International Gas Union Research Conference 2014 Development of New Model Residential PEMFC micro-chp Systems

Similar documents
Enhancement of quality of houses including earthquake resilience through financial assistance : Japanese experience. Masahiro Kobayashi

CORPORATE SQUARE. Sector - 127, Noida

SCOPE OF WORK. 2. The company reserves the right to reject any one of the offers without assigning any reason.

Lutron Stairwell Fixture Solutions

Property condition survey for the Ewa Silo building located in the premises of the Port of Szczecin

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 277

OF CHANGE IN SHEAR WALL LOCATION ON STOREY DRIFT OF MULTISTOREY BUILDING SUBJECTED TO LATERAL LOADS

Balanced ventilation in apartment buildings

World Renewable Energy Congress (WRECX) Editor A. Sayigh 2008 WREC. All rights reserved. 822

Home is where the Heart is

GTSYSTEM Video Multi-Tenant System

Energy consumption in an old residential building before and after deep energy renovation

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

Notice Concerning Obtainment of Preferential Negotiation Right for Acquisition of Residential Properties

Tiny House on Wheels A Tiny House

TENANT DESIGN MANUAL UPDATED JULY 2015

Fiscal Impact Analysis Evergreen Community

TRUST CONSTRUCTIONS. Tower Hills Residency

Mitsui Fudosan to begin Toyosu 2nd District 2-1 Project (Towers A and C )

All images and drawings are for illustrative purposes. THE MARQUEE COLLECTION

Sekisui House Group Medium - term Management Plan

Notice Concerning Acquisition of Domestic Real Estate Trust Beneficiary Right

Page POWER SUPPLIES DIN RAIL MOUNT VERSION Single, two and three phase Output voltage: 24 or 48VDC Output power: W.

MASTERPLAN A GR AND COMMUNITY

Surface mounting, flush mounting, and DIN track mounting

Study of the energy performance of Korean apartment buildings with alternative balcony configurations

Andraus high-rise, Sao Paulo, Brazil, February 1972

TENANT DESIGN MANUAL UPDATED JULY 2015

Property-Replacement. May 23, Himonya Shopping Center. AEON MALL Uki. the b fukuoka tenjin. the b roppongi (Annex) Musashimurayama warehouse

Wind Energy System (Residential) Application

Ordering Information. Tactile Switch B3W. Tactile Switch with Sealed Construction for Automatic Soldering. Tactile Switch B3W 1

FOR SALE or LEASE 2086 New Danville Pike, Lancaster, PA Pequea Township

Measuring the Quality of Transport Infrastructure and Housing Conditions in Hong Kong

2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC.

SPECIFICATIONS. Exteriors Cement Plaster; Cement based weather coat painting.

Notice of Acquisition of Asset (TK Shinbashi Building)

PROPERTY CONDITION CHECK LIST FOR A LICENCED HMO

E1-12: Final Decision AS

Step-by-Step Guide for Configuring and Implementing SAP REFX

Investment Corporation Canadian Solar Infrastructure Fund, Inc.

Anemomaster

Capital Assets & Depreciation Policy

307 Sherbourne Street - Zoning Amendment Application - Preliminary Report

Presentation By. Chris Poujol. Jeffery Rodriguez. James Rigley

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

Review of the Prices of Rents and Owner-occupied Houses in Japan

LC Engineering Services Pte Ltd

Investment Corporation Canadian Solar Infrastructure Fund, Inc.

Notice Concerning Acquisition of Asset (TMK Preferred Securities)

Analyzing Ventilation Effects of Different Apartment Styles by CFD

Pool Enclosure Permit Application

Title of the measure: EST 19 Support scheme for energy efficient renovation of apartment buildings ( )

The Impact of Balconies on Wind Induced Ventilation of Singlesided Naturally Ventilated Multi-storey Apartment

NZE Lease Excerpts. Lease excerpt from the Bullitt Center pertaining to its energy budget:

MASTERPLAN ATHERSTONE. 1 Sales & Information Centre 2 Display Village RETAIL

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

Richmond Street West - Zoning Amendment Application - Preliminary Report

Commission No : 5 RCBMS : OVERVIEW

Apartment Lifts There are individual lifts dedicated to the Building. Security lifts to all levels including car park.

GRAND IN MORE WAYS THAN ONE

INDIAN INSTITUTE OF TECHNOLOGY BOMBAY OFFICE OF DEAN (INFRASTRUCTURE PLANNING SUPPORT)

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JANUARY 2016

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

Municipality of Brockton Planning Report

th Street West Saskatoon, SK S7M 0W9 Phone: Website: sessolarcoop.

All images and drawings are for illustrative purposes.

3M Proptic High-Capacity Optical Distribution Frames

Solar Power Purchase Agreement

Contemporary villas Panoramic view 3 minutes from Bonita Beach

Notice Concerning Acquisition of Asset (Silent Partnership Equity Interest)

This fee structure applies to applications submitted on or after January 1, 2018.

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

Berkenkamp Enschede, The Netherlands, 1988.

adjustable height mechanisms

TENANT DESIGN MANUAL UPDATED JUNE 2015

Boiler Design Documents Appraisal Procedure

TENANT DESIGN MANUAL UPDATED AUGUST 2016

1. PRESENTATION OF THE PROJECT

Assistant Director of Housing and Built Environment. 109 St Helens Park Road, Hastings, TN34 2JW

International Finance Corporation (IFC) World Bank Group Hungary Energy Efficiency Co-financing Project (HEECP) Models, 2004

LC Engineering Services Pte Ltd

Proposed Variation No. 5 (Student Accommodation) to the Cork City Development Plan April 16 th 2018

ELECTRICAL LOAD CHARACTERISTICS OF SUPERINSULATED MULTIFAMILY HOUSING: A CASE STUDY

KUL KUBE. Make The Right Move. Cosy. Customized Living. Studio Apartments. Pashan, Pune

Duties of Surveyors under Statutory Conventions and Codes

BUILDING CODE INTERPRETATION

DWGM and Victorian Gas FRC Final budget and Fees June Australian Energy Market Operator Limited

Cogeneration and Small Power Production Facilities Rules

3 Oakhurst Avenue, Harpenden, Hertfordshire AL5 2NB

Explanation of the Analysis Format

. \. structure. portion of a. yard setback. in height. for that. above 45 ft. structure above. 20-ft. front. 2, additional.

Mission Profile Based Analysis Tool for Reliability Studies

TENANT DESIGN MANUAL UPDATED JUNE 2015

110 BISHOPSGATE, EC2. 10,845 23,444 SQ FT Newly Available

Phone: (707) Fax: (707) Web:

HOUSES IN MULTIPLE OCCUPATION Standard Guidance. Houses in Multiple Occupation Standards Guidance

TENANT DESIGN MANUAL UPDATED JULY 2015

(THIS IS NOT A PERMIT)

INFO-PACK. Tiara Tower 14-Feb-14 Page 1

Transcription:

International Gas Union Research Conference 2014 Development of New Model Residential PEMFC micro-chp Systems September 18, 2014 Takayuki Watanabe Residential Fuel Cell Business Development Dept. Tokyo Gas Co., Ltd. 1

Contents 1. Introduction 2. New model for apartment buildings 3. Optional units for power outage 4. Summary 2

1. Introduction 2. New model for apartment buildings 3. Optional units for power outage 4. Summary 3

1. Introduction Residential Fuel Cell ENE-FARM First model (2009~10) Second model (2011~12) Third model (2013~) Total efficiency(lhv) 89% 90% 95% Installation space (depth) Display Panel of user interface Durability 3.9m 2 (1,100mm) B/W (2 inch) 40,000hrs 4,000 times SS 2.0m 2 (900mm) B/W (3.5 inch) 50,000hrs 4,000 times SS 2.0m 2 (750mm) Color (4.3 inch) 60,000hrs 4000times SS Fixed price (tax excluded) JPY 3,300,000 JPY 2,630,000 JPY 1,900,000 4

Units 1. Introduction 40000 35000 30000 25000 20000 15000 10000 Tokyo Gas Japan Tokyo Gas Accumlation 5000 0 2009 2010 2011 2012 2013 2014(Plan) Fiscal year 5

1. Introduction To promote ENE-FARM sales Cost Reduction - Technology development -> Reduction of device cost -> Reduction of number of components - Mass- production Expanding market potential - Installation to apartment buildings Product Appeal - User interface - Meets users concern -> Optional units for power outage 6 6

1. Introduction 2. New model for apartment buildings 3. Optional units for power outage 4. Summary 7

2. New model for apartment buildings # High ratio of apartment residences in Tokyo area New house construction in 2013 Calculated using residence statistic report by the Ministry of Land, Infrastructure, Transport and Tourism, Japan Apartment 597,222 390,032 54,652 93,326 40% JAPAN 987,254 Detached 60% Apartment 63% Tokyo met. 147,978 Detached 37% Apartment model is essential for market expansion in Tokyo area 8 8

2. New model for apartment buildings Developed based on 2013 detached house model # Feature of 2013 (3 rd Gen) detached house model (1) Improved installability -Reducing depth of installation space (Key in Tokyo area) -Flexible layout 3 rd Gen 2 nd Gen FC 750mm 50mm HWS BB 400mm 2691mm HWS 900mm FC 2270mm (2) Higher efficiency (3) More user-friendly 3 rd Gen model 2 nd Gen model 120mm 480mm 3 rd Gen 2 nd Gen Display size: 95x54mm Display size 78x42mm 9

2. New model for apartment buildings Specifications of the previous model and the new model Performance Dimension Dry weight Life time Apartment building model Detached model Power generation output 200W-750W Electrical efficiency 39.0%LHV / 35.2%HHV Heat recovery efficiency 56.0%LHV / 50.6%HHV Overall efficiency 95.0%LHV / 85.8%HHV Tank capacity 147L H 1,750mm H 1,850mm Fuel cell unit W 399mm W 400mm D 395mm D 400mm H 1,850mm H 1,850mm Hot water storage unit W 400mm W 560mm D 560mm D 400mm Fuel cell unit 99kg 90kg Hot water storage unit 54kg 55kg 60,000hrs and 4,000times SS 10

2. New model for apartment buildings Image of apartment buildings in JAPAN Example of one floor in apartment buildings Example of pipe shaft Gas boiler Corridor Entrancel PS Entrance PS Gas meter Electric meter Gas pipe etc. 11

2. New model for apartment buildings Image of apartment buildings in JAPAN BRANZ CITY SHINAGAWA-KATSUSHIMA Completion : July 2015 Households :356 THE PREMIER SKY SHINAGAWA-NAKANOBU Completion : August 2015 Households :100 12

2. New model for apartment buildings Overview of New model (1) Installable in pipe shaft (2) Complies with requirements for apartment installation (3) Enables layout flexibility Hot water unit Backup boiler FC unit 13 13

2. New model for apartment buildings (1) Installable in pipe shaft # Increasing air tightness of FC unit # Increasing thickness of the external panel (0.6mm 0.8mm) To meet authorized requirement for installation in pipe shafts in Japan based on fire protection law Backup boiler exhaust FC exhaust 14

2. New model for apartment buildings (2) Complies with requirements for apartment installation # Earthquake resistance Strengthening legs anchoring units using larger anchor bolts to meet building installation regulation in Japan Confirming no toppling at 1.0G 15 15

2. New model for apartment buildings (2) Complies with requirements for apartment installation # Wind resistance Confirming stable operation under 30m/s wind (necessary for buildings over 100m in height) (a) Improving composition of intake and exhaust (b) Mitigating the effects of wind pressure on the internal components Detached housesmodel Distributed intake and exhaust ports apartment buildings model Aggregate intake and exhaust ports Exhaust Intake Exhaust Intake

2. New model for apartment buildings (3) Enables layout flexibility # Examples of installation in pipe shaft Home System installed in one space Door Gas meter HWS unit Backup boiler BB FC unit Hot water unit FC unit Home System installed in separated space Gas meter HWS unit Door FC unit BB 17 17

1. Introduction 2. New model for apartment buildings 3. Optional units for power outage 4. Summary 18

3. Optional units for power outage # After 2011 Earthquake, user demand of operating ENE-FARM during power outage became apparent Unit name Switching unit Option A Continuing FC generation Starting up FC Max. power output on grid power outage Max. available power on grid power outage FC : 700W Approx. 700W Option B (1) Power supply unit (with Li ion battery) (2) Switching unit FC : 700W Power supply unit : 500W (Including 1000Wh Battery) Approx. 1200W Approx. supply duration on grid power outage Max. 4 days Load until 700W : Max. 4 days Load until 900W : Max. 10 hours Load until 1200W : Max. 2 hours Fixed price (tax excluded) JPY 130,000 (1) JPY 472,000 (2) JPY 143,000 19

3. Optional units for power outage # Operation with Option A (Normal use) Normal use circuit Distribution board Emergency outlet Switching unit FC TK BB

3. Optional units for power outage # Operation with Option A (Grid power outage) Normal use circuit Distribution board Emergency outlet Switching unit FC TK BB

3. Optional units for power outage # Operation with Option B (Normal use) Normal use circuit Emergency light Identified circuit Distribution board Switching unit Power supply unit FC TK BB

3. Optional units for power outage # Operation with Option B Distribution board Normal use circuit Emergency 非常灯 light (FC in operation at Grid power outage) Identified circuit Switching unit Power supply unit FC TK BB

3. Optional units for power outage # Operation with Option B Normal use circuit Emergency light (FC NOT in operation at Grid power outage) Identified circuit outlet Distribution board Switching unit Power supply unit FC TK BB

1. Introduction 2. New model for apartment buildings 3. Optional units for power outage 4. Summary 25

4. Summary # Development of ENE-FARM for apartment buildings [released in April 2014] - Installable in pipe shaft - Complies with earthquake and wind resistance requirements for high-rise buildings - Fit to variety of installation configurations # Developing optional units for power outage - Option A: to make ENE-FARM survive [released in April 2014] - Option B: not only for survival, but also start up ENE-FARM [to be released in October 2014] 26

27 Part of this work was supported by NEDO (New Energy and Industrial Technology Development Organization) and METI (Ministry of Economy, Trade and Industry) of Japan. 27

Government subsidies Year Subsidy(JPY) Sales units In Japan Amount(JPY) 2009 1,400,000 4997 6,995,800,000 2010 1,300,000 6469 8,409,700,000 2011 1,050,000 13460 14,133,000,000 2012 700,000 24517 17,161,900,000 2013 450,000 33531 15,088,950,000 2014 380,000 28

Detached houses model Apartment buildings model TOP TOP 1850mm 1750mm Backup boiler exhaust FC exhaust Adjusting stand 29

Detached model Three place exhaust apartment model One place exhaust Exhaust Intake 30

Economy/Environment/Saving Energy Comparison with a conventional energy supply system of CO 2 emissions (Rated power) Reduction of CO 2 emissions for year Comparison with a conventional energy supply system of Primary Energy consumption volumes (Rated power) Reduction of Primary Energy consumption volumes for year Apartment buildings model 49% decreasing Detached house model 1.0t 1.3t 37% decreasing 10.7GJ 14.4GJ Utility costs for years JPY 30,000-40,000 reduction JPY 50,000-60,000 reduction This is supposition case. Detached house mode is used electric, 5900kWh, for year.(residential space120 m 2, family consisting of four) Apartment buildings model is used electric, 3600kWh for year(residential space from 70 to 80m 2, family consisting of 2 or 3) 31

Parts description Unit name Dimensions / weight Installation location Option A Switching unit H325 W485 D155 / 13kg Indoor wall-mounted Retail price JPY 130,000 Option B (1) Power supply unit (2) Switching unit (1) H350 W605 D155 / 20kg (2) H325 W485 D155 / 14kg (1) JPY 472,000 (2) JPY 143,000 32

Using gas and electric for a year Apartment buildings model No ENE- FARM Buying power 1,098kWh 3,644kWh Using gas 1,160m3 740m3 residential space is 80Sq m, family is consisting of three, using floor warmer, calculated by Tokyo gas. Utility cost for a year Apartment No ENE-FARM Total buildings model Gas fee 13.1 10.8 2.2 Electric fee 3.6 9.7 6.0 Total 16.7 20.5 3.8 (Ten thousand / year) residential space is 80Sq m, family is consisting of three, using floor warmer, calculated by Tokyo gas. 33

FC Option A Grid 200V ~ Inverter Grid 100V ~ BB HWS Trans former Emergency load AC200V AC100V 34