Fee Schedule Last Updated: November 21, 2017

Similar documents
MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

2018 FEE SCHEDULE. Chapter 8 Animals, Article ll Dog License Dog at Large $75.00

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

City of East Bethel 2019 Fee Schedule

2018 Fee Schedule Effective January 1, 2018

2018 FEE SCHEDULE. Assessment Searches...$30.00 per tax parcel. Building Permits... see 1997 Uniform Building Code

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

City of Tonka Bay 2018 Fee Schedule Type of Charge Fee Defined per City Ordinance

Appendix G Fee Schedule

CITY OF ROSEVILLE ORDINANCE NO AN ORDINANCE AMENDING CHAPTER , FEE SCHEDULE ADOPTING THE 2019 FEE SCHEDULE

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

CITY OF SPRING LAKE PARK 2018 FEE SCHEDULE

City of Arden Hills Ordinance Appendix A Amended 2018 Fee Schedule

5755 Country Club Road * Shorewood, MN * / City of Shorewood MASTER FEE SCHEDULE

APPENDIX A 2018 FEE SCHEDULE

ORDINANCE NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COMMERCE, TEXAS, THAT:

CITY OF BEL AIRE Schedule of Service, License and Permit Fees 2016

VILLAGE OF ALLOUEZ SCHEDULE OF FEES AND CHARGES

Utility Charges Assessment Administrative Fee (only if assessed to taxes)

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

ORDINANCE NO (revised by Ordinance )

2018 FEE SCHEDULE Exhibit A PLANNING COMMISSION. Land Use Fee Schedule Land Use Application and Hearing Fees. $250 + recording fee.

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

2018 Fee Schedule DESCRIPTION. As of January 1, 2018 BUILDING DEPARTMENT

Belle Plaine City Code Chapter 1, Section 108 Fee Schedule Page 1

CHAPTER 1321 Permit and Inspection Fees

APPENDIX A BUILDING PERMIT AND RELATED FEES

Community Development Fees (as of March 2015)

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

ORDINANCE NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COMMERCE, TEXAS, THAT:

MASTER FEE SCHEDULE Amended June 12, 2018

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

The City of Daytona Beach Fee Schedule

Fee Resolution

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

VILLAGE OF SHOREWOOD HILLS FEE SCHEDULE

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

City of. Approved by the Apple Valley City Council at its December 14, 2017, meeting. Fees are effective January 1, 2018.

10% of Building Permit in addition to the full Building Permit Fee

CITY OF FALCON HEIGHTS 2019 Fee Schedule

Administrative Services Department

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

Building Permit Fees below include $30 Zoning Filing fee and $4 State Education and Training fee, unless noted otherwise.

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

City of Wausau Building, Housing and Zoning Fee Schedule 2019

CITY OF FORT CALHOUN LOCAL FEES SCHEDULE

Village of Kenilworth 2018 Annual Fee Schedule

BOROUGH OF BRIDGEPORT FEE SCHEDULE 2018

THE TOWN OF Angier N O R T H C A R O L I N A

City of Mayville 2018 Schedule of Fees

APPENDIX B - SCHEDULE OF FEES * Code Section CHAPTER 6 ADVERTISING. Description

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

CONSTRUCTION PERMIT FEE SUMMARY

City of High Point Development Fee Schedule

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

TOWN OF PERINTON FEE SCHEDULE 2019 DEPARTMENT OF PUBLIC WORKS PERMIT & INSPECTION FEES. $60 per inspection / $150 per re-inspection

City of Medina Fee Schedule Effective January 1, 2015 Administration

Town Code Section Department Fee Type Parking Permits (pro-rated fees)

FY 2018 FEE SCHEDULE (Effective )

EXHIBIT A to Ordinance No PART 1

Appendix B PENALTY, SALARY, BONDS and FEES

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

KODIAK ISLAND BOROUGH, ALASKA FEE SCHEDULE Effective: August 3, 2017

City of Hobart Municipal Code Fee Schedule Page 1

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

Building Division Fee Schedule January 2018

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

City of Lake Dallas Master Fee Schedule Fiscal Year 2017

BUI L DIN G A ND E L E V A T O R F E ES

CITY OF BLUE SPRINGS COMPREHENSIVE FEES AND CHARGES SCHEDULE

2 Janesville - Index

Planning&Development Fee Standards

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

Proposed City of Harris 2016 Fee Schedule

1. Permit Fees for new single family dwellings, duplexes, and multifamily dwellings with eight units or less are as follows:

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

City of Ridgefield, WA Master Fee Schedule Effective Date: February 24, 2017

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

Location in Code Subject Fees

2019 Orono Fee Schedule Table of Contents A. Planning, Building, and

$10.00/dog for the duration of rabies certification. $ annual, $1.00/billable transaction, bond $200.00/7 day week Group Peddler $200.

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

City of Lake Dallas Master Fee Schedule Fiscal Year 2019 Fee Fee Amount Code Reference

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Community Development Fees Revised October 2018

DEPARTMENT OF BUILDING AND SAFETY

THE EVESHAM MUNICIPAL UTILITIES AUTHORITY RATE SCHEDULE

Town of Walworth Fee Schedule 2019

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Transcription:

Fee Schedule Last Updated: November 21, 2017

Table of Contents DEVELOPER S DEPOSITS... Page 5 Appeal Architectural Review Conditional Use Permit Grading/Excavation Planned Unit Development PUD Amendment Rezoning Rezoning to PUD Concept Review Subdivision Text Amendment Vacation Variance GENERAL CONSTRUCTION... Pages 6-11 Building (includes decks, fire sprinkler systems, garages, homes, windows, demolition, etc.) Electrical Work Filling/Grading Permits Mechanical Permits Miscellaneous Permits Plumbing Permits LICENSES... Pages 12-13 Adult Use Amusement Devices Amusement Parks Animal Day Care/Kennel License Bingo Hall Contractors Deer Hunting Dog Licenses Entertainment Fireworks Gasoline Filling Stations Gambling (Temporary) Handicap Accessibility & Mobility Vehicle Sales with Accessory Outdoor Storage Liquor Licenses Massage Therapy Business Massage Therapy Individual Motor Vehicle Repair Fee Schedule Page 2 of 17

Motor Vehicle Sales Outdoor Storage Parades/Public Assembly Pawn Shops Pet Therapy Refuse Collection Rental Housing Saunas Solicitors & Peddlers Tattoo Parlor Temporary Outdoor Sales/Displays Tobacco Wagon Vendors MISCELLANEOUS FEES... Pages 14-15 Assessment Searches Business List Copies/Fax Machine Use, Scan/Email Pages Day Care Inspection False Burglar Alarms False Fire Alarms Filing Fee for Public Office Flags History Book A Voyageur s Vision History Calendar (1984) History Notecards History Video Lapel Pins Municipal Code Book NSF Checks Notary Public Park Charge Commercial Park Charge Residential Rental Fees Old Fire Hall Rental Fees Park Shelters Resident List DVD & Tape Dubs Zoning Code Book Zoning Letter Zoning & Other Maps PUBLIC WORKS... Pages 16 Hydrant Meter Permits Right-of-Way Permits Fee Schedule Page 3 of 17

UTILITIES... Page 17 Lawn Sprinkler Water Rate Sewer Rate Water Rate Water Service Charge Trash & Recycling Rates Fee Schedule Page 4 of 17

Development Fees Each separate land use request shall be charged a separate fee even if submitted on the same application. In addition to the application fee, all planning cases are evaluated on a project-by-project basis and subject to additional charges to cover any consulting or additional costs the City may incur. For applications that involve excessive staff time, services performed by city staff will be billed at actual payroll costs including hourly rates, payroll taxes and benefit charges. Appeal $250 Architectural Review $500 Comprehensive Plan Amendment $750 Conditional Use Permit $350 Single-family $500 All Others Conditional Use Permit Amendment $350 Grading/Excavation $300 Deposit required if extensive engineering review is necessary. Interim Use Permit Interim Use Permit Amendment or Renewal $500 $350 Planned Unit Development $900 PUD Amendment $500 Rezoning $500 Rezoning to PUD $750 Concept Review $1,000 Subdivision $350 Subdivision or lot line adjustment - 3 or less lots $1,500 Subdivision or Plat (4 or more lots) Text Amendment $400 Vacation $200 Variance $350 Single & Two Family $500 All Others Fee Schedule Page 5 of 17

General Construction BUILDING PERMIT FEES Value Range Fee $1 - $500 $25.00 $501 - $2,000 $25.00 for the first $500 plus $3.25 for each additional $100, or fraction thereof, to and including $2,000 $2,001 - $25,000 $73.75 for the first $2,000 plus $14.75 for each additional $1,000, or fraction thereof, to and including $25,000 $25,001 - $50,000 $413 for the first $25,000 plus $10.75 for each additional $1,000, or fraction thereof, to and including $50,000 $50,001 - $100,000 $681.75 for the first $50,000 plus $7.50 for each additional $1,000, or fraction thereof, to and including $100,000 $100,001 - $500,000 $1,056.75 for the first $100,000 plus $6 for each additional $1,000, or fraction thereof, to and including $500,000 $500,001 - $1,000,000 $3,456.75 for the first $500,000 plus $5 for each additional $1,000, or fraction thereof, to and including $1,000,000 $1,000,001 and up $5,956.75 for the first $1,000,000 plus $4 for each additional $1,000 Plan Check Fee Up to 65% of the calculated permit fee State Surcharge.0005 x the value of the job (minimum surcharge is 50 ) Plan review fees for similar building plans = 25% of normal building permit fee. Work commencing before permit issuance = 100% of normal building permit fee. Fee refunds upon written application not more than 80% of building permit fee and 80% of plan review fee when plans are withdrawn or cancelled before review is done. Inspections outside of normal business hours = $50.50 per hour (minimum of two hours). Sod escrow (if turf is not established at time of occupancy) = $2,000.00 Demolition Fee based on valuation. Contact MN Pollution Control and Ramsey County Environmental Health ten (10) days prior to actual demolition. Fee Schedule Page 6 of 17

General Construction (cont.) ELECTRICAL PERMIT FEES All Services Circuits and Feeders 0 300 amp $50 0 30 amp $8 400 amp $58 31 100 amp $10 500 amp $72 101 200 amp $15 600 amp $86 300 amp $20 800 amp $114 400 amp $25 1000 amp $142 500 amp $30 1100 amp $156 600 amp $35 1200 amp $170 700 amp $40 Add $14 for each additional 100 amps Add $5 for each additional 100 amps Minimum Fee: Minimum permit fee is $40 plus $5.00 state surcharge. This is for one inspection only. Minimum fee for rough-in inspection and final is $80 plus $1.00 state surcharge. Maximum Fee: Maximum fee for single family dwelling not over 200 amps is $175 plus $1.00 state surcharge. Maximum of 3 inspections. Apartment Buildings: Maximum fee per unit of an apartment or condominium complex is $70. This does not cover service, unit feeders, or house panels. A separate permit must be issued for house wiring. Swimming Pools: $80 + circuits (Includes 2 inspections) Additions, Remodels, or Basement Finishes $80 (Includes 10 circuits and 2 inspections) Accessory Structures $50 for panel plus $8 per circuit OR $80 for 2 inspections Traffic Signals: $7 per each standard Street Lighting & Parking Lot Lights: $4 per each standard Transformers/Generators: $10 up to 10 KVA, $40 11 KVA to 74 KVA, $60 75 KVA to 299 KVA, $150 over 299 KVA Retro Fit Lighting: $.65 per fixture Sign Transformer: $8 per transformer Remote Control/Signal Circuits: $.75 per device Re-inspection Fee: $40 State Surcharge $1.00 ** The fee is doubled if the work starts before the permit is issued. Fee Schedule Page 7 of 17

General Construction (cont.) FILLING/GRADING PERMIT FEES Please note: 100+ c.y. needs Council approval 50 c.y. or less $23.50 51-100 c.y. $37.00 101 1,000 c.y. $37.00 for the first 100 c.y. plus $17.50 for each additional 100 c.y. or fraction thereof. 1,001 10,000 c.y. $194.50 for the first 1,000 c.y. plus $14.50 for each additional 1,000 c.y. or fraction thereof. 10,001 100,000 c.y. $325.00 for the first 10,000 c.y. plus $66.00 for each additional 10,000 c.y. or fraction thereof. 100,001 c.y. $919.00 for the first 100,000 c.y. plus $36.50 for each additional 10,000 c.y. or fraction thereof. Inspections outside of normal business hours $50.50 per hour (minimum of 2 hours)* Reinspection fees assessed under provisions $50.50 per hour* of Section 108.8 Inspections for which no fee is specifically $50.50 per hour (minimum of ½ hour)* indicated State Surcharge $1.00 *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Fee Schedule Page 8 of 17

General Construction (cont.) MECHANICAL PERMIT FEES Commercial Base Fee $50.00 (charged in addition to the permit fee) Permit Fee Project value* x 1.25% State Surcharge Project value* x.0005 with minimum charge of 50 Residential Minimum Fee $25.00 Furnace $75.00 New $50.00 Replacement $25.00 Unit heaters Air Conditioning & Refrigeration $45.00 New $25.00 Replacement Air Exchanger w/ Duct Work $35.00 Gas Fireplace $35.00 per unit Mobile Home Connection $35.00 Radiant Floor Heat $35.00 Duct Work $30.00 Gas Line $25.00 Gas Direct Vent Heater $25.00 per unit Gas or Oil Space Heater $25.00 per unit Furnace (wood burning) $30.00 per unit Replacement of Water Heater $30.00 Swimming Pool Heater $30.00 State Surcharge $1.00 *Project value means the actual or estimated dollar amount charged for permitted work including materials, labor, profit, and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor or installation are furnished by the owner, tenant, or any other party, the reasonable market value of such items must be added to the estimated cost or project value for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the city may request the submission of a signed copy of the actual contract. Fee Schedule Page 9 of 17

General Construction (cont.) MISCELLANEOUS PERMIT FEES Driveway Permit $25.00 (No State Surcharge) Fence Permit Fee is based on value see building permit fees above (No State Surcharge) Sign Permit (Permanent Sign) Fee is based on value see building permit fees above (No State Surcharge) Sign Permit (Temporary Sign) $2/day, $25 minimum & $50 maximum plus $200 deposit. Only good for 30 days and only four permits per property are allowed each year with a 120 day maximum. Only two non-banner signs allowed per year. There must also be 30 days in between each permit application for single tenants. (No State Surcharge) Fee Schedule Page 10 of 17

General Construction (cont.) PLUMBING PERMIT FEES Outside Sewer/Water Residential Water $25.00 Residential Sewer $25.00 Commercial Water $35.00 (4 line or larger) Commercial Sewer $35.00 (6 line or larger) MCES Interceptor System - $900.00 Metropolitan Council Direct Connection Application Fee (Pass-Through Cost) Sewer Availability Charge Local $260.00 per unit State Surcharge $1.00 Inside Plumbing Base Fee $25.00 (charged in addition to the other fees) Fixtures $8.00 each Water Turn-on $15.00 Water Turn-off $15.00 Water Meter Water Availability Charge Septic Pumping $5.00 Well Drilling $10.00 Replacement Spacer $20.00 Remove or Install Underground $25.00 Storage Tank State Surcharge $1.00 $362.00 ¾ for single family homes $425.00 1 for lawn sprinkler systems >1 Current price charged by supplier $300.00 (charged only for existing homes connecting to city water that haven t already been assessed this fee) Fee Schedule Page 11 of 17

Licenses Adult Use $10,000 Amusement Devices $15/base plus $15/device Amusement Parks $100 Bingo Hall $150 Contractors Excavating, General, HVAC, $50 Tree Removal Deer Hunting (Bow & Arrow) $50 Dogs $15/2 years if spayed or neutered $20/2 years Emergency Vehicle Sale/Storage Lot with $300 Ancillary Outfitting Services Fireworks $100 - permanent structure $350 temporary structure Gasoline Filling Stations $200/base plus $20/pump Gambling (Temporary) $35 Handicap Accessibility & Mobility Vehicle $300 Sales with Accessory Outdoor Storage Liquor Licenses $719 - On-Sale Wine $4,981 - On-Sale Intoxicating $1,000 - On-Sale Intoxicating (Billiard halls only) $200 - On-Sale Sunday $150 - On-Sale 3.2 $150 - Off-Sale 3.2 $310 - Off-Sale Liquor ($100 Reduction if in compliance with SS 340A.408 Subd. 3) ½ of State License Fee - 2 a.m. License $35 Temporary Liquor Massage Therapy Business $300 Principal Use $100 Accessory Use Massage Therapy Individual $75 Motor Vehicle Repair Major, Minor, or $300 Salvage Motor Vehicle Sales Wholesale, Retail, $300 Indoor Only, & Outdoor Outdoor Storage $50 $250 120 Day Temporary License (1 st ) $500 120 Day Temporary License (2 nd ) Parades/Public Assembly $10 Pawn Shops $500 Multiple Sales $8,000 Pawnbroker $300 Second Hand Goods Pet Therapy $10 Fee Schedule Page 12 of 17

Refuse Collection $150 Rental Housing License Condominium: $50/unit Multi-unit Building: $100/bldg. + $12/unit Single Family Home: $112/entire property or $100/shared living space Rental Housing Inspector s License $100 Saunas $10,000 Solicitors & Peddlers $50 Temporary Outdoor Sales/Displays $50 Tattoo Parlor $300 Tobacco $250 One Year License $125 Six Month License Wagon Vendors $50 Fee Schedule Page 13 of 17

Miscellaneous Fees Animal Day Care/Kennel License $100.00 Assessment Searches $10.00 Business List $15.00 For Profit Request Certification Fee $25.00 Copies/Fax Machine use, Scan/Email pages 25 per page Day Care, Foster Home, Group Home $50.00 Inspections False Burglar Alarms $50.00 3 to 6 $200.00 7 to 9 $500.00 Over 9 False Fire Alarms $250.00 3 to 6 $500.00 7 to 9 $1,000.00 Over 9 Filing Fee for Public Office $2.00 Flags $50.00 History Book A Voyageur s Vision $20.00 History Calendar (1984) $3.50 History Notecards $5.00 History Video ($5 extra for mailing) $15.00 Lapel Pins with City Logo $1.00 Municipal Code Book ($15 on disk) $35.00 NSF Checks $20.00 Notary $1.00 per signature Park Charge Residential $3,500.00 per unit 1 unit through 8 units $1,950.00 per unit 9 units or more Park Charge Commercial 10% Land or 7% FMV Rental Fees Old Fire Hall $350 deposit required Rental Fees Park Shelters $100 deposit for residents or $250 deposit for non-residents required Resident List $91 - Up to 4 Hours (Mon-Thur) $91 Up to 4 Hours (8am-6pm, F-Sun, Hol) $180 Up to 4 Hours (6pm-12am, F-Sun, Hol) $150 Over 4 Hours (M-Th) $180 Over 4 Hours (F-Sun & Holidays) Pioneer Park Desoto (Any Day) $50 resident or $90 non-resident Spooner Upper (Monday-Friday) $105 resident or $140 non-resident Spooner Upper (Saturday-Sunday & Holidays) $150 resident or $200 non-resident Spooner Lower (Any Day) $60 resident or $100 non-resident $15.00 For Profit Request Fee Schedule Page 14 of 17

DVD Dubs $15.00 Zoning Code Book ($15 on disk) $35.00 Zoning Letter $50.00 Zoning Maps & Laminated Maps $5.00 Fee Schedule Page 15 of 17

Public Works HYDRANT METER PERMIT FEES $500 deposit required until meter is returned. Commercial Use Meter Rental $50.00 per month Hydrant Wrench Rental $10.00 per month Fire Hose Rental $20 per use Water Usage Summer Water Rate per 1,000 gallons **Charge sales tax on total amount of this permit** Residential Use Meter Rental Water Usage $50 for first 30 days, additional $50 for more than 30 days Summer Water Rate per 1,000 gallons **Charge sales tax on total amount of this permit** RIGHT-OF-WAY PERMIT FEES Right-Of-Way Permit $200.00 State Surcharge No State Surcharge Fee Schedule Page 16 of 17

Utilities SEWER & WATER RATES Lawn Sprinkler Water Rate $3.41/1,000 gallons Sewer Rate Sewer Base Fee (included in minimum) $15.00 Commercial $3.80/1,000 gallons with a $43.64 minimum for the first 7,000 gallons. Multi-Family Residential (8 units +) $3.80/1,000 gallons with a $43.64 minimum for the first 7,000 gallons. Charged on a per dwelling unit basis. Residential $3.80/1,000 gallons with a $43.64 minimum for the first 7,000 gallons. Rate is based on first quarter usage. If water usage drops below first quarter water usage in subsequent quarters, the sewer rate will be adjusted to the lower rate, but never lower than the $43.64 minimum. The first quarter sewer rate is the ceiling for the year. Charged on a per dwelling unit basis. Sewer Only $50.00 Private Wells $55.00 On City System but no meter readings Water Rate $3.40/1,000 gallons (winter rate) $3.51/1,000 gallons (summer rate) Water Service Charge $13.50/Quarterly Water Meter Fixed-Network $12.00/Quarterly Technology Non- Compliance Surcharge Water Meter Fixed-Network $12.00/Quarterly Technology Opt-Out Fee TRASH & RECYCLING RATES 30 Gallon 60 Gallon 90 Gallon Up to 360 Gallons Disposal Fee $2.70 $4.24 $6.36 $8.48 ($58/ton) Collection Fee* $5.84 $6.24 $6.40 $6.40 Single Sort $6.38 $6.38 $6.38 $6.38 Recycling** Subtotal $14.92 $16.86 $19.14 $21.26 Fuel Surcharge N/A N/A N/A N/A Total Monthly Rate Before Taxes $14.92 $16.86 $19.14 $21.26 *Includes the collection of bulky items **$.75 retained by City for Recycling Services Fee Schedule Page 17 of 17