Secondary Suites Pre-application Workshop. It could be your first step to a secondary suite.

Similar documents
Secondary suites. A guide to developing a secondary suite. Home Improvements. calgary.ca call Helpful, Equitable, Accurate, Responsive.

Is the Apartment in my House Legal?

The City of Orillia s Guide to additional Dwelling Units (Apartments in houses) Q.1: Was a Building Permit issued for the apartment in my house?

A Guide to Secondary Suites

The Secondary Suite Program

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

MANITOBA HOUSING SECONDARY SUITES PROGRAM APPLICATION GUIDE

ACCESSORY DWELLING UNITS

Homeowners new and old face similar challenges today.

The Secondary Suite Program

Regional District of Nanaimo Secondary Suite Program

Woodbridge Home Improvement Program PROGRAM INFORMATION HANDOUT

C Secondary Suite Process Reform

Fees vary depending on our 3 service levels (Fully Managed, Rent Collect or Tenant Find.)

Development Permit Application

BUILDING AN ADU GUIDE TO ACCESSORY DWELLING UNITS PLANNING DIVISION

A TENANT S GUIDE TO HOUSING

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

RM2 Low Density Row Housing RM3 Low Density Multiple Housing

Control % of fourplex additions on a particular street. Should locate to a site where there are other large buildings

Accessory Coach House

INFORMATIONAL HANDOUT FOR GARAGES AND ACCESSORY BUILDINGS RESIDENTIAL PROPERTIES ZONED R-3 (SINGLE FAMILY, MIN. LOT 11,000 SQ. FT.

Landlord Fees Fully Managed

Development Approvals Process (Development Permits)

DEVELOPMENT PERMIT APPLICATION BED & BREAKFAST

City of Mississauga Consultation on Second Units

VILLE DE / TOWN OF BEAUMONT

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

19 Casimir Avenue $197, ' x 107'

Understanding the Development Review Process in the City of Minneapolis

RESIDENTIAL MANAGEMENT AGREEMENT

LAND USE BYLAW NO. 747


Tiny House on Wheels A Tiny House

FOR LEASE or SALE WESTWOOD BUSINESS PARK

City of Maple Ridge. Rental Housing Program: Secondary Suite Update and Next Steps

The Permit & Licence Process at the City of Vancouver. Presented By Bob Gill July 24, 2017

LAND USE AMENDMENT ITEM NO: 05

êéëé~êåü=üáöüäáöüí Code Requirements and Costs of Incorporating Accessory Apartments in Houses

Company: Name: Address: City: Province: Postal Code: Type of Business: Cash Debit Visa MasterCard

Landlord Fees FULLY MANAGED

S U B D I V I S I O N A N D D E V E L O P M E N T A P P E A L B O A R D A G E N D A

Accessory Dwelling Units

A Place to Call Home Tenant and Landlord Information

Edmonton Subdivision and Development Appeal Board

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

The documents listed below must be attached to the Loan Application when submitted to our office.

Single Family Rental and Inspection Program Update. Code Compliance Services Office of Equity and Human Rights

City of Tacoma Planning and Development Services

Residential Rental Certification Program Landlord Guide (Revised August 2018)

ONTARIO RENOVATES PROGRAM Application Form for Homeowners

INDEPENDENT REDRESS PROVIDED BY: The Property Ombudsman

RECOMMENDATION(S) OF THE CALGARY PLANNING COMMISSION

Secondary Suites Design Standards & Guidelines for houses built after July 1998

Frequently Asked Questions (& Answers!)

LANDLORD S RIGHT OF ENTRY

Short-term residential rental authorized advertisement

Accessory Dwelling Units (ADU) & Junior Accessory Dwelling Units (JADU) Building a Bridge to Housing Security

ADUs in San Francisco May 2017

Please complete the enclosed application and PRINT clearly.

LANDLORDS TERMS AND CONDITIONS

ADMINISTRATION RECOMMENDATION(S) 2017 May 04. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

Attic Floor Bedrooms 1 & 2 Family Dwellings

This program includes two different funding streams:

The standard lease and your rights

CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT

Municipal Tools for Housing Affordability in Canada s Most Expensive City. City of Vancouver s Inclusionary Housing

Village of Rycroft st Street Box 360 Telephone: Rycroft Alberta T0H 3A0 Fax:

The Process and Common Questions

VILLAGES AT WALNUT CREEK

COMMUNITY OF CHRIST FACILITY NEEDS ASSESSMENT

CREATING A SECOND SUITE

Rental Housing Improvement Program Application Form

Owner FAQs. Additional commonly asked questions:

Professional Residential Letting & Management Services

LANDLORD Information Package

Landlord/Tenant Application Form

Landlord Fees RENT COLLECT

2016 Social Infrastructure Fund Investment in Affordable Housing (2016 SIF IAH) ONTARIO RENOVATES APPLICATION

Welcome. Please show us where you live: A Zone and Design Guidelines for the Apartment Transition Area. We want your feedback!

Residential Building Permit Application: Renovations/Additions Conversions, Ancillary Buildings TYPE OF APPLICATION:

R E A L E S T A T E S T A G I N G P R I C I N G C A N A D A

Part 9 Specific Land Uses - Dual Occupancy

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

APARTMENT INFORMATION CHECKLIST

Owner Information Packet

Conditions. For the purpose of licensing conditions attached to a licence:

Outline of Land Use Bylaw, 1P2007 Changes

Combined Zoning/Minor Variance and Boulevard Parking Agreement Exception

HOUSING STABILITY: Skills for Successful Resettlement. September 2016

Accessory Dwelling Regulations Update Community Forum. May 13, 2017

Condor Properties. Room Number - Address - Page 1 of 5. the landlord or landlords. the tenant or tenants and student ID. Date:

SANTA CRUZ COUNTY ACCESSORY DWELLING UNIT ADU BASICS

Landlords Guide. bramleys.com

City of Kingston Information Report to Housing and Homelessness Advisory Committee Report Number HHC

RURAL - Residential Development Permit Application FORM A

This bulletin applies to real estate brokerages, brokers, associate brokers, and associates.

1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report

~ Please Detach and Save This Page ~

SUBDIVISION AND DEVELOPMENT APPEAL BOARD

Transcription:

Secondary Suites Pre-application Workshop It could be your first step to a secondary suite.

Agenda 1. Introductions 2. Overview 3. What is a Secondary Suite? 4. DP/BP Application Process 5. Design Considerations 6. Alberta Building Code and Fire Code 7. Secondary Suites Grant Program 8. Financial Checklist 9. About Being a Landlord 10. Questions

Resources www.calgary.ca/secondarysuites www.calgary.ca/secondarysuitesgrants Other weblinks (handout) Secondary Suites Package CRRA leaflets Secondary Suites, A Guide for Homeowners A Guide to Developing a Secondary Suites Alberta Building Code Requirements About Your House, Hiring a Contractor (CMHC) Workshop presentation

Secondary Suites : The Process Secondary Suite Grant Appl Grant Approval & Payments start Final Inspection & Payment Rent Review (for 5 years) Land Use Development Permit Application Building Permit Application Occupancy Permit Land Use Bylaw Community Consultation Alberta Building Code Property Insurance Fire Code Income Tax Inspections Gas/Plumbing, HVAC/Mech, Electrical, Permits Property Assessment Contract with Tenant

What is a Secondary Suite?

What is a Secondary Suite? Secondary Suite: A suite located within a singledetached dwelling, typically known as a basement suite but can be anywhere in the house.

What is a Secondary Suite? Secondary Suite Detached Garden: An atgrade, stand-alone suite located in the rear yard of a single-detached dwelling.

What is a Secondary Suite? Secondary Suite Detached Garage: A suite located in the same building as a detached garage in the rear yard of a single-detached dwelling.

What is a Duplex? Duplex: a building which contains two dwelling units, one located above the other, with each having a separate entrance.

Development Permit Process

Secondary Suites - can I have one? Find out if you have the proper Land Use designation to proceed with a secondary suite application. Calgary s Land Use Bylaw (1P2007) governs the rules on land use for secondary suites, including rules on parking, setbacks, floor area, amenity space, parcel width, etc. My Property calgary.ca/secondarysuites

Summary of Land Use Requirements

Secondary Suites by the Numbers 1 parking stall 7.5m 2 of amenity space (81ft 2 ) 70m 2 maximum floor area (10% relaxation) (753ft 2 ) Stuck? Call 268-5311

Preparing Application Drawings Who can prepare the plans? Drawing to scale Site Plan, Elevation Drawings, Sections, Floor Plans, Real Property Report Development Permit checklist www.calgary.ca/secondarysuites

Development Permit Application Dedicated planner for all secondary suite applications (Karen Heatherington) Bring application to the 3 rd Floor DBA Counter or mail it Checks that applications meet all Land Use Bylaw requirements Makes decisions on relaxations Public notification Appeals

Public Notification Circulation to Community Association Notice posting on property (detached only) Then, Advertising Be a Good Neighbour. Talk to them about your plans. Think about how design and construction considerations can minimize impact on your neighbours.

Fees How much do the permits cost? Development Permit (subject to change)$428 Building Permit Electrical Permit Mechanical Permit Plumbing Permit Construction Costs (ranging from $30-$70K)

Design Considerations

Design Considerations Traffic and Parking Provide dedicated parking

Design Considerations Views Design detached suites with shared views in mind (e.g. placement of windows)

Design Considerations Light & Shadowing Garden suites can result in shading on neighbours yards and homes. Think about shadowing and light pollution.

Privacy and Parking

Design Considerations Construction Limit hours of construction and be flexible with neighbours* Share construction schedule with neighbours * Community Standards Bylaw

Building Permit Process Alberta Building Code A.B.C. Section 9.37. - Secondary Suites Applies to suites in the primary dwelling Applicable Sections A.B.C. Part 9; A.B.C. Section 9.10. Fire Protection Applies to suites in detached buildings

Alberta Building Code 2006 Calgary Public Library (reference only) SAIT Bookstore Alberta Municipal Affairs

Alberta Building Code Section 9.37. Secondary Suites Applies to suites in the primary dwelling: Minimum 6 5 floor-to-ceiling height Bedroom egress windows 3.8 sq ft and no dimension less that 15 Exit Stairs and landings Exit and Suite Doors

Alberta Building Code Section 9.37. Secondary Suites Applies to suites in the primary dwelling: Means of Egress Shared/Common Exit Protection of Shared Exits Unenclosed Exits Stairs Side entrance vs Rear entrance

Alberta Building Code Section 9.37. Secondary Suites Applies to suites in the primary dwelling: Smoke Separations Required - ½ gypsum board on ceiling and on both sides of wall studs separating different spaces Furnace rooms Common areas Smoke alarms Carbon monoxide alarms Protect against the spread of smoke and fire

Alberta Building Code Section 9.37. Secondary Suites Applies to suites in the primary dwelling: Independent Heating and Ventilation Forced Air Furnace Electric baseboards/hrv Radiant heating/hrv

Alberta Building Code Section 9.37. Secondary Suites Applies to suites in the primary dwelling: Example of HRV (Heat Recovery Ventilator)

Alberta Building Code Section 9.37. Secondary Suites Applies to suites in the primary dwelling: Common Plumbing permitted Common Electrical permitted with provisions

Alberta Building Code Section 9.37. Secondary Suites Example of electric baseboard heater

Alberta Building Code Part 9; Section 9.10. Fire Protection Applies to suites in detached buildings: Fire separations are required Fire stopping may be required Doors within fire separations Separate heating & ventilation Egress windows for bedrooms Unprotected openings

Preparing Application Drawings Approved Development Permit Two (2) Copies - Site Plan (Real Property Report), Elevations, Floor Plans & Sections Applicable Engineering Documents New Windows in Existing Foundations Concrete Walk Down Building Permit checklist www.calgary.ca/secondarysuites

Site Plan

Floor Plan

Main Floor

Elevations

Section

Construction process Types of Inspections Building Trades DCP Development Completion Permit Grant Final Inspection To book inspections/check status of permits call 311 or visit www.calgary.ca/vista

Advice from Final Inspector How you can get better estimates Hiring a contractor http://www.hiringacontractor.com/ Construction insurance Bad Advice

Why should I get a Permit? SAFETY! Liability Reliable income source Insurance

Financial Assistance? You may be eligible for up to $25,000 in funding through the Secondary Suites Grant Program.

Secondary Suites Grant Program ELIGIBILITY Property must have the right land use No property tax arrears Registered property owners or valid offer to purchase Must live in the home Suite not started yet*

Secondary Suites Grant Program FUNDING TERMS Maximum one-time grant up to $25,000 Up to 70% of eligible costs Eligible costs: development, permit fees & construction costs related to DP/BP Ineligible costs: furnishings & appliances Must be available for rent for 5 years Must be registered owner (on title) Family members are legitimate tenants

Secondary Suites Grant Program FUNDING TERMS Max rent per month (utilities excluded) Rent can increase annually (CMHC Rental Market Report - Calgary) Must provide information on rents annually Selling your home? Must pay remainder of grant or transfer the grant agreement to new owner.

Secondary Suites Grant Program PROCESS for new home buyers: apply to Grant Program after signing PA for conditional approval itemized estimate for suite equity information before Occupancy Permit, final Grant Program inspection After title transfer, sign grant agreements one payment made upon completion Flexibilities may apply up to 4 months after title transfer

Secondary Suites Grant Program APPLICATION PROCESS Have the right land use designation, Then: 1. Attend a workshop 2. Obtain application package 3. Complete Application + sign 3 Grant Agreements 4. Conditional acceptance ESTIMATES 5. Apply for Development Permit 6. Development Permit released 7. Grant acceptance EQUITY INFO DP FORGIVEABLE

Secondary Suites Grant Program PAYMENT PROCESS 1 st installment of Grant Funding can be after DP 2 nd installment of Grant Funding at midconstruction 3 rd installment of Grant Funding after all final Inspections (5% holdback) Payment can take up to 4 weeks

Secondary Suites Grant Program Post-Construction Obligations Residential Tenancy Agreement Annual monitoring City may inspect Selling your home? Must pay remainder of grant or transfer the grant agreement to new owner.

Secondary Suites Grant Program Total funding: $6M for 240 units 226 applications to date 54 completed 157 in various stages 17 held for developer Program has been approved F for extension

Financial Checklist

Financial Checklist What monthly rent will you charge? What mortgage amount do you pay monthly? What will it cost to create or upgrade the suite? You can only receive 70% of the costs up to a maximum of $25,000. How will you finance the remaining amount? What other expenses do you have? Whole house expenses (e.g. mortgage interest, maintenance, repairs, heat, hydro, water, insurance, property tax) Are any of these expenses tax deductable? What impact will these new expenses and revenues have on your property and income taxes?

About being a Landlord

You are about to be a Landlord Calgary Residential Rental Association Membership Code of Ethical Principles Resources Lease forms Inspection reports Tenancy Agreements Notices Education (seminars, luncheons and courses) www.crra.ca

You are about to be a Landlord Residential Tenancies Act www.landlordandtenant.org Discuss expectations Formal tenancy agreement Checklist for Renters and Landlords (online) Human Rights, Citizenship & Multiculturalism Acts www.albertahumanrights.ab.ca Cannot refuse someone based on source of income, family status, nationality, religion, gender or sexual orientation

Have you considered everything? Land Use Designation Building Code Separate Permits Revenue Canada Rental Income Municipal Taxes Landlord Tenant Act Landlord, Tenant & Building Insurance Separate address for the suite for utility purposes

Questions? Karen Heatherington, Senior Planning Tech Vanessa Gash, Safety Codes Officer Jacquie Mercier-McMurrer, Grant Administration Todd Wagstaff, Safety Codes Officer (final inspections) Karen Morgan, Grant Program Manager