban Poor Program. in Naga City

International Journal on Emerging Technologies 8(1): (2017) Demand for Rental Housing: A Study of Slums in Delhi


To achieve growth, property development, redevelopment and an improved tax base in the cities and boroughs in the Lehigh Valley.

Table of Contents. Appendix...22

Barbara County Housing Element. Table 5.1 Proposed Draft Housing Element Goals, Policies and Programs

DELHI DEVELOPMENT AUTHORITY

City of Blue Springs, Missouri. Main Center Redevelopment Corporation Incentive Policy

b. providing adequate sites for new residential development

AFFORDABEL HOUSING FOR ALL

SOCIAL HOUSING THE WAY FORWARD

CITY OF SASKATOON COUNCIL POLICY

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

Scheme of Service. for. Housing Officers

REVIEW OF LAND MANAGEMENT PRACTICES IN URBAN GROWTH PERSPECTIVE

UN-HABITAT SCROLL OF HONOUR AWARD CALL FOR NOMINATIONS

Housing Challenges in Third World Cities Dr. Kevon Rhiney Department of Geography & Geology The University of the West Indies, Mona

Land consolidation and rural development in Serbia

Housing and emergence of slums in Asian Cities

Monday July 29, :00 to 16:30 (local time) Pretoria, South Africa

RECENT DEVELOPMENTS IN HOUSING FINANCE IN LITHUANIA

The post-2005 period has seen in India intensive discussions on the alternative approaches to addressing issues of slums and affordable housing.

Hennepin County Department of. Housing, Community Works and Transit. Transit Oriented Development (TOD) Guidelines

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

City of Winnipeg Housing Policy Implementation Plan

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

CE6007-Housing Planning and Management Prepared By, M. Sathyanarayanan AP-III /Civil VCET-Madurai

VIEWS ON CLUSTER DEVELOPMENT URBAN RENEWAL SCHEME/CLUSTER DEVELOPMENT [DCR 33/9]

City of Brandon Brownfield Strategy

The City shall support a suitable mix of housing by: [9J (3)(c)(5)]

Click to edit Master title style

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005.

DEMAND No.26 HOUSING AND URBAN DEVELOPMENT DEPARTMENT POLICY NOTE CONTENTS SUBJECT

The Review on Policy for In-Situ Upgradation of Slums by Public Private Partnership

World Bank Responses to the Problem of Informal Development: Current Projects and Future Action

Village of Port Jefferson Urban Renewal Plan

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Planning Policy Guidance 3: Housing

Participants of the Ministerial Meeting on Housing and Land Management on 8 October 2013 in Geneva

Evaluating the award of Certificates of Right of Occupancy in urban Tanzania

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

AN OVERVIEW OF PRESENT HOUSING CRISIS IN PAKISTAN AND A WAY FORWARD By DR. NOMAN AHMED

Strata Titles Act Reform Consultation Summary

PIA would be pleased to meet with the Department to outline any aspect of our submission. Please contact myself or John Brockhoff on

City of Johannesburg Approach

DRAFT Housing Technical Bulletin

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

Key Concepts, Approaches and Tools for Strengthening Land Tenure Security

Cadastral Template 2003

Terms of Reference for Town of Caledon Housing Study

Transcription:

SLUMS IN DELHI ISSUES AND POLICY PERSPECTIVES SEMINAR ON URBAN GOVERNANCE IN THE CONTEXT OF JAWAHARLAL NEHRU NATIONAL URBAN RENEWAL MISSION (JNNURM) 24th-25th November 2006, New Delhi DELHI DEVELOPMENT AUTHORITY

CONTENTS INTRODUCTION PRESENT SITUATION PRESENT POLICY FRAME PROGRESS OF RELOCATION AND INNOVATIVE SCHEMES PROPOSED MAJOR ISSUES PROVISIONS OF DRAFT MPD - 2021 ALTERNATIVE POLICY PERSPECTIVES CONCLUDING REMARKS

DEFINITION OF SLUMS AREAS BROUGHT UNDER THE PURVIEW OF THE SLUM IMPROVEMENT AND CLEARANCE AREAS ACT, 1956. LEGAL CLUSTERS ENTITLED TO BENEFITS UNDER THE ACT. DEFINITION BUILDINGS THAT ARE UNFIT FOR HUMAN HABITATION IN ANY RESPECT OR BY REASON OF DILAPIDATION, OVERCROWDING; FAULTY ARRANGEMENT AND DESIGN OF BUILDINGS, STREETS, LIGHTS OR SANITATION FACILITIES OR COMBINATION OF THESE MAY BE DECLARED AS THE SLUM AREA UNDER SECTION 3 OF THE ACT. IN DELHI THESE INCLUDE PARTS OF OLD CITY, JJ CLUSTERS ETC.

SLUMS AS GENERALLY UNDERSTOOD IN DELHI SQUATTER SETTLEMENTS/ JJ CLUSTER THAT ARE ENCROACHMENTS ON LAND THAT MAY BE PUBLIC OR PRIVATE. ILLEGAL CLUSTERS BEREFT OF ANY LEGAL ENTITLEMENTS INCLUDING SUBSTANDARD AREAS. WALLED CITY, WHICH IS A VERY IMPORTANT HERITAGE AREA, IS ALSO DESIGNATED AS A SLUM. POPULATION IN SLUMS AS PER CENSUS 2001-20.29 LAKHS AS PER MCD - 18.51 LAKHS (URBAN POPULATION) PROPORTION OF KATCHA HOUSES - 16 % (3.7 LAKHS KATCHA HOUSES AGAINST A TOTAL OF 25.5 LAKH HOUSES AND THERE ARE ABOUT 1.5 LAKH DERELICT HOUSE STRUCTURES, CONCENTRATED MOSTLY IN THE NOTIFIED SLUMS OF THE OLD CITY AREAS.)

Sr. No. Type of settlement Nos. Estimated population in Lakh. 1 JJ Resettlement Colonies 44 18 2. Slum Rehabilitation Colonies 61 2 3. Unauthorised- Regularised 567 15 Colonies PRESENT SITUATION TYPES OF SETTLEMENTS OTHER THAN PLANNED COLONIES IN DELHI 2001 4. Unauthorised colonies >1400 15 5. Urbanised Villages >120 12 6. J.J Clusters 1500 30 7. Katras in notified slum area 2800 3 TOTAL: 95 Total population 2001 census = 138.5 Lakh Urban 129 Lakh Rural = 9.5 Lakh RECORD ESTIMATES

PRESENT POLICY FRAME NATIONAL SLUM POLICY UPGRADING AND IMPROVEMENT APPROACH AS OPPOSED TO RESETTLEMENT EMPHASISES ON STRENGTHENING THE LEGAL AND POLICY FRAMEWORK, ALSO INVOLVING STAKEHOLDERS FOR IMPLEMENTATION PROPOSES EXISTING PLANNING INSTRUMENTS TO BE MODIFIED TO INTEGRATE THE SLUMS INTO THE WIDER URBAN AREA. COMMUNITY INVOLVEMENT, UPGRADATION OF SHELTER AND INFRASTRUCTURE DEVELOPMENT AND ECONOMIC EMPOWERMENT OF SLUM DWELLERS SUSTAINABLE FINANCING MECHANISM FOR SLUM IMPROVEMENT THROUGH A SLUM DEVELOPMENT FUND

PRESENT POLICY FRAME GOVERNMENT POLICY AND STRATEGY NO FRESH ENCROACHMENTS PERMITTED ON PUBLIC LAND AND PAST ENCROACHMENTS, PRIOR TO 31.1.90, WILL NOT BE REMOVED. A THREE-PRONGED STRATEGY HAS BEEN ADOPTED AS UNDER: RELOCATION IN-SITU UP-GRADATION ENVIRONMENTAL IMPROVEMENT IN JJ CLUSTERS

STATUS OF RELOCATION THE SLUM AND JJ DEPTT. OF MCD IS THE MAIN AGENCY DEALING WITH MATTERS RELATING TO SLUMS IN DELHI. SINCE 1991, IT HAS ALLOTTED ABOUT 53,800 PLOTS TO ELIGIBLE SQUATTERS. DDA HAS BEEN UNDERTAKING RESETTLEMENT SCHEMES TO RESETTLE THE JJ CLUSTERS FROM THE DDA PROJECT SITES. AS PER THE POLICY, THE PRE-1990 SQUATTERS & PRE - 1998 SQUATTERS ARE ALLOTTED 18 SQM. AND 12.5 SQM. OF LAND RESPECTIVELY. FOR REHABILITATION OF ELIGIBLE JJ DWELLERS, DDA IS NOW CONSIDERING RELOCATION IN MULTI STORIED BUILT UP ACCOMMODATION IN PLACE OF HORIZONTAL RELOCATION BY ALLOTMENT OFGROUP HOUSING PLOTS.

MAJOR ISSUES 1. POLICY EMPHASIS SHIFTED FROM SITES AND SERVICES APPROACH TO IN-SITU UPGRADATION, DUE TO PROBLEMS ASSOCIATED WITH RELOCATIONS ON THE OUTSKIRTS OF THE CITIES DEPRIVING THE PEOPLE OF THEIR MEANS OF LIVELIHOOD. PLANNING, LAND USE & DEVELOPMENT CONTROL PLAN FOR REDEVELOPMENT SHOULD BE AN INTEGRATED APPROACH RATHER THAN UTILIZATION OF INDIVIDUAL SQUATTER SITES. POOLING OF ALL SUCH LANDS ON ZONAL BASIS TO FACILITATE ACCEPTANCE OF HOUSING CREATED FOR HIG. LINK THE SPATIAL AND ECONOMIC DIMENSIONS IN TERMS OF RELOCATION WITH EMPHASIS ON RESERVATION OF SITES FOR THE EWS HOUSING NEAR WORK CENTERS AND TRANSPORT CORRIDORS.

MAJOR ISSUES 2. LAND ADEQUATE AND TIMELY SUPPLY OF LAND SUITABLE FOR RESETTLEMENT LANDS OWNED BY DDA AND MCD COULD BE POTENTIAL SITES FOR RESETTLEMENT. EMPHASIS ON INVENTORY AND RESERVATION OF LAND FOR EWS ATTEMPT TO HAVE SUCH LAND SCATTERED IN ALL POCKETS OF THE CITY. AS PER THE LAND POLICY, COST OF LAND TO BE MET THROUGH REVOLVING FUND CREATED BY THE GOVERNMENT AND EXPENDITURE BORNE BY DDA ON DEVELOPMENT TO BE MET OUT THROUGH SALE OF LAND.

MAJOR ISSUES 3. MANAGEMENT HOUSING SCHEMES ANNOUNCED BY DDA ARE BASED ON DISTINCT INCOME CATEGORIES COST OF HOUSES OF EWS EVIDENTLY INDICATES THAT THE POOR SECTION HAS NOT GOT MUCH BENEFITED OF HOUSING SCHEMES THE POST OCCUPATION MANAGEMENT ALSO LACKS TOTALLY RESULTING IN RESALE AND POOR LEVEL OF MAINTENANCE 4. FINANCE - COST AND FUNDING NEED OF INSTITUTIONAL RESTRUCTURING TO INVOLVE PRIVATE SECTOR, CHARITABLE INSTITUTIONS, NGO S AND SELF-HELP GROUPS WITH INCENTIVES USING OTHER MEANS OF RESOURCES. AREAS FOR IN-SITU UPGRADATION TO BE JUDICIOUSLY SELECTED FOR DEVELOPMENT. PRIORITY SHOULD BE FOR AFFORDABLE REDEVELOPMENT WITH EMPHASIS ON RE-DENSIFICATION TO ALLOW FOR THE OPTIMUM USE OF LAND.

MAJOR ISSUES 5. TENURE OWNERSHIP OF LAND FOR ALMOST ALL SITES BELONGS TO THE GOVERNMENT. TENURE PROVISION HAS ATTRACTED COMMUNITY INVOLVEMENT TOWARDS SLUM IMPROVEMENT. 6. SERVICES LOCATION OF SETTLEMENTS IS BENEFICIAL TO MAJORITY OF RESIDENTS AS DISTANCE BETWEEN WORK PLACE AND RESIDENCE IS COMPARATIVELY SHORT. AS GOES FOR THE SLUM REDEVELOPMENT SCHEMES UNDERTAKEN THE SERVICES ONCE PROVIDED BECOME A MAINTENANCE LIABILITY ON THE ALREADY LOADED PUBLIC AGENCY. THIS EXCESSIVE DEPENDENCE NEEDS TO BE CHECKED THROUGH INSTITUTIONAL RESTRUCTURING.

HOUSING STRATEGY ( MPD-2021) DEVELOPMENT OF NEW HOUSING AREAS. (@50,000,DU PER ANNUM (450-500 HA RESD. LAND P.A) UPGRADATION & INTENSIFICATION. (Existing Unplanned Areas) UPGRADATION & INTENSIFICATION. (Existing Planned Areas) REDEVELOPMENT IN U/C, U/V & SA. DRAFT MPD-2021

INDICATIVE DISTRIBUTION IN HOUSING TYPES Sr. No. Housing Type Development Agencies % 1 SLUM & JJ Public Agency 25 1. In-situ Rehabilitation Private Agency 2. Relocation/Reconstruction Co-op society 3. Up-gradation 2. Houses on Independent Plots Public Agency 8 & Redevelopment Private Agency 3. Group Housing Public Agency 42 (35% of total DU s not to Private Agency exceed 2 room sets) Co-op society 4. Employer Housing Central/State Govt. 4 5. Unauthorised/Regularised Co-op Society/ 15 Colonies infill Resident association/ Private Agency 6. Other Housing Public Agency 6 Upgradation of old areas/ Private Agency Traditional areas/villages Co-op Society Note : 50-55% of Housing is to be for urban poor & EWS (upto 40 sqm) Urban poor housing to form part of all the types. DRAFT MPD-2021

HOUSING FOR URBAN POOR - THE BIGGEST CHALLENGE. ( Squatters, informal Sector e.g. hawkers, vendors, low paid workers etc.) REHABILITATION / RELOCATION OF SLUM & JJ. A) RELOCATION ( 18 & 12.5 SQM PLOT) B) IN SITU UPGRADATION. C) ENVIRONMENTAL UP GRADATION. D) ALTERNATE APPROACH WITH FOLLOWING FEATURES - Insitu upgradation / relocation on built up 25 sqm. Use of land as a resource, with private sector participation. Incentives - higher FAR part commercial & TDR Tenure rights - cooperative societies. Accommodation provided - based on affordability. Avoid large scale - JJR sites; small clusters near work centres. Transit camps - near the same site CBOs NGOs involved. Formulate Slum Clearance & Urban Renewal Authority. Atleast 10% of the net residential land - for EWS housing EWS fund, plan fund & institutional financing be used. DRAFT MPD-2021

GUIDELINES FOR COMMUNITY REHABILITATION / RELOCATION / IN-SITU UPGRADATION FOR URBAN POOR I. Maximum density of the dwelling units = 600 units per ha.+10% variation. II. The scheme is to be designed in a composite manner with an overall max. FAR of 250 for in-situ rehabilitation. III. Mixed land use / Commercial component = upto 10%. IV. Specific situations may require clubbing of scattered squatter JJ sites in the neighborhood to work out an overall comprehensive scheme. V. The minimum component of the land area for rehabilitation of squatters has to be 60% and maximum area for remunerative use has to be 40%. VI. Area of Dwelling Unit for rehabilitation = not to exceed 25 sqm. VII. The space standards = as per IS Code 8888,(1993). CONTINUED DRAFT MPD-2021

GUIDELINES FOR COMMUNITY REHABILITATION / RELOCATION / IN-SITU UPGRADATION FOR URBAN POOR VIII. IX. Common parking is to be provided which can be relaxed wherever required, except for the parking for remunerative component. No restriction on ground coverage (except set backs) X. Schemes to be approved by specified body. DRAFT MPD-2021

PILOT PROJECTS INITIATED TEHKHAND SCHEME : Integrated development (14.3 Ha) by private sector with compulsory housing for the poor (3500 units of 28sq.m) and the rest 750 units for free sale. NARELA GROUP HOUSING PROJECT : Private/co-operative sector group housing with mandatory 15% FAR to be used for constructing EWS tenements free of cost for DDA, and the rest for free sale. JNNURM PROJECTS : Provision of 28sq.m unit with high density development to use the land effectively. Cost to be shared by the land owning agency, state government, central subsidy, and the beneficiary.

ADDITIONAL THOUGHTS

SIGNIFICANCE OF INFRASTRUCTURE WORLD ADEQUATE INFRASTRUCTURE DEVELOPED COUNTRIES INADEQUATE INFRASTRUCTURE UNDEVELOPED COUNTRIES COUNTRY CITIES AND TOWNS VILLAGES CITY PLANNED AREAS UNPLANNED AREAS LOCAL AREA LEVEL POSH COLONIES SLUMS, SQUATTER SETTLEMENTS, VILLAGES, OLD CITY AREAS, ETC. MARGINAL AREAS where urban poor live generally pose disproportionate share of health risk compared to planned urban areas.

INFRASTRUCTURE COMPONENTS INFRASTRUCTURE PHYSICAL WATER SUPPLY SEWERAGE POWER SOLID WASTE DRAINAGE SUPPORTIVE SECTORS: roads, highways, ports, airports and everything that adds to quality of living. HEALTH SOCIAL EDUCATION COMMUNICATION SECURITY FIRE DISTRIBUTIVE SERVICES (eg. Milk, LPG, etc.) ROADS provide the prime utility corridors at different levels of urban development.

SUGGESTIONS 1. THRUST ON GREATER EQUITY i.e. priority on projects which helps in minimising geographic disparities / imbalances: upgrade marginal settlements multiple use of facility spaces grouping of facilities for greater use right to information may help to prioritize the projects preparation of local area plans 2. MINIMISE INFRASTRUCTURE GAPS by: Demand management Optimising the existing assets Minimise line losses / leakages / thefts Phased augmentation Effective people s participation

SUGGESTIONS 3. GREATER INTER-AGENCY COORDINATION: minimise over lapping work-responsibilities and jurisdiction prepare comprehensive infrastructure improvement plan institutional capacity building measures eg: simplification of procedures, formulation of work manuals, design briefs, standardization, guidelines. 4. PHASED AUGMENTATION, REDEVELOPMENT & RENEWAL: formulate guidelines based on well defined physical parameters eg: road width, density, age of buildings, level of infrastructure, etc. time bound specific area upgradation / redevelopment schemes use of innovative concepts of development eg: AR, TDR, etc

SUGGESTIONS 5. MONITORING FRAME AND ACTION PLANS: system of periodic review performance evaluation identification of critical infrastructure projects formulation of citizen action groups

THANK YOU THANK YOU