Oak Ridges Moraine Site Plan Manual: Information Package

Similar documents
Part Lot Control Exemption Manual: Submission Package

Committee of Adjustment Consent Application City of Mississauga 300 City Centre Drive Mississauga ON L5B 3C1

APPLICATION FOR SITE PLAN DEVELOPMENT WITHIN THE OAK RIDGES MORAINE

APPLICATION FOR SITE PLAN DEVELOPMENT FOR MULTIPLE RESIDENTIAL AND NON-RESIDENTIAL

Fasttrack Permit Service Permit Application Requirements - Decks

Complete applications are due by 2:00 p.m. on the submission cut-off date.

Sheds / Carports / Garages under 55m² or 592 ft²

APPLICATION FOR VARIANCE OR PERMISSION UNDER SECTION 45 OF THE PLANNING ACT

COMMITTEE OF ADJUSTMENT FOR THE TOWN OF INNISFIL. APPLICATION FOR MINOR VARIANCE Under Section 45 of the Planning Act

CONDOMINIUM APPLICATION GUIDE application for approval under Section 51 of the Planning Act, R.S.O. 1990

COMMITTEE OF ADJUSTMENT APPLICATION FOR CONSENT SUBMISSION CHECKLIST

Committee of Adjustment Agenda

PLANNING JUSTIFICATION REPORT

THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE

APPLICATION INSTRUCTION AND INFORMATION SHEET Minor Variance or Special Permission (Also see instructions on the application form)

With consent from the Committee, the Chair added New Business to future agendas.

That the Committee of Adjustment Minutes dated July 13, 2016, be received.

Office Consolidation. Tariff of Fees By-Law with Respect To Planning and Other Municipal Applications By-Law 85-96

Applicant: ELVIO AND VICKI DE MENEGHI. 8 Quail Run Boulevard, Maple

Committee of Adjustment Agenda

Public Meeting Information Report Development Approval and Planning Policy Department

Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities)

The Corporation of the Township of Oro-Medonte

APPLICATION FOR CONSENT TO SEVER AND CONVEY LANDS

instructions for consent application

Committee of Adjustment Public Hearing Wednesday, April 22, 2015 Council Chambers, City Hall - 5:00 p.m. Agenda

IMPORTANT NOTICE MINOR VARIANCE APPLICATION

September 26, 2012 PL Ontario Municipal Board Commission des affaires municipales de l Ontario

TEMPORARY USE PERMITS (TUP) A Guide to the Municipal Approvals Process in Chilliwack September 2014

Development Application Type

Consent Application Form

Dec. 16, 2008 Ontario Municipal Board Commission des affaires municipales de l Ontario

File: B001/17, B038/17 & B039/17. Applicant: DI POCE REAL ESTATE HOLDINGS LIMITED 9711 HUNTINGTON RD. KLEINBURG

Applicant: ONTARIO INC. JOE NUOSCI. MARK MCCONVILLE Humphries Planning Group Inc.

SANITARY BACKWATER VALVE REBATE APPLICATION. Applicant No. Date Received

4027 and 4031 Ellesmere Road Zoning Amendment and Draft Plan of Subdivision Applications - Request for Direction Report

1.0 General Information Municipal Address: Assessment Roll No. Concession: Registered Plan No.

Ontario Municipal Board Commission des affaires municipales de l Ontario

CONSENT APPLICATION FORM

Condominium Application Checklist

Committee of Adjustment CONSENT INFORMATION/GUIDELINE The following is preliminary information only

Permanent Sign Application

5, 7 and 9 Dale Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

RESIDENTIAL / DEVELOPMENT PROJECTS

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

RESIDENTIAL ACCESSORY BUILDINGS (Detached Garage, Gazebo, Shed serving a Single Detached, Semi-Detached, Duplex Dwellings and Row Houses)

Development Approvals

Statutory Public Meeting

Instructions for APPLICATION FOR CONSENT

Greenfield Development Requirements

EVALUATION REPORT PLANNING DEPARTMENT

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 5, 2009

A Guide to the Land Severance Process

FAQ CONSENT APPLICATION

Ward #2 File: B076/14, B077/14, A319/14 & A320/ Trade Valley Drive, Woodbridge. RYAN MINO-LEAHAN/ADAM GROSSI KLM Planning Partners Inc.

THE BUILDING PERMIT PROCESS FOR SINGLE-FAMILY DWELLINGS REVISED MAY 2006

The following information is required at submission. Complete submissions can be processed within 10 business days.

Committee of Adjustment Agenda

Development Approval & Planning Policy Department

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

Applicant: SOBEYS CAPITAL INCORPORATED Huntington Road, Woodbridge

Please read the entire application form prior to completing

3650 Langstaff Road, Woodbridge LISA DI CLEMENTE

COMMITTEE OF THE WHOLE PLANNING PUBLIC MEETING DECEMBER 19, That Report #PD be considered at the Public Meeting on December 19, 2018;

City of Kingston Report to Committee of Adjustment Report Number COA

DEMOLITION PERMIT APPLICATION & INFORMATION

1. That the Block 18 Phasing Plan (Attachment #4) BE APPROVED.

LOT AREA AND FRONTAGE

APPLICATION INSTRUCTION AND INFORMATION SHEET CONSENT APPLICATION (Also see Instructions on the application form)

Applicant: ALEXANDER AND SVETLANA BELINSKI. 71 Pondview Road, Thornhill.

Building Permit Requirements New / Enlarged Openings

County of Peterborough

2018 DEVELOPMENT APPLICATION FEES Effective January 1, 2018

DEVELOPMENT APPLICATION PRE-CONSULTATION FORM

The Town of Wasaga Beach Committee of Adjustment/Consent November 20, 2017

BUILT BOUNDARY CIP REDEVELOPMENT GRANT APPLICATION FORM

377 Poetry Drive, Woodbridge HUMPHRIES PLANNING GROUP INC. Condition of Approval Building Standards B020/14 A074/14 B020/14 B020/14

8 Lester B. Pearson Street, Kleinburg

Grey Sauble Conservation 2019 Fee Schedule for All Departments

Sign Permit Requirement Checklist

Subdivision/Condominium Approval Procedures

A Guide to the Municipal Planning Process in Saskatchewan

Applicant: ROYAL 7 DEVELOPMENTS LTD 2900 HIGHWAY 7 WEST, CONCORD. LUKA KOT Royal 7 Developments Inc.

Committee of Adjustment Hearing Thursday, September 1, 2016 at 7 p.m. 225 East Beaver Creek Road, Richmond Hill, ON 1 st Floor (Council Chambers)

Summary of Comments. B Queen Street West

Application for OFFICIAL PLAN AMENDMENT

Building Permit Requirements Back Flow Prevention Device

TOWNSHIP OF SOUTH FRONTENAC PLANNING DEPARTMENT. South Frontenac Municipal Offices, Sydenham

Staff Report for Council Public Meeting

4700 Highway 7, Woodbridge. ROSEMARIE HUMPHRIES Humphries Planning Group Inc.

Township of Georgian Bay (Name of municipality, upper-tier municipality, board of health or conservation authority)

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 30, 2009

APPLICATION INSTRUCTION AND INFORMATION SHEET Minor Variance or Special Permission (Also see instructions on the application form)

Planning Justification Report Addendum

21 Old Mill Road - Official Plan and Zoning Amendment Applications - Preliminary Report

59 Flatbush Avenue, Woodbridge. Richard Wngle Architect

THE CORPORATION OF THE TOWN OF GEORGINA IN THE REGIONAL MUNICIPALITY OF YORK COMMITTEE OF ADJUSTMENT

APPENDIX 2 PROCEDURES AND SUPPLEMENTARY INFORMATION

Committee of Adjustment Agenda

City Development Department Application for Site Plan Approval Instructions and Information. Completeness of the Application

Transcription:

Oak Ridges Moraine Site Plan Manual: Information March 2015

Table of Contents Introduction 1 Streams of Site Plan Approval 3 4 5 6 7 9 10 11 Contact List 12 Copies of the ORM Scoped Site Plan Application Form, are available on our website at www.caledon.ca or at the Development Approval & Planning Policy Department, Development Section.

Introduction Page 1 The Oak Ridges Moraine Conservation Plan (ORMCP) has been established by the Ontario government to provide land use and resource management direction for land and water within the Moraine. Municipalities are required to take Provincial Policy into consideration when making decisions on development applications and in their Official Plan policies. The purpose of this application is to mitigate any potential negative effects on features located within the Moraine. Site Plan Control By-law (2013-0086) This By-law requires that within the ORMCP, development on lands zoned Environmental Policy Area 1 (EPA1) and Environmental Policy Area 2 (EPA2) or those that are located within the associated 90 metre buffer, is required to obtain ORM Scoped Site Plan Approval. Zoning By-law 2008-50 Zoning By-law 2008-50 has been approved by Council but has not yet been approved by the Province. This By-law proposes to rezone portions of land within the ORMCP to Environmental Policy Area 1 (EPA1) and Environmental Policy Area 2 (EPA2) in order to protect natural features on site. This By-law is not yet in full force and effect but does provide guidance to staff and the public. Fees ORM Scoped Site Plan Applications are subject to fees required to be paid at the time of application. Please refer to the Fees By-law. Please note that if a review of the application is required by the Conservation Authority, further fees may be required to be paid. In addition, should the application warrant the creation of a Building Envelope or an Agreement, further legal fees may be required to be paid.

Introduction Page 2 Exemptions Development Based These exemptions are applicable providing there is no requirement for site alterations (i.e. grading, parking, substantial removal of vegetation). At this time, the following items are exempt from obtaining ORM Scoped Site Plan Approval: Sheds which are exempt under the Ontario Building Code; Roof-mounted solar panels; Servicing connections; The demolition and/or re-construction of a building, shed or deck within an existing footprint; Construction of additional floors above the ground floor; Enclosing of an existing deck or porch; Replacement of a septic system so long as it is located within the same footprint (or smaller) and there is not an enlargement from the existing system; Any development within an approved ORM Envelope. Location Based Oak Ridges Moraine Site Plan Approval is not required within the following plans of subdivision, unless it is otherwise required in the Zoning By-law or a related Minor Variance application: 43M-1481 Old Paisley Estates 43M-1576 Pine Glen Farms Ltd. 43M-1589 Blackhorse Village Estates (Phase 2) 43M-1723 Oxford Homes 43M-1787 Diamonwood Properties Ltd. 43M-1827 Sunshine Estates 43M-1828 Alliance Palgrave Inc. (Phase 1) 43M-1837 Cancian Construction Limited 43M-1840 Chateaux of Caledon Corp. 43M-1895 Glorco Holdings Inc.

Streams of Site Plan Approval Page 3 The Town has created streams of Oak Ridges Moraine Site Plan approval. While there are similarities in all processes, the streams, timelines and requirements for each are slightly different. Full Stream This stream is used when the proposed development: Will occur within an area regulated by a Conservation Authority; and/or, Will occur within an area with a natural feature (Key Natural Heritage Feature or Key Hydrologic Feature) where circulation is required to a Conservation Authority for review as the technical advisor; and/or, Will require a building envelope. A building envelope is required where an applicant is proposing new development within lands zoned EPA 1 or EPA 2, or in the case where it is determined through consultation with the appropriate conservation authority that a building envelope is required. Applications requiring a building envelope require the execution of a Letter of Undertaking or Site Plan Agreement, registration of a Reference Plan on title and the posting of securities. Scoped Stream This stream affects all applications that do not fall under one of the other streams noted. Fast-Track Stream This stream is utilized when the proposed development qualifies for the Fast-Track Building Permit Service and approval is not required from any external agencies. The following items may be considered for the Fast-Track Stream at the discretion of Town staff: Enlargement to/replacement of a Septic System Swimming Pool (Inground/Above Ground) and Related Enclosure Fences Driveway Expansions/Extensions (provided no new access is proposed) Small detached garages, carports and sheds Basic Decks Demolition of existing buildings and structures Through the review of the Site Plan, Planning staff will work with appropriate agencies and departments to create an ORM Envelope (where possible). Please note that this may not be appropriate or possible in all circumstances due to the proposed development and features on or adjacent to the property.

What Approvals Are Required? Page 4 In order to determine what approvals are required for your proposed project, begin by contacting the following departments and agencies for additional information: 1. Contact the Development Approval & Planning Policy, Zoning at 905-584-2272 ext. 4104 regarding: Zoning of the property; Determining if the property and proposal lie within a regulated area of the applicable Conservation Authority; Determining if your proposal is subject to ORM Scoped Site Plan Approval; Obtaining an ORM Scoped Site Plan Application ; and, Obtaining clarification and further information regarding additional submission requirements. 2. Contact the Building Section at 905-584-2272 ext. 2233 regarding Building Permit applications, requirements and timelines. 3. If required, contact the appropriate Conservation Authority regarding permit requirements: Toronto and Region Conservation Authority (TRCA) at 416-661-6600 Credit Valley Conservation (CVC) at 905-670-1615 Lake Simcoe Region Conservation Authority (LSRCA) at 905-895-1281 Nottawasaga Valley Conservation Authority (NVCA) at 705-424-1479

Page 5 The Town of Caledon Development Approval and Planning Policy Department provides the opportunity for applicants to meet with Planning staff to discuss their proposal prior to submitting an ORM Scoped Site Plan Application. To request a meeting: 1. Complete the Request Form (visit our website www.caledon.ca); 2. Attach a concept plan illustrating the proposal; 3. Submit the form and the plan to the Development Approval and Planning Policy Department. When the applicant has submitted the form and supporting material, the meeting will be arranged within 5 business days. At the meeting, Planning staff will provide the applicant feedback regarding the proposal. Please note that all comments and direction offered by staff is preliminary and based solely on the information available at the time of the meeting. Through a review of the application, additional information may be identified or discussed.

Application Submission Page 6 Required permits can be applied for at the same time and may be reviewed concurrently. However, ORM Scoped Site Plan Approval will not be granted until Conservation Authority Approval is received (if applicable) and a Building Permit will not be issued without both ORM Scoped Site Plan Approval and a Permit from the Conservation Authority (if applicable). *Note: If you are applying for a FastTrack Building Permit, ORM Scoped Site Plan Approval and Conservation Authority permits are required prior to submission of the application. Preparing and Submitting an ORM Scoped Site Plan Application 1. Complete the ORM Scoped Site Plan Application form in full, ensuring that: A full address has been provided (including city/town and postal code) under Section 1: Applicant Information ; ALL existing and proposed development are listed and information provided on the application form; The owner has provided authorization for the agent (if applicable); and, The checklist is completed in full. 2. Prepare and complete 10 copies of the site plan drawing in association with the checklist and application form and using the Example Site Plan as guidance. 3. Payment of the application fee. 4. Submit the completed package to the Town of Caledon Development Approval and Planning Policy Department in person.

Page 7 When the application has been received, a Lead Planner will be assigned to the file and the application will be circulated for review. The application may be circulated to the following internal departments and external agencies: Full Streams Development Approval and Planning Policy Department o Zoning (all applications) o Engineering (all applications) o Planning Law (all applications) o Heritage (if property/structure is designated) o Urban Design (if the property is a corner lot) o Building (if building permit may be required) Public Works Department o Property Standards (if fill is proposed) o Engineering Services (if a new access is proposed) Applicable Conservation Authority (if regulated) o TRCA o CVC o LSRCA o NVCA Ministry of Natural Resources (if requested by the Conservation Authority) Ministry of Transportation (if adjacent to a Highway) Region of Peel (if adjacent to Regional Road or for site servicing) Where an application is circulated within the Town of Caledon (internally) only, the processing will take a minimum of 2 weeks to complete. If the application requires circulation of an external agency, the processing will take a minimum of 1 month to complete. Please note that staff strongly recommend that the applicant contact external agencies to assist in the timely submission of comments. Where an application requires technical review by external agencies, the submission of comments may take longer than requested by staff. Scoped Streams Where an application is circulated within the Town of Caledon only, the processing will take a minimum of 2 weeks to complete. Fast-Track Streams Where an application is circulated within the Town of Caledon only, the processing will take a minimum of 5 days to complete.

Page 8 Site Visit During the circulation period, the Lead Planner will complete a review of the site which may include a site visit to the property. A site visit will be used to determine the scope and impact of the proposed development on the surrounding natural features. If the property is regulated by a Conservation Authority the site visit may be completed in coordination with staff from the Authority. Depending on the nature of the site, a feature staking exercise may be completed on site with Conservation Authority, Ministry of Natural Resources (if requested by the Conservation Authority) and Town staff.

Page 9 When the circulation period is complete, typically, one of the following may occur: No Comments/Concerns If all comments have been received and it is identified that there are no comments or concerns with the application, the Lead Planner will recommend approval of the application to the Director of Development Approval and Planning Policy. Additional Information Required Through the review of the site plan, commenting agencies and departments may require additional information to be provided by the applicant. This information may include, but is not limited to: Proof of Consent (i.e. proof that the lot was created by a severance); Minimum Distance Separation (MDS) Calculations; Engineering drawings stamped by a Qualified Professional; Supporting studies and documentation (i.e. Natural Heritage Evaluation, Environmental Impact Study and Management Plan). The applicant is responsible for providing the required additional information to the Lead Planner, for recirculation and comments. Establishment of a Building Envelope Through the review of the site plan, it may be determined that a Building Envelope must be established on the property. This typically occurs where a new dwelling is being constructed on a vacant lot. Should this be required, staff will issue a Conditional Approval subject to the applicant working with the Planning Law Office to register a reference plan and agreement on title to establish the envelope. The applicant/owner are responsible to hire a surveyor to prepare a reference plan, as well as make the required payments to the Planning Law Office in order to assist in the registration of the reference plan and agreement related to the envelope.

Page 10 When staff is of the opinion that the proposal is satisfactory and all comments and concerns have been addressed, the Lead Planner will recommend approval of the application to the Director of Development Approval and Planning Policy. A copy of the approval package (letter and drawings) will be sent to the applicant/owner. A copy of the approval package will also be forwarded directly to the appropriate department to issue the permit.

Page 11 The Building Permit can be issued when: of the Site Plan Application has been granted; and, The Building Permit review process has been satisfactorily completed. For more information regarding the Building Permit process, please contact the Building Section at 905-584-2272 ext. 2233. Please note that payment of additional fees may be required at the time of issuance of the building permit. Development Charges - Please contact the Barb Johnson, Corporate Services Department for development charges inquiries at 905-584-2272 ext. 4216. Securities Please contact Angeline Vanniasinghe, Corporate Services Department for security inquiries at 905-584-2272 ext. 4033.

Contact List Page 12 Town of Caledon 905-584-2272 6311 Old Church Road, Caledon, ON, L7C 3J6 General Planning Inquiries ext. 4291 General Zoning Inquiries ext. 4104 General Building Inquiries ext. 2233 Region of Peel 905-791-7800 10 Peel Centre Drive, Brampton, ON, L6T 4B9 Jennifer Maestre ext. 4645 Ministry of Natural Resources 905-713-7400 Aurora Office 50 Bloomington Road, Aurora, ON, L4G 0L8 Ministry of Transportation 416-235-4592 1201 Wilson Avenue, 7 th Floor, Building D, Downsview, ON, M3M 1J8 Toronto Region Conservation Authority 416-661-6600 5 Shoreham Drive, Downsview, ON, M3N 1S4 Credit Valley Conservation 905-670-1615 1255 Old Derry Road, Mississauga, ON, L5N 6R4 Lake Simcoe Region Conservation Authority 905-895-1281 120 Bayview Parkway, Box 282, Newmarket, ON, L3Y 4X1 Nottawasaga Valley Conservation Authority 705-424-1479 John Hix Conservation Administration Centre, 8195 8 th Line, Utopia, ON, L0M 1T0