PLANNED UNIT DEVELOPMENT (PUD) PROCEDURAL GUIDE

Similar documents
FINAL PLAT SUBMITTAL CHECKLIST

MINOR SUBDIVISION SKETCH PLAN SUBMITTAL CHECKLIST

DEPARTMENT OF PLANNING SERVICES 1555 N 17 th Ave Greeley CO Phone (970) Fax (970)

ZONING PERMIT MOBILE HOME (ZPMH) SUBMITTAL CHECKLIST

SUBDIVISION EXEMPTION (SUBX) SUBMITTAL CHECKLIST

WELD COUNTY OIL AND GAS LOCATION ASSESSMENT (WOGLA) PROCEDURAL GUIDE SUBMITTAL CHECKLIST

Weld County Oil & Gas Location Assessment (WOGLA) Application Requirements Checklist

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

MINOR SUBDIVISION INFORMATION

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

I. Requirements for All Applications. C D W

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015

SUBDIVISION APPLICATION (CHECK THE BOX THAT APPLIES)

Guide to Minor Developments

APPLICATION PROCEDURE

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

Guide to Combined Preliminary and Final Plats

City Of Attleboro Conservation Commission

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

Sketch Plan 2018 Bargersville Plan Commission Application Kit

Guide to Preliminary Plans

CHAPTER 3 PRELIMINARY PLAT

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

Initial Subdivision Applications Shall Include the Following:

APPLICATION FOR 555 Washington Street Tentative Map Red Bluff, CA Subdivision Map (530) ext Parcel Map.

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

Residential Major Subdivision Review Checklist

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Residential Subdivision Preliminary Plat Application

Waseca County Planning and Zoning Office

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

SKETCH PLAN REVIEW SPECIAL EXCEPTION, SPECIAL REVIEW,

CITY OF RIFLE MAJOR SUBDIVISION APPLICATION INFORMATION & PACKET SKETCH, PRELIMINARY & FINAL PLAT CHECKLISTS

Residential Minor Subdivision Review Checklist

MINOR PLAT FILING APPLICATION

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

Operating Standards Attachment to Development Application

APPLICATION PROCEDURES FOR A MAJOR SUBDIVISION PRELIMINARY PLAT

PRELIMINARY PLAT CHECK LIST

WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION

CHECKLIST FOR DEVELOPMENT REVIEW

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

TENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

ARTICLE 4 MAJOR SUBDIVISION/LAND DEVELOPMENT PLAN REQUIREMENTS

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

Preliminary Subdivision Application (Major) (Four (4) lots or more)

APPLICATION REVIEW CHECKLISTS

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

SUBDIVISION APPLICATION AND SUMMARY FORM

SUBDIVISION APPLICATION

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

Applicant: Address: Fee Owner: Address: Property Location (Address and Complete (long) Legal Description: Detailed Reason for Request:

Conditional Use Permit / Standard Subdivision Application

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

Plan and Zoning Commission Review Process

SPECIAL USE PERMIT APPLICATION FOR NATURAL DEPOSITS, EXTRACTION AND PROCESSING; CONCRETE BATCH PLANTS; HOT MIX (ROAD/ASPHALT) PLANTS

TENTATIVE MAP INFORMATION SHEET

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

TRANSFERABLE DEVELOPMENT RIGHTS PROCESS GUIDE

Major Subdivision Application Packet. Revised June 2018

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

APPLICATION PACKET SUBDIVISION PLAT REVIEW TENTATIVE PRELIMINARY PLAT

SHORT PLAT Information

LAND USE APPLICATION

SECTION 10 STANDARD PLATS

Special Use Permit - Planned Unit Development Checklist. Property Address:

Charter Township of Garfield Grand Traverse County

THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

TOWN OF LEWISTON PLANNING BOARD APPLICATION

APPENDIX C: PLAT SPECIFICATIONS AND CERTIFICATES

Land Use Application

Conditional Use Sketch Plan Application Non-Residential Zone

Certified Survey Map (CSM) Submittal Updated: 6/29/18

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

SUBDIVISION APPLICATION

Community Services Department REGULATORY ZONE AMENDMENT WITH SPECIFIC PLAN APPLICATION

Tentative Map Application Review Procedures

PRELIMINARY PLAT Checklist

Plat Checklist PLAT TYPES AND DESCRIPTIONS

LAND USE PERMIT APPLICATION

ARTICLE 13 CONDOMINIUM REGULATIONS

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

A Final Plat will be reviewed concurrently with any other development review application(s) that is required.

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

FOR OFFICE USE ONLY Date Submitted Received By Fees Paid $ Receipt No. Received By Application No. Application Complete Final Action Date

Applications will be received on business days between 9:00 AM and 3:00 PM

Transcription:

PLANNED UNIT DEVELOPMENT (PUD) PROCEDURAL GUIDE APPLICATION FEE HEARINGS/MEETINGS Step 1. Sketch Plan PUD(1-9 Lots) $2,100.00 Dept. of Planning Services Colorado Geological Survey PUD(10+Lots) $5,000.00 *see below Step 2. Change of Zone PUD (1-9 Lots) $1,500.00 + $50 Weld County Planning Commission per buildable lot PUD (10+ Lots) $3,000.00 + $50 Board of County Commissioners per buildable lot $11.00 + $10.00 each additional page Plat recording Step 3. Final Plat PUD (1-9 Lots) $1,500.00 + $100 Board of County Commissioners per buildable lot Utility Advisory Board PUD (10+ Lots) $3,000.00 + $100 per buildable lot $13.00 + $10.00 each additional page Plat recording Each Subdivision application and buildable lot will be assessed an additional 30% fee if the site is located in an Urban Growth Boundary, Urban development node, Intergovernmental defined growth area, and/or a mixed use land area, also for Urban Scale developments outside an urban area. Fees are non-refundable and due at time of application submittal. Fees are set by the Board of County Commissioners by Resolution. County Staff is not authorized to negotiate fees and cannot, under any circumstance, change, reduce, or amend the fees set forth in the Weld County Planning Fee Schedule. * The application shall be referred to any municipality or county governing body within a three mile radius of the parcel under consideration for a PUD. * Colorado Geological Survey Application Fees: All Sketch Plan applications will be submitted to the Colorado Geological Survey for review along with the required geologic maps and investigation reports. The following fee shall be collected by the Department of Planning Services at the time the Sketch Plan is submitted. As the fee will be forwarded, please make checks payable to the Colorado Geological Survey. Very Small Residential Subdivisions: 1-3 dwellings and <100 acres. Cost = $600.00 Small Subdivision Review: Subdivisions with >3 dwellings and <100 acres. Cost = $950.00 Large Subdivision Reviews: Subdivisions with >100 acres and <500 acres. Cost = $1550.00 Very Large Subdivision Review: Five hundred acres or more. Cost =$2500.00 Although most reviews listed above will fall within the estimated time and costs built into the listed standard charges, it is necessary, in fairness to all users, to provide for those cases that will incur excess review costs. The Colorado Geological Survey will contact the local planner if it is evident that additional review costs will be requested. The applicant is responsible for all fees associated with the geological review. Excess time or travel charges will be made for those expenditures in excess of the normal range of review time (maximum 6.75 hours on small reviews or 8.75 hours for large reviews), or for extensive travel related to a particular case. Updated 10/2017

* An additional investigation fee shall be added to the cost of the permit application when specific land, uses, buildings, manufactured homes, mobile homes, and structures that require a permit by the Weld County Code are located, moved, operated, or constructed prior to obtaining a permit. The investigation fee shall be fifty percent of the fee, established by separate action by the Board of County Commissioners for land-use applications. The payment of such investigation fee shall not relieve any persons from fully complying with the requirements of the Weld County Code, nor from any other penalties. * Site Plan Review applications may also be required for commercial, industrial and/or residential R-2, R-3 and R- 4 districts following completion of the PUD process. PURPOSE The purpose of this packet is to provide general information to an applicant about the Planned Unit Development (PUD) application process. It is not intended to be a substitute for the specific requirements of the Weld County Code, Chapter 27. It is the responsibility of the applicant to be knowledgeable of the specific requirements of the Weld County Code, Chapter 27 for the PUD application process. INTENT AND APPLICABILITY The PUD District is intended to allow an alternative method for property owners to apply flexibility in developing their land which may not be possible under the Subdivision application procedure. The PUD process encourages innovation in residential, commercial and industrial development and the conservation and more efficient use of open space in the development. STEP 1: PUD SKETCH PLAN The Department of Planning Services shall be responsible for processing all PUD Sketch Plan applications in the unincorporated areas of Weld County in accordance with Sections 27-4-30 and 27-4-40, of the Weld County Code. The Department of Planning Services may request additional information, application packets and/or fees that will aid in the review of the Sketch Plan application. STEP 2: PUD CHANGE OF ZONE The Department of Planning Services shall be responsible for processing all PUD Change of Zone applications in the unincorporated areas of Weld County in accordance with Section 27-6-120 of the Weld County Code. The Department of Planning Services' Staff shall prepare comments for use by the Planning Commission addressing all aspects of the application. The Planning Commission shall hold a hearing to consider the application. The Planning Commission shall provide a recommendation to the Board of County Commissioners concerning the disposition of the requested zone change. The Board of County Commissioners shall hold a public hearing to consider the Change of Zone application and to take final action thereon. It is recommended that the applicant attend all hearings scheduled for consideration of the Change of Zone application in order to present the proposal and answer questions of the involved governing bodies. Step 3: PUD FINAL PLAN In the event that Planning Services determines that the Final Plan submittal is consistent with the Sketch Plan and Change of Zone submittals, and a Specific Development Guide was submitted at the Change of Zone application, the Final Plan shall be administratively reviewed by the Department of Planning Services in accordance with Section 27-7-40.B.2 of the Weld County Code if the Board of County Commissioners granted the administrative review at the Change of Zone. In the event that the Planning Services determines that the Final Plan submittal is not consistent with the Sketch Plan and Change of Zone applications or if a Conceptual Development Guide was submitted at the Change of Zone application, the Board of County Commissioners shall hold a hearing to consider the Final Plan in accordance with Section 27-7-40.D

PLANNED UNIT DEVELOPMENT (PUD) SKETCH PLAN SUBMITTAL CHECKLIST The Planned Unit Development (PUD) Sketch Plan is the first step of the PUD process. The submittal requirements are stated in Section 27-4-20 of the Weld County Code which can be accessed at www.co.weld.co.us APPLICATION REQUIREMENTS: The applicant shall submit the PUD Sketch Plan application fee and the required Sketch Plan application materials as follows: Sketch Plan application form One digital or electronic copy of completed application materials, if required Legible deed or legal instrument identifying the applicants interest in the property. Signatures of all fee owners of property must sign this application or if an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included showing the signatory has legal authority of the partnership to sign for the corporation or partnership of corporation to do business in the State of Colorado. A Certificate of Good Standing is also required. Geologic Maps and Investigation Reports regarding area suitability for the proposed PUD Development as required by Section 27-4-20.C of the Weld County Code (submittal requirements attached) Sketch Plan map (maps shall conform to Section 27-9-10 of the Weld County Code) Sketch Plan Development Questionnaire addressing Section 27-4-20.E of the Weld County Code If this application is being reviewed as a Cluster PUD, submit a narrative addressing how this application complies with the Cluster PUD standards listed in Section 27-10-20 of the Weld County Code Statement of Taxes from the Weld County Treasurer showing no delinquent taxes exist for the original parcel Application fee (see front page) Colorado Geological Survey fee (see front page) Investigation fee, if required (see front page) Drainage Report Traffic Study Flood Hazard Development Permit (FHDP) Geologic Hazard Development Permit (GHDP) The applicant shall submit 1 packet containing one original of all of the above for a 7 day completeness review. The packet shall be bound with either paper clips or binder clips (no substitutes). Applications bound in any other fashion may be returned to the applicant without review.

PLANNED UNIT DEVELOPMENT (PUD) SKETCH PLAN APPLICATION FOR PLANNING DEPARTMENT USE RECEIPT # /AMOUNT # _/$ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: _ PLANNER ASSIGNED: Parcel Number - - - - (12 digit number - found on Tax I.D. information, obtainable at the Weld County Assessor's Office, or www.co.weld.co.us) (Include all lots being included in the application area. If additional space is required, attach an additional sheet.) Legal Description, Section, Township North, Range West Property Address (If Applicable) Existing Zone District: Proposed Zone District: _Total Acreage: _ Proposed #/Lots Average Lot Size: Minimum Lot Size: Proposed Subdivision Name: _ Proposed Area (Acres) Open Space: Is this application to be reviewed as a Cluster PUD? Yes No Are you applying for an exception to the Public Water requirements? Yes No FEE OWNER(S) OF THE PROPERTY (If additional space is required, attach an additional sheet) Name: Work Phone # Home Phone # Email Address_ Address: City/State/Zip Code APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: Work Phone # Home Phone # Email Address_ Address: City/State/Zip Code UTILITIES: DISTRICTS: Water: Sewer: Gas: Electric: Phone: School: Fire: Post: I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating the signatory has the legal authority to sign for the corporation. Signature: Owner or Authorized Agent Date Signature: Owner or Authorized Agent Date

PLANNED UNIT DEVELOPMENT (PUD) CHANGE OF ZONE SUBMITTAL CHECKLIST The Planned Unit Development (PUD) Change of Zone is the second step of the PUD process. In order to proceed with the Change of Zone application, the applicant must have completed the PUD Sketch Plan procedure. The submittal requirements are stated in Section 27-5-30 of the Weld County Code which can be accessed at www.co.weld.co.us The applicant shall schedule an appointment with the planner of record that processed the Sketch Plan application to submit the Change of Zone application. The Department of Planning Services may request additional information, application packets and/or fees that will aid in the review of the Change of Zone application. APPLICATION REQUIREMENTS: Unless otherwise indicated in Sketch Plan Comments, the applicant shall submit the PUD Change of Zone application fee the required Change of Zone application materials as follows: Change of Zone application One digital or electronic copy of completed application materials, if required Summary of any concerns identified during the PUD sketch plan application process with an explanation of how the concerns will be addressed or resolved Affidavit and certified list of the names, addresses and the corresponding parcel identification number assigned by the Weld County Assessor of the owners of property (the surface estate) within 500 feet of the property being considered. This list shall be compiled from the records of the Weld County Assessor, the Weld County Website, www.co.weld.co.us, or a person qualified to do the task, and shall be current as of a date no more than thirty days prior to the date the application is submitted to the Department of Planning Services. Change of Zone Plat (maps shall conform to Section 27-9-20 of the Weld County Code) A Specific or Conceptual Development Guide as described in Article VI, Chapter 27 of the Weld County Code. The applicant shall address the eight major components of the Development Guide. If this application is being reviewed as a Cluster PUD, submit an original plus three copies of narrative addressing how this application complies with the Cluster PUD standards listed in Section 27-10-20 of the Weld County Code. Document showing evidence of adequate water supply (e.g. well permit or letter from a water district or municipality), that has been approved by the Weld County Attorney s office. If using a well, please complete the attached Water Supply Information Summary. An agreement with the owner of any ditch associated with the subject property or evidence that an adequate attempt has been made to accommodate the concerns of the ditch owners in accordance with Section 27-5-30.I of the Weld County Code Statement of Taxes from the Weld County Treasurer showing no delinquent taxes exist for the original parcel An existing easement or dedicated right-of-way when it is contiguous to an easement or right-of-way of the proposed PUD Erosion Control Plan (if required at Sketch Plan) Deed or legal instrument identifying applicant's interest in the property. Signatures of all fee owners of property must sign this application or if an Authorized Agent signs, a letter of authorization from all fee

owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included showing the signatory has legal authority of the partnership to sign for the corporation or partnership of corporation to do business in the State of Colorado. Application fee (see front page) Drainage Report Investigation fee, if required (see front page) The applicant shall submit 1 packet containing one original of all of the above for a 7 day completeness review. The packet shall be bound with either paper clips or binder clips (no substitutes). Applications bound in any other fashion may be returned to the applicant without review.

PLANNED UNIT DEVELOPMENT (PUD) CHANGE OF ZONE APPLICATION FOR PLANNING DEPARTMENT USE RECEIPT # /AMOUNT # _/$ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: _ PLANNER ASSIGNED: Parcel Number Legal Description: Property Address (If Applicable) Existing Zone District: Proposed Zone District: Total Acreage Proposed #/Lots:_ Acres Open Space: Are you applying for Conceptual or Specific Guide? Conceptual Specific FEE OWNER(S) OF THE PROPERTY (If additional space is required, attach an additional sheet.) Name: Work Phone # Work Phone #_ Email Address: Address: APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: Work Phone # Work Phone #_ Email Address: Address: UTILITIES: DISTRICTS: Water:_ Sewer:_ Gas: Electric: Phone: School: Fire: Post: _ I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating the signatory has the legal authority to sign for the corporation. I (we), the undersigned, hereby request hearings before the Weld County Planning Commission and the Board of County Commissioners concerning the proposed Change of Zone for the above described unincorporated area of Weld County, Colorado: Signature: Owner or Authorized Agent Date Signature: Owner or Authorized Agent Date

PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAT SUBMITTAL CHECKLIST The Planned Unit Development Final Plat is the third and final step of the Planned Unit Development process. In order to proceed with the PUD Final Plat application, the site must be located within a PUD Zone District. The Department of Planning Services shall be responsible for processing all PUD Final Plat applications in the unincorporated areas of Weld County in accordance with Section 27-7-40 of the Weld County Code. The Department of Planning Services shall schedule a public meeting for the applicant with the Weld County Utility Coordinating Advisory Committee. It is recommended that the applicant attend all hearings scheduled for the Final Plan application in order to present the proposal and answer questions of the governing bodies. The Department of Planning Services may request additional information, application packets and/or fees that will aid in the review of the Final Plat application. APPLICATION REQUIREMENTS: Unless otherwise indicated in the Sketch Plan comments, the applicant shall submit the PUD Final Plat application fee and the required sketch plan application materials as follows: Recorded Change of Zone Plat which delineates the proposed uses PUD Final Plat application One digital or electronic copy of completed application materials, if required If the PUD Change of Zone was submitted as a Conceptual Development Guide, the applicant shall submit one original copy of the Specific Development Guide as described in Article VI, Chapter 27 of the Weld County Code. The applicant shall address the eight major components of the Development Guide. Certificate of Title issued by a title insurance company or an attorney=s opinion of the title in accordance with Section 27-7-20.B of the Weld County Code. The Certificate of Title or opinion shall be completed within thirty days of the application submission date. Title commitment issued by a title insurance company or a title opinion by an attorney licensed to practice in the State of Colorado (The commitment or opinion shall set forth the names of all owners of property. The commitment or opinion shall include a list of all mortgages, judgments, liens, easements, contracts, and agreements of record in Weld County affecting the property described in the application. If the attorney's opinion or title commitment discloses additional holders or owners of such mortgages, judgments, liens, easements, contracts, or agreements, not party to the application, the Board may require them to join in and approve it. The title commitment or opinion shall be completed with thirty days prior to the application submission date.) Warranty deed or other suitable document ready to record which deeds to the appropriate public body all lands other than streets which are to be held for or used for public purposes Statement of Taxes from the County Treasurer showing no delinquent taxes or special assessments on the property of the proposed PUD final plan Certificate from a qualified engineer in the State responsible for the design of the utilities All deed restrictions, including those required by the Board of County Commissioners which govern the future use of all land in the PUD and, covenants, grants of easements or restrictions to be imposed upon the use of the land, buildings and structures An improvements agreement according policy regarding collateral for improvements in accordance with Sections 2-3- 30, 24-9-10 and 24-9-20 of the Weld County Code Evidence from the appropriate jurisdiction stating that the street and/or highway facilities providing access to the property are adequate in functional classification, width and structural capacity to meet the traffic requirements of the uses of the proposed zone district If applicable, of a proposed off-site public road improvements agreement (the agreement shall be made in accordance with Section 27-7-30.J of the Weld County Code) PUD construction schedule in accordance with Section 27-7-30.K of the Weld County Code

Statement describing the method of financing for the development in accordance with Section 27-7-30.L of the Weld County Code Affidavit and certified list of the names, addresses and the corresponding parcel identification number assigned by the Weld County Assessor of the owners of property (the surface estate) within five hundred feet of property being considered. This list shall be compiled from the records of the Weld County Assessor, the Weld County Website, www.co.weld.co.us, or a person qualified to do the task, and shall be current as of a date no more than thirty days prior to the date the application is submitted to the Department of Planning Services. Statement indicating that the proposed PUD final plan is in compliance and meets all criteria as set forth in the change of zone. The statement should demonstrate a detailed description of the uses on site and demonstrate how the development guide has been followed and adhered to. Final Plan plat map in compliance with Section 27-9-20 the Weld County Code Landscape Plan in compliance with Section 27-9-30 of the Weld County Code Utility map in compliance with Section 27-9-40 of the Weld County Code Any covenants, grants of easement, and restrictions imposed upon any land, buildings, and structures within the proposed PUD Road plans (a complete estimate of costs shall accompany the road plans) Application fee (see front page) Drainage Report Investigation fee, if required (see front page) The applicant shall submit 1 packet containing one original of all of the above for a 7 day completeness review. The packet shall be bound with either paper clips or binder clips (no substitutes). Applications bound in any other fashion may be returned to the applicant without review.

PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAT APPLICATION FOR PLANNING DEPARTMENT USE RECEIPT # /AMOUNT # _/$ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: PLANNER ASSIGNED: Parcel Number - - - - (12 digit number - found on Tax I.D. information, obtainable at the Weld County Assessor's Office, or www.co.weld.co.us) (Include all lots being included in the application area. If additional space is required, attach an additional sheet.) Legal Description, Section, Township North, Range West Property Address (If Applicable) Existing Zone District: _ Proposed Zone District: _Total Acreage: Proposed #/Lots Average Lot Size: Minimum Lot Size: Proposed Subdivision Name: Proposed Area (Acres) Open Space: Are you applying for Conceptual or Specific Guide? Conceptual Specific FEE OWNER(S) OF THE PROPERTY (If additional space is required, attach an additional sheet) Name: Work Phone # Home Phone # Email Address Address: City/State/Zip Code APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: Work Phone # Home Phone # Email Address Address: City/State/Zip Code UTILITIES: Water: _ Sewer: _ Gas: _ Electric: Phone: _ DISTRICTS: School: _ Post: _ I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating the signatory has the legal authority to sign for the corporation. I (we), the undersigned, hereby request the Department of Planning Services to review this PUD Final Plat or request hearings before the Weld County Planning Commission and the Board of County Commissioners concerning the PUD Final Plat for the above described unincorporated area of Weld County, Colorado: Signature: Owner or Authorized Agent Date Signature: Owner or Authorized Agent Date

Colorado Geological Survey Application/Fees All Plans submitted for review shall be accompanied with a geology report containing information on the specific items herein. This report will be reviewed by agencies to evaluate the area being subdivided or developed. Five copies of this report shall be submitted to the Department of Planning Services, including all supporting documentation, including maps. The soils and geology report shall be prepared by a professional geologist, as defined by State statutes. The following concerns shall be fully addressed. If any of these items are addressed in other reports, refer to these reports appropriately. It is recognized that certain geologic interpretations cannot be firm or complete, at least in advance of grading operations, but it is expected that all pertinent data will be presented fully and clearly, so that interpretations and recommendations can be critically reviewed by others. 1. Mapping A detailed large-scale map normally will be required for a report on a tract, as well as for a report on a smaller area which the geologic relationships are not simple. Where three-dimensional relationships are significant but cannot be described satisfactorily in words alone, the report should be accompanied by one or more appropriately positioned structure sections. The locations of test holes and specific sources of subsurface information should be indicated in the text of the report, or better, on the map and any sections that are submitted with the report. 2. General information Each report should include definite statements concerning the following matters: A. Location and size of the subject area and its general setting with respect to major geographic and geologic features. B. Who did the geologic mapping upon which the report is based and when was the mapping done. C. Any other kinds of investigations made by the geologist and where pertinent, reasons for doing such work. D. Topography and drainage in the subject area. E. Abundance, distribution and general nature of exposures of earth materials within the area. F. Nature and source of available subsurface information. Suitable explanations should provide any technical reviewer with the means for assessing the probable reliability of such data. (Subsurface relationships can be variously determined or inferred, for example, by projection of surface features from adjacent areas, by the use of test-hole logs, and by interpretation of geophysical data, and it is evident that different sources of such interpretation can differ markedly from one another in degree of detail and reliability according to the method used.) 3. Geologic Descriptions The report should contain brief but complete descriptions of all natural materials and structural features recognized or inferred within the subject area. Where interpretations are added to the recording of direct observations, the basis for such interpretations should be clearly stated. The following checklist may be useful as a general, though not necessarily complete, guide for descriptions: A. Bedrock (igneous, sedimentary, metamorphic types): 1) Identification as to rock type (e.g., granite, silty sandstone, etc.) 2) Relative age, and where possible, correlations with named formations 3) Distribution 4) Dimension features (e.g., thickness, outcrop breadth, vertical extent) 5) Physical characteristics (e.g., color, grain size, nature of stratification, foliation, or schistocity, hardness, coherence)

6) Special physical or chemical features (e.g., calcareous or siliceous cement, concretions, mineral deposits, alteration other than weathering) 7) Distribution and extent of weather zones; significant differences between fresh and weathered rock 8) Response to natural surface and near surface processes (e.g., raveling, gullying) B. Structural features, stratification, foliation, schistocity, folds, zones of contortion or crushing, joints, shear zones, faults, etc. 1) Occurrence and distribution 2) Dimensional characteristics 3) Orientation, and shifts in orientation 4) Relative ages (where pertinent) 5) Specific effects upon the bedrock (describe conditions of the planar surfaces) 6) Specific features of faults (e.g., zones of gorge and breccia, nature of offsets, timing of movements); are faults active in either the geologic sense or the historical sense C. Surficial (unconsolidated) deposits: artificial (man-made) fill, topsoil, stream-laid alluvium, beach sands and gravels, residual debris, lake and pond sediments, swamp accumulations, dune sands, marine and non-marine terrace deposits, talus accumulations, creep and slope wash materials, various kinds of slump and slide debris, etc. 1) Distribution, occurrence and relative age; relationships with existing topography 2) Identification of material as to general type 3) Dimensional characteristics (e.g., thickness, variation in thickness, shape) 4) Surface expression and correlation with features such as terraces, dunes, undrained depressions, anomalous protuberances 5) Physical or chemical features (e.g., moisture content, mineral deposits, content of expandable clay mineral, alteration, cracks and fissures, fractures) 6) Physical characteristics (e.g., color, grain size, hardness, compactness, coherence, cementation) 7) Distribution and extent of weathered zones; significant differences between fresh and weathered material 8) Response to natural surface and near-surface processes (e.g., raveling, gullying, mass movement) A. Drainage: surface water and groundwater 1) Distribution/occurrence (e.g., streams, ponds, swamps, springs, seeps, subsurface basins) 2) Relations to topography 3) Relations to geologic features (e.g., previous strata, fractures, faults) 4) Sources and permanence 5) Variations in amounts of water (e.g., intermittent spring and seeps, floods) 6) Evidence for earlier occurrence of water at localities now dry 7) Effect of water on the properties of the in-place materials E. Features of special significance (if not already included in the foregoing descriptions) 1) Features representing accelerated erosion (e.g., cliff reentrants, badlands, advancing gully heads) 2) Features indicating subsidence or settlement (e.g., fissures, scarplets, offset reference features, historic records and measurements) 3) Features indicating creep (e.g., fissures, scarplets, distinctive patterns of cracks and/or vegetation, topographic budges, displaced or tilted reference features, historic records and measurements) 4) Slump and slide masses in bedrock and/or surficial deposits; distribution, geometric characteristics, correlation with topographic and geologic features, age and rates of movement 5) Deposits related to recent floods (e.g., talus aprons, debris ridges, canyon-bottom trash) 6) Active faults and their recent effects upon topography and drainage 4. Mineral Resources Types, location and value of mineral resources within the land to be subdivided. These include, but are not limited to, limestone used for construction, coal, sand, gravel, and quarry aggregate, for which extraction by an

extractor is or will be commercially feasible, or which is a deposit having significant economic or strategic value to the county, state or nation. Any area known to contain a commercial mineral deposit shall not be subdivided until such deposit is extracted, unless the Board of County Commissioners finds that extraordinary environmental damage or public hazard results from such extraction. 5. The Bearing of Geologic Factors upon the Intended Land Use Treatment of this general topic, whether presented as a separate section or integrated in some manner with the geologic descriptions, normally constitutes the principle contribution of the report. It involves both the effects of geologic features upon the proposed grading, construction, and land use; and the effects of these proposed modifications upon future geological processes in the area. The following checklist includes the topics that ordinarily should be considered in submitting discussion, conclusions, and recommendations in the geologic reports: A. General compatibility of natural features with proposed land use: Is it basically reasonable to develop the subject area? 1) Topography 2) Lateral stability of earth materials 3) Problems of flood inundation, erosion, and deposition 4) Problems caused by features or conditions in adjacent properties 5) Other general problems B. Special recommendations 1) Areas to be left as natural ground 2) Removal or buttressing of existing slide masses 3) Flood protection 4) Problems of groundwater circulation 5) Position of structures, with respect to active faults PERFORMANCE REPORT GUIDELINES (Individual Sewage Disposal Systems (ISDS), if applicable) 1. A report conforming to the following standards for lots between one acre to five acres, where individual sewer systems are proposed, shall be submitted in addition to the Performance Report Guidelines for Geology and Soils Report. The report shall be prepared by a registered professional engineer licensed to practice in Colorado. A map drawn at the same scale as the preliminary plan locating all lots, drainage-ways, flood plains, slopes in excess of thirty percent, surface and subsurface soils hazards, geologic hazards, depth to bedrock, water table depth and other hazards. 2. The report shall address the following: A. Percolation tests shall be conducted for no fewer that twenty percent of the total number of lots in the filing. In cases in which unique geologic, topographic, or soils conditions, such as: depth to bedrock, depth to water. Slopes in excess of ten percent, etc. are found, additional tests may be required by the appropriate review agency. B. All locations not suited for placement of leach fields due to soils, geologic, topographic, or hazard conditions shall be noted on the plan. The Change of Zone plan shall be designed as to insure that each lot has a minimum of two sites appropriate for individual sewage disposal systems (ISDS) which do not fall in the restricted zones noted on the plan. C. Relationship of the leach fields to leach fields, wells, and structures, lakes, streams, irrigation systems, and other water forms on adjoining parcels and identification of any possible hazards. Such identification shall be based on an analysis of the probable effects of water on the soils, geology and hydrology of the area. D. The availability of a central sewage system and the feasibility of inclusion into such systems. In the event a community sewer system collection line is constructed within four hundred (400) feet of the PUD, the lot shall abandon their septic system and obtain service from that community system. All Sketch Plan applications will be submitted to the Colorado Geological Survey for review along with the required geologic maps and investigation reports. The following fee shall be collected by the Department of Planning Services at

the time the Sketch Plan is submitted. As the fee will be forwarded, please make checks payable to the Colorado Geological Survey. Colorado Geological Survey Application Fees: All Sketch Plan applications will be submitted to the Colorado Geological Survey for review along with the required geologic maps and investigation reports. The following fee shall be collected by the Department of Planning Services at the time the Sketch Plan is submitted. As the fee will be forwarded, please make checks payable to the Colorado Geological Survey. Very Small Residential Subdivisions: 1-3 dwellings and <100 acres. Cost = $600.00 Small Subdivision Review: Subdivisions with >3 dwellings and <100 acres. Cost = $950.00 Large Subdivision Reviews: Subdivisions with >100 acres and <500 acres. Cost = $1550.00 Very Large Subdivision Review: Five hundred acres or more. Cost =$2500.00 For more information, please contact the Colorado Geological Survey Division of Minerals and Geology, 1313 Sherman St, Rm 715, Denver, Co. 80203 (303) 866-2611.

AFFIDAVIT OF INTEREST OWNERS SURFACE ESTATE Property Legal Description: Parcel Number - - - - (12 digit number - found on Tax I.D. information, obtainable at the Weld County Assessor's Office, or www.co.weld.co.us) (Include all lots being included in the application area. If additional space is required, attach an additional sheet.) THE UNDERSIGNED, being first duly sworn, states that to the best of his or her knowledge the attached list is a true and accurate list of the names, addresses, and the corresponding Parcel Identification Number assigned by the Weld County Assessor of the owners of property (the surface estate) within five hundred feet of the property being considered. This list was compiled from the records of the Weld County Assessor, or a person qualified to do the task, and shall be current as of a date no more than thirty days prior to the date the application is submitted to the Department of Planning Services. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating the signatory has the legal authority to sign for the corporation. I (We) hereby depose and state under the penalties of perjury that all statements, proposals and/or plans submitted with or contained within the application are true and correct to the best of my (our) knowledge. Signature Date Signature Date Signature Date

APPLICATION ASSISTANCE AND OFFICE LOCATIONS Weld County Planning and Zoning Department of Planning Services 1555 N 17 th Ave Greeley CO 80631 (970) 353-6100 x3540 Web link www.co.weld.co.us/departments/planningzoning Weld County Public Roads Weld County Department of Public Works 1111 H St Greeley CO 80631 (970) 356-4000 x3750 Web link www.co.weld.co.us/departments/publicworks Weld County Building Inspection Department of Planning 1555 N 17 th Ave Greeley CO 80631 (970) 353-6100 x3540 Web link www.co.weld.co.us/departments/planningzoning Water Wells Division of Water Resources 1313 Sherman St Rm 818 Denver CO 80203 (303) 866-3581 Division of Water Resources 810 Ninth St 2 nd Floor Greeley CO 80631 (970) 352-8712 Web link - www.water.state.co.us. Geological Colorado Geological Survey Division of Minerals and Geology 1313 Sherman St Rm 715 Denver CO 80203 (303) 866-2611 Colorado Highways Colorado Dept. of Transportation 1420 Second St Greeley CO 80631 (970) 353-1232 Web link www.coloradodot.info/ Weld County Septic Permits Department of Public Health and Environment 1555 N 17th Ave Greeley CO 80631 (970) 304-6415 Web link www.co.weld.co.us/departments/healthenvironment Soil Conservation Districts Big Thompson (Fort Collins) - 970-493-1638 Boulder Valley (Longmont) - x3 Fort Collins - 970-221-0611 Morgan - 970-867-9659 x3 Platte Valley (Brighton) - 303-857-6721 Southeast Weld (Brighton) - 303-659-7004 x101 West Adams (Brighton) - 303-659-2080 West Greeley - 970-356-8097 x3 Web link www.cacd.us Web link - www.geosurvey.state.co.us.

DRAINAGE REPORT REVIEW CHECKLIST Project Name: The purpose of this checklist is to provide the applicant s Engineer a basic list of items that County Staff will review in regards to a drainage report. The drainage design shall meet the requirements of the Weld County Code and commonly accepted engineering practices and methodologies. A detention pond design (or other stormwater mitigation design) is appropriate for projects which have a potential to adversely affect downstream neighbors and public rights-of-way from changes in stormwater runoff as a result of the development project. The design engineer s role is to ensure adjacent property owners are not adversely affected by stormwater runoff created by development of the applicant s property. REPORT ( = complete, = required) Stamped by PE, scanned electronic PDF acceptable Certification of Compliance Variance request, if applicable Description/Scope of Work Number of acres for the site Methodologies used for drainage report & analysis Design Parameters Design storm Release rate URBANIZING or NON-URBANIZING Overall post construction site imperviousness Soils types Discuss how the offsite drainage is being routed Conclusion statement must also include the following: Indicate that the historical flow patterns and run-off amounts will be maintained in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off for the 100-year storm. How the project impacts are mitigated. Construction Drawings Drawings stamped by PE, (scanned electronic PDF preferred) Drainage facilities Outlet details Spillway Maintenance Plan Frequency of onsite inspections Repairs, if needed Cleaning of sediment and debris from drainage facilities Vegetation maintenance Include manufacturer maintenance specifications, if applicable Comments: 4/27/2016 Weld County Colorado Department of Planning Services Development Review 1555 N. 17 th Avenue, Greeley, CO 80631 Ph: 970-353-6100 Fax: 970-304-6498 www.co.weld.co.us/departments/planningzoning