Hank's Exchange Road Bridge Replacement Project

Similar documents
DESIGN PUBLIC HEARING JULY 7, 2016 CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

REDFOOT ROAD BRIDGE 1416 SCOPE OF WORK

Locally Administered Projects Overview

OAKGREEN AVENUE. Project Goals. (County Road 65) Corridor Improvement Project. Turn lanes Resurfacing Stormwater management

DESIGN PUBLIC HEARING FEBRUARY 9, ABIGAIL ADAMS MIDDLE SCHOOL Auditorium WEYMOUTH, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

FM 1626 Public Hearing - January 14, 2016

TABLE OF CONTENTS General Legal Authority for Certification of Right of Way Control 24-2

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

PUBLIC HEARING AGENDA Gregg Manor Road - From Hill Lane to US 290 Travis County, Texas

Frequently Asked Questions From the Certification of R/W Training Sessions

Board of Supervisors' Agenda Items

Sound Wal Overview 1

TECHNICAL PRESENTATION Project History and Description of the Proposed Improvements Perry Steger, Steger & Bizzell Engineering, Inc.

OFFICE OF REAL ESTATE

CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA. Meeting Date: November 18, Item Number: 8.D.5. Subject: Summary of Information:

JAMES R. HALL, SR. REALTY OFFICER FEDERAL HIGHWAY ADMINISTRATION OFFICE PHONE:

Right of Way Acquisition

Right-of-Way Acquisition and

SUB /CAR /PUD

Putting it all together. Presented by: RIGHT OF WAY SERVICES

PROJECT: P 0037(129)207 PCN: 039K BROWN COUNTY. S.D. Highway 37 From Aspen Ave to U.S. Highway 12 in Groton

PROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY. SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD

Order of Business. Board of Supervisors' Agenda Items

Figures List for New LPA Manual

PROJECTS: P 0083(74)56; 036E; JONES COUNTY NH 0083(79)45; 04E7; MELLETTE COUNTY NH 0083(80)44; 04E8; MELLETTE COUNTY

COUNTY OF EL DORADO DEVELOPMENT SERVICES PLANNING COMMISSION STAFF REPORT TENTATIVE MAP

Project NH 0018(179)402 PCN 036L Hutchinson and Turner County. US18 From US81 to SD19. Grading, Structure (Bridge), and Interim Surfacing

DESIGN PUBLIC HEARING

RIGHT OF WAY PRIMARY ROLES & RESPONSIBILITIES

3. Adopt the Preliminary Use and Management Plan for the property granted to the District.

County of Sacramento REQUEST FOR BIDS 8902 BEDFORD AVENUE FAIR OAKS, CALIFORNIA. Minimum Bid Price: $75,000

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT

ENVIRONMENTAL CONSIDERATIONS WHEN ACQUIRING RIGHT-OF-WAY EARLY. Patrick Lee TxDOT Environmental Affairs Division

Ohio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis

LOCAL PUBLIC AGENCY MANUAL

content chapter Section 4(f) Parks, Recreation Areas, Historic Sites, Wildlife and Waterfowl Refuges

DESIGN PUBLIC HEARING NOVEMBER 15, 2017 CARLTON M. VIVEIROS ELEMENTARY SCHOOL COMMUNITY ROOM 525 SLADE STREET FALL RIVER, MA :00 PM

PUBLIC INFORMATION MEETING JULY 19, 2017 HOLYOKE COMMUNITY COLLEGE KITTREDGE CENTER HOLYOKE, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING FEBRUARY 28, 2018 KENNEDY MIDDLE SCHOOL, AUDITORIUM SPRINGFIELD, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

Task Central Office Real Estate Responsibilities District Responsibilities

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH

Yolo Habitat Conservancy County of Yolo City of Davis City of Winters City of West Sacramento City of Woodland University of California, Davis

a. provide for the continuation of collector streets and thoroughfare streets between adjacent subdivisions;

NSP City of Jacksonville, Florida. Process Diagram

7-3. Engineering and Operations Committee. Board of Directors. 7/11/2017 Board Meeting. Subject. Executive Summary

Washington County CDBG/HOME Application for Funds

Welcome! Sarpy Transmission Project. Public Hearing October 23, 2018

STATE OF OHIO FINANCIAL REPORTING APPROACH GASB 34 IMPLEMENTATION ISSUES TRANSPORTATION INFRASTRUCTURE

COUNTY OF EL DORADO, CALIFORNIA COMMUNITY DEVELOPMENT SERVICES DEPARTMENT OF TRANSPORTATION NOTICE TO BIDDERS

EASEMENT BASICS. Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations.

Uniform Act for CDBG-DR

Executive Summary: This is a preliminary plat to construct 8 residential lots and 2 commons lots with a private road on 3.87-acres in Meridian, Idaho.

B-08-MN October 1, 2015 thru December 31, 2015 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

County Bridge Inspection. IACC Conference Presented by: Michael L. McCool, PE Bridge Department Manager Beam, Longest and Neff, LLC

Draft Model Access Management Overlay Ordinance

DRIVEWAY/ACCESS PERMIT APPLICATION INSTRUCTIONS Douglas County Trunk Highways

CONSOLIDATION INCENTIVE AID

SPECIAL COUNCIL MEETING AND WORK SESSION AGENDA #23

FOR OFFICE USE ONLY Date Submitted Received By Fees Paid $ Receipt No. Received By Application No. Application Complete Final Action Date

Section 4(f) Why don t we build the road through this green space over here?

VDOT/Weldon Cooper Center 2017 Highway Finance Survey: line items instructions

Bridge Asset Valuation and the Role of the Bridge Management System. Dr. Reed M. Ellis, Stantec Consulting Ltd. Paul D. Thompson, Consultant

INFORMATIONAL HANDOUT

RIGHT OF WAY DATA SHEET (Form #)

December 31, 2014 RE: PROGRAM EXTENSION REQUEST FOR SP NORTH CREEK REGIONAL GREENWAY TRAIL. Dear Mr. Keel:

Boot Camp Breakout Session #3. September 19, 2018 Carolyn France Moderator Transportation Alternatives Program Manager, Central Office

INTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY

DESIGN BUILD PROJECTS

INDEX. of subrecipients, VIII -2 records, VI-1, 4, 13. OMB Circular A-122, VIII- 3 certification: I-28

City of Owasso Public Work Department STATUS REPORT February 6, 2018

Administration and Projects Committee STAFF REPORT July 3, 2014 Page 2 of 3 Changes from Committee B. CT 208 Historical Summary of Contract s. C. Reso

Buchanan Field. Buchanan Field. Airport Planning Program. Steering Committee. Airport Master Planning Program. March 15, 2007

Welcome to the Location & Design Public Hearing for: Baymont Inn & Suites, Lake Hamilton, Arkansas Thursday, June 25, How do I become involved?

CHAPTER 3: IDENTIFYING SECTION 4(f) PROPERTIES

DATE: February 22, 2018 All Proposers RFP# CTH M Design FROM: Pete Patten, Purchasing Agent SUBJECT: ADDENDUM #1 to RFP# CTH M Design

BOULDER COUNTY/BROOMFIELD COUNTY REGIONAL CONSORTIUM S COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS DISPLACEMENT PLAN

Federal Aid Acquisition Guide. For Property Owners

Project Description Preferred Alternative

SECTION 7000 LAND DEVELOPMENT REQUIREMENTS

BOUNDARY LINE ADJUSTMENT APPLICATION GUIDE

PROJECT MANAGEMENT INSTITUTE

Butte County Board of Supervisors Agenda Transmittal

PILT Report to the Legislature Minn. Laws 1st Special Session, ch. 2, art. 4, sec. 35

DOUGLAS COUNTY ADMINISTRATIVE POLICIES AND PROCEDURES

PROPERTY OWNERS MEETING SEWER SERVICE RATES

NYS HOME Local Program

RECORDKEEPING PROCESS. All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review.

COUNTY OF RIVERSIDE TRANSPORTATION AND LAND MANAGEMENT AGENCY

RIGHT-of-WAY in INDIAN COUNTRY

CITY OF RENO REDEVELOPMENT RENO CITY COUNCIL CHAMBER ONE EAST FIRST STREET RENO, NV Wednesday, June 13, :00 P.M.

Programmatic Agreement for Minor Transportation Projects. Operating Procedures

County Engineers Workshop February 4, Little River Casino and Resort Manistee, Michigan

By: John R. Navratil, ASA, SR/WA, R/W-AC, R/W-NAC

WYOMING COUNTY PURCHASE OF DEVELOPMENT RIGHTS (PDR) PROGRAM. NYS Farmland Protection Implementation Grants (FPIG) PRE-APPLICATION

B-08-MN October 1, 2015 thru December 31, 2015 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

Certified Survey Map (CSM) Submittal Updated: 6/29/18

TABLE OF CONTENTS. The Real Estate Cycle 7 Economic Downturns from the Past 9 Real Estate Downturn of the Great Recession 9

ED-900C EDA Application Supplement for Construction Programs

Short Title: Performance Guarantees/Subdivision Streets. (Public) April 28, 2016

Transcription:

Hank's Exchange Road Bridge Replacement Project Public Information Meeting, Wednesday, May 12, 2014 Gold Oak School Presented By: El Dorado County Community Development Agency, Transportation Division John Kahling, P.E. Deputy Director of Engineering Dwight Anderson, P.E. Associate Civil Engineer David Friestad Assistant in Civil Engineering 1

Public Meeting Agenda Welcome and Introduction John Kahling County Bridge Program / Funding John Kahling Hank s Exchange Bridge - Facts / Conditions Dwight Anderson Project Overview Dwight Anderson Open Question & Discussion Period County Staff Available to Answer Questions and Receive Public Input 2

County Bridge Inventory 79 Bridges in County Bridge Inventory 21 are in 2013-14 Capital Improvement Program adopted February 11, 2014 http://www.edcgov.us/government/dot/cip.aspx (see Section VIII: West Slope Projects) Included in the CIP Hank s Exchange Road at Squaw Hollow Creek Bridge Replacement (CIP# 77135) Project is eligible for 100% reimbursement from the federal funding Highway Bridge Program (HBP) 3

Highway Bridge Program (HBP) Federal funding program for bridge safety projects - maintenance, rehabilitation and replacement Program authorized by Federal Highway Administration (FHWA) & administered by State DOT s (CA Caltrans) Requires Planning, Environmental, and Preliminary Engineering (PE) completed within 10 years of PE authorization date April 2012 County received FHWA authorization to proceed with PE for Hank's Exchange at Squaw Hollow Creek Bridge Replacement Project 100% Federal Participating Share - No Local Match (County General Fund will NOT be used) 4

Bridge Inspections / Sufficiency Ratings Each bridge is thoroughly inspected by Caltrans every 2 years and rated on 140 elements Given a Sufficiency Rating (SR) score of 0 to 100 Rating is overall measure of the bridge condition and sufficiency to remain in service Used to determine eligibility for federal funds and prioritization 5

Federal Funding Eligibility Criteria SR < 80 is eligible for Rehabilitation SR < 50 is eligible for Replacement -Hank s Exchange Bridge Sufficiency Rating: 40.7 (2011 inspection) Rehab projects cannot use any additional federal aid for 10 years. Replacement projects - bridge must be either functionally obsolete or structurally deficient. 6

Bridge Sufficiency Terminology Structurally Deficient: Limitations of the structural condition of the bridge, such as weight limits or load capacity. Functionally Obsolete: Built to standards that are not used today, such as inadequate lane widths, shoulder widths, or vertical clearances to serve current traffic demand. This status of this bridge is Functionally Obsolete. 7

Hank's Exchange Bridge Location 8

Hank's Exchange Bridge Facts / Condition Year Built: 1930 (84 years old) Expected life: 75 years One-lane,13.5-foot wide x 22-foot span Reinforced Concrete Slab Avg. Daily Traffic: 1,245 (both directions, 2010 traffic count) Sufficiency Rating: 40.7 (2011) Functionally Obsolete 2011 inspection shows abutments are abraded along and below water line. 9

Hank's Exchange Bridge Photos 10

Why Replace the Existing Bridge? Bridge is 19 years past the 75 year life expectancy Bridge is classified as Functionally Obsolete Anticipated 100% federal funding; this funding may not be available in future, if the project is postponed No County funds are proposed to be used for this project Narrow one-lane bridge restricts emergency access 11

Hank's Exchange Bridge Existing Conditions 12

Hank's Exchange Bridge Alternatives Considered Option 1 PRELIMINARY DESIGN 13

Hank's Exchange Bridge Existing Conditions 14

Hank's Exchange Bridge Alternatives Considered Option 2 PRELIMINARY DESIGN 15

Hank's Exchange Bridge Existing Conditions 16

Hank's Exchange Bridge Alternatives Considered PRELIMINARY DESIGN 17

Perfecting the Right-of-Way El Dorado County uses the CALTRANS RW process Permits to Enter for Surveying & Environmental Studies County Right-of-Way in Fee Utility, Slope & Drainage Easements Temporary Construction Easements Acquisition Process: Appraisals Negotiations Closing Escrow 18

Estimated Project Schedule Project Prioritized/Federal Funding Programmed (Highway Bridge Program) 2014 Develop Alternatives, Public Meeting, Preliminary Design 2014/15 Prepare Environmental Document in Compliance with CEQA & NEPA 2015/16 Public Review 2015/16 Develop Plans, Specifications and Estimate (PS&E) 2015/17 Right of Way Acquisition 2016/17 Construct Project Hank's Exchange Bridge - Public Information Meeting, May 12, 2018/19 19

Questions or Comments Fill out a Comment Card Today Visit the project website: www.edcgov.us/bridgeprojects/ Email: hanks.exchange.bridge@edcgov.us Mail: El Dorado County CDA-Transportation Attn: Dwight Anderson 2441 Headington Road Placerville, CA 95667 Phone: (530) 621-6593 20