PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

Similar documents
BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

BUILDING PERMIT FEE SCHEDULE

BUILDING PERMIT APPLICATION. Commercial Building Permit Application Checklist

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

CHAPTER 1321 Permit and Inspection Fees

Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

Resolution Fee Schedule

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Appendix B PENALTY, SALARY, BONDS and FEES

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

SCHEDULE A. Classes of Permits and Fees (Reference By-law No ) 1.) Calculation of Permit Fees (All fees are exempted from HST)

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 60-12

City of Georgetown. Inspection Services

MEDINA COUNTY BUILDING REGULATIONS

MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

City of High Point Development Fee Schedule

Class of Permits and Fees Schedule A

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

3. COMMUNITY DEVELOPMENT Approved FY 18 19

Planning&Development Fee Standards

Worcester Township Fee Schedule

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

City of Wausau Building, Housing and Zoning Fee Schedule 2019

TOWN OF CASTLE ROCK. Fee Schedules. Development Services MAY 2018

City of Georgetown. Inspection Services

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

FY 2018 FEE SCHEDULE (Effective )

MEDINA COUNTY BUILDING REGULATIONS

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 29-11

REQUEST FOR COUNCIL ACTION

City of Wausau Building, Housing and Zoning Fee Schedule

Schedule of City Fees & Charges

CHAPTER 6: ALCOHOLIC BEVERAGES

CITY OF TORONTO. BY-LAW No A By-law under the Building Code Act, 1992 respecting permits and related matters.

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

Project Address. Name of Project/business name. Owner of Property Phone . Emergency contact phone number. Parcel Number

Building Division Fee Schedule January 2018

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

BUILDING PERMIT FEE SCHEDULE

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

FEES ASSOCIATED WITH DEVELOPMENT

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW NUMBER

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

Prepared by: Office of Management and Budget

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

City of Beaumont Development Related Fee Schedule

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

Department of Public Works Permit Fee Schedule

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

CONSTRUCTION PERMIT FEE SUMMARY

This fee structure applies to applications submitted on or after January 1, 2018.

REPORT TO COUNCIL City of Sacramento

Development and Other Services Fee Schedule"

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

APPENDIX A BUILDING PERMIT AND RELATED FEES

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

CITY OF SPRING LAKE PARK 2018 FEE SCHEDULE

CITY OF GALION OHIO CONSOLIDATED FEE SCHEDULE

By-Law of The Corporation of the City of Oshawa

SCHEDULE K PLANNING & BUILDING SERVICES

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

Fee Resolution

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

Commissioners to enact, amend, and enforce technical construction and building codes; and,

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

Three Oaks TWP. (269) FAX THREE OAKS, MICHIGAN MECHANICAL PERMIT APPLICATION

C. For all areas of unincorporated Multnomah County:

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

Chapter Fees (d) OFFICIAL ZONING MAP UPDATE (EXCLUDING FINAL PLATS) $10.00, PER LOT (e) HOME OFFICE PERMIT

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

Planning, Development, and Building Fees and Charges 2018

Total Cost of the Building Permit. Total Valuation*

Planning, Zoning and Building Fee Schedule

RESOLUTION NO AMENDING RESOLUTION NO TOWN OF BEL AIR S FEE SCHEDULE

FEE SCHEDULE SAFETY CODE PERMIT FEES EFFECTIVE JANUARY 1, 2018 PART 1 - DEFINITIONS

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

BUILDING SERVICES ~ FEE SCHEDULE

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

The Corporation of the Town of Bradford West Gwillimbury. By-law Building By-law

List of Principal Officials

10% of Building Permit in addition to the full Building Permit Fee

Building Permit Application

Hamilton Conservation Authority Watershed Planning and Engineering

SCHEDULE OF BUILDING PERMIT FEES

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

Transcription:

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION TABLE OF CONTENTS BUILDING FEE CALCULATION 2 BUILDING FEES HAMILTON COUNTY BUILDING CODE (1-2 DWELLING UNITS) 2 OHIO BUILDING CODE 3 FIRE SUPPRESSION SYSTEMS 3 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) 4 TYPE OF CONSTRUCTION FACTOR 4 HAMILTON COUNTY ADMINISTRATIVE FEES 5 HAMILTON COUNTY PENALTY FEES 5

BUILDING FEE CALCULATION Fees for permits, inspections, certificates shall be paid to the Building Official as set forth herein. This Fee Schedule shall become effective January 1, 2009, as adopted by the Hamilton County Board of County Commissioners pursuant to Sections 307.37 ORC. To calculate a fee using a Permit Fee Multiplier, you need the building gross area (total of all floors), type of construction (page 3) and the permit fee multiplier. FORMULA A: Building Permit and HVAC application combined Permit Fee = Gross Area X 107.8 X Construction X Multiplier X 1.25 = FORMULA B: Building Permit Only (no HVAC) Permit Fee = Gross Area X 107.8 X Construction X Multiplier = FORMULA C: HVAC Permit Only (no building) Permit Fee = Gross Area X 107.8 X Construction X Multiplier X.25 = FORMULA D: One and Two and Three Family Residential Building Permit and HVAC application combined Permit Fee = Building Gross Area X $.21 (Building Gross Area includes occupied garage, basement, finished or unfinished) MINIMUM PERMIT USE/TYPE EACH FRONT FEE MULTIPLIER CO/CC 1 st 30 DAYS REVISION BUILDINGS AND STRUCTURES REGULATED BY THE HCBC - 1-2-3 DWELLING UNITS BUILDINGS AND STRUCTURES REGULATED BY THE HCBC & RCO (ADD OBBS ASSESSMENT FEE - 1%) 1. New Dwellings (Formula D) -- $295 $295 -- $ 43 $111 $111 2. Additions (Formula D) -- $295 $295 -- $ 43 $111 $111 (Includes ductwork only) (To add or replace HVAC units, add fees from line 6) 3. Industrialized Dwellings (Includes all HVAC) $256 $295 -- -- $ 43 $111 $111 4. Alterations and Fire Repair $100 ea. $198 $198 -- $ 43 $111 $111 (To add or replace HVAC units, floor add fees from line 6) (Total loss by fire or natural disaster reviewed as New Dwelling) 5. Accessory Structures (over 200 sf) $198 $241 -- -- $ 43 $111 $111 6. Mechanical Additions & Replacements A. Heating or air conditioning $ 73 $ 96 -- -- $ 23 -- -- B. Combined (includes ductwork) $139 $162 -- -- $ 23 -- -- 7. Decks and Ramps without Roofs $149 $192 -- -- $ 43 $111 $111 (Attached or Detached) 8. Partial Permits (when granted) $198 $221 -- -- $ 23 -- -- 9. Moving $198 $221 -- -- $ 23 -- -- 10. Pools A. Above Ground $120 $163 -- -- $ 43 $111 $111 B. In-Ground $295 $338 -- -- $ 43 $111 $111 11. Retaining Walls (up to 300 ft.) $5.85/lf $100 $100 -- $ 23 -- $111 (301 ft. and above) $2.98/lf 12. Towers $100 $123 -- -- $ 23 $111 13. Wrecking $43/1000 sf TOTAL $ 64 -- $ 23 -- 2

MINIMUM PERMIT USE/TYPE EACH FRONT FEE MULTIPLIER CO/CC 1 st 30 DAYS REVISION BUILDINGS AND STRUCTURES REGULATED BY THE OBC (ADD OBBS ASSESSMENT FEE - 3%) 1. New Buildings -- $490 $490.0019 $141 $221 $221 2. Additions -- $490 $490.0019 $141 $221 $221 3. Industrialized (includes all HVAC) $256 $397 -- -- $141 $221 $221 4. Alterations and Fire Repair A. Entire building, floor, fire -- $490 $490.0043 $141 $221 $221 repair alterations B. Minor Alterations (as determined $355 $490 $490 -- $141 $221 $221 by the Building Official) C. Change of Use (No building or mechanical work included) $490 $630 -- -- $141 -- $221 D. Minor Alterations and Change of Use (as determined by the Building Official) sq.ft. over $490 $490 $490.0043 $141 $221 $221 10,000 shall be calculated at 10,000 sq. ft. 5. Partial Permits (conditional permits) A. Footing and foundation $392 $415 -- -- $ 23 -- $221 B. Shell (Formula B) -- $490 $490.0019 $ 23 -- $221 C. Interior Build-out of Shell -- $490 $490.0019 $141 $221 $221 6. Utility/Miscellaneous Structure -- $339 $198.0019 $141 $221 $221 7. Awnings, Canopies and Marquees A. Light Construction $100 $123 -- -- $ 23 -- $111 B. Heavy Construction $198 $339 -- -- $141 $221 $111 8. Decks and Ramps without Roofs $219 $360 -- -- $141 $221 $111 (Attached or detached) 9. Kitchen Exhaust Hoods $52.00/lf $198 $198 -- $ 23 -- $111 10. Membranes -- $295 $436.0019 $141 $221 $221 11. Moving $198 $221 -- -- $ 23 -- -- 12. Pools $390 $531 -- -- $141 $221 $111 13. Re-Roofing $.040/sf TOTAL $276 -- $ 23 -- -- 14. Retaining Walls and Monuments $ 5.85/lf $100 $100 -- $ 23 -- $111 (301 ft. and above) $ 2.98/lf 15. Signs A. Permanent Ground Supported $198 $221 -- -- $ 23 -- $111 (over 3 sf) B. Wall, Projecting and Roof $ 80 $103 -- -- $ 23 -- -- (over 22 sf) C. Single Sign Face Change $ 80 $103 -- -- $ 23 -- -- (Multiple Face Changes on $ 23 ea. add=l. same site) 16. Spray Booths $160 $301 -- -- $141 -- $111 17. Temporary Structures - under 180 $100 $100 $100 -- $141 -- B days (See Section 624.0) $ 23 ea. additional 18. Tents $100 $100 $100 -- $141 -- -- $ 23 ea. additional 19. Wrecking $43/1000 sf TOTAL $ 64 -- $ 23 -- -- 20. Gas Line (per meter) $ 80 $103 -- -- $ 23 -- $111 21. Other Building Service Piping $ 80 $103 -- $ 23 $111 (refrigeration lines) FIRE PROTECTION SYSTEMS, Regulated by the OBC (Add OBBS Assessment Fee) 1. Inside suppression work-including limited area A. New $.061/sf $203 $180 -- $ 23 -- $111 B. Alteration (arm-overs only) $.0099/sf $203 $180 -- $ 23 -- $111 2. Outside Fire Line Work $180 $203 -- -- $ 23 -- $111 3. Gravity and Pressure Tanks $100 $123 -- -- $ 23 -- $111 4. Fire Pumps $100 $123 -- -- $ 23 -- $111 5. Standpipes - House or FD hose system $43/story/standpipe $221 $198 -- $ 23 -- $111 3

MINIMUM PERMIT USE/TYPE EACH FRONT FEE MULTIPLIER CO/CC 1 ST 30 DAYS REVISION FIRE PROTECTION SYSTEMS, Regulated by the OBC (ADD OBBS Assessment Fee - 3%) 6. Hoods - Suppression System Only $100 $123 -- -- $ 23 -- $111 7. Fire Alarms A. New (Use Groups E, I and R) $.0199 per sf $318 $295 -- $ 23 -- $111 (All other Use Groups) $.0146 per sf $318 $295 -- $ 23 -- $111 B. Alterations (Use Groups E, I and R) $.0146 per sf $318 $295 -- $ 23 -- $111 (All other Use Groups) $.0050 per sf $318 $295 -- $ 23 -- $111 HEATING, VENTILATION AND AIR CONDITIONING, REGULATED BY THE OBC (Add OBBS Assessment Fee 3%) 1. HVAC Equipment Replacement Only (Single or Combined Unit) A. Includes Ductwork $198 $221 -- -- $ 23 -- $111 B. Without Ductwork, Unit Only $141 $164 -- -- $ 23 -- -- C. Ductwork Only $141 $164 -- -- $ 23 -- -- 2. New/Additions/Alterations* -- $221 $198.0019 $ 23 -- $111 (Formula C) 3. Alterations to Buildings** -- $221 $198.005 $ 23 -- $111 (Formula C) 4. HVAC work related to permits using $141 $221 $198.005 $ 23 _ $111 Calculation as per 4.D (Formula C); Sq. ft. over 10,000 shall be calculated at 10,000 sq ft * When building permit work necessitates mechanical work. ** When a new mechanical system is installed in an existing building as regulated by OMC. TYPE OF CONSTRUCTION FACTOR * USE GROUP 1A 1B 2A 2B 3A 3B 4 5A 5B A-1 Assembly, theaters 1.78 1.73 1.69 1.60 1.51 1.50 1.56 1.40 1.36 A-2 Assembly, nightclubs, 1.27 1.23 1.20 1.13 1.05 1.05 1.09 0.96 0.93 restaurants, bars, banquet halls A-3 Assembly, churches, general, 1.27 1.23 1.20 1.13 1.05 1.05 1.09 0.96 0.93 community halls, libraries, museums A-4/A-5 Assembly, arenas 1.25 1.22 1.17 1.11 1.03 1.03 1.08 0.93 0.91 B Business 1.20 1.15 1.11 1.04 0.93 0.93 1.00 0.82 0.79 E Educational 1.28 1.23 1.20 1.13 1.04 1.01 1.08 0.91 0.88 F-1 Factory and industrial, moderate hazard 0.76 0.73 0.68 0.64 0.55 0.57 0.62 0.47 0.45 F-2 Factory and industrial, low hazard 0.75 0.71 0.68 0.63 0.55 0.55 0.61 0.47 0.43 H-1 High Hazard, explosives 0.73 0.70 0.66 0.61 0.54 0.54 0.59 0.45 N.P. H-2 -H-4 High Hazard 0.73 0.70 0.66 0.61 0.54 0.54 0.59 0.45 0.42 H-5 HPM 1.20 1.15 1.11 1.04 0.93 0.93 1.00 0.82 0.79 I-1 Institutional, supervised environment 1.22 1.17 1.14 1.07 0.99 0.99 1.07 0.90 0.87 I-2 Institutional, incapacitated 1.77 1.73 1.69 1.62 1.50 N.P. 1.57 1.39 N.P. I-3 Institutional, restrained 1.39 1.34 1.30 1.23 1.13 1.11 1.19 1.02 0.96 I-4 Institutional, day care facilities 1.22 1.17 1.14 1.07 0.99 0.99 1.07 0.90 0.87 M Mercantile 0.97 0.93 0.88 0.83 0.74 0.75 0.79 0.65 0.63 R-1 Residential, hotels/motels 1.32 1.28 1.25 1.18 1.10 1.09 1.17 1.01 0.97 R-2 Residential, multiple family 1.11 1.06 1.03 0.97 0.89 0.88 0.96 0.80 0.76 R-3 & IRC Residential, one- and two-family 0.92 0.89 0.86 0.82 0.78 0.78 0.81 0.73 0.68 R-4 Residential, care/assisted living facilities 1.22 1.17 1.14 1.07 0.99 0.99 1.07 0.90 0.87 S-1 Storage, moderate hazard 0.72 0.68 0.63 0.60 0.51 0.52 0.58 0.43 0.41 S-2 Storage, low hazard 0.71 0.67 0.63 0.59 0.51 0.51 0.56 0.43 0.39 U Utility/Miscellaneous 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 4

HAMILTON COUNTY ADMINISTRATIVE FEES 1. Certificate of Occupancy (CO) where required A. Buildings and structures regulated by the HCBC $ 43 B. Buildings and structures regulated by the OBBC $141 C. Certificate of Completion of Permit (CC) - for all permits where a CO is not required $ 23 2. Certificate of Temporary Occupancy (TCO) A. Buildings and structures regulated by the HCBC $111-1 st 30 days + $57 ea addn l 30 days If addn 1 TCO is required $221 1 st 30 days + $111 ea addn l 30 days B. Buildings and structures regulated by the OBC $221-1 st 30 days + $111 ea addn l 30 days If addn 1 TCO is required $440 1st 30 days + $221 ea addn l 30 days C. Occupying w/o TCO, penalty fee = Residential-$221 Commercial-$440 to be paid in addition to TCO fee. D. Occupying w/o a Certificate of Occupancy Residential = $221 Commercial = $440 3. Refund of Permit Fee (Section HC.A108.4). If granted, shall be in the amount of half the entire permit fee, after deducting the Up-Front Fee and the Zoning Certificate Fee. 4. Time Extensions (Section HC.A105.6) each $100 5. Unspecified Permit Fee - for any permit type, not specifically listed in this Fee Schedule, the fee shall be calculated to the most similar permit type, use group and type of construction to be determined at the discretion of the Building Official. 6. Scanning fee for Permit Applications reviewed under OBC for paper documents submitted without a digital copy in an approved format Documents up to 82 x 14 (including Specs.) $ 2.00/side Documents larger than 82 x 11 (B) size $ 5.85/sheet 7. Field Inspection and Processing Fee (non building permit related) Commercial $141 Residential $111 8. After Hours Inspection (OBC Permits) $134 per hour Minimum fee $527 to be paid at time of scheduling inspection 9. Plan Review Fee - Accessed at 3 rd review for each hour thereafter Residential $111 hr (no fractions thereof - rounded up) Commercial $221 hr (no fractions thereof - rounded up) Hourly time to include Plan Examiner, Supervisors and Department Head time involved. 10. Board of Building Appeals Residential $166 Commercial $330 11. Fences over 6 in height requiring a permit Commercial $141 Residential $111 4. Re-inspection Fee - Not Ready and Failed Inspections shall result in a Re-inspection Fee $134 5. Violations Penalties (Section HC.A113) -Violations issued under the Code shall be punishable by a fine of not more than $300.00 for each offense as provided in Ohio Revised Code Section 307.37 and 307.99(C). -Violations issued for offenses to ORC Chapters 3781 and 3791 shall not be more than $1000.00 -Each day that any such violation or failure continues shall be deemed a separate offense. HAMILTON COUNTY PENALTY FEES 1. Starting Without a Permit - (See Section HC.A105.1.1) - Permit fee + 200% penalty fee 2. Rescinding a Revoked Permit Fee - (Section HC.A110.6) - $295.00 or original fee, whichever is less 3. Missed Inspection Fee - Failure to schedule a Acalled-for@ inspection before proceeding to cover the work shall result in a Missed Inspection Fee $221 5