Village of Palm Springs 226 Cypress Lane Palm Springs, FL Phone (561) Fax (561)

Similar documents
RIGHT OF WAY PERMIT INSTRUCTION PACKAGE REV

RIGHT OF WAY PERMIT INSTRUCTION PACKAGE

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

Demolition Application Package

City of Umatilla 1 South Central Avenue P.O. Box 2286 Umatilla, FL Phone (352) FAX (352) DEMOLITION PERMIT APPLICATION

Doors & Windows Package

T E M P O R A R Y B A N N E R P E R M I T P R O C E D U R E

-EXTERIOR STRUCTURE ALTERATIONSIDING DOORS - WINDOWS

-ROOFNEW ROOF RE-ROOF ROOF OVER

PLANNING, ENVIRONMENTAL & DEVELOPMENT SERVICES DEPARTMENT APPLICATION FOR NON-BINDING INFORMATION LETTER

BUILDING PERMIT APPLICATION

- HANDICAPPED RAMP - MISCELLANEOUS ACCESSORY STRUCTURE BUILDING PERMIT APPLICATION PACKET

TEMPORARY USE AND OCCUPANCIES PERMIT PROCEDURE

BUILDING PERMIT APPLICATION

MINERAL COUNTY SHERIFF S OFFICE

PLANNING DEPARTMENT Application for a Nonconforming Use Modification

AAR SUBMITTAL CHECKLIST

COMMERCIAL BUILDING PERMIT APPLICATION

NASSAU COUNTY SIDING PERMIT APPLICATION

CITY OF PALM COAST SPECIAL EXCEPTION DEVELOPMENT ORDER APPROVAL PALM COAST SUPERWASH LOT 16/SOUTHWEST QUADRANT PHASE III

Administrative Action Request

CHECKLIST FOR SCHOOL CONCURRENCY VESTED RIGHTS APPLICATION

Fence Checklist. Permit application and supporting documents. 2. Notarized, Owner/Builder Affidavit (if applicable).

Instructions and Application Procedures Plan Amendments

MEDICAL HARDSHIP. TEMPORARY USE PERMIT APPLICATION For a Mobile Home

HERNANDO COUNTY PERMIT APPLICATION PACKET MECHANICAL PERMIT

RESCINDING A BINDING LOT AGREEMENT

CITY OF PAHOKEE SITE PLAN SUBMITTAL REQUIREMENTS

T E M P O R A R Y U S E A N D O C C U P A N C Y P E R M I T P R O C E D U R E

APPLICATION FUTURE LAND USE MAP AMENDMENT PLANNING AND ZONING DEPARTMENT CITY OF INDIAN ROCKS BEACH

Community Improvement 100 NW 1 st Avenue Delray Beach, Fl INSTRUCTIONS FOR APPLICATION AND AFFIDAVIT FOR LANDLORD PERMIT RESIDENTIAL PROPERTY

RESIDENTIAL ADDITION/ALTERATION PERMIT APPLICATION

-MECHANICAL- BUILDING PERMIT APPLICATION PACKET

INDIAN RIVER COUNTY/CITY OF VERO BEACH ALTERATIONS AND ADDITIONS Generator INFORMATION/CHECKLIST BUILDING DIVISION

NASSAU COUNTY MECHANICAL PERMIT APPLICATION

APPLICATION FACADE IMPROVEMENTS INCENTIVE PROGRAM GAINESVILLE COMMUNITY REDEVELOPMENT AGENCY FIFTH AVENUE/PLEASANT STREET COMMUNITY REDEVELOPMENT AREA

-PLUMBING- BUILDING PERMIT APPLICATION PACKET

WALLS: PERIMETER / RETAINING

INSTRUCTION PAGE. Definitions

INSTRUCTION PAGE. 3. All SBE firms included on SBE utilization plan must complete a Schedule C.

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

PETITION APPLICATION PROCEDURE

Planning & Development Department Petition for Annexation

SHEDS. You must submit the following items:**

- POOL / HOT TUB / JACUZZI / SPA - MISCELLANEOUS ACCESSORY STRUCTURE BUILDING PERMIT APPLICATION PACKET

Fence Application Package

USE AGREEMENT AMONG <OWNER>, <LESSEE>, AND ORANGE COUNTY. THIS USE AGREEMENT (the Agreement ) is entered into by and among

CITY OF BELLE GLADE. 110 Dr. Martin Luther King Jr. Blvd., West Belle Glade, FL Telephone (561) Fax (561)

APPLICATION FOR NOTICE OF PROPOSED CHANGE

BINDING SITE PLAN Checklist

INDIAN RIVER COUNTY/CITY OF VERO BEACH ALTERATIONS AND ADDITIONS Generator INFORMATION/CHECKLIST BUILDING DIVISION

PLANNING DEPARTMENT Application for a Type 2 Use through the Board of Adjustment & Appeals

Procedures to Apply for an Online Sarasota County ROW Use or Culvert Permit

BASIC PERMIT CHECKLIST (Roof, Electric, Plumbing, Gas)

PLANNING AND DEVELOPMENT DEPARTMENT PRELIMINARY PLAT APPLICATION

In which State are the incorporation and/or organization documents filed?

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

CERTIFICATE OF APPROVAL OF COUNTY COMMISSION

APPLICATION FOR FINAL PLAT APPROVAL (Major Subdivision)

1 S Central Ave, PO Box 2286 Umatilla, FL (352) Fax# (352)

WEST PALM BEACH REGISTER OF HISTORIC PLACES NOMINATION FORM

6 TH EDITION (2017) OF THE FLORIDA BUILDING CODE IS IN EFFECT

FENCE and or POOL BARRIER CHECKLIST

Change of Contractor

DEPARTMENT OF PLANNING Application for Variances, Special Exceptions through the Board of Adjustment

PRIVATE PROVIDER PROGRAM General Information Rev

This certification comes after periodic inspections of the work site, while work was being done and a final inspection of the completed work on.

NEW MOBILE HOME PERMIT APPLICATION

COMMONWEALTH OF KENTUCKY TRANSPORTATION CABINET DIVISION OF RIGHT OF WAY AND UTILITIES INVITATION FOR PROPOSAL/BID

The construction or installation of a minor structure or service system in an easement shall be by design and shall be easily removed if required.

Progressive Review Time Submittal of application and necessary documents

APPLICATION FOR PLAN EXAMINATION / BUILDING PERMIT or ZONING PERMIT

CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

Chelan County Department of Community Development 316 Washington Street, Suite 301, Wenatchee, WA Telephone: (509) Fax: (509)

SHORT PLAT Information

APPLICATION PROCEDURES FOR A MAJOR SUBDIVISION PRELIMINARY PLAT

DETERMINATION OF NONCONFORMITY

PERMITS & PLANS APPROVALS ADVANCED MODULE INTERNET

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

Revised Reroof Checklist

CLASS 6B ELIGIBILITY APPLICATION

PALM BEACH COUNTY THRIFT STORE SURPLUS SEALED BID Bid # /AD

COMMERCIAL AND MULTI-USE DOCK PERMIT APPLICATION PINELLAS COUNTY WATER AND NAVIGATION

UTILITY EASEMENT AGREEMENT

Licenses timely and properly renewed are valid for a period of 12 months (that is, until August 31, 2013).

Gulf Power Customer Service

File Name: Private Provider Requirements and Information

VARIANCE FROM THE DEVELOPMENT STANDARDS APPLICATION PROCEDURES

CITY OF PANAMA CITY BEACH Building and Planning Department

VARIANCE APPLICATION

Highlands County, Florida Special Exception Application

APPLICATION PROCEDURES FOR A PLAT AMENDMENT OR REVISION

EL DORADO COUNTY BUILDING SERVICES

Irrigation Permit Requirements FOR OWNER/BUILDER

Town of Palm Beach Building Division CONSTRUCTION PERMIT APPLICATION

SHEDS/STORAGE BUILDINGS/DETACHED GARAGES Please submit/upload plans in PDF format

LANDSCAPE AND MAINTENANCE EASEMENT. THIS LANDSCAPE AND MAINTENANCE EASEMENT, (hereinafter Easement )

Highlands County, Florida Variance Application

Transcription:

Village of Palm Springs 226 Cypress Lane Palm Springs, FL 33461 Phone (561) 965-4016 Fax (561) 439-4132 www.vpsfl.org RIGHT-OF-WAY USE PERMIT APPLICATION Instructions Please print clearly. Incomplete applications will not be processed. Typical processing time is a minimum of 5 business days. 1. Property Address (mandatory) Applicant must provide a physical property address or block number for all Permit Types. (i.e.: 123 Main Street or Block 100 Main Street) Provide an anticipated start date and working days duration. (Permit durations are from 5 days to 180 days) 2. Type of Permitted Use Complete this section to identify the type of permit for which application is made. Adjacent to each permit type are the requirements for application. Please review the note, as indicated by the asterisk (*), that follows the permit types. Utility Service Maintenance / Construction Select this permit type as a utility services provider performing routine maintenance within any public right-of-way or an easement of the Village. Residential Right-of-Way (ROW) Construction Select this permit type as a property owner completing work to repair or replace sidewalk or perform minor work in the right-of-way conjoined to your property. Building Maintenance / Construction Select this permit type for activity requiring use of the public right-of-way for the purpose of building maintenance or construction remodeling work. This permit type includes, but is not limited to, such activity in the public right-of-way as placing a roll off container, erecting a crane, storing materials, or exterior building work. Street / Block Construction Select this permit type for activity requiring construction work within the public right-of-way. This permit type is applicable for all permit applications not specifically covered by the other permit types, and requires construction bonding. Telecommunications Maintenance / Construction This permit type is reserved exclusively for maintenance or construction completed by registered telecommunications companies. Telecommunications companies must be registered with both the Florida Department of Commerce and the Village as a telecommunications company at the time of permitting. Electric Maintenance / Construction This permit type is reserved exclusively for maintenance or construction completed by Florida Power & Light or Lake Worth Electric Utilities.

Right-of-Way Use Permit Application Page 2 3. Applicant Information Complete this section if you are the individual making application for permit. This includes licensed contractors or private property owners, whichever may be applicable. Provide the required contact information including e-mail address for the applicant responsible for an issued permit. 4. Contractor Information Complete this section for the prime contractor completing work for this permit. Provide the required contact information including e-mail address for the prime contractor completing work for this permit. 5. Property / Utility Owner Information 6. Project Description Complete this section regarding the property owner of any private property or easement associated with the permitted work activity. Provide the required contact information and e-mail address for the associated property owner or utility owner. Private property owners applying as owner-builder may skip this section. Complete this section by providing a description and drawing/sketch of the work activity and location of the activity. (i.e. Address, side of street, blocking traffic, closing sidewalk, or both, etc.) Provide a maintenance of traffic (MOT) plan for all road or sidewalk obstructions or closures. 7. Signatures 8. Notarized 9. Documentation Please read all attesting statements and minimum conditions included in the permit application prior to signing. Applicant signatures are required for all permit applications. If the permit application does not include conjoined private property or utility easements, the owner signature is not applicable. Permit applications associated with private property, a signature is required of at least one (1) property owner, as listed on the current property deed, for each separate property (parcel). Permit applications associated with more than one private property, please use the attached Property / Utility Owner Supplemental Information form to identify and provide owner signatures for each property (parcel) Owner signatures are required for all permits applications conjoined with private property. Private property owners that are completing the permit activity or work as owner-builder and without the use of a contractor or subcontractor may affix their signature to the applicant section only. All signatures placed on the permit application as an agent of the owner or applicant must include an agency affidavit. All signatures in the permit application must be notarized. All permit applicants must demonstrate the appropriate professional and occupational licensing. The permit applicant must demonstrate adequate liability and workers compensation insurance. 10. Permit Application Process All permit packages should be completed in entirety and attachments clearly labeled. Permit applications must be submitted to the Land Development Department, 226 Cypress Lane, Village Hall, First Floor.

Village of Palm Springs 226 Cypress Lane Palm Springs, FL 33461 Phone (561) 965-4016 Fax (561) 439-4132 www.vpsfl.org RIGHT-OF-WAY USE PERMIT APPLICATION PROPERTY ADDRESS: (MANDATORY INFORMATION SEE APPLICATION INSTRUCTIONS) Anticipated Start Date Anticipated Construction Duration Days (No more than one category per application) Permit Type Minimum Permit Documentation 1) Utility Service Maintenance / Construction Permit application.* 2) Residential Right-of-Way Construction Permit application and sketch of proposed work.* 3) Building Maintenance / Construction Permit application and sketch of proposed work.* 4) Street / Block Construction Permit application and four (4) sets of complete sealed construction drawings.* 5) Telecom Maintenance / Construction (see Ordinance 2015-28 for requirements) 6) Electric Utility Maintenance / Construction Permit application.* APPLICANT INFORMATION Applicant Name: Company Name: Address: City: State: Zip: Telephone: Email: CONTRACTOR INFORMATION Applicant Name: Company Name: Address: City: State: Zip: Telephone: Email:

PROPERTY / UTILITY OWNER INFORMATION (Legal Property Owner - Required for All Permits Associated with Real Property) Owner Name: Company Name: Address: City: State: Zip: Telephone: Email: Description of Work

(I) (We) affirm and certify that (I) (We) have read, understand, and will comply with the provisions and regulations of the Village of Palm Springs Right-of-Way Administration Regulations. (I) (We) affirm and certify that (I) (We) have read, understand, and will comply with the provisions of the minimum conditions applicable to permit application, as defined in the attached document. (I) (We) further certify that the above statements and showings made in any paper or plan submitted herewith are true to the best of (my) (our) knowledge and belief. (I) (We) understand that the application and attachments shall become part of official public record and are subject to public disclosure. (I) (We) understand that if one or more deficiencies exist in the application or attachments, (I) (We) will be notified of the deficient items, and no further action on the application will take place until the required information is submitted. (I) (We) understand that misrepresentation of information contained within this application and attachments may be cause to void any development approvals and permits associated with this application. (I) (We) understand that separate permits may be required from other regulatory agencies. Applicant Signature Date Owner Signature (When Applicable) Date AUTHORIZATION NOTE: By placing signature upon this application, the property / utility owner is providing written designation, delegation, and authorization to the above named Applicant to execute this application as a binding obligation of the Property / Utility Owner. The Village will not accept any application that does not include the foregoing authorization. Applicant The foregoing instrument was acknowledged before me this day of, 20 who is personally known to me or has produced as identification and who did (or did not ) take an oath. Notary Signature (For Applicant) Commission Expiration: Seal: Owner* The foregoing instrument was acknowledged before me this day of, 20 who is personally known to me or has produced as identification and who did (or did not ) take an oath. Notary Signature (For Owner) Commission Expiration: Seal: * Use separate duplicate page for each additional owner.

Village of Palm Springs 226 Cypress Lane Palm Springs, FL 33461 Phone (561) 965-4016 Fax (561) 439-4132 www.vpsfl.org RIGHT-OF-WAY USE PERMIT APPLICATION Application is for: New Registration Transfer Owner 1. NAME OF COMMUNICATION BUSINESS (Parent Company and DBA or Trade Name, as applicable): 2. MAILING ADDRESS: 3. CONTACT / REPRESENTATIVE NAME: 4. PHONE NO: EMERGENCY PHONE NO: 5. FAX NO.: EMAIL ADDRESS: 6. TYPE OF COMMUNICATION SERVICES (if more than one, state all that apply, or if none, state that the applicant is a Non-Dealer or is a Pass Through Provider: 7. FCC CERTIFICATE OF AUTHORIZATION or LICENSE NUMBER for provision of Communication Services # On behalf of the Company, the undersigned represents and acknowledges that (a) the information provided is true and correct, including all attachments, (b) he/she is authorized to apply for Registration on behalf of the Company and (c) the appropriate employee(s) for the Company has received and reviewed a copy of Ordinance 2015-28. SIGNATURE OF APPLICANT PRINT NAME and TITLE Required Attachments: Resale certificate issued by Florida Department of Revenue State Certifications: o o o Certificate of Registration by Florida Department of Revenue Certificate of Authorization, Public Convenience and Necessity or similar certificate issued by Florida Public Service Commission (copies of other applicable franchises, use agreements, or licenses); Certificate issued by Florida Department of State authorizing Company to do business in Florida Palm Beach County Business Tax Receipt and Village BTR Certificate of Insurance per Sec 66-70, naming Village as additional insured

Registration shall not in itself establish any right to place or maintain or priority for the placement or maintenance of a communications facility in public rights-of-way within the Village, but shall establish for the registrant a right to apply for a permit, if permitting is required by the Village. Registrations are expressly subject to any future amendment to or replacement of this article and further subject to any additional Village's ordinances, as well as any state or federal laws that may be enacted. A registrant shall renew its registration with the Village by April 1 of even numbered years in accordance with the registration requirements in this article, except that a registrant that initially registers during the even numbered year when renewal would be due or the odd numbered year immediately preceding such even numbered year shall not be required to renew until the next even numbered year. Within 30 days of any change in the information required to be submitted pursuant to division (c). If no information in the then-existing registration has changed, the renewal may state that no information has changed. Failure to renew a registration may result in the Village restricting the issuance of additional permits until the communications services provider has complied with the registration requirements of this section. In accordance with applicable Village ordinances, codes or regulations and this article, a permit shall be required of a communications services provider that desires to place or maintain a communications facility in public rights of way. An effective registration shall be a condition precedent to obtaining a permit. Notwithstanding an effective registration, permitting requirements shall continue to apply. A permit may be obtained by or on behalf of a registrant having an effective registration if all permitting requirements are met. A registrant that places or maintains communications facilities in the public rights of way shall be required to pay compensation to the Village as required by applicable law and ordinances of the Village. If a registrant transfers, sells or assigns its assets located in public rights of way incident to a transfer, sale or assignment of the registrant's assets, the transferee, buyer or assignee shall be obligated to comply with the terms of this article. Written notice of any such transfer, sale or assignment shall be provided by such registrant to the Village within 24 days after the effective date of the transfer, sale or assignment. If the transferee, buyer or assignee is a current registrant, then the transferee, buyer or assignee is not required to re-register. If the transferee, buyer or assignee is not a current registrant, then the transferee, buyer or assignee shall register as provided in Sec. 66-62 of this article within 60 days of the transfer, sale or assignment. If permit applications are pending in the registrant's name, the transferee, buyer or assignee shall notify the land development department that the transferee, buyer or assignee is the new applicant.

VILLAGE USE: $25,000 Annual Surety Bond (performance bond, cash deposit or irrevocable letter of credit) Signature: Printed Name: Date: