INSTRUCTION: This section consists of TWO (2) structured questions. Answer ALL questions.

Similar documents
INSTRUCTION: This section consists of TWO (2) structured questions. Answer ALL questions.

PK504: BUSINESS LAW. INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL.

RMK 357 Land Administration [Pentadbiran Tanah]

INSTRUCTION: This section consists of THREE (3) essay questions. Answer ALL questions.

RMK 357- Land Administration fpentadbiran Tanah]

RMK 357 Land Administration [Pentadbiran Tanah]

CADASTRE SURVEY (SGHU 2313)

CADASTRE SURVEY (SGHU 2313)

CADASTRE SURVEY (SGHU 2313)

TEMPLATE SERAGAM SENARAI SEMAK DOKUMEN DAN SENARAI SEMAK TERPERINCI AGENSI TEKNIKAL JKT

RAK 346 History and Theory in Architecture 1 [Sejarah dan Teori Senibina 1]

JADUAL IX KANUN TANAH NEGARA [Aturan 36J (2)] NOTIS TAWARAN

CADASTRE SURVEY PRACTICE (SGHU 4323)

Jadual 1: Faktor Pemberat Bagi Jenis Petak (F1)

ESTIMATE IN FORMATION OF CONSTRUCTION CONTRACT EZATUL SHARIDA BINTI AHMAD TERMIZI UNIVERSITI TEKNOLOGI MALAYSIA

MANUAL PROSEDUR KERJA PEMBANGUNAN APLIKASI

DLANGUAGE STUDIO NO 30 1 st FLOOR PERSIARAN B RAYA LANGKAWI MALL KEDAH D.A KERTAS PENERANGAN L FRONT OFFICE ASSISTANT

Practical issue arising and how can developers adapt to new requirement

OUTLINE. Office Practice

Section 7 : Road Lighting

KAWALAN DOKUMEN. Tarikh: 29 Disember 2017 Tarikh: 29 Disember 2017

KERAJAAN MALAYSIA SURAT PEKELILING PERBENDAHARAAN BIL. 4 TAHUN 2003

Tafsiran Dokumen untuk Permohonan evdr PRA

UNIVERSITI TEKNOLOGI MALAYSIA

LAND ACQUISITION ISSUES FOR JABATAN KERJA RAYA s ROAD WORK PROJECT NOOR FAZURA ABU SAMAAN

HURAIAN PINDAAN DOKUMEN ISO UPM

THE INFLUENCE OF INTEREST AND UNDERSTANDING OF HOUSING DEVELOPERS ON GATED COMMUNITIES DEVELOPMENT AINUR ZAIREEN BINTI ZAINUDIN

SALINAN DOKUMEN TERKAWAL

LAND LAW AND SURVEY REGULATION (SGHU 3313)

CADASTRE SURVEY PRACTICE (SGHU 4323)

PENGURUSAN. Kod Dokumen: UPM/PGR/P001. PROSEDUR PENGURUSAN DOKUMEN ISO Tarikh: 20/6/2017

Faculty of Built Environment Universiti Teknologi Malaysia

Submit to State PTG by proprietor within 2 weeks. State CS within 1 month. Superstructure Stage

TAJUK PEMBENTANGAN : PERUNDANGAN TANAH DI BRUNEI DARUSSALAM DISAMPAIKAN OLEH : AMAL HAYATI HAJI JUNAIDI PEGAWAI TANAH BAHAGIAN PENDAFTARAN

CADASTRE SURVEY (SGHU 2313)

Faculty of Information and Communication Technology

ISU-ISU PENGINTEGRASIAN PANGKALAN DATA UKUR KADASTER DAN SISTEM PENDAFTARAN TANAH BERKOMPUTER GENGATHARAN A/L MARIAPPAN

PROFESSIONAL PRACTICE (SGHU 4342)

SOKONGAN KEWANGAN. PEJABAT BURSAR Kod Dokumen: UPM/SOK/KEW-BUY/P005. PROSEDUR SEBUT HARGA UNIVERSITI Tarikh: 18/08/2016

PRESENTATION SUMMARY

CADASTRAL STUDIES (MGU1014 / MGHU1514)

NOVATION AGREEMENT IN DESIGN AND BUILD CONTRACTS NATASHA SAHIL UNIVERSITI TEKOLOGI MALAYSIA

DOCTRINE OF PRIVITY AND ITS APPLICATION IN RELATION TO SUB-CONTRACTOR S PAYMENT NOR AIDA BINTI MOHD AMIN

Jadual H, Fasal 27 Cara Penyerahan Pemilikan Kosong Akta Pemajuan Perumahan (Kawalan Dan Pelesenan) 1966 Akta 118

HURAIAN PINDAAN DOKUMEN ISO UPM

UNIVERSITI PERTAHANAN NASIONAL MALAYSIA (UPNM)

CADASTRE SURVEY PRACTICE (SGHU 4323)

PROCLAMATION OF SALE In The Matter of Loan Agreement, Deed of Assignment and Power of Attorney all dated 14th Day Of January 2002

PROCLAMATION OF SALE

PROCLAMATION OF SALE

RESEARCH TOPIC FOR NAPREC YEAR 2019

Rencana-Rencanal Arlicles

ISI KANDUNGAN. BAB 3: BEKERJA DENGAN DOKUMEN 3.1 Mencipta Dokumen Baru. 3.2 Membuka Dokumen 3.3 Compatibility Mode. LATIHAN

PROCLAMATION OF SALE

Zonation of Land Value as a Part of Comprehensive Land Management in Indonesia

THE STUDY OF PROBLEMS FACED BY PROPERTY MANAGEMENT IN MANAGING THE HIGH RISE CONDOMINIUM IN MALAYSIA NORAZIAH AZMIN BT ABD LATIF AZMI

PROCLAMATION OF SALE

PROCLAMATION OF SALE

OPERASI PERKHIDMATAN SOKONGAN PERPUSTAKAAN SULTAN ABDUL SAMAD Kod Dokumen: UPM/OPR/PSAS/P015. PROSEDUR PERKHIDMATAN MAKLUMAT Tarikh: 29/06/2018

VNIMPS" P1. AYS OF FORMAL LAND OWNERSHIP AND LAND TITLING WITH REFERENCE TO THE RURAL COMMUNITIES A STUDY OF PEOPLE'S PERCEPTION

SISTEM TEMPAHAN KERETA SEWA BERASASKAN WEB (UKM EZ-CAR) Noor Aznida Farina Binti Md Saad Masnizah Mohd

KENYATAAN TAWARAN TENDER HOSPITAL PUSRAWI SDN BHD

PROCLAMATION OF SALE

UNIVERSITI TUI{ HUSSEIN ONN MALAYSIA

PROCLAMATION OF SALE

KEBERKESANAN PENGELUARAN HAKMILIK KEKAL BERDASARKAN PINDAAN KANUN TANAH NEGARA 1965 (AKTA A1104)

FORM OF ACCEPTANCE AND TRANSFER CONDITIONAL MANDATORY TAKE-OVER OFFER DATUK SERI TAN JING NAM, MR ANDREW TAN JUN SUAN AND DATO TAN LEE SING

CONSULTANT ARCHITECT S DILIGENCE IN RAIL INFRASTRUCTURE PROJECT SHAMS ARIDA BIN ARIFFIN

DOKUMEN TIDAK TERKAWAL

METHODOLOGY FOR THE DEVELOPMENT OF NATIONAL DIGITAL CADASTRAL DATABASE (NDCDB)

PROCLAMATION OF SALE

PROCLAMATION OF SALE IN THE MATTER OF DEED OF ASSIGNMENT DATED 16 TH APRIL, 2004

OPERASI PERKHIDMATAN SOKONGAN. PERPUSTAKAAN SULTAN ABDUL SAMAD Kod Dokumen: UPM/OPR/PSAS/P016

BETWEEN AmBank Islamic Berhad [ U] AND PIVOTAL ACHIEVEMENT SDN. BHD [Company No V)

OPERASI PERKHIDMATAN SOKONGAN PERPUSTAKAAN SULTAN ABDUL SAMAD Kod Dokumen: UPM/OPR/PSAS/P015. PROSEDUR PERKHIDMATAN MAKLUMAT Tarikh: 18/08/2017

HURAIAN PINDAAN DOKUMEN ISO UPM

APARTMENTS OWNERSHIP AND MAINTENANCE

CADASTRE SURVEY PRACTICE (SGHU 4323)

CADANGAN PINDAAN JADUAL KE KETIGA BELAS, PERATURAN-PERATURAN JURUUKUR TANAH BERLESEN 2011 PERBANDINGAN KADAR FI UKUR SEDIA ADA / YANG DICADANGKAN

PROCLAMATION OF SALE IN THE MATTER OF DEED OF ASSIGNMENT (1 ST PARTY) AND POWER OF ATTORNEY (1 ST PARTY) BOTH DATED THE 5 TH DAY OF NOVEMBER, 2014

PROCLAMATION OF SALE IN THE MATTER OF DEED OF ASSIGNMENT, POWER OF ATTORNEY AND FACILITY AGREEMENT ALL DATED 17 TH DECEMBER 2013

PROCLAMATION OF SALE IN THE MATTER OF THE COMPOSITE LOAN AGREEMENT AND ASSIGNMENT AND POWER OF ATTORNEY BOTH DATED 07 TH DAY OF DECEMBER, 2005

CADANGAN PINDAAN/ TAMBAHAN DOKUMEN (CPD)

PROCLAMATION OF SALE

PROPERTY AUCTION HOUSE SDN BHD (187793X)

POLITEKNIK MELAKA KEMENTERIAN PENGAJIAN TINGGI MALAYSIA

ELEMEN-ELEMEN KRITIKAL PENGURUSAN PERUBAHAN DI PERINGKAT REKABENTUK PROJEK PEMBINAAN ABDUL AZIZ BIN HARUN

PROCLAMATION OF SALE IN THE MATTER OF THE COMPOSITE LOAN AGREEMENT AND ASSIGNMENT, AND POWER OF ATTORNEY BOTH DATED THE 20 TH DAY OF JULY, 2005

ASSIGNEE RESERVE PRICE: RM70,000.00

KEMENTERIAN PENDIDIKAN

=anm. 'jffm. JffD. JfFQ JffU JULAI - DISEMBER ^LeaKMUJfifll'Ggl. UNIVEiRBITI TfcKNOLODI M A R A PfcRLIS JGTT) INFOREC

HURAIAN PINDAAN DOKUMEN ISO UPM

KAJIAN TERHADAP KUALITI UDARA DALAMAN BAGI BILIK KULIAH DI POLITEKNIK MERLIMAU

THE PROCLAMATION OF SALE IN THE MATTER OF THE COMPOSITE LOAN AGREEMENT AND ASSIGNMENT AND POWER OF ATTORNEY BOTH DATED THE 18 TH APRIL 2005 BETWEEN

PROCLAMATION OF SALE

PROCLAMATION OF SALE

Datuk Bandar and Cordova are collectively referred to as Parties and individually as Party.

MEMBUAT DAN MENGUJI UNIT KAWALAN SUHU MOHD FARMEZEE BIN ABDULLAH UNIVERSITI TEKNIKAL MALAYSIA MELAKA

PROCLAMATION OF SALE

HURAIAN PINDAAN DOKUMEN ISO UPM

Transcription:

SECTION A : 50 MARKS BAHAGIAN A : 50 MARKAH INSTRUCTION: This section consists of TWO (2) structured questions. Answer ALL questions. ARAHAN: Bahagian ini mengandungi DUA (2) soalan berstruktur. Jawab SEMUA soalan. QUESTION 1 SOALAN 1 CLO1 C1 a) Define the terms below: Berikan maksud istilah-istilah di bawah: i) Cadastral [2 marks] Kadaster [2 markah] ii) Cadastral Survey Ukur Kadaster [3 marks] [3 markah] CLO1 b) Describe FIVE (5) functions of State Department of Survey And Mapping Malaysia Pilih LIMA (5) fungsi Jabatan Ukur Dan Pemetaan Malaysia (JUPEM) Negeri CLO1 c) Application for survey is a term used for seeking permission from authorities to perform survey work. Using a suitable diagram, identify the procedure of application for survey. Permintaan Ukur adalah istilah yang digunakan bagi mendapatkan kebenaran kerajaan untuk menjalankan kerja ukur. Dengan menggunakan gambarajah yang sesuai, tentukan prosedur yang perlu dilalui untuk melakukan permintaan ukur. 2

QUESTION 2 SOALAN 2 CLO1 Explain the following cadastral terms. Terangkan istilah-istilah kadaster berikut. i. Cadastral Reference Mark (CRM) [3marks] Stesen Tanda Rujukan Ukur Kadaster (CRM) ii. Geocentric Datum Malaysia (GDM2000) [3marks] Datum Geosentrik Malaysia (GDM2000) iii. Long Line [3marks] Garisan Panjang iv. Short Line [3marks] Garisan Pendek v. National Digital Cadastral Database (NDCDB) [4marks] Pangkalan Data Ukur Kadaster Berdigit Kebangsaan [4markah] vi. Geocentric Cassini Coordinate System [3marks] Sistem Koordinat Cassini Geosentrik vii. Single Leg [3marks] Single Leg viii. Geocentric RSO Coordinate System [3marks] Sistem Koordinat Geosentik RSO 3

SECTION B :50 MARKS BAHAGIAN B : 50 MARKAH INSTRUCTION: This section consists of FOUR (4) structured questions. Answer TWO (2) questions only. ARAHAN: Bahagian ini mengandungi EMPAT (4) soalan berstruktur. Jawab DUA (2) semua soalan sahaja. QUESTION 1 SOALAN 1 a) Identify FIVE (5) situation which require EDM to be calibrated [5 marks] Tentukan LIMA (5) situasi dimana EDM perlu dikalibrasi [5 markah] b) Differential Field Test (DFT) is one of the tests conducted on the Electronic Distance Measurement (EDM). Illustrate the procedure of Differential Field Test. Differential Field Test (DFT) adalah salah satu ujian yang dijalankan pada alat Electronic Distance Measurement (EDM). Gambarkan prosedur Differential Field Test tersebut. 4

(c) By using Appendix 1, calculate and complete the Calibration test form below. Dengan menggunakan Lampiran 1,Kira dan lengkapkan borang ujian kalibrasi di bawah; PILLAR NO. MEASURED HORIZONTAL ORIGINAL BASIC FROM TO DISTANCE DISTANCE (A) DISTANCE DIFFERENCES (B) ( A - B ) 1 2 4.998 5.001-0.003 1 3 10.030 10.036 1 4 50.001 49.998 0.003 1 5 87.310 87.316-0.006 1 6 125.550 125.554 1 7 163.007 163.010 1 8 200.999 200.998 1 9 251.004 251.006 1 10 300.498 300.500-0.002 2 3 5.097 5.110-0.013 2 4 44.514 44.512 0.002 2 5 82.166 82.171 2 6 120.231 120.236 2 7 158.995 158.998-0.003 2 8 196.505 196.510-0.005 2 9 246.773 246.771 0.002 2 10 295.418 295.415 TANDATANGAN JURUKUR NAMA JURUKUR: = 5

QUESTION 2 SOALAN 2 a) Survey datum is the main requirement for each new survey to enable the determination of planimetry control and coordinate value. Each cadastral survey must be based on satisfied and sufficient datum. Based on the statement above, interpret the conditions of datum that has been applied and practice in Peninsular Malaysia for cadastral work according to Survey Regulation 2009. Datum ukuran adalah satu keperluan utama bagi setiap ukuran baru untuk membolehkan penentuan asas planimetri ukuran dan nilai koordinat. Setiap ukuran ukur kadaster mestilah berdasarkan kepada datum yang memuaskan dan mencukupi. CLO 2 Berdasarkan petikan di atas, terangkan syarat- syarat datum yang diguna dan diamalkan di Semenanjung Malaysia bagi kerja ukur kadaster berdasarkan Peraturan Ukur 2009. CLO 2 b) i) By using an appropriate sketch, explain close traverse and open traverse. Dengan menggunakan lakaran yang sesuai, terangkan trabas terbuka dan trabas tertutup. ii) List the general statements for cadastral closed traverse. Senaraikan penyataan trabas tertutup dalam ukur kadaster [5 marks] [5 markah] 6

QUESTION 3 SOALAN 3 a) Sketch and explain clearly the procedure of EDM calibration test. Terangkan dengan jelas prosedur ujian kalibrasi EDM b) By using the data from Table B3, complete the traverse booking with C correction for this close traverse if the given bearing of BKL 1 BKL 2 is 225 55 40. (Use Appendix 2 to answer your question) Dengan menggunakan data dari Jadual B3,lengkapkan pembukuan trabas beserta pembetulan C bagi trabas tertutup tersebut jika bearing dari BKL 2 BKL 1 adalah 225 55 40. (Sila guna Lampiran 2 untuk menjawab) [15 marks] [15 markah] 7

Table B3 / Jadual B3 Line BKL 2 BKL 1 Bearing Distance Face Left Face Right Face Left Face Right Datum dari PA 02-240714 225 55 '40" BKL 2-3 95 22' 46" 275 22 46 82.931 82.931 3-4 139 35' 38" 319 35 40 84.185 84.183 4-5 165 16' 29" 345 16 30 97.988 97.984 5-6 74 00' 53" 254 00 53 52.870 52.865 6 BKL 1 327 06' 43" 147 06 43 80.471 80.471 BKL 1 BKL 2 45 55' 50" 225 55 50 85.125 85.125 8

QUESTION 4 SOALAN 4 a) Relate the use of Cadastral Reference Mark (CRM) and old boundary mark in cadastral survey work. Nyatakan hubungkait penggunaan Cadastral Reference Mark (CRM) dengan sempadan lama dalam kerja ukuran kadaster. [5 marks] [5 markah] CLO 1 b) i) One of the fuctions of cadastral survey is for planning and development of land. Explain clearly the above statement with suitable examples. Salah satu kegunaan ukur kadaster adalah untuk perancangan dan pembangunan tanah. Terangkan dengan jelas ayat diatas bersama contoh yang sesuai. CLO 1 ii) Certified Plan (CP) and Standard Sheet are two things related to cadastral survey. Explain the function and relationship of these two plans. Pelan Akui (PA) dan Standard Piawai adalah dua perkara yang berkaitan dengan ukur kadaster. Huraikan fungsi dan hubungkait dua pelan tersebut. SOALAN TAMAT 9