Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Similar documents
Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)

Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412)

Sample Procurement Plan

Prior Review Thresholds

PROCUREMENT PLAN (Textual Part)

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Project: Rwanda Stunting Prevention and Reduction Project: P

Public Disclosure Authorized

3 and above Less than 3 Less than 1 Recommended to advertise for 7 days for RFQ above 0.5

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: To Be Initiated.

YESSO 18 Months Procurement

Procurement Plan. I. General

Procurement Plan. I. General

Jhelum & Tawi Flood Recovery Project (Project ID: P154990) Procurement Summary

PROCUREMENT PLAN (P162086)

MINISTRY OF HEALTH Transforming Health Systems for Universal Care Project Project Procurement Plan Financial Year 2016/2017 IDA CREDIT No.

Textual Procurement Plan

Textual Procurement Plan

Sample Procurement Plan

Sample Procurement Plan

Sample Procurement Plan

2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

A Framework for Benchmarking Land Administration Systems

Procurement Plan. Prior Review Threshold (US$) 1. ICB and LIB (Goods) USD 3,000,000 All 2. NCB (Goods and Nonconsultant prior review by the bank

PROCUREMENT PLAN (Textual Part)

I. General. II. Goods and Works and non-consulting services. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Recognized Obligation Payment Schedule (ROPS 13-14B) - Summary Filed for the January 1, 2014 through June 30, 2014 Period

Sample Procurement Plan

Integrated Safeguards Data Sheet (Initial)

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

LIS a motivation for SDI initiative

FROM RESIDENTIAL LICENSES TO FULL TITLE IN TANZANIA

PROCUREMENT PLAN (Textual Part)

June 8, The Honorable Eric Garcetti Mayor, City of Los Angeles Room 300, City Hall 200 North Spring Street Los Angeles, CA 90012

MILLER BUILDINGS, INC.

miami report MIAMI S A LOOK At WHAT S LEFT MAY 2012 An in-depth analysis of South Florida s New Developer Condominium Inventory

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

SERVICE CONTRACTS (except for A/E professional services) AND PURCHASE CONTRACTS (purchasing apparatus, supplies, materials, or equipment)

NOTICE OF TRIBUNAL CONVENED MEETING OF THE SECURED CREDITORS

The World Bank Support to the Afghanistan Independent Land Authority (P156225)

CAPITAL ASSET POLICY

company profile simplicity is the ultimate sophistication

Following are the amendments to the RFP Reference No. IT-04/ dated 24/12/2018:

OCCUPIER SERVICES OCCUPIER SERVICES STRATEGIC PROPERTY PORTFOLIO ADVICE AND TENANT REPRESENTATION

ERSO: experimental reimbursable seeding operations

City of Urbandale Surplus Property Disposal Policy

The American University in Cairo. Financial Policies and Procedures

Re-announced. Request for Quotation (RFQ)

Performance Appraisals. Procedures Guide

Procurement Method. Preparatio n of TORs/invi tation

Evaluating the award of Certificates of Right of Occupancy in urban Tanzania

PROCUREMENT PLAN (Textual Part)

GENERAL TERMS AND CONDITIONS. 2. The NPPF will dispose off the items on AS IS WHERE IS basis through sealed bids.

City of Keller Glossary of Procurement Terms. Addendum: A written change to a Bid, Quote, RFQ, or RFP during the solicitation process.

SAP FIORI UX DESIGN & BUILD CHALLENGE

Marlboro County School District

BID DOCUMENTS FOR DISPOSAL OF OFFICE EQUIPMENT

CONTRACTING - BID LAWS

A D D E N D U M # 2. This Addendum is issued to the above referenced to RFP make the following changes, additions, deletions, and/or clarifications:

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS

UTTAR PRADESH JAL NIGAM

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

Capital Asset Accounting Policies POLICY STATEMENT

LAKE ZUMBRO RESTORATION PROJECT FEASIBILITY REPORT

Administration s Finance Office Approval Date: 4/10/12 Effective Date: 4/10/12 Capital Assets and Property Review Date:

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 2188

Fixed Asset & Depreciation Policy

Visual On land Trash Assessment Protocol for Stormwater

Alternative Project Delivery Strategies for Expansion and Renovation

Note: these sessions provide an overview of information and should not be used in lieu of legal and other professional advice.

University of Mysore University Engineering Division, Opp to Fire Brigade, Saraswathi Puram, Mysore -9

ISSUES MOBILIZATION GUIDANCE DOCUMENT

LEGALS. McCabe, Weisberg & Conway, LLC 312 Marshall Avenue, Suite 800 Laurel, Maryland

Making the Most from your Premises. Gordon Ludlow Ethical Property Foundation

Property Control Procedure

Tangible Capital Asset Policy

MINISTRY OF TRANSPORTATION

Policy on University of Southern Maine Surplus & Moving Items

REQUEST FOR PROPOSALS DEPOSITORY BANK SERVICES RFP NO: ADDENDUM 1

218 Uber Road Mercer County, PA Agricultural Lease Request for Proposals

BOARD OF TRUSTEES JEFFERSON TOWNSHIP, MONTGOMERY COUNTY, OHIO RESOLUTION NO 16-38

POLICY PROCEDURE. The words and phrases listed below when used in this policy shall have the following meanings ascribed to them:

ASSESSMENT OF STATE AGENCIES WITH RESPONSIBILITIES FOR LANDS AND OTHER REAL PROPERTIES

FINANCE. Tangible Capital Assets are non-financial assets having physical substance that:

Fixed Asset Management

In accordance with Property Management Policy C.2.7, the following procedures under Property Management are further expanded to include:

REQUEST FOR PROPOSAL FOR REAL ESTATE BROKER SERVICES FOR

Tom Nordin, Realtor Re/Max Advantage Plus Andy Prasky, Realtor Re/Max Advantage Plus

FLOWCHART #3 - NEW BUILDING CONSTRUCTION AND MAJOR RENOVATION PLANNING MILESTONES

Transcription:

I. General Procurement Plan 1. Project Informati Country: Tanzania Project Name: Secd Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Implementati Agency: Ministry of Water and Irrigati Dar es Salaam Water Supply and Sewerage Authority Dar es Salaam Water Supply ans Sewerage Corporati 3. Date of the Procurement Plan: April 2017 4. Period Covered by this Procurement Plan: First 18 Mths II. Thresholds for Review, Procurement es and Methods A. Goods, Works and N-Csulting Services Category Procurement es and Methods (US$ millis) Review (US$ millis) Open Internatial Open Natial Request for Quotati (RfQ) Works 10 15.0 < 15 0.2 Goods, IT, and ncsulting services B. Csulting Services 2 5 < 5 0.1 Category Review Short List of Natial Csultants (US$ milli) (US$ millis) Csulting Services Engineering and Cstructi Supervisi Csultants (Firms) 1 0.3 0.3 Individual Csultants 0.3 NA. NA. [Overall Project Procurement Risk is SUBSTANTIAL] Notes: Terms of Reference: Terms of Reference for all ctracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Csultancy Service for Ctracts estimated to cost US$ 300,000 equivalent and above per ctract shall be advertised in UNDB line in additi to advertising in Natial News Paper(s) of wide circulati and/or Regial News Paper(s). 1

Page 1 PROCUREMENT Tanzania : Secd Tanzania Water Sector Support Project PLAN General Informati Country: Tanzania Bank s Approval Date of the Original Procurement Plan: 2017-04-13 Revised Plan Date(s): (comma delineated, leave blank if n 2018-12-28 Project ID: P150361 GPN Date: Project Name: Secd Tanzania Water Sector Support Project No:, IDA / V0310 Executing Agency(ies):Ministry of Water and Irrigati WORKS Procurement Prequalificati Actual Amount (Y/N) Status Draft Pre-qualificati Documents Prequalificati Evaluati Report Draft Bidding Document / Justificati Specific Procurement Notice / Invitati Bidding Documents as Issued Proposal Submissi / Opening / Minutes Bid Evaluati Report and Recommendati for Award TZ-MOW-12669-CW-RFB / Drilling Works for Ground Water Mitoring Network in Wami-Ruvu and Internal 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20 Drainage Basins TZ-MOW-12671-CW-RFB / Civil Works Cstructi and Installati of Water Resources Mitoring Gauges in all the nine Basins in 2018-07-02 2018-07-07 2018-08-18 2018-09-17 2018-10-22 2019-04-20 Tanzania TZ-MOW-12673-CW-RFB / Cstructi of Office Block for the Proposed Water Resources Centre of Excellency (COE) in Dar es 2019-03-04 2019-03-09 2019-04-20 2019-05-20 2019-06-24 2019-12-21 Salaam TZ-MOW-12670-CW-RFB / Cstructi of office and water laboratory buildings for Wami-Ruvu Basin Water Board (BWB) Headquarter at Morogoro and Water Users Associati (WUA) Offices at Msowero and rehabilitati and extensi of office building for Wami-Ruvu BWB in Dodoma. 0.00 Canceled 2018-06-04 2018-06-09 2018-07-21 2018-08-20 2018-09-24 2019-03-23 GOODS Procurement Prequalificati Actual Amount (Y/N) Status Draft Pre-qualificati Documents Prequalificati Evaluati Report Draft Bidding Document / Justificati Specific Procurement Notice / Invitati Bidding Documents as Issued Proposal Submissi / Opening / Minutes Bid Evaluati Report and Recommendati for Award TZ-MOW-11480-GO-RFB / Supply of eighteen four- Wheel Drive Vehicles for the Basin Water Boards and 2017-07-03 2017-07-08 2017-08-07 2017-08-28 2017-10-02 2017-12-31 MoWI's Divisi of WR. TZ-MOW-12602-GO-RFB / Supply of Motorbikes and Bicycles (100 of each) to support 100 WUAs 2017-07-03 2017-07-08 2017-08-07 2017-08-21 2017-09-25 2017-11-24

Page 2 TZ-MOW-12667-GO-RFB / Supply of office data management tools and equipment including ICT 2018-03-01 2018-03-06 2018-04-05 2018-05-05 2018-06-09 2018-09-07 equipment TZ-MOW-12610-GO-RFP / Supply of water quality mitoring equipment and tools 2017-07-01 2017-07-06 2017-08-05 2017-09-04 2017-10-09 2018-04-07 TZ-MOW-12605-GO-RFB / Supply of surface and groundwater mitoring network gauges mitoring instruments for large dams Request for Bids Open - Natial 2017-07-03 2017-07-08 2017-08-07 2017-09-06 2017-10-11 2018-04-09 and sediment mitoring equipment TZ-MOW-10924-GO-RFB / Supply of Water Users Associatis Survival Working Kits 2017-05-30 2017-06-04 2017-06-25 2017-07-25 2017-08-29 2017-11-27 TZ-MOW-63647-GO-RFQ / Purchase of office furniture (Office tables, Office chair Office cabinet Request for Quotatis Open - Natial 2018-08-20 2018-10-15 2019-04-13 TZ-MOW-63646-GO-RFQ / Purchase of office equipments (Laptop Desktop, Ups, Network Printer, Scanner, Photocopier, Projector, WiFi Request for Quotatis Open - Natial 2018-08-06 2018-10-01 2019-03-30 Router, Printer LaserJet pro M402dne, Garmin GPS NAVA F 78) TZ-MOW-70318-GO-UN / Supply of eighteen four- Wheel Drive Vehicles for the Basin Water Boards and UN Agencies (Direct) Direct 2018-08-22 2018-08-27 2018-10-01 2019-03-30 MoWI's Divisi of WR. TZ-MOW-12668-GO-RFB / Supply of Communicati Strategy Materials 2018-09-27 2018-10-02 2018-11-01 2018-12-01 2019-01-05 2019-04-05 NON CONSULTING SERVICES Procurement Prequalificati Actual Amount (Y/N) Status Draft Pre-qualificati Documents Prequalificati Evaluati Report Draft Bidding Document / Justificati Specific Procurement Notice / Invitati Bidding Documents as Issued Proposal Submissi / Opening / Minutes Bid Evaluati Report and Recommendati for Award CONSULTING FIRMS Ctract Type Actual Amount Status Terms of Reference Expressi of Interest Short List and Draft Request for Proposals Opening of Technical Notice Request for Proposals as Issued Proposals / Minutes Evaluati of Technical Proposal Combined Evaluati Report and Draft Negotiated Ctract

Page 3 TZ-MOW-11548-CS-CQS / Csultancy Services for Technical Assistance Preparati of Water Resources Use Charges Csultant Qualificati Selecti Open - Natial 0.00 Implementati 2017-08-30 2017-09-20 2017-11-03 2017-12-03 2018-01-07 2018-07-06 Regulatis TZ-MOW-11553-CS-CQS / Csultancy for Development and Implementati of Laboratory Informati Csultant Qualificati Selecti Open - Natial Implementati 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2018-07-27 Management System TZ-MOW-11854-CS-QCBS / Csultancy services for Natial Hydrological Based Selecti Internatial Implementati 2017-08-18 2017-09-08 2017-10-22 2017-11-19 2017-12-19 2018-01-23 2018-02-27 2019-02-27 Aquifer Mapping TZ-MOW-11857-CS-QCBS / Csultancy Services for Operatial Decisi Support System Through Enhanced Based Selecti Internatial Review 2017-10-05 2017-11-04 2017-12-18 2018-01-15 2018-02-14 2018-03-21 2018-04-25 2019-04-25 Hydro- Meteorological Services TZ-MOW-11878-CS-CQS / Design and Supervisi for Centre of Excellence Building Csultant Qualificati Selecti Open - Natial 0.00 Implementati 2017-05-25 2017-06-15 2017-07-29 2017-08-28 2017-10-02 2018-03-31 TZ-MOW-10918-CS-QCBS / Csultancy Services for Catchment Cservati in Based Selecti Internatial Implementati 2017-03-30 2017-04-28 2017-06-02 2017-06-30 2017-07-30 2017-08-29 2017-10-03 2018-10-03 Wami-Ruvu Basin TZ-MOW-44490-CS-CQS / Csultancy services for Csolidati of Data, Informati and Models from the IWRMD Plans and Preparati of Requirements Csultant Qualificati Selecti Open - Natial 277,090.70 Signed 2018-01-18 2018-02-08 2018-03-24 2018-04-23 2018-05-28 2018-11-24 Specificati for WRIS & Web Portal TZ-MOW-54418-CS-QCBS / Csultancy Services Water Resources Management Financing Based Selecti Internatial 385,210.34 Signed 2015-02-03 2015-02-13 2015-09-23 2015-11-13 2016-02-10 2016-07-01 2018-12-15 2019-06-13 Optis TZ-MOW-54421-CS-QCBS / Csultancy Services for Preparati of Integrated Water Management and Based Selecti Internatial Implementati 2015-02-03 2015-02-13 2015-09-07 2015-11-12 2016-04-04 2016-12-21 2017-06-01 2017-11-28 Development Plan for Wami/Ruvu Basin TZ-MOW-64973-CS-QCBS / Csultancy Service for Project Management Firm to Support Implementati of Based Selecti Internatial 0.00 Implementati 2018-06-20 2018-07-11 2018-08-15 2018-09-12 2018-10-12 2018-11-16 2018-12-21 2019-12-21 WSSP II

Page 4 TZ-MOW-11389-CS-QCBS / Csultancy Services for design review and supervisi of cstructi of office and laboratory buildings for Wami-Ruvu Basin Water Boards Based Selecti Internatial 0.00 Canceled 2017-09-05 2017-09-26 2017-10-24 2017-11-21 2017-12-21 2018-01-25 2018-03-01 2019-03-01 Headquarter Morogoro and Water Users Associatis Offices at Msowero and rehabilitati and extensi at Dodoma TZ-MOW-12527-CS-QCBS / Institutial development support technical assistance Based Selecti Internatial 0.00 Canceled 2017-10-20 2017-11-10 2017-12-24 2018-01-21 2018-02-20 2018-03-27 2018-05-01 2019-05-01 COE TZ-MOW-10915-CS-QCBS / Csultancy Services for Modernizing Hydrological and Meteorological Based Selecti Internatial 0.00 Canceled 2017-03-30 2017-04-28 2017-06-02 2017-06-30 2017-07-30 2017-08-29 2017-10-03 2019-11-30 Mitoring Systems TZ-MOW-10921-CS-QCBS / Csultancy Services for Operatial Decisi Support System through Enhanced Based Selecti Internatial 0.00 Canceled 2017-04-11 2017-05-12 2017-06-16 2017-07-14 2017-08-13 2017-09-12 2017-10-17 2018-10-17 Hydro-Meteorological Services TZ-MOW-11875-CS-CQS / Csultancy Services for the Csultant study of institutial set up Qualificati Open - Natial 0.00 Canceled 2017-05-25 2017-06-15 2017-07-29 2017-08-28 2017-10-02 2018-03-31 for water Resources Centre Selecti of Excellence TZ-MOW-12529-CS-CQS / Csultancy Services for preparati of future investments Csultant Qualificati Selecti Open - Internatial 0.00 Canceled 2017-07-03 2017-07-24 2017-08-21 2017-09-04 2017-10-09 2018-04-07 TZ-MOW-11533-CS-CQS / Technical Assistance for strengthening Ground water Resources Development and Csultant Qualificati Selecti Open - Natial 0.00 Implementati 2017-08-10 2017-08-31 2017-10-14 2017-11-13 2017-12-18 2018-06-16 Management in Tanzania TZ-MOW-79016-CS-QCBS / Csultancy Services for Preparati of Strategic Envirmental and Social Appraisal (SESA) for Integrated Water Resources Based Selecti Internatial Implementati 2018-11-14 2018-12-05 2019-01-18 2019-02-15 2019-03-17 2019-04-21 2019-05-26 2020-05-25 Management and Development (IWRMD) Plans for Five Basins in Tanzania. TZ-MOW-64970-CS-CQS / Csultancy Services for Project Manager Csultancy for Support of WSSP II Csultant Qualificati Selecti Open - Natial 0.00 Canceled 2018-10-16 2018-11-06 2018-12-11 2019-01-05 2019-02-09 2019-08-08 TZ-MOW-11545-CS-CQS / Technical Assistance Csultant Supporting Implementati Qualificati Open - Natial 0.00 Canceled 2017-08-30 2017-09-20 2017-11-03 2017-12-03 2018-01-07 2018-07-06 of IWRMD at Natial and Selecti Basin Levels

Page 5 TZ-MOW-11558-CS-CQS / Technical Assistance for Cceptualisati, Strategic Planning and Opertislisati of the Csultant Qualificati Selecti Open - Natial 0.00 Implementati 2017-11-30 2017-12-21 2018-02-03 2018-03-05 2018-04-09 2018-10-06 Water Resources Centre of Excellence (WRCoE) INDIVIDUAL CONSULTANTS