TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

Similar documents
TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TENANT DESIGN MANUAL UPDATED JANUARY 2016

TENANT DESIGN MANUAL UPDATED MAY 2016

TENANT DESIGN MANUAL UPDATED JUNE 2016

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2016

TENANT DESIGN MANUAL UPDATED AUGUST 2016

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED AUGUST 2015

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATE JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

LOUIS JOLIET MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

PLAZA WEST COVINA TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

SOUTHLAKE MALL. Southlake Mall Tenant Design & Construction Criteria TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

TECHNICAL CRITERIA ARROWHEAD TOWNE CENTER THE PLACE TO SHOP

The Promenade at Casa Grande 1005 N Promenade Pkwy Casa Grande, AZ 85294

14400 Bear Valley Road, Victorville, CA 92392

GENERAL INFORMATION. Landlord s Tenant Coordinator

San Tan Village 2218 E. Williams Field Rd. #235, Gilbert, AZ 85295

General Information RETAIL AND RESTAURANT

TWELVE OAKS GENERAL INFORMATION (BUILDING E ONLY)

FRANKLIN PARK MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

Tenant Design Criteria Section t Technical Criteria Updated: August Wilton Mall at Saratoga 3065 Route 50, Saratoga Springs, NY 12866

TWELVE OAKS GENERAL INFORMATION (BUILDINGS A, B, C, and D ONLY)

TECHINICAL CRITERIA DEPTFORD MALL THE PLACE TO SHOP

TENANT DESIGN CRITERIA V. Technical Criteria 34

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

th Street Boulder CO 80301

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

LANDLORD WORKLETTER EXHIBIT C-1 CONSTRUCTION REQUIREMENTS AND STANDARDS GREY SHELL ONLY

8000 Cooper Avenue, Glendale, NY 11385

TECHNICAL CRITERIA THE PLACE TO SHOP THE SHOPS AT ATLAS PARK

Construction Document Criteria

FOR LEASE. Capitol Hill Corner Cafe/Restaurant Space th Avenue, Seattle, WA Please call brokers for more information:

a) Tenant shall require its Contractor to provide and maintain the following insurance coverage:

Construction Document Criteria

FAIR OAKS GENERAL INFORMATION

E x p a n s i o n P r o j e c t

Tenant Design Criteria Section rd Restaurant Design Criteria Updated: June E. Camelback Road, Scottsdale, AZ 85251

Submission Procedures

Construction Document Criteria

Restaurant Addendum to Tenant Construction and Design Criteria. Restaurant Criteria. Replace Existing Tenant

Construction Document Criteria

TENANT MANUAL 5 January 2006

Bangor Mall Bangor, ME

CHAPTER 1321 Permit and Inspection Fees

The Shops at Montebello Montebello Town Center Dr, Montebello, CA 90640

CHARLESTON PLACE TENANT CALCULATION CHECK/DATA TABULATION SHEET(S) Forms must be completed by the Tenant's Mechanical or Electrical Engineer.

TECHNICAL CRITERIA THE PLACE TO SHOP LOS CERRITOS CENTER

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

RENTER'S INSPECTION WORKSHEET Free form provided at

Exhibit C - Shops 1 & 2

CONSTRUCTION CRITERIA

TENANT DESIGN MANUAL JANUARY, 2018

CONSTRUCTION CRITERIA

Design and Construction Document Criteria

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045

THE PLACE TO SHOP CHANDLER FASHION CENTER

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE

BUI L DIN G A ND E L E V A T O R F E ES

THE BAY STREET STORY. Page 1 of 32

Shoreview Corporate Center

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

COLD DARK SHELL LEASE EXHIBIT

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

No Surprises: What You Need to Know About the TPRs and Cost Segregation. Trent Baeckl, CPA Tax Senior Manager

EXHIBIT C. Leasehold Improvements Work Letter

MERRILLVILLE CORPORATE CENTER BUILDING FACTS & AMENITIES

Summary of Oregon Home Inspector Certification Law (ORS 701) and Standards of Practice for Home Inspections

TENANT DESIGN MANUAL. February 27, 2015

GENERAL GROWTH PROPERTIES, INC.

APPENDIX A BUILDING PERMIT AND RELATED FEES

ARLINGTON S COOLEST SQUARE BLOCK HAS RISEN TO ITS EXPECTATIONS. #HQCOOL

Charles Kozminski Elementary Community Academy

Procedures on Maintenance Services and. Required Inspections for the ADR Tenants. Seattle Tacoma International Airport.

ANCHOR SPACE FOR LEASE Civic Square Shopping Center W. El Camino Real Sunnyvale, CA 94087

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

THE PLACE TO SHOP TOWNE MALL

THE PLACE TO SHOP THE SHOPS AT NORTH BRIDGE

Coconut Point (Community Center) Estero/Bonita Springs, Florida

VANCOUVER CENTRE MALL TENANT CONSTRUCTION GUIDELINES MANUAL. Table of Contents. 1.0 General Information 1.1 Building Management

Transcription:

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

PROJECT OVERVIEW Montgomery Mall is located at the intersection of US 202 and SR 309 in the heart of Philadelphia s affluent northern suburbs. 2

PROJECT OVERVIEW Montgomery Mall features four department stores, JCPenney, Macy's, Sears, Wegman s, and Dick's Sporting Goods, as well as 150 specialty shops. 3

TENANT INFORMATION PACKAGE The Tenant Information Package (TIP) is intended to provide you with the project s design and construction criteria and consists of several parts: COMPONENT TIP Index Tenant Design Manual Kiosk Design Manual Architectural Criteria MEP/FP Criteria Bulletins DESCRIPTION Will provide a comprehensive list of topics to help locate information Provide mall specific architectural, sign and engineering design criteria Outline submission requirements and will provide necessary guidelines to design your store. (same as Architectural Criteria) 4

TENANT INFORMATION PACKAGE The Tenant Information Package can be accessed from Simon s website simon.com.» Select the business header, search for the property name, click on the Tenant Info Package link on the right side of the page.» If you have any difficulties working with the website, please contact your Tenant Coordinator. *For questions regarding the Landlord s design and construction requirements, please contact your Tenant Coordinator or call 317-636-1600 and ask for Tenant Coordination. 5

MALL BUILDING DATA Occupancy/ Use: Construction Classification: Building Levels: Sprinkler System: Mercantile Type IIA Two (2) Level Fully Sprinkled *Site Plan and Leasing Plan available for Tenant s to use on Simon.com. Select the business header, search for the property name, click on links on right side of page. 6

STOREFRONT ZONE PLAN- LEVEL 1 13 10 7

STOREFRONT ZONE PLAN- LEVEL 2 12 9 Food Court 12 9 8

STOREFRONT ELEVATION- LEVEL 1 Mall Bulkhead ¾ Reveal Storefront height throughout first floor is 13 10 A.F.F. Neutral Pier The Tenant is responsible for removing existing neutral pier, and installing a 2" reveal at the center line of the demising wall, bringing their storefront finishes to the new reveal. If reveal is already in place at center line of demising wall, Tenant shall remove GWB finishes and install Tenant storefront finishes to the edge of the reveal. 9

STOREFRONT ELEVATION- LEVEL 2 Mall Bulkhead Storefront height throughout second floor is 12 9 A.F.F. Neutral Pier The Tenant is responsible for removing existing neutral pier, and installing a 2" reveal at the center line of the demising wall, bringing their storefront finishes to the new reveal. If reveal is already in place at center line of demising wall, Tenant shall remove GWB finishes and install Tenant storefront finishes to the edge of the reveal. 10

NEUTRAL PIER DETAIL Lease Line 2x2 Black Channel 11

STOREFRONT SIGNS, AWNINGS & CANOPIES 12

FOOD COURT STOREFRONT Mall Bulkhead Storefront height throughout food court is 12 9 A.F.F. Neutral Pier 13

FOOD COURT NEUTRAL PIER DETAIL 14

HVAC RETAIL TENANTS This is a central plant mall. Engineer is required to accommodate conditions that may affect the performance of the HVAC system for their store. Condensate Drain Condensate to be piped from AHU in Tenant ceiling to approved sanitary connection within space. Outside/Relief Air Economizer and barometric or fan powered relief through Tenant installed fresh air plenum or through roof hoods. Return Plenum (Ducted return is for odor producing Tenants only and subject to Landlord approval). Exhaust/Relief None required. Toilet Exhaust By Tenant including fan, ductwork to common toilet exhaust and roof cap if needed. Odor, Thermal & Process Equipment Exhaust Size for application by Tenant. Temperature Controls Stand-alone digital electric/electronic control system by Tenant. Test & Balance Tenant shall employ a TAB, NEBB or AABC Certified Air Balance Contractor to perform final testing and balancing. See Criteria Sheet MEP-1 for further information. 15

PLUMBING RETAIL TENANTS Water Available by Landlord via overhead mains. Minimum 1 valved connection. Tenant supplied meter from local waste authority w/remote reader for large water users only. In portions of the mall, Tenants are a direct customer of the Utility. Refer to the Utility Redistribution Plan within this criteria for applicable location. Waste 4 wye connection off Landlord main. Designated connection point within or adjacent to space. Vent Utilize existing connection or Tenant to install new. Grease Waste No Landlord provisions. Natural Gas Utility service available at central meter locations. All work by Tenant including meter if not existing. Toilet Rooms As required by code. Drinking Fountain Per code and ADA requirements. Service Sink As required by code. See Criteria Sheet MEP-1 for further information. 16

FIRE PROTECTION RETAIL TENANTS Implementation Tenant shall directly employ the Landlord designated contractor to install and/or modify existing grid or utilize connection provided. Tenant Flow Switch Not permitted. Valve for Tenant Space Not permitted. See Criteria Sheet MEP-1 for further information. 17

ELECTRICAL RETAIL TENANTS Voltage 277/480, 3ph, 4-wire Landlord Equipment Exterior cable busway with meters and fusible switches or interior metering boards. Minimum 2 empty conduit. Power Provided by Landlord redistribution system. Tenant to provide disconnect, fusing, meter and conductors and connect to Landlord distribution board (if not existing). Metering Reuse existing or provide new per Landlord specification. If over 200 AMP Tenant needs to supply. Capacity TENANT MAXIMUM ALLOTMENT IS 20 WATTS PER SQUARE FOOT. Submit connected and demand electrical load data to support electric service size requested. Telephone 3/4 minimum conduit with pull wire to designated connection point in central locations. Fire Alarm Interface with Landlord system is only permitted when the Tenant occupancy requires a system to meet Code. If required by Code, Tenant to provide required panel and devices compatible with Simplex 4100 system. Duct detectors to shut down RTU equipment to be annunciated within Tenant space only. See Criteria Sheet MEP-1 for further information. 18

HVAC FOOD COURT TENANTS This is a central plant mall. Engineer is required to accommodate conditions that may affect the performance of the HVAC system for their store. Condensate Drain Condensate to be piped from VAV boxes through curb to approved sanitary connection within space. Return Ducted (Plenum return is for non-odor producing Tenants only and subject to Landlord approval). Smoke Exhaust/Relief None required. Odor, Thermal & Process Equipment Exhaust Size for application by Tenant. Grease Exhaust Per code. Protect roof with Grease Guard containment system. Exhaust Replacement Air Draw from Common Area for thermal exhaust (3,000 SCFM) and process exhaust (up to 5,000 SCFM). Thermal Exhaust 3,000 SCFM MAX through thermostatically controlled damper registers, duct extension and sensor installation by Tenant. Kitchen and Process Equipment Exhaust Size for application by Tenant. Utilize exhaust only system up to 5,000 SCFM. Toilet Exhaust N/A. Temperature Controls Stand-alone digital electric/electronic control system by Tenant. Thermal exhaust sensor installation by Tenant. Each Tenant has a T-Stat that controls VAV boxes. Test & Balance Tenant shall employ a TAB, NEBB or AABC Certified Air Balance Contractor to perform final testing and balancing. See Criteria Sheet MEP-1 for further information. 19

PLUMBING FOOD COURT TENANTS Water Redistributed by Landlord via overhead mains. Minimum 1 1/2 valved connection. Tenant supplied check meter w/remote reader. Waste 4 connection off Landlord main. Designated connection point within or adjacent to space. Vent Through roof by Tenant or connect to existing. Grease Waste Each Tenant has their own grease trap with 4 wye connection to each Food Court Tenant. Natural Gas Gas is available from the utility at exterior pipe and regulator connection if not existing. Provide automatic gas shut off valve. Toilet Rooms Per code. Drinking Fountain Per code. Service Sink Consult with Health Department for specific requirements. See Criteria Sheet MEP-1 for further information. 20

FIRE PROTECTION FOOD COURT TENANTS Implementation Tenant shall directly employ the Landlord designated contractor to install and/or modify existing grid or utilize connection provided. Tenant Flow Switch Not permitted. Valve for Tenant Space Not permitted. See Criteria Sheet MEP-1 for further information. 21

ELECTRICAL FOOD COURT TENANTS Voltage 277/480, 3ph, 4-wire Landlord Equipment Distribution metering switchboards with switches and meters. 4 conduit minimum. Power Provided by Landlord redistribution system. Tenant to provide fusing, meter (if not existing), conductors and connect to Landlord distribution board. Metering Reuse existing or provide new per Landlord specification. Capacity FOOD COURT TENANT MAXIMUM ALLOTMENT IS 100 WATTS PER SQUARE FOOT. Submit connected and demand electrical load data to support electric service size requested. Telephone 3/4 conduit to designated connection point in central locations. Fire Alarm Connect hood extinguishing system to Landlord s Simplex 4100 system. Connection to system to be by Landlords designated vendor. Duct detectors to shut down RTU equipment and be annunciated within Tenant space. See Criteria Sheet MEP-1 for further information. 22

MEP CALCULATION FORMS Tenant s Engineer shall use their own form for HVAC Load Calculations: Appliance Heat Gain Electrical Load Summary Kitchen Exhaust Fan Specifications Kitchen Make-up Air Unit Specification RTU/Split System Specification Maintenance 23