BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

Similar documents
SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

SCHEDULE A. Classes of Permits and Fees (Reference By-law No ) 1.) Calculation of Permit Fees (All fees are exempted from HST)

Class of Permits and Fees Schedule A

By-Law of The Corporation of the City of Oshawa

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 29-11

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 60-12

SCHEDULE K PLANNING & BUILDING SERVICES

The Corporation of the Town of Bradford West Gwillimbury. By-law Building By-law

CITY OF TORONTO. BY-LAW No A By-law under the Building Code Act, 1992 respecting permits and related matters.

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW NUMBER

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

City of Mississauga Planning and Building Department

Fee Resolution

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

PLANNING & DEVELOPMENT COMMITTEE THE CORPORATION OF THE CITY OF MISSISSAUGA MONDAY, OCTOBER 28, :00 P.M.

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

BUILDING PERMIT FEE SCHEDULE

City of High Point Development Fee Schedule

FY 2018 FEE SCHEDULE (Effective )

Planning&Development Fee Standards

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

City of Mississauga Planning and Building Department

CHAPTER 1321 Permit and Inspection Fees

APPENDIX A BUILDING PERMIT AND RELATED FEES

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Resolution Fee Schedule

Building Division Fee Schedule January 2018

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

BUILDING CODE COMMISSION

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

Planning, Development, and Building Fees and Charges 2018

BUI L DIN G A ND E L E V A T O R F E ES

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

This fee structure applies to applications submitted on or after January 1, 2018.

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

THE CITY OF WINNIPEG BY-LAW NO. 66/2016. A By-law of THE CITY OF WINNIPEG to impose planning, development and building fees.

New Business Information Packet

City of Kingston. Building Permit Fees Review Industry Consultation Meeting. May 2, 2017

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

TENANT IMPROVEMENT APPLICATION Page 1 of 4

SCHEDULE OF BUILDING PERMIT FEES

CITY OF CORNWALL SUMMARY OF BUILDING AND PERMIT DIVISION ACTIVITY PERIOD ENDING: JUNE 30, 2015

City of Wausau Building, Housing and Zoning Fee Schedule 2019

2018 BUILDING PERMIT FEES New Commercial

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

GENERAL INFORMATION. Landlord s Tenant Coordinator

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

BUILDING PERMITS SUMMARY REPORT JULY 2018

THE CORPORATION OF THE CITY OF GUELPH. WHEREAS the City of Guelph will experience growth through development and redevelopment;

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

CITY OF TARPON SPRINGS, FLORIDA

List of Principal Officials

City of Beaumont Development Related Fee Schedule

Permit Fee Estimator Worksheet for New or Replacement Single Family Dwellings

Worcester Township Fee Schedule

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

Schedule of City Fees & Charges

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

General Information RETAIL AND RESTAURANT

Department of Public Works Permit Fee Schedule

RESOLUTION NO

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

Element Z General Design Requirements Owner Standards and Other Requirements

The City of Daytona Beach Fee Schedule

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017

a) Tenant shall require its Contractor to provide and maintain the following insurance coverage:

TOWN OF WHITBY - BUILDING DIVISION REPORT - PLANNING AND DEVELOPMENT DEPARTMENT - BUILDING ACTIVITY REPORT

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

City of Wausau Building, Housing and Zoning Fee Schedule

THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

BUILDING SERVICES ~ FEE SCHEDULE

BUILDING CODE COMMISSION

Location in Code Subject Fees

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

INFO-PACK. Knight s Court Info Pack Page 1

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016-

CITY OF TORONTO BY-LAW NO. ~-20~

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

FEES FOR BUILDING REGULATION APPLICATIONS The Land Planning and Development (Fees) (Amendment) Regulations, 2017

County of Fresno / Public Works and Planning Master Schedule of Fees for Development Services, Effective January 3, 2008

Mayor's Office of Housing and Community Development Commercial Space Underwriting Guidelines

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

Transcription:

How to Calculate Permit Fees: To calculate the mit fee required at the time of application the following is used 1. Determine which Class of Work is applicable 2. Determine the Area of Work (i.e. project area proposed) 3a. Calculate fee as Area of Work x Base Rate + Rebate Fee, or 3b. Calculate fee as Flat Fee Rate + Rebate Fee Note: Septic mit fees must be paid even when work is in conjunction with another mit. Where the construction proposed falls under multiple categories please contact the Building Division at (519) 623-1340 to determine the appropriate fee. Shell Top up Fees Proposed Classification/Use of Space Additional Cost Sqft for Shell Top-Up Fee Existing Classification/Use of Shell Building A B D E F A $ 0.00 $ 0.00 $ 0.40 $ 1.09 $ 1.55 B $ 0.17 $ 0.00 $ 0.57 $ 1.26 $ 1.72 D $ 0.00 $ 0.00 $ 0.00 $ 0.69 $ 1.15 E $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.46 F $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 Note: See the interpretations for information on the shell top-up fees. Shell mits are not issued for Residential buildings and as such are not included in table. Page 1 of 9

INTERPRETATION: The following requirements are to be applied in the calculation of mit fees: Floor area of the proposed work is to be measured to the outer face of exterior walls and to the centre line of party walls or demising walls (excluding residential garages). In the case of interior alterations or renovations, area of proposed work is the actual space receiving the work, e.g. tenant suite. Mechanical penthouses and floors, mezzanines, lofts, habitable attics and interior balconies are to be included in all floor area calculations. Except for interconnected floor spaces, no deduction is made for openings within the floor area (e.g. stairs, elevators, escalators, shafts, ducts, etc.). Unfinished basements for single family dwellings (including semis, duplexes and townhouses, etc.) are not included in the floor area. Attached garages and fireplaces are included in the mit fee for single family dwellings. Where interior alterations and renovations require relocation of sprinkler heads or fire alarm components, no additional charge is applicable. Ceilings are included in both new shell and finished (partitioned) buildings. The Service Index for ceiling applies only when alterations occur in existing buildings. Minor alterations to existing ceilings to accommodate lighting or HVAC improvements are not chargeable. Where demolition of partitions or alteration to existing ceilings is a part of an alteration or renovation mit, no additional charge is applicable. Corridors, lobbies, washrooms, lounges, etc. are to be included and classified according to the major classification for the floor area on which they are located. The occupancy categories in the Schedule correspond with the major occupancy classifications in the Ontario Building Code. For mixed occupancy floor areas, the Service Index for each of the applicable occupancy categories may be used, except where an occupancy category is less than 10% of the floor area. Temporary tent is considered to be a building that will be erected for not more than one year. When a building shell mit is received under one classification and a subsequent interior finishing mit is applied for under a different classification, then the following applies: I. If the classification of the interior finishing mit were to be applied to the building shell, and the resulting classification of the shell would result in higher fees, then the difference between the fees which originally were paid and the fees of the reclassified portion of shell building shall apply to the finishing mit, and are payable at the time of the interior finishing mit application. II. The payment of the additional fees applies to the entire building, or the portion subject to the reclassification. III. There is no reduction or rebate on fees for those shell buildings which are now classified at a lower fee structure following the interior finishing mit. IV. The fees related to the shell reclassification are in addition to the interior finishing mit fee. Fee for classes of mits not described or included in this schedule shall be determined by the Chief Building Official. Page 2 of 9

NEW BUILDINGS, MEZZANINES OR ADDITIONS TO EXISTING BUILDINGS Group A: Assembly Building (Shell Only) $ 2.33 sqft Min. $ 120.00 Building (Finished) $ 2.65 sqft Min. $ 120.00 Portables ( site) $ 208.00 flat fee Group B: Institutional Building (Shell Only) $ 2.50 sqft Min. $ 120.00 Building (Finished) $ 2.82 sqft Min. $ 120.00 Group C: Residential SFD, Semi, Row, Townhouse, Duplex $ 1.43 sqft Min. $ 120.00 New Building Addition - $250 flat fee Manufactured Home $ 1.26 sqft Min. $ 120.00 Finished Basement as part of New Part 9 Res. Building New Building Addition - $250 flat fee $ 0.45 sqft Water Meter for New SFD and Semi, (Where No Meter Chamber Provided) $ 10.00 meter Infill Grading Deposit (New SFD, Semi, Duplex or Triplex) $4000.00 Per Lot Deposit is required for all Infill or Severance Lots Not under the control of a Plan of Sub-Division or Site Plan Control Agreement Page 3 of 9

Apartment Building (Part 3) $ 1.38 sqft Min. $ 120.00 Hotels/Motels $ 2.23 sqft Min. $ 120.00 Residential Care Facility $ 1.99 sqft Min. $ 120.00 Foundation Permit (Multi- Residential, Hotel, Motel, Care Facilities) $ 0.20 sqft Min. $ 120.00 Group D: Business and Personal Services Building (Shell Only) $ 1.93 sqft Min. $ 120.00 Building (Finished) $ 2.23 sqft Min. $ 120.00 Group E: Mercantile Building (Shell Only) $ 1.24 sqft Min. $ 120.00 Building (Finished) $ 1.58 sqft Min. $ 120.00 Page 4 of 9

Group F: Industrial Building (Shell Only) $ 0.78 sqft Min. $ 120.00 Building (Finished) $ 0.99 sqft Min. $ 120.00 Parking Garage $ 0.80 sqft Min. $ 120.00 Other Buildings/Structures: Garage/Shed/Carport for SFD, Semi, Townhouse Deck for SFD, Semi, Row, Townhouse $ 0.43 sqft Min. $ 120.00 $250 flat fee $ 120.00 flat fee $250 flat fee Exterior Ramp $ 78.00 flat fee $250 flat fee Air Supported Structures $ 0.49 sqft Min. $ 120.00 Temporary Tents ( site) $ 169.00 flat fee Roof Structure Only $ 0.45 sqft Min. $ 120.00 Shed (non-residential) $ 0.38 sqft Min. $ 184.00 Deck (non-residential) $ 184.00 flat fee $250 flat fee Farm Building $ 0.51 sqft Min. $ 120.00 Page 5 of 9

RENOVATIONS TO EXISTING BUILDINGS Alterations, Renovations, Interior Finishing: Alterations, Renovations, Finished Basements (SFD, Semi, Row, Townhouse, Duplex) Alterations, Renovations, Interior Finishing (all other buildings) Shell Top Up Fee for Interior Finishing Permits (See Interpretation of Fees on second page) Structural Work (repairs/ alterations/upgrades) $ 0.45 sqft Min. $ 120.00 $250 flat fee $ 0.45 sqft Min. $ 120.00 Refer to How to Calculate Fees for Table (start of fee schedule) $20.81 $1000 of construction value Min. $ 120.00 Miscellaneous: Fireplace/Woodstove (each) $ 120.00 flat fee $250 flat fee In-rack storage system $ 0.44 sqft Min. $ 120.00 Food Premise Installation $ 247.00 flat fee $250 flat fee Elevators, lifts and escalators Balcony Guard Replacement ( linear foot) Ceiling (new or replace sq. ft.) $ 354.00 flat fee $250 flat fee $ 0.70 linear ft Min. $ 120.00 $250 flat fee $ 0.10 sqft Min. $ 120.00 $250 flat fee Storefront (replace) $ 184.00 flat fee $250 flat fee Re-clad Wall ( sq. ft.) $ 0.09 sqft Min. $ 120.00 $250 flat fee Outdoor Patio $ 202.00 flat fee $250 flat fee Page 6 of 9

OTHER PERMITS Special Categories: Demolition Permit $ 0.14 sqft Min. $ 184.00 Change of Use Permit (no construction) $ 184.00 flat fee $250 flat fee Conditional Permit $ 0.18 sqft Min. $ 120.00 Designated Structures: Retaining Wall $ 3.49 linear ft Min. $ 120.00 $250 flat fee Outdoor Public Pool $ 918.00 flat fee $250 flat fee Solar Collector Part 9 Residential $ 120.00 flat fee $250 flat fee Solar Collector All other application types $ 374.00 flat fee $250 flat fee All Other Designated $ 354.00 flat fee $250 flat fee Structures Plumbing Work: Independent of Building Permit Plumbing Permit for Any Combination Identified Below Add calculated fee for each category from below together Min. $ 89.00 $250 flat fee (No Fee for Site Services to New SFD, Semi, Row, Townhouse, Duplex) Plumbing Permit ( fixture) Catchbasins/Manholes/Roof Drains $ 14.71 fixture Min. $ 89.00 $250 flat fee $ 14.71 each Min. $ 89.00 $250 flat fee Building/Site Services $ 0.85 linear ft Min. $ 89.00 $250 flat fee (Except for Services to New SFD, Semi, Row, Townhouse, Duplex) Backflow Prevention Device Permit $ 78.00 device Min. $ 89.00 Page 7 of 9

Page 8 of 9 Sewage (Septic) System Work: New Installation $ 583.00 flat fee $250 flat fee Class 5 Sewage System for Temporary Oation Not Exceeding 12 Months in $ 92.00 flat fee $250 flat fee Duration Major Repair $ 287.00 flat fee $250 flat fee Minor Repair $ 99.00 flat fee $250 flat fee Mechanical Work: Independent of Building Permit HVAC Permit (residential) $ 113.00 suite $250 flat fee HVAC Permit (non-res.) $ 0.15 sqft Min. $ 120.00 $250 flat fee Sprinkler System (NFPA 13) $ 0.07 sqft Min. $ 184.00 $250 flat fee Standpipe and Hose System (retrofit) $ 113.00 flat fee $250 flat fee Commercial Kitchen (NPFA 96 Hood) $ 184.00 flat fee $250 flat fee Spray Booth $ 184.00 flat fee $250 flat fee Dust Collector $ 184.00 flat fee $250 flat fee Electrical Work: Independent of Building Permit Emergency Lighting $ 113.00 Fire Alarm System and Electrical Work storey $ 0.07 sqft $250 flat fee Min. $ 184.00 $250 flat fee Max. $ 565.00 $250 flat fee Electromagnetic Locks $ 49.00 each Min. $ 120.00 $250 flat fee Hold Open Devices $ 49.00 each Min. $ 120.00 $250 flat fee Additional Fees: After Hours Overtime Rate for Plans Examination or Field Inspections $ 104.00 hour Min. $ 312.00 Revision to Examined Plans $ 0.04 sqft Min. $ 92.00 Transfer of Permits (Where ownership changes on proty, no other changes to project or professional services) 10% of the original mit fee Request to Extend Permit (OBC Act, Section 8(10)) $109.00 hourly rate Min. $ 109.00

Special Permit Fee (With respect to construction, change of use, demolition, heating, ventilation, air conditioning, electrical, plumbing or drainage work where such work was commenced prior to the issuance of a mit.) Regular mit fee plus an additional fee equal to 100% of the amount calculated as the regular mit fee Max. $7905.00 Permit to Occupy Unfinished Building (Where an owner wishes to occupy an unfinished building) $ 120.00 unit Liquor License Approval Letter $64.00 Each Status of Permit Letter $25.00 Each Permanent Sign Permit $54.00 sign, plus $54.00 $1000 value of sign Min. $129.00 Page 9 of 9