GENERATOR APPLICATION PROCESS - 1

Similar documents
DEMOLITIONS LICENSING REQUIREMENTS APPLICATION PROCESS. 1 of 2

CITY OF BIRMINGHAM Community Development Building Department 151 Martin Street, Birmingham, MI 48009

Three Oaks TWP. (269) FAX THREE OAKS, MICHIGAN MECHANICAL PERMIT APPLICATION

NELSON TOWNSHIP APPLICATION FOR BUILDING PERMIT

LOT SUBDIVISION LOT BLOCK SIZE

HERNANDO COUNTY PERMIT APPLICATION PACKET MECHANICAL PERMIT

Application for a Building/Zoning Permit

APPLICATION FOR BUILDING PERMIT

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

IMPORTANT INFORMATION REGARDING 2017 CONTRACTOR REGISTRATION

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

TECHNICAL BULLETIN FX-1

SHED (UNDER 200 SQ. FT.) PERMIT APPLICATION

BUILDING PERMIT APPLICATION

CITY OF MADISON HEIGHTS OAKLAND COUNTY, MICHIGAN. RESOLUTION regarding FEE SCHEDULE FOR COMMUNITY DEVELOPMENT DEPARTMENT SERVICES

BUILDING PERMIT APPLICATION

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

CHAPTER 18 SITE CONDOMINIUM PROJECTS

CITY OF NAPERVILLE Transportation, Engineering, & Development (T.E.D.) Business Group

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

BUILDING PERMIT APPLICATION

HOME ADDITION PERMIT PROCESS

MECHANICAL HVAC PERMIT CHECKLIST

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

EL DORADO COUNTY BUILDING SERVICES

PERMITS & PLANS APPROVALS ADVANCED MODULE INTERNET

MEDINA COUNTY BUILDING REGULATIONS

Doors & Windows Package

Bradford County Building, Zoning & Planning 945-F North Temple Ave. Starke, FL Phone: Fax:

MACOMB TOWNSHIP BUILDING DEPT TEL: (586) BROUGHTON ROAD FAX: (586) MACOMB MI 48042

-MECHANICAL- BUILDING PERMIT APPLICATION PACKET

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

ZONING BOARD OF APPEALS APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI Phone: (616) Website:

City of Mascotte. 100 East Myers Blvd. * Mascotte, Florida * Phone (352) * Fax (352) FENCE CHECKLIST

APPLICATION FOR PLAN EXAMINATION / BUILDING PERMIT or ZONING PERMIT

OWNER-BUILDER STATEMENT/AFFIDAVIT

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

Demolition Application Package

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

DO NOT START CONSTRUCTION UNTIL A PERMIT HAS BEEN ISSUED BY THE BUILDING INSPECTOR

Demolition Permit Application Check List. Notice: Please review and follow the check list to avoid any delays in the permit process.

(voice) (fax) (voice) (fax) Site Plan Review

APPENDIX E FORMS INDEX OF ZONING FORMS

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

Remember, PA One-Call before excavating. Simply dial 811 or

NEW HOME CONSTRUCTION PERMIT PROCESS

4. Building plans should include top of foundation elevation

Community Development Department Fee Schedule

City of Umatilla 1 South Central Avenue P.O. Box 2286 Umatilla, FL Phone (352) FAX (352) DEMOLITION PERMIT APPLICATION

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Interim Use Permit Application

TOWN OF FAIRPLAY BUILDING PERMIT APPLICATION FOR NEW CONSTRUCTION, ADDITIONS, AND REMODELS

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

Review Fee Receipt No. Total Amount Rec d Credit Card Authorization FLORIDA BUILDING AND ACCESSIBILITY CODE, 2010 EDITION APPLIES

Huntington Building Inspection

NASSAU COUNTY MECHANICAL PERMIT APPLICATION

Septic Tank / Drainfield / Holding Tank Permit Application

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

DEMOLITION REQUIREMENTS

City of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL

This permit application includes the land use/zoning and building inspection reviews.

Cassia County Accessory Dwelling Unit (ADU) Permit Application

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

INDIAN RIVER COUNTY/CITY OF VERO BEACH ALTERATIONS AND ADDITIONS Generator INFORMATION/CHECKLIST BUILDING DIVISION

Hamilton County Building Department County Court House Room NE First Street Jasper, FL Phone (386) Fax (386)

BUILDING PERMIT APPLICATION

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

Bradford County Building, Zoning & Planning 945 N. Temple Ave. Starke, FL Mailing: P.O. Box B Starke Phone: Fax:

EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION (REVISED MAY 11, 2018)

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

CITY OF PANAMA CITY BEACH Building and Planning Department

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

NEW CONSTRUCTION OR ADDITIONS PERMIT CHECKLIST

SHORT TERM RENTAL REGISTRATION PROCESS

SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations

-EXTERIOR STRUCTURE ALTERATIONSIDING DOORS - WINDOWS

A/C PERMIT APPLICATION 2017 FLORIDA BUILDING CODE

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

SWIMMING POOL PERMIT APPLICATION PACKET

ZONING and PA UNIFORM CONSTRUCTION CODE (UCC) PERMIT APPLICATION. I. Zoning Permit Section Date Received Ins. Addendum Y N

Change of Contractor

Irrigation Permit Requirements FOR OWNER/BUILDER

- HANDICAPPED RAMP - MISCELLANEOUS ACCESSORY STRUCTURE BUILDING PERMIT APPLICATION PACKET

Village of Baxter Estates Fee Schedule

Residential Building Permit Application (To be entered by issuing agency) Parcel #: Permit Number: Intake Person: Project Address:

SHORT TERM RENTAL PERMIT/BUSINESS REGISTRATION

BOUNDARY LINE ADJUSTMENT APPLICATION

SWIMMING POOL GUIDELINES

PREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows:

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

Project Address. Name of Project/business name. Owner of Property Phone . Emergency contact phone number. Parcel Number

LEASE APPLICATION INSTRUCTIONS

ORDINANCE NO

Boyertown Borough and Colebrookdale and Pike Townships Joint Zoning Ordinance

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Transcription:

Bloomfield Township P.O. Box 489, 4200 Telegraph Road Bloomfield Hills, MI 48303-0489 Phone (248) 433-7715 Fax: 433-7729 www.bloomfieldtwp.org GENERATOR APPLICATION PROCESS - 1 All stand-by generators require three (3) permits to be issued at the same time from the Building Division and must comply with The Charter Township of Bloomfield ClearZoning and Chapter 14, Article II, Sec. 14-20- Ordinance to Control Excessive Noise. An additional Building Permit will be required if a screen wall is proposed or if required to screen the generator from public view or to lower the noise level of the generator. Once the permits have been issued the installation may commence. Electrical Permit At the time of inspection, the Township will ensure that the generator has been installed according to the 2015 Michigan Residential Code or the National Electrical Code 2014, NEC 2014 Part 8 Rule and according to the Code of the Charter Township of Bloomfield Ordinance Chapter 42 in addition to the 2015 MBC for commercial: Rear Yard Location Placed immediately adjacent to the residential building (maximum 36 from the residential wall) and maintaining a minimum 16 side yard setback. Side Yard or Secondary Front Yard Location Placed immediately adjacent to the residential building (maximum 36 from the residential wall) and maintaining a minimum 16 side yard setback or 40 front yard setback. Placement in a side or secondary front yard shall be screened from view through the use of materials identical to those used on the main building or through the use of evergreen plant material at least the height of the equipment ( screen wall ) and located at the point of placement of the equipment. The screen wall shall screen the equipment at a height not less than the height of the equipment. Screen walls, other than vegetative screen walls, shall not be located in the required sixteen (16) foot side yard setback as measured from the side lot line and at a height no greater than four (4) feet. Mechanical Permit At the time of inspection, the Township will ensure that the generator has been installed according to the 2015 Michigan Residential Code or for Commercial the 2015 Michigan Mechanical Code. Generator Use Permit At the time of inspection, the Township will test the generator operating under load for the purpose of ensuring that noise requirements are met according to the Codes of the Charter Township of Bloomfield Chapter 14, Article II, Sec. 14-20 Weekly generator testing permitted during daytime hours only. (Periodic testing time between 9 AM and 5 PM weekdays) Generator decibel level must register 70 db (A) or less at a location 25 feet away from the source from which the sound emanates, with the exception of the measurement provided for in subsections 4.01 (7). The owner must comply with the Codes of the Charter Township of Bloomfield Chapter 14, Article II, Sec. 14-20 through means of additional sound abatement measures. Additional sound abatement measures may be reached with the use of evergreen screening or a sound abatement wall with materials identical to the main building. When the ambient noise is greater than 65dB(A) at the point of measurement, the noise generated from the generator in combination with the ambient noise shall not exceed more than 10dB(A) above the ambient noise. Building Permit At the time of inspection, the Township will ensure that the screen wall has been built according to the 2015 Michigan Residential Code and our local ordinance. 1 of 2

GENERATOR APPLICATION PROCESS - 2 The screen wall shall screen the equipment at a height not less than the height of the equipment and no more than four (4) feet. Screen walls, other than vegetative screen walls, shall not be located in the required sixteen (16) foot side yard setback as measured from the side lot line. The following items are required to be submitted prior to permit release: $50.00 Plan Review Fee Use Permit Application (Signed by homeowner and electrical contractor) Electrical Permit Application Current copy of driver s, master s and contractor s license of electrical contractor $100.00 Electrical Permit Fee Mechanical Permit Application Current copy of driver s and contractor s license of mechanical contractor $100.00 Mechanical Permit Fee Engineered site plan or a copy of the mortgage survey (cannot be reduced or enlarged) to include the following o Identify all streets and lot lines o Orientation of the home o Equipment location o Setback distance from property line(s) o Distance from the wall of the building to the equipment o Screening requirements (Placement, material, and height) Subdivision Association approval or comments Generator specifications and load calculations (total connected load) must be onsite for inspections. In the event that a screen wall is proposed, the following items are required in addition to the above: $30.00 plan review fee Building Permit Application Current copy of drivers and contractor s license of building contractor A dimensioned and detailed wall cross-section identifying screen wall materials (any wall higher than 4 feet will require a variance from the Zoning Board of Appeals $120.00 Building Permit fee A variance from the Zoning Board of Appeals is required for any proposed generator with any of the following issues: Front yard installation and nonconforming side and rear yard installations Screening wall, other than vegetative screen walls, higher than 4-0 Propane tank installation above ground Encroachment into the rear or side yard setback Operation of the generator is prohibited until the noise level has been tested and approved by Bloomfield Township and the decibel level is confirmed to comply with the Codes of the Charter Township of Bloomfield Chapter 14, Article II, Sec. 14-20. Inspection requests must be called into the Building Division 24 hours prior to the requested inspection date. Generators must be screened in accordance with Township Ordinance. In the event inclement weather prevents the installation of the screening, a minimum $200 cash bond, as determined by the Building Official, will be required at the time of final inspection. The screening must be completed prior to May 1, 20. Upon verification, the bond will be refunded. Address of Job: Signature of Homeowner Signature of Contractor 2 of 2

Application # Application Bloomfield Township P.O. Box 489 4200 Telegraph Bloomfield Township, MI 48303-0489 Phone (248) 433-7715 Fax: 433-7729 www.bloomfieldtwp.org APPLICATION FOR GENERATOR USE PERMIT Permit # Issue Please print or type: Address of Job: Sidwell # 19- Section: Lot: Sub: Applicant/Contractor: Phone: Fax: Email: Address: City: State: Zip: Owner: Phone: At the time of inspection, the Township will test the generator operating under load for the purpose of ensuring that noise requirements are met. Weekly generator testing permitted during daytime hours only. (Periodic testing time between 9:00 AM and 5:00 PM, weekdays.) Generator decibel level must register 70 db(a) or less at the closest measurement to the property line. If the generator exceeds 70 db(a) noise level at the closest property line, the owner must comply with the Code of the Charter Township of Bloomfield Chapter 14, Article II, Sec. 14-20 through means of additional sound abatement measures. Additional sound abatement measures may be reached with the use of evergreen screening or a sound abatement wall with materials identical to the main building. Operation of the generator is prohibited until the noise level has been tested and approved by Bloomfield Township and the decibel level confirmed to comply with the Code of the Charter Township of Bloomfield Chapter 14, Article II, sec. 14-20. Signature of Homeowner Signature of Applicant

Bloomfield Township P.O. Box 489 4200 Telegraph Bloomfield Township, MI 48303-0489 Phone (248) 433-7715 Fax: 433-7729 Website: www.bloomfieldtwp.org APPLICATION FOR PERMIT Permit # Issue ELECTRIC PLUMBING SEWER Address of job Lot # Sub. Section Applicant Phone Email Fax Address City State Zip Property Owner Phone New Building Addition Remodeling Repairs Replacement Other Electrical: Plans are required for all buildings using over six (6) circuits before a permit is issued for electrical work. Mechanical: A/C condenser location No Front Yard Installations Rear Yard Side Yard (requires screening & site plan) Number of units Mech. Equipment Type Hydronic Forced Air Boiler Number of units Mechanical classifications 1 2 3 4 5 6 7 8 9 10 Generators: See Generator Application Process. Sewer Contractors: A current ten thousand dollar ($10,000) surety bond must be posted on a Township form (copies not acceptable). Bonds expire at end of each calendar year. Remarks Zoning Board of Appeals required for work being performed? YES / NO granted: STATE OF MICHIGAN REQUIRED INFORMATION: License Number Issued by Exp. Federal Employer ID number or reason for exemption Workers Comp Insurance Carrier or reason for exemption MESC Employer number or reason for exemption A permit remains valid as long as work is progressing and inspections are requested and conducted. A permit shall become invalid if the authorized work is not commenced within 180 days after issuance of the permit or if the authorized work is suspended or abandoned for a period of 180 days after the time of commencing the work. A PERMIT WILL BE CLOSED WHEN NO INSPECTIONS ARE REQUESTED AND CONDUCTED WITHIN 180 DAYS OF THE DATE OF ISSUANCE OR THE DATE OF A PREVIOUS INSPECTION. CLOSED PERMITS CANNOT BE REFUNDED. Section 23a of the State Construction Code Act of 1972, 1972 PA 230, MCL 125.1523A, prohibits a person from conspiring to circumvent the licensing requirements of this state relating to persons who are to perform work on a residential building or a residential structure. Violators of Section 23a are subjected to civil fines. Signature of Applicant

Bloomfield Township P.O. Box 489 4200 Telegraph Bloomfield Hills, MI 48303-0489 Phone (248) 433-7715 Fax: 433-7729 www.bloomfieldtwp.org Permit # Issue APPLICATION FOR MECHANICAL PERMIT Address of Job Lot # Sidwell # Subdivision Applicant/Contractor Email Telephone Fax Address City State Zip Property Owner Telephone New Construction Addition Remodel Repairs Replacement Generator Fee No. Amount Application Fee $20 New Construction New Construction (one furnace, one A/C w/duct work*) 170 Each additional furnace 80 Each additional A/C* 50 Prefab fireplace 100 Gas-line 80 Addition/Alteration/Replacement Single item inspection 50 Installation of furnace and/or A/C per unit* 50 Duct alterations 80 Prefab fireplace 100 Gas-line (provide pressure test) 80 A/C unit added to existing furnace * 50 Processed Piping 120 Boiler installation (must provide boilers license) 50 Fire suppression/kitchen hood suppression 100 Self-contained HVAC units, per unit 50 Re-inspection Fee 50 Mechanical Registration 15 Commercial Fees Assessed at plan review by the inspector Minimum 100 Description Total Due $ *Indicate exterior equipment location: Rear Yard Side Yard Front Yard Roof For ground equipment locations, you must provide a detailed site plan indicating all streets, lot lines, orientation of home, equipment location, setback distance from property line(s), distance from wall of building to equipment, screening requirements (placement, material and height) & subdivision comments. For commercial roof top equipment locations, you must provide a detailed roof plan, distance from outer wall of building to equipment, screening requirements (placement, material and height). Please note that all equipment must be screened from view per the Codes of the Charter Township of Bloomfield, Chapter 42, Article IV, Sec. 42-5.1. Final inspection will not be approved until screening is installed. Applicants Signature Company Name

Bloomfield Township P.O. Box 489 4200 Telegraph Bloomfield Township, MI 48303-0489 Phone (248) 433-7715 Fax: 433-7729 www.bloomfieldtwp.org APPLICATION FOR MECHANICAL PERMIT - 2 STATE OF MICHIGAN REQUIRED INFORMATION License # Issued by: Expiration : Federal employer I.D. # or reason for exemption: Worker s Comp. Insurance carrier or reason for exemption: MESC Employer # or reason for exemption: A permit remains valid as long as work is progressing and inspections are requested and conducted. A permit shall become invalid if the authorized work is not commenced within 180 days after issuance of the permit or if the authorized work is suspended or abandoned for a period of 180 days after the time of commencing the work. A PERMIT WILL BE CLOSED WHEN NO INSPECTIONS ARE REQUESTED AND CONDUCTED WITHIN 180 DAYS OF THE DATE OF ISSUANCE OR THE DATE OF A PREVIOUS INSPECTION. CLOSED PERMITS CANNOT BE REFUNDED. Section 23a of the Michigan Construction Code Act of 1972, 1972 PA 230, MCL 125.1523a, prohibits a person from conspiring to circumvent the licensing requirements of this state relating to persons who are able to perform work on a residential building or a residential structure. Violators of Section 23a are subject to civil fines. Signature of Applicant : Company Name 2 of 2