PARK COUNTY DEVELOPMENT PERMIT APPLICATION

Similar documents
TOWN OF FAIRPLAY BUILDING PERMIT APPLICATION FOR NEW CONSTRUCTION, ADDITIONS, AND REMODELS

Retail and Medical Marijuana Facility License Application

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

MANUFACTURED HOME SUBMITTAL REQUIREMENTS

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

BUILDING PERMIT APPLICATION

APPLICATION FOR PLAN EXAMINATION / BUILDING PERMIT or ZONING PERMIT

G R O W T H M A N A G E M E N T D E P A R T M E N T DEMOLITION PERMIT APPLICATION

BUILDING PERMIT APPLICATION

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

Remember, PA One-Call before excavating. Simply dial 811 or

Septic Tank / Drainfield / Holding Tank Permit Application

Huntington Building Inspection

FOR OFFICE USE ONLY Date Submitted Received By Fees Paid $ Receipt No. Received By Application No. Application Complete Final Action Date

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

STEP 1: SOIL EVALUATION

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

CITY OF PANAMA CITY BEACH Building and Planning Department

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

Note to the Owner, Applicant & Agent:

Application for a Building/Zoning Permit

REQUIREMENTS FOR RESIDENTIAL PLAN REVIEW New Constructions, additions and remodel

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

Sheds, Fences, Decks (All Permitted Structures Except New and/or Expansion of Principal Buildings )

City of Desert Hot Springs Planning Department

City of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

NELSON TOWNSHIP APPLICATION FOR BUILDING PERMIT

City of Umatilla 1 South Central Avenue P.O. Box 2286 Umatilla, FL Phone (352) FAX (352) DEMOLITION PERMIT APPLICATION

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

Zoning Permit Application

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Septic Tank / Drainfield / Holding Tank Permit Application

LOT SUBDIVISION LOT BLOCK SIZE

TOWN OF WATERVILLE VALLEY OFFICE OF THE BUILDING INSPECTOR APPLICATION FOR BUILDING PERMIT INFORMATION FOR BUILDING PERMIT APPLICANTS

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

~ Please Detach and Save This Page ~

Chelan County Department of Community Development 316 Washington Street, Suite 301, Wenatchee, WA Telephone: (509) Fax: (509)

Demolition Permit Application Check List. Notice: Please review and follow the check list to avoid any delays in the permit process.

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

SWIMMING POOL GUIDELINES

INTRUCTIONS FOR BUILDING/USE PERMIT APPLICATION All applicable sections of this packet must be completed.

APPENDIX E FORMS INDEX OF ZONING FORMS

CITY OF BELLE GLADE. 110 Dr. Martin Luther King Jr. Blvd., West Belle Glade, FL Telephone (561) Fax (561)

Application is hereby made to: a structure or land located at Repair at a cost of $ for: Extend Remove. Other Use Occupy

APPLICATION FOR FINAL PLAT APPROVAL (Major Subdivision)

MARIJUANA FACILITY CONDITIONAL USE PERMIT APPLICATION File No.

PRELIMINARY PLAT Checklist

SHORT PLAT Information

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

SPECIAL USE PERMIT FOR TEMPORARY DEPENDENT HOUSING

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

OSSF Permit Application

Greenbrier County Building Code Administrative Policy Manual

RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

TOWN OF ROXBURY INSTRUCTIONS FOR FILING A BUILDING PERMIT. Phone/Fax/Message(607) Phone/Fax (607) REVISED 6/2/17

APPLICATION TO CONSTRUCT A DOCK

City of Williston Building Department

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

APPLICATION FOR CLEARANCE OF SHORELINE VEGETATION AND

4. Building plans should include top of foundation elevation

ADMINISTRATIVE PERMIT FOR TEMPORARY MOBILE HOME APPLICATION

PRE CONSTRUCTION CHECK LIST FOR BUILDING PERMITS

Chelan County Department of Community Development 316 Washington Street, Suite 301, Wenatchee, WA Telephone: (509) Fax: (509)

REQUEST FOR SPECIAL EXCEPTION FOR MANUFACTURED HOMES IN THE AR-1 & R-5 DISTRICT APPLICATION NO.

Complete applications are due by 2:00 p.m. on the submission cut-off date.

Dallas Sloan General Manager Barron Area Phone: (715) Toll Free: Fax: (715) NEW SERVICE PROCESS

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

PERMIT FEES Within the shore impact zone (Includes Rip-Rap and Sand Blankets) $ Over 51 cubic yards $100.00

Commercial Requirements Packet Sheridan, Indiana Hamilton County

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

TOWN OF FREEDOM FREEDOM, NH ZONING-BUILDING PACKET

Date Received: Permit #:

Boundary Line Adjustments and Lot Line Vacations Minor Subdivision Application Packet

RESIDENTIAL SINGLE FAMILY DETACHED & ATTACHED BUILDING PERMIT APPLICATION SUBMISSION PROCEDURES

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

Short-Term Rental Licensing Guide

APPLICATION FOR BUILDING PERMIT

EL DORADO COUNTY BUILDING SERVICES

Zoning/Building Permit Application

INFORMATION REQUIRED FOR OBTAINING A BUILDING PERMIT

BUILDING LOCATION PERMIT APPLICATION

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

TOWN OF OSSIPEE ZONING BOARD OF ADJUSTMENT REQUEST FOR VARIANCE

PRELIMINARY PLAT APPLICATION INFORMATION

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950, 209 SEMINARY STREET, KENANSVILLE, NC (910) FAX: (910)

Review Fee Receipt No. Total Amount Rec d Credit Card Authorization FLORIDA BUILDING AND ACCESSIBILITY CODE, 2010 EDITION APPLIES

WEST COCALICO TOWNSHIP P.O. Box 244 Reinholds, PA (717) ZONING/BUILDING PERMIT APPLICATIONS INFORMATION & PROCEDURES

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

Transcription:

1246 County Road 16 P.O. Box 517, Fairplay, CO 80440 Office: 719-836-4255 Fax: 719-836-4268 Inspection Line: 719-836-4257 www.parkco.us PARK COUNTY Schedule No: Project Address: Legal Description: Metes & Bounds: Township Section Range OR Subdivision: Lot: Block: Filing: Unit: Name For septic and building permits, have you contacted your HOA for project approval? q Yes q No Property Acreage: Applicant/Contractor Property Elevation: State Installer ID #: (if applicable) Name: Park County License #: Mailing Address: City: State: Zip Code: Home/Cell Phone: Other Phone: Fax Number: Email Address: Property Owner Same as Applicant (proceed to next section) OR Name: Mailing Address: City: State: Zip Code: Phone Number: Email Address:

Permit Application Type (check all that apply): Required Information (see Fee following pages for Sections) Request for Address Plot plan showing preliminary $0 driveway location Site Evaluation Section A $150 Driveway Section A $150 Septic System Registration Section A, B; NAWT-certified $100 inspection Septic System Mod/Repair Section A, B System - $300 Field only - $150 Tank only - $100 Septic System - New Section A, B Residential - $500 + $23 Commercial - $700 + $23 Septic System Transfer of Title Section A, B; NAWT-certified $50 inspection Residence Site-Built Residence HUD Residence Modular Addition Remodel Section A (if not on file), B, C Basement Finish Section A (if not on file), B, C Deck Scope-based Roof/Cover Accessory Structure Type: Commercial Structure Type: Demolition Section A, C $100 Excavation Section A, C $100 Foundation $200 Other: Scope-dependent Scope-based The applicant is responsible for the accuracy and completeness of all information submitted in this application. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or 2

not. The granting of a permit does not presume to give the authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. New structures shall not be used, occupied, or furnished (in part or in whole) prior to final inspection and issuance of a Certificate of Occupancy by a building official. Doing so is a violation of the Building Code and may cause delays in the completion of the project. I acknowledge that some roads in Park County are not maintained by the County. It is my/our responsibility to contact Public Works for information regarding maintenance conducted by the County on my road and in my area. I understand that development of my property does not obligate the County to any maintenance responsibility. In order to receive a Certificate of Occupancy for your structure, your septic system file must be finalized and closed with the Environmental Health Department. It is the RESPONSIBILITY OF THE PROPERTY OWNER to make sure all documents have been submitted to the Environmental Health Department for permit closure, including the well permit and well log, final engineer s letter, and an as-built diagram of the existing septic system. / / Applicant/General Contractor Name (please print) Signature Date / / Property Owner s Name (please print) Signature Date / / Additional Property Owner s Name (please print) Signature Date 3

A. PLANNING & ZONING APPROVAL Provide a plot plan including the following. 1. A plot plan, sketched on a recorded plat for properties in subdivisions, OR, a survey plat for properties in metes and bounds, showing: a. The location of all existing and proposed structures (with dimensions including the height, length, square footage). b. Distance between all existing and proposed structures. c. The location of the driveway, roads, streets, right-of-ways, access easements, all parking spaces, including ADA parking, if the project is for commercial purposes and appropriate signage. d. Location of the septic tank and leach field. e. Any watercourses or wetlands (may be shown on USGS topo maps, the National Wetlands Inventory (www.fws.gov/wetlands/data/mapper.html), and Army Corps of Engineers information). f. Overhead utility lines (applicable to small wind energy systems). g. All setback distances from each existing building(s), proposed building(s), septic tank, leach field, and well to all property lines (measured at 90 ). h. Property line dimensions i. The name of project, project address, a north arrow, and preparation date. 2. A recorded and current Warranty Deed showing the full legal description of the parcel. If the property owner is an entity other than a person(s), supporting documentation to verify who is permitted to sign for that entity will be required as well as a Certificate of Good Standing with the Secretary of State. 3. If there are multiple names on the current Warranty Deed demonstrating ownership other than in Joint Tenancy, all other owners on the deed must either sign this application or provide a notarized letter of authorization stating approval for the project. 4. If any of the following administrative processes has been performed, please attach a copy of the signed Compliance Report: a. Administrative Plat Amendment b. Boundary Line Adjustment c. Unlawful Parcel Exemption d. Lot Consolidation 5. If any of the following public processes has been performed, please attach a copy of the recorded Resolution: a. Conditional Use Permit b. Exemption from Subdivision c. Exemption for Illegal Parcels d. Rezoning e. Road Vacation f. Variance 6. If the application is for a Retail or Medical Marijuana Establishment, please attach a copy of the applicable State and County Licenses. 7. If a temporary construction dwelling is being occupied during construction, the property owner shall complete an Affidavit to Register and Occupy a Construction Dwelling as a Temporary Use. This document can be obtained from the Planning Department to be kept on file during construction. B. Individual Sewage Disposal System (ISDS) Approval Please complete the following information for the Environmental Health Department approval of your project. New system engineered design attached Existing system Existing Number of Bedrooms: Additional Bedrooms being added: 4

BUILDING DEPARTMENT REVIEW To obtain a building permit, your submitted plans will be reviewed by the Building Department for compliance with 2012 International Building Code and other County regulations. Please be sure all of the following information is included, as omission of any item can delay the acceptance of your application. 1. If you are the property owner and are building the structure yourself, please provide the attached Homeowner Statement of Responsibility. 2. If you are the general contractor, a notarized Authorization from the Homeowner or signed construction contract is required for you to apply and receive the building permit. 3. Two sets of construction drawings to scale (i.e. 1/8 = 1 ft., ¼ = 1 ft., etc.) on a minimum paper size of 11 x17 showing: a. Address, wind load, snow load, live and dead loads, and clearly marked scale. Plans will not be accepted without this information. b. Foundation plan showing footing and foundation sizes, rebar size and locations, and foundation details. c. Floor plan showing size and use of areas, windows and window egresses, door locations and size, smoke and carbon monoxide detectors, stairways, and decks. d. Floor framing plan indicating the connections, lumber species, grade, size, spacing and span of all members including any deck framing. e. Roof framing plan indicating the connections, lumber species, grade, size, spacing, and span of all members. Roof trusses are an engineered product and as such, we require stamped engineered truss drawings to be submitted prior to or at the framing inspection. f. Typical wall section indicating the types of materials and method of construction from the footing to the roof covering, size of walls, and steel placement in stem/basement walls. g. Elevations showing all exterior views with construction details and grades of North, East, South, and West. h. Deck frame i. Door, window, and header schedule j. Any special construction details, etc. 4. If you are remodeling, renovating, or demolishing a structure, you must call the Colorado Department of Public Health & Environment (CDPHE) for an Asbestos Inspection and Report (303-692-3100). The asbestos inspector will inform the property owner about testing requirements and will require the property owner to send the inspection report to CDPHE verifying the inspection. CDPHE will notify the property owner if no regulated asbestos materials will be impacted during the planned renovation or if there will be abatement. This report must be submitted to the Building Department prior to permit issuance. 5. Platte Canyon Fire Department Mitigation Permit (if applicable) Contact Fire Department 303-838-5853. 6. Jefferson/Como Fire Protection District Fire Mitigation Survey Impact Fee (if applicable) 719-836-2082. 7. Hartsel Fire Protection District Impact Fee Receipt (if applicable) Contact Fire Department 719-836-3500. 8. Southern Park County Fire Protection District signs off on card required before final inspection. Contact Fire Department 719-689-9479. 9. Minimum of 50% of the permit fee. Narrative of Proposed Work: 5

Construction type: PARK COUNTY DEVELOPMENT SERVICES Frame Log Steel Post & Beam SIP ICF Masonry Other: State Plumbing Permit: q Yes q No State Electric Permit: q Yes q No Building Square Footage: Please only fill in the square footage for the proposed building project Main Floor sq. ft. Uncovered Deck sq. ft. Second Floor sq. ft. Covered Deck sq. ft. Rough Basement sq. ft. Accessory: sq. ft. Finish Basement sq. ft. Other: sq. ft. Type of Heat: LPG (propane) Natural Gas Stove (wood) Fireplace Electric Solar Other: To be completed by Building Department Staff only Date Plans Received: Date Plans Reviewed: Date Plans Approved: Occupancy: Group: Division: q Effluent Filter Required q Septic File Closed q HOA Approval Revision #1 Received: Revision #1 Approved: Revision #2 Received: Revision #2 Approved: q Received Platte Canyon FPD Mitigation Permit q Received Hartsel Fire Impact Fee q Southern Park FPD sign off on inspection card q Received Jefferson/Como Fire Impact Fee Notes: 6

HOMEOWNER STATEMENT OF RESPONSIBILITY I understand that by signing this statement of responsibility, I, as the owner of the real property listed below, have assumed the responsibility of the General Contractor for the structure to be erected on the real property listed below. I also understand that as a Homeowner/Builder, I am required to have a working knowledge of the current building code and a working knowledge of what is expected when each inspection listed on the building inspection card is performed. I also understand that while acting as my own General Contractor that I must commence work within 180 days of permit issuance and have a scheduled inspection performed within every 180 days. I am also fully responsible for code compliance of any and all work done on the project. I certify that the home is not for sale or rent. PLEASE DO NOT CONTINUE COMPLETION OF THIS FORM IF YOU DO NOT UNDERSTAND THE ABOVE PARAGRAPH OR FEEL YOU ARE NOT QUALIFIED AS OUTLINED IN THE ABOVE PARAGRAPH. I,, being the owner of real property located at: Name and legally described as: Address Legal Description I am accepting all of the responsibilities of acting as my own General Contractor and I acknowledge that I have read and fully understand all of the terms of the HOMEOWNER STATEMENT OF RESPONSIBILITY section of the Park County Building Permit Application. I have applied for a building permit with the Park County Building Department to build: on said property. Type of Structure i.e.: Dwelling, Garage etc. Homeowner Signature Date 7

AUTHORIZATION FROM OWNER TO CONTRACTOR I/we, the undersigned grant the authority to act as REPRESENTATIVE/AGENT My/our representative/agent to submit and pick up documents related to any Development Permits: Legal description Address Signature of Owner/Contractor Signature of Owner/Contractor STATE OF COUNTY OF Acknowledged before me this day of By Witness my hand and seal. My Commission expires: Notary Public NOTE: Building Contractors are required to be licensed in Park County (Resolution 2003-78) 8