ACCESS TO ACCEPTABLE LAND: A KEY FACTOR IN POWER GENERATION AND TRANSMISSION THE VRA EXPERIENCE

Similar documents
LAND ADMINISTRATION REFORM IN GHANA DR W.ODAME LARBI PROJECT DIRECTOR GHANA LAND ADMINISTRATION PROJECT

LAND REFORM IN MALAWI

A REVIEW OF THE NIGERIAN LAND USE ACT OF 1978

Guidance about Land Rights for connections involving Independent Connection Providers (ICP s) and Independent Distribution Network Operators (IDNO s)

Land Rights For Connection Customers

Resettlement Policy Framework

COMPULSORY LAND ACQUISITION AND COMPENSATION IN GHANA: SEARCHING FOR ALTERNATIVE POLICIES AND STRATEGIES WORDSWORTH ODAME LARBI GHANA

Minimum Educational Requirements

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

Heathrow Expansion. Land Acquisition and Compensation Policies. Interim Property Hardship Scheme. Policy Terms

Scheme of Service. for. Housing Officers

The State of Valuers: South Pacific Perspective

From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director

Statement of Proposal

GUIDANCE FOR LANDOWNERS AND OCCUPIERS ON CONTRIBUTIONS TOWARDS PROFESSIONAL COSTS

Why Uganda should be cautious about amending ARTICLE 26 of the Constitution

La w of forfeiture faced with radical reform An overview of the Landlord and Tenant (Termination of Tenancies) Bill

REPUBLIC OF SOUTH AFRICA

ISSUES ON COMPENSATION FOR DAM AFFECTED PERSONS

Easements, Covenants and Profits à Prendre Executive Summary

Anthony Blasdale. Persistent just kept going, never seemed to tire really. made us believe that a settlement could be achieved.

NFU Consultation Response

Assets, Regeneration & Growth Committee 11 July Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Property issues and warranties in share purchase agreements

South African Council for Town and Regional Planners

Tenancy Policy. 1 Introduction. 12 September Executive Management Team Approval Date: Review date: September 2018

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005

Councillor Daniel Thomas

LAND ACQUISITION BILL: THEN AND NOW

Chartered Surveyors Commercial Property Consultants. The Minimum Energy Efficiency Standards: A Guide for Commercial Property

Landowner's rights. When the Crown requires your land for a public work. April 2010

Supporting Capacity Development for Sustainable Land Administration Infrastructures

HOUSING (SCOTLAND) BILL

THINKING OUTSIDE THE TRIANGLE TAKING ADVANTAGE OF MODERN LAND MARKETS. Ian Williamson

IFA submission to the Law Reform Commission of Ireland s review of the current law on compulsory acquisition of land.

UNRA Connecting Uganda! LA - DRBD 1

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Regulation No May 2015

Heathrow Expansion. Draft Land Acquisition and Compensation Policies. Agricultural Land and Property

SP Energy Networks Fee Scale

Classification: Public. Heathrow Expansion. Land Acquisition and Compensation Policies. Interim Property Hardship Scheme 1.

Compulsory Purchase Reform : Temporary Use of Land Valuation and practical issues.

ICP/IDNO Land Rights Guide

ROTHERHAM METROPOLITAN BOROUGH COUNCIL S STRATEGIC TENANCY POLICY,

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Viability and the Planning System: The Relationship between Economic Viability Testing, Land Values and Affordable Housing in London

Property & Development

Date: 9 February East Walworth. Deputy Chief Executive

Business and Property Committee

How Swaziland Is Upgrading Its Slums

Securing Land Rights for Broadband Land Acquisition for Utilities in Sweden

The Ministry of Defence s arrangement with Annington Property Limited

Land Acquisition and Property

POLICY BRIEFING. ! Housing and Poverty - the role of landlords JRF research report

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Papers The Digital Economy Act : What surveyors need to know about changes to the law on telecommunications equipment

BOROUGH OF POOLE BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016

State Highway Revocation: Policy and Guidance

Valuation Methodology of Unregistered Properties in East Africa

Key findings from an investigation into low- and medium-value property sales. National Audit Office September 2017 DP

F.18. New Zealand. Railways Corporation STATEMENT OF CORPORATE INTENT

PROSPECTUS Real Estate Fundamentals

1.3. The Policy is based on the City of London governing principles:

DISPOSAL AND APPROPRIATION OF LAND BY LOCAL COUNCILS

NUS SCOTLAND WRITTEN SUBMISSION

Putting it all together. Presented by: RIGHT OF WAY SERVICES

RENT ARREARS POLICY March 2011

How effectively does it work?

Urban Redevelopment Compulsory Purchase in Hong Kong

Council Policy Name: Policy Statement and Rationale: Scope: Council Policy No.: C205 CAO 044. Date Approved by Council: May 26, 2015

Introduction: Proposals:

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS

land expropriation without compensation 16 May 2018

Property Consultants making a real difference to your business

Acquisition of investment properties asset purchase or business combination?

Outstanding Achievement In Housing In Wales: Finalist

NATIONAL LAND POLICY ON AGRICULTURE DEVELOPMENT

Community Housing Federation of Victoria Inclusionary Zoning Position and Capability Statement

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand

On the Implementation of Land Title Registration in Ghana

Executive Summary of the Direct Investigation Report on Monitoring of Property Services Agents

APPRAISAL INSTITUTE SPEECH

Choice-Based Letting Guidance for Local Authorities

WORLD BANK/IFC 6 TH GLOBAL HOUSING FINANCE CONFERENCE, AFFORDABLE HOUSING FINANCE: THE ROLE OF GOVERNMENT MRS AKON EYAKENYI

FACT SHEET: Tenure requirements for Major Customer Connections

CROSSRAIL INFORMATION PAPER C10 - LAND DISPOSAL POLICY

POLICY FOR THE DISPOSAL OF THE MUNICIPALITY S LAND AND

Community Empowerment and Renewal Bill A Consultation. Response from the Chartered Institute of Housing Scotland

Security of Tenure Review of the Residential Tenancies Act 1997

Regeneration and Property Committee. 16 March 2017

Working together for more homes

Developing Land Policy in a Post-Conflict Environment: The Case of Southern Sudan

Submission on Residential Tenancies Amendment Bill (No. 2)

Anthony Banfield, FRICS Banfield Real Estate Solutions Ltd

Proposal to Restructure

Surveyors and phone masts

CLACKMANNANSHIRE TENANTS AND RESIDENTS ASSOCIATION WRITTEN SUBMISSION

The Housing, Communities and Local Government Committee. The effectiveness of current land value capture methods

Note on housing supply policies in draft London Plan Dec 2017 note by Duncan Bowie who agrees to it being published by Just Space

Transcription:

ACCESS TO ACCEPTABLE LAND: A KEY FACTOR IN POWER GENERATION AND TRANSMISSION THE VRA EXPERIENCE Meister Afriyie, F Gh.I.S, SCV Emmanuel.T. Martey, A.Gh.I.S, BL 1 1.1 THE LAND FACTOR IN ELECTRICAL POWER SCHEMES Land is a sine qua non for efficient power generation, transmission and distribution facilities land requirements for power schemes (unlike other forms of development are quite unique) different types of power systems have varying degrees of land requirement. 2

1.1 THE LAND FACTOR IN ELECTRICAL POWER SCHEMES -Linear for TL, Medium size for thermal,and extensive area for hydro acquisition presents their own social and environmental challenges. projects need to be strategically sited. 3 1.1 THE LAND FACTOR IN ELECTRICAL POWER SCHEMES demand for land in Ghana is persistently increasing for competing uses. major challenge securing acceptable land in the face of socio-political and geographical changes: -move from military dictatorship/pseudo socialism to democracy. -high population growth,citizens asserting rights to land. no land is easily taken by state/statutory body without the co-operation of the owners. 4

1.2 HISTORICAL PERSPECTIVE The critical role of land in Ghana s power production was long recognised during the Colonial period. The Preparatory Commission in 1955 anticipated that the construction of the Hydro Electric Dam, which was originally to be sited at Adjena, was going to flood an area in excess of about 3,500 square miles at the maximum elevation 5 1.2 HISTORICAL PERSPECTIVE The valuation survey undertaken between 1954 and 1955 estimated compensation to be about Three Million Pounds ( 3,000,000). The Commission, did not recommend the resettlement of the people to be affected. The people were to resettle themselves. 6

1.3 THE VRA S LAND PORTFOLIO. Act 46 Section 27 gave authority to the VRA to acquire land for the following purposes: - For the construction of the dam - For inundation of the lake bed - Resettlement sites - Akosombo ( Township) - For the proper discharge of its functions Land was requisitioned for the 52 resettlement townships, lakebed and Akosombo in the early nineteen sixties. 7 1.3 THE VRA S LAND PORTFOLIO These lands were acquired mainly by resort to the compulsory acquisition machinery. The socio-political dynamics in Ghana at the time; President Nkrumah was seen as a socialist, with an agenda for industrialization of the country. The Akosombo Project was the catalyst for growth; anybody that was perceived to be hampering the smooth implementation of the project was regarded as a reactionary who had to be swept aside. -. Land owners and chiefs were pressurised to donate land for the project. 8

1.3 THE VRA S LAND PORTFOLIO The writers opine that the CPP government never intended to pay compensation for the lands. the legal acquisition came so many years after lands had been taken. 9 2.0 LEGAL AND INSTITUTIONAL CHALLENGES 10

Table 1 : VRA LAND PORTFOLIO DESCRIPTION AREA IN ACRES REMARKS Lake Bed 2,176,000 Legally acquired in 1974 (E.I. 98/74) even though flooding started in 1963 52 Resettlement Sites 1,207,000 1st legal instrument was promulgated in 1968, even though VRA took possession of the Sites in 1962. Kpong Hep Including 6 Resettlement Towns 17,700 Acquired in 1980 Akosombo Township 7,000 Half of the land was through the Concession Ordinance and other half by Executive Instrument No. 35 of 1969 Aboadze Thermal Plant Site 425 Land acquired in 1995, Legal Instrument will be issued in 2005. Others Lands 350 Lands for smaller estates, substations etc. Easement For Transmission Line Right-Of-Way 4,000 Circuit Kilometres This is the easement for 225KV 161KV, 69KV and 34.5KV 11 2.2 INSTITUTIONAL CHALLENGES Land as a commodity is unique. Its ownership; the exercise of all forms of rights, transfer and alienation are regulated by rules and laws (both customary practices & statutory 12

2.3 LEGAL CONSIDERATIONS/MODALITIES FOR ACQUISITION OF LAND Article 20 of the 1992 Constitution of the Republic of Ghana makes adequate provision for the protection of property ownership rights No property of any description, interest in or right over any property shall be compulsorily taken possession of or acquired unless : -a) the acquisition is necessary -b) clearly stated reasonable justification for causing hardship that may result to property owners. -C) Provision for prompt payment of fair and adequate compensation. 13 State acquisitions can only be done when there are 2.3 LEGAL CONSIDERATIONS/MODALITIES FOR ACQUISITION OF LAND Some projects suffered temporary hold ups as a result of people preventing physical access to the land on account of delay by the LVB to process compensation to victims. The operations of some of these state agencies are characterised by bottlenecks such as administrative bureaucracy, ineptitude, lack of co-operation etc MODALITIES FOR ACQUISITION OF LAND -Private Treaty Acquisition 14

2.3 LEGAL CONSIDERATIONS/MODALITIES FOR ACQUISITION OF LAND -Compulsory Purchase -bulk of VRA s acquisition; preferred option,free from encumbrances. -Act 186 and Act 46 for ROW. -less than 20% of land for ROW,no compensation. This law is however being challenged as being inconsistent with the Constitution. 15 2.4 CURRENT LAND REFORMS Governments over the years have sought to streamline land management in the country Land Administration Project (LAP) aimed at taking a holistic view of the land sector challenges and introduce reforms Major policy objectives; ensuring that socioeconomic activities are consistent with such land use through sustainable land use planning, facilitate equitable access to and security of tenure of land, protect the interests and rights of landowners, ensure prompt payment 16 of fair and adequate compensation of government acquired

2.4 CURRENT LAND REFORMS The implications of follows: reforms for VRA are as -Access to land can only be achieved by following required procedure -Land would no longer be obtained at relatively cheap prices. - payment is expected to be made upfront before the land could be utilised. 17 3.0 IMPACT OF LAND VALUES ON POWER PROJECT Table 2 : TRENDS IN LAND VALUES TRENDS IN LAND VALUE IN AN AREA IN ACCRA UNDER THE ROW YEAR VALUE OF LAND PER ACRE REMARKS 1992 $7,500 This was the average per acre compensation paid by VRA 1997 $9,000 This was the average per acre compensation paid by VRA 2000 $50,000 Market value 2005 $100,000 Market value 18

3.1 REQUIREMENTS OF INTERNATIONAL FINANCIAL AGENCIES International Financial Agencies have strengthened their policies in favour of fair treatment of victims of developmental projects. developmental projects must be done at minimum socio-economic cost to the affected people. They also prescribe full payment based on FULL Replacement values for affected properties, vulnerability allowances, etc 19 3.1 REQUIREMENTS OF INTERNATIONAL FINANCIAL AGENCIES premium on sites of socio-cultural significance extensive consultations with all stakeholders. Payment of compensation, must be upfront. 20

COMPENSATION PAYMENTS Act 46, put a cap of 3.5 Million ( Pounds Sterling) on compensation compensation paid by VRA was in excess of 9 Million Pounds The Government has since 1971 has been responsible for payment. DESCRIPTION OF PROJECT AMOUNT US $ REMARKS Table 3: TTPP NESRP Takoradi Esiama Project Ghana-Ivory Coast Interconnection Kpong H. E. P. 1,979,547.00 Crops and Structures only 1,538,702.00 Crops and Structures only 85,370.00 Crops and Structures 569,916.00 Crops and Structures only 2,659,420.00 Crops, Lands and Structures, excluding Resettlement Towns National Electrification Project Lower Volta Elec Sch 293,147.00 Crops and Structures only 21 432,206.55 Crops and Structures 4.0 HUMAN RESOURCE REQUIREMENT Land management is a specialised discipline, which require professional expertise. Unfortunately, most state agencies do not give much consideration to this vital human resource requirement. In the case of the VRA, until 1990, there was no Real Estate Department. Lands Department handled all issues on land. - lack of internal capacity contributed to problems on land management. 22

4.1 REQUIRED STAFF To ensure efficiency in land acquisition, a separate Department or unit needs to be in place. Key skills :Land Law, Physical Planning, Land Use Planning, Project Management, Environmental Management, Land Appraisal/Valuation and sociocultural appreciation. negotiation skills, organisation, communication, analytical and resilience to work are required. Certified Estate Surveyors who undertake CPDs Capacity to develop clout, and also networking. 23 5.0 LESSONS FROM VRA OPERATIONS The common problem ; resistance of the people, court action for compensation, lack of documentation of acquisition/compensation records; non completion of formal/legal acquisition after taking possession of land etc. Specific lessons that have been drawn from VRA s Power Project Operations include: - The need for Long Term Planning 24

5.0 LESSONS FROM VRA OPERATIONS - Deployment of Right Calibre of staff - Non Reliance of External Agencies - Prompt Payment Of Compensation - Extensive Consultations 25 6.0 PAYMENT FOR LAND Non payment of land acquired for transmission lines. By the Land Statutory Wayleave Act 1963 Act 186 unless the land taken is more than 1/5 of the holdings and the reminder could not be effectively used, no payment is made. 26

7.0 RECOMMENDATION The following recommendations are therefore made: (1) There must be long term planning for electric power schemes. 27 7.0 RECOMMENDATION (2) Estate surveyors must be involved at initial planning and selection of sites/row. Not as an after thought. (3) Some form of compensation must be paid for all right-of-ways acquired transmission lines. (4) Power systems must be designed in ways that will minimise the amount of land required and its effects on rights in land and settlements 28

7.0 RECOMMENDATION (5) Adequate arrangements should be made to secure financial and other supports (6) The existing laws on state acquisition of lands would have to be reviewed 29 7.0 RECOMMENDATION (7) Compensation due for communal lands or rights taken must be structured in such a way that it extends, the benefits beyond the present generation to posterity (8) Adequate records and documentation should be kept. (9) residual issues of resettlement and environmental problems should be properly dealt with. 30

8.0 CONCLUSION considered the role and criticality of land it is increasingly becoming difficult securing access to inexpensive acceptable lands lessons discussed and recommendation made will serve as guide 31 REFERENCES 1992 Constitution of the Republic of Ghana State Lands Act 1962 Act 125 Lands (Statutory Way leaves) Act 1963 Act 186 Volta River Authority Act 1961 Act 46 Land as Resource for Development Proceedings of the Ghana Academy of Arts and Sciences Vol xxxvi 1997 Accra Volta Man s Greatest Lake James Moxon, 1984 Volta River Project: Report of the Preparatory Commission, 1955 Ghana Land Policy Document, 1999 32

33 YEDA MO ASE 34

GROWTH OF VRA S TRANSMISSION LINES APPENDIX '1' GROWTH OF VRA'S TRANSM ISSION LINES (FROM 1965 TO DATE) LENGTH IN KM 4,400 4,200 4,000 3,800 3,600 3,400 3,200 3,000 2,800 2,600 2,400 2,200 2,000 1,800 1,600 34.5kV 69kV 161kV 225kV TOTAL 1,400 1,200 1,000 800 600 400 200 0 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 a 1990 1991 b 1992 1993 1994 1995 1996 1997c 1998 d 1999e 2002 YEAR 35