ARTICLE (SM) SURFACE MINING ZONE. 2. To allow the development and use of mineral and aggregate resources;

Similar documents
Extractive Industrial Regulatory Ordinance No. 21 revised Dec. 28, 2010 EXTRACTIVE INDUSTRIAL REGULATORY ORDINANCE TYRONE TOWNSHIP, MICHIGAN

RESOLUTION NO ORDINANCE NO. 02-1

SECTION 7: LAND USE POLICIES - MINERAL AGGREGATE

LOCAL LAW NO. 2, 1987 A LOCAL LAW REGULATING EXCAVATION AND TOPSOIL REMOVAL WITHIN THE TOWN OF CAMBRIA

ARTICLE 7. SPECIFIC USE STANDARDS

Chapter 210 CONDITIONAL USES

EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER

Appendix F - Earth Materials Extraction, Processing and Site Reclamation

HOUSE BILL lr3434 A BILL ENTITLED. Department of the Environment Licensing and Permitting Prohibited for Mountaintop Removal Coal Mining

The intent of the Exclusive Farm Use District is to preserve and maintain commercial agricultural land within the County.

This EFU District is provided to meet the Oregon statutory and administrative rule requirements.

Lane Code CHAPTER 10 CONTENTS

DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER th Street NW East Wenatchee, WAS BEFORE THE DOUGLAS COUNTY HEARING EXAMINER

Planned Unit Development (PUD). Sections:

ARTICLEIII: LAND USE DISTRICTS 344 AGRICULTURE AND FOREST DISTRICT (AF 20)

CCC XXX Rural Neighborhood Conservation (NC)

CHAPTER 50 LAND USE ZONES ARTICLE 50 BASIC PROVISIONS

Understanding the Conditional Use Process

STAFF REPORT PIPKIN MINERAL EXTRACTION

A Minor Land Excavation Operating Permit is used to:

Lapeer County, Michigan. Earth Material Removal Ordinance No. 801, As amended.

SPECIAL USE PERMIT APPLICATION FOR NATURAL DEPOSITS, EXTRACTION AND PROCESSING; CONCRETE BATCH PLANTS; HOT MIX (ROAD/ASPHALT) PLANTS

Residential Project Convenience Facilities

RACINE COUNTY ECONOMIC DEVELOPMENT & LAND USE PLANNING COMMITTEE. SUMMARY MINUTES June 19, :00 p.m.

CHAPTER URBAN TRANSITION - UT ZONE

WASHINGTON COUNTY DEVELOPMENT CODE

Chapter 9 - Non-Conformities CHAPTER 9 - INDEX

COLUMBIA COUNTY SURFACE MINING ORDINANCE

CHAPTER XVIII SITE PLAN REVIEW

This Chapter shall become effective upon adoption hereof by the Board of County Commissioners.

8.16 NON-FERROUS MINING ORDINANCE 1 THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS: 2

May 12, Chapter RH HILLSIDE RESIDENTIAL ZONES REGULATIONS Sections:

Date. A ppucnt. Address. CoIIeed by. Telephirne PARCEL #2: Town.ship. Thwn-sbip. RanJe. Rarue. Ta mt. Tx Lot. Ztine. Zone.

ORDINANCE NO. _4.06 AN ORDINANCE TO ESTABLISH BUILDING SITE REGULATIONS SECTION A PURPOSE AND INTENT

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

By-Law of The Corporation of the City of Oshawa

ARTICLE 24 SITE PLAN REVIEW

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

OFFERING CIRCULAR Acres Rural Industrial Zone 6855 NW Cornelius-Schefflin Rd. Cornelius, Oregon. Presented by:

CHAPTER 10 Planned Unit Development Zoning Districts

ARTICLE 5 GENERAL REQUIREMENTS

1. Approval of Plans and Specifications/Architectural Review Procedure.

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

CHAPTER34 PRUD - PLANNED RESIDENTIAL UNIT DEVELOPMENT

Chapter 420 TIMBER-GRAZING ZONE (TG)

Senate Bill 644 Ordered by the Senate July 4 Including Senate Amendments dated June 29 and July 4

CHAPTER 80 SPECIAL USE STANDARDS ARTICLE 80 BASIC PROVISIONS

COUNTY ZONING ORDINANCE REGARDING METALLIC MINERAL MINING AND RECLAMATION. Ordinance. Recitals

Mineral Resources. Tonight s presentation will cover 3 areas: 1. Regulation (detail in handout) 2. Current Issues 3.

ARTICLE 24 PRIVATE ROAD, SHARED PRIVATE DRIVEWAY AND ACCESS EASEMENT STANDARDS

CHAPTER XV PUD PLANNED UNIT DEVELOPMENT DISTRICT

CHAPTER 30 BUILDING CODE

FSM MINERALS AND GEOLOGY WO AMENDMENT EFFECTIVE 6/1/90 CHAPTER MINERAL RESERVATIONS AND OUTSTANDING MINERAL RIGHTS.

ARTICLE IV: DEVELOPMENT STANDARDS

RURAL GENERAL RG 1. PERMITTED USES DISCRETIONARY USES

Article XII. R-1 Agricultural-Low Density Residential District

MOTION TO SET ROAD SPECIFICATION STANDARDS

EXCAVATION SITE PLAN REVIEW REGULATIONS

March 26, Sutter County Planning Commission

A. ARTICLE 16 - STEEP SLOPE CONSERVATION DISTRICT

CHAPTER SURFACE MINING AND LAND RECLAMATION

Oregon Theodore R KjibngDski, Governor

CHAPTER 3 REGULATIONS INSIDE THE COASTAL ZONE

ARTICLE A. MULTIPLE USE, AGRICULTURE AND RURAL RESIDENTIAL DISTRICTS

Umatilla County Department of Land Use Planning

b) Tangerine Corridor Overlay District 1) Tangerine Corridor District Regulations

Senate Bill 1051 Ordered by the House July 5 Including House Amendments dated July 5

ADUs and You! Common types of ADUs include mother-in-law suite, garage apartments and finished basements.

CHAPTER CC (COMMUNITY COMMERCIAL) ZONE

ARTICLE 8 CONDITIONAL USES CONDITIONAL ZONING CERTIFICATES

Special Use Permit - Planned Unit Development Checklist. Property Address:

Midwest City, Oklahoma Zoning Ordinance

Combined Zoning/Minor Variance and Boulevard Parking Agreement Exception

CANYON COUNTY PLANNING & ZONING COMMISSION MINUTES OF REGULAR MEETING HELD Thursday, October 4, :30 P.M.

Legal Description Part of the Western Half of the Eastern Half of the Northwest Quarter of Section 30, Le Ray Township

ARTICLE 14 PLANNED UNIT DEVELOPMENT (PUD) DISTRICT

Local Government and Industrial Sand Mining. Wisconsin has no known petroleum deposits, but the state has lots of sand and the right kind of sand.

Division 6 Residential Medium Density Zone: Assessment Criteria and Assessment Tables

Planning Justification Report

1. Allow a workable, interrelated mix of diverse land uses;

15.02 PERMITTED USES: The following uses and no other shall be deemed Residential, R-1, uses and permitted in all R-1 districts:

Multiple Use Forest District (MUF)

Sample Interim Development Control Bylaw For a Rural Municipality

ARTICLE 16 - MOBILE HOME PARKS, INDIVIDUAL SINGLE-WIDE MOBILE HOMES & DEPENDENT RELATIVE SINGLE-WIDE MOBILE HOMES

Guide to Minor Developments

OFFICIAL PLAN FOR THE CORPORATION OF THE TOWNSHIP OF MORLEY

Interim Use Permit Application

Public Hearing Published 8/21/2017 Public Hearing 9/21/2017 Approved 10/5/2017 RESOLUTION NO

TOWN OF WARNER, NEW HAMPSHIRE EARTH EXCAVATION REGULATIONS

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

TOWN OF NEW HAVEN, DUNN COUNTY NON-METALLIC MINE OPERATOR S LICENSE ORDINANCE ORDINANCE NO:

ZONING ORDINANCE ITASCA COUNTY, MINNESOTA EFFECTIVE DATE: APRIL 15,2012

ARTICLE VII. NONCONFORMITIES. Section 700. Purpose.

PROPOSED AMENDMENTS TO THE DERBY ZONING REGULATIONS AUGUST 12, 2008

ROAD APPROACH ORDINANCE #44 TILLAMOOK COUNTY OREGON. ADOPTED September 18, UPDATED June 23, UPDATED June 28, UPDATED July 24, 1996

SICKLERVILLE FOREST PRESERVATION INITIAL REVIEW RESULTS

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

Bids Due and Opening Wednesday, December 7, 2016 Time 2:00 p.m.

Transcription:

ARTICLE 15.00 (SM) SURFACE MINING ZONE 15.01 PURPOSE The purposes of the Surface Mining Zone are: 1. To implement the policies of the Comprehensive Plan; 2. To allow the development and use of mineral and aggregate resources; 3. To provide uniform standards for extraction and processing of mineral and aggregate resources; 4. To protect the health and safety of the public and of property adjoining surface mining zones; 5. To assure all land and water resources affected by surface mining operations receive protection. 15.02 USES PERMITTED OUTRIGHT The following uses and their accessory uses are permitted outright in the SM Zone: 1. Farm uses as defined in Section 1.08. 2. Forest uses as defined in Section 1.08. 15.03 USES PERMITTED OUTRIGHT SUBJECT TO SITE PLAN REVIEW The following uses are permitted outright subject to site plan review standards: 1. Extraction of any mineral or aggregate material. 2. Stockpiling and storage of mineral or aggregate materials. 3. Crushing and aggregate processing. 4. Sale of extracted or processed materials. 5. Related activities such as batch plants, mineral refining plants, hot mix asphalt plants and concrete products plants. Article 15.00 Page 1

6. Buildings, structures, apparatus, equipment and appurtenances necessary for the above uses to be carried out except dwellings. 15.04 CONDITIONAL USES SUBJECT TO SITE PLAN REVIEW The following uses are subject to conditional use standards in Section 21.06 (1) and Planning Commission review and approval: 1. Expansion or replacement in essentially the same location of a pre-existing legal dwelling. 2. Other uses accessory to those listed outright and conditionally and approved by the County Planning Commission per Section 21.06(2). 3. One temporary or portable residence when necessary to house a caretaker or a night watchman. 15.05 SITE PLAN REQUIREMENTS AND MINING STANDARDS The following site plan and mining standards shall be approved by the Planning Commission before the beginning of any use requiring site plan review under this Article. 1. The applicant shall submit a site plan application in accordance with Section 20.10 of this Ordinance. 2. The applicant shall state how the proposed site will be reclaimed and subsequently used. 3. Use Setbacks: A. Any mining, equipment, structural use or access roads within a Surface Mining Zone shall maintain a minimum setback of 250 feet from a noise or dust-sensitive use or structure and 100-feet from all designated wetlands unless a different setback is specified by the Planning Commission. Exception to these standards shall be allowed for the following: (1) Agricultural activities. (2) Access roads approved as a part of the site plan review. (3) Landscaped berms. (4) Written agreement(s) for a reduced setback made between the owner of the noise or dust sensitive use or structure located within 250 feet of the Article 15.00 Page 2

proposed activity and the owner or operator of the proposed surface mine. The agreement shall be notarized and recorded in the Union County Clerk's Office and shall remain with the parcel if conveyed. The agreement shall be considered during site plan review. B. Mineral and aggregate material storage and aggregate processing equipment creating noise and dust shall not be located closer than 1,320 feet from a noise or dust-sensitive use or structure, unless the applicant demonstrates that: 4. Size of Open Pit: (1) Due to the parcel size, topography, existing vegetation or location of conflicting uses or resources, there is no other on-site location that will have less noise or dust impacts; and (2) All Department of Environmental Quality noise control and air quality standards can be met by the proposed use for which the excavation is requested. The size of an open pit in a mining area operation shall be set on a case-by-case basis through the Section 20.10 Site Plan Review Process. Continued mining may occur concurrently with the satisfactory completion of the required reclamation as specified by Department of Geology and Mineral Industries. An open pit operation occurring within 500-feet of another unreclaimed open pit mine under the same ownership shall comply with the Site Plan progression for opening and closing excavation sites. Any violation of this provision shall be recognized as a continuing violation of this ordinance and subject to cancellation of site plan approval upon conviction. 5. Air, Water and Noise Standards: Air and water quality and noise level requirements shall comply with State and Federal standards. Unless agreed to in writing by adjoining property owner(s), existing waterways on the site are not changed in a manner which substantially interferes with waterway patterns on adjoining property or which drains waste materials or waste water onto adjoining property or waters of the state. The discharge of any contaminants or the disposal of any seepage waters shall be approved by the Department of Environmental Quality. 6. Vegetation: Where a surface mining site is adjacent to a lake, stream or designated wetland area, all existing vegetation within 100 feet of the mean-high water mark shall be retained. 7. Road Maintenance Responsibility: Article 15.00 Page 3

All improved or unimproved on-site roadways and nearby public roads providing access to the mining site shall be maintained in a durable dustless condition and any damage to public use or county roads, or state highways sustained by the use of the mining operator's heavy equipment shall be repaired on an annual basis or upon completion of the mining activity, whichever comes first. 8. Traffic Routing: All trucks and heavy equipment transporting mining aggregate or processing materials shall avoid travel through residential areas, unless no other route is available, by using the routes approved on the site plan. 9. Maximum Heights: Maximum height of all berms adjacent to excavation sites shall not exceed ten (10) feet. Storage or stock piles of overburden, reject or processed aggregate shall not exceed twenty (20) feet in height for a temporary period not to exceed two (2) years. 10. Screening and Fencing: A. Use of the existing land forms, an earthen berm and/or mature or fast growing vegetative screening shall be established to fully screen the view of any mineral and aggregate activity including related equipment located within 1,320 feet of a noise or dust sensitive area. Screening or fencing may be waived by the Planning Commission where steep slopes would render such barriers ineffective. B. Fencing or approved barrier shrubs shall be required where noise or dust sensitive uses are within 1320 feet. If fencing is used it shall be of cyclone type and a minimum of five (5) feet high. 15.06 IMPACT OVERLAY AREA - USES AND DEVELOPMENT STANDARDS 1. Uses Permitted Outright. Uses permitted outright in the underlying zone, except noise or dust sensitive uses or conflicting uses, may be permitted subject to the standards and criteria of the underlying zone(s). A. Uses Allowed Conditionally (1) Noise or dust sensitive uses or conflicting uses shall be reviewed as conditional uses subject to the standards and criteria of the underlying zone and this section. Article 15.00 Page 4

(2) Conditional uses in the underlying zone(s) which are not noise or dust sensitive uses or conflicting uses shall be reviewed as conditional uses subject to the standards and criteria of the underlying zone. B. Prohibited Uses. Uses identified through the Goal 5 process as incompatible with mining in all instances shall not be permitted within the Impact Area. C. Review Criteria. To approve uses allowed conditionally in the Impact Area, the applicant must demonstrate compliance with the following criteria: (1) The proposed use will not interfere with or cause an adverse impact on lawfully established and lawfully operating mining operation; (2) The proposed use will not cause or threaten to cause the mining operation to violate any applicable standards of this chapter, or the terms of a state agency permit. The applicant for a new noise sensitive use shall submit an analysis prepared by an engineer or other qualified person, showing that applicable DEQ noise control standards are met or can be met by a specified date by the nearby mining operation. (3) Any setbacks or other requirements imposed through the Goal 5 process have been met, or can be met by a specified date. 15.07 FINAL SITE PLAN APPROVAL Following site plan approval and prior to beginning any surface mining activities, the Planning Director or designee shall physically view the site for conformance with site plan approval. When it has been determined that all conditions of the approved site plan have been met, final approval shall be issued. 15.08 EXPIRATION OF APPROVAL The Site Plan shall expire 12-months from the date of approval unless the required permits have been issued and the mining operation has commenced. 15.09 PERFORMANCE GUARANTEE The mining operator shall enter into a performance agreement with Union County guaranteeing faithful performance of all the requirements of a surface mining permit in a Surface Mining Article 15.00 Page 5

Zone. The agreement shall be in accordance with the procedures and specifications outlined in Article 31.00 of this Ordinance. Article 15.00 Page 6