HOME ADDITION PERMIT PROCESS

Similar documents
NEW HOME CONSTRUCTION PERMIT PROCESS

Application for a Building/Zoning Permit

MANUFACTURED HOME SUBMITTAL REQUIREMENTS

Septic Tank / Drainfield / Holding Tank Permit Application

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

~ Please Detach and Save This Page ~

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

APPLICATION PACKET FOR RESIDENTIAL ALTERATION COVER SHEET

DEMOLITION REQUIREMENTS

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

1. STRUCTURE TYPE (CHECK ONE): METHOD FOR MEETING ENERGY CODE COMPLIANCE: RESIDENTIAL COMMERCIAL PRESCRIPTIVE REScheck COMcheck PERFORMANCE

Septic Tank / Drainfield / Holding Tank Permit Application

LAKE COUNTY INTERIM USE APPLICATION VACATION RENTAL HOME

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

DEMOLITIONS LICENSING REQUIREMENTS APPLICATION PROCESS. 1 of 2

Septic Tank / Drainfield / Holding Tank Permit Application

Lake of the Woods County Land Use Permit Instruction Sheet

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

Before I can issue a permit, I need the following items:

Lake of the Woods County Land Use Permit Instruction Sheet

What is a Conditional Use? When is a Conditional Use Necessary? Who decides if I will get a Conditional Use Permit

TOWN OF FAIRPLAY BUILDING PERMIT APPLICATION FOR NEW CONSTRUCTION, ADDITIONS, AND REMODELS

Instructions to the Applicant

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

BONNER COUNTY PLANNING DEPARTMENT

LAND DIVISION APPLICATION

TECHNICAL BULLETIN FX-1

Interim Use Permit Application

SWIMMING POOL GUIDELINES

GENERATOR APPLICATION PROCESS - 1

BUILDING LOCATION PERMIT APPLICATION

Remember, PA One-Call before excavating. Simply dial 811 or

This permit application includes the land use/zoning and building inspection reviews.

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

Department of Planning and Development

Date Received: Permit #:

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

STEP 1: SOIL EVALUATION

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

Demolition Permit Application Check List. Notice: Please review and follow the check list to avoid any delays in the permit process.

OSSF Permit Application

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

206 8 th Ave SE Suite #290 Baudette, MN Phone: Fax: Instructions to Applicant

TOWN OF CHILI 3333 Chili Avenue, Rochester, NY Tel: Fax:

Three Oaks TWP. (269) FAX THREE OAKS, MICHIGAN MECHANICAL PERMIT APPLICATION

FENCE and or POOL BARRIER CHECKLIST

Cassia County Accessory Dwelling Unit (ADU) Permit Application

APPLICATION FOR APPROVAL OF LAND DIVISION

City of McMinnville Community Development Department

City of Greensburg. Step by Step Guidelines for your Project. Informational Packet for a Compliance Permit

LAND USE PERMIT APPLICATION INSTRUCTION SHEET

INCOMPLETE APPLICATIONS WILL BE RETURNED! GENERAL PROPERTY INFORMATION. Applicant s name Day Phone address Authorized Agent (if applicable)

BOROUGH OF CHESTER 50 NORTH ROAD CHESTER NJ Chester Borough Business License Application Guidelines

PERMIT FEES Within the shore impact zone (Includes Rip-Rap and Sand Blankets) $ Over 51 cubic yards $100.00

RESIDENTIAL FERRY COUNTY BUILDING PERMIT CHECKLIST

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

Certified Survey Review Instructions

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

-EXTERIOR STRUCTURE ALTERATIONSIDING DOORS - WINDOWS

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

MENARD COUNTY ZONING PERMIT APPLICATION (PLEASE READ BEFORE PROCEEDING WITH APPLICATION)

VILLAGE OF SALEM LAKES

Certificate of Occupancy Application

NEW SINGLE FAMILY RESIDENTIAL

STEPS FOR CHANGING A TAX PARCEL

PLANNING DEPARTMENT Application for a Nonconforming Use Modification

Huntington Building Inspection

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

MECHANICAL HVAC PERMIT CHECKLIST

County of San Bernardino Department of Public Health Environmental Health Services

- HANDICAPPED RAMP - MISCELLANEOUS ACCESSORY STRUCTURE BUILDING PERMIT APPLICATION PACKET

MANUFACTURED HOUSING UNIT PLACEMENT Article 11.2 of the Zoning Ordinance

Sheds, Fences, Decks (All Permitted Structures Except New and/or Expansion of Principal Buildings )

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

TEMPORARY OUTDOOR SALES/SEASONAL EVENT PACKET

SWIMMING POOL PERMIT APPLICATION PACKET

City of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL

Athens Township Zoning Permit

11/30/2016. Residential Building Plan submittal:

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

APPENDIX E FORMS INDEX OF ZONING FORMS

Please complete the enclosed application and PRINT clearly.

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

Madison County Health Department Environmental Health 493 Medical Park Drive, Marshall, NC Telephone: Fax:

ADMINISTRATIVE PERMIT FOR TEMPORARY MOBILE HOME APPLICATION

Environmental Health Division Serving Crawford, Kalkaska, Lake, Manistee, Mason, Mecosta, Missaukee, Newaygo, Oceana, and Wexford Counties

Worcester Township Fee Schedule

OWNER-BUILDER STATEMENT/AFFIDAVIT

A/C PERMIT APPLICATION 2017 FLORIDA BUILDING CODE

-MECHANICAL- BUILDING PERMIT APPLICATION PACKET

Permit Fee Estimator Worksheet for New or Replacement Single Family Dwellings

SIGN PERMIT APPLICATION

ATCHISON COUNTY NEIGHBORHOOD REVITALIZATION PLAN

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

Town of Westerlo Planning Board & Zoning Board of Appeals Application Process

RESIDENTIAL SINGLE FAMILY DETACHED & ATTACHED BUILDING PERMIT APPLICATION SUBMISSION PROCEDURES

CONDITIONAL USE APPLICATION

Burnett County, WI SUBDIVISION VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS PROCESS (NOTE: PLEASE READ ENTIRE APPLICATION BEFORE PROCEEDING)

Zoning/Building Permit Application

Transcription:

TOWNSHIP COOPERATIVE PLANNING ASSOCIATION 4111 11 th Avenue SW Room 10 Roger Ihrke, Administrator Rochester, MN 55902 David H. Meir, Administrator Barbara Literski, Adm. Asst. Phone: (507) 529-0774 roger@tcpamn.org Fax: (507) 281-6821 david@tcpamn.org TCPA HOME ADDITION PERMIT PROCESS This packet includes the forms you will need to submit an application to build an addition to an existing home within the townships administered by TCPA. 1. Building Permit application: Complete as much of the form as possible and remember to sign it. 2. Zoning Certificate application: Complete and sign. In particular you MUST include a site plan showing the location of the proposed home in relation to all lot lines, the distance from the well and the distances from the septic field and septic tank. Your permit cannot be processed without this required site plan. 3. Energy Calculations form: Most people will have their HVAC contractor complete this form. Notice the items that are starred as being required for additions. 4. Wall Section form: This form is provided for your convenience. If you ve had professional construction plans drawn they will most likely include this required information. 5. Septic permit: No form included in this packet. If the addition to the dwelling includes a bedroom, you ll need a septic compliance check to determine whether the septic system is sized properly for the proposed number of bedrooms. If the system is not sized for the proposed number of bedrooms you ll need a new septic permit. Your building permit cannot be issued until we ve received your septic permit. (If you need a septic permit.)

BUILDING PERMIT APPLICATION NO: TOWNSHIP COOPERATIVE PLANNING ASSOCIATION 4111 11TH Avenue SW Room 10 Rochester, MN 55902 PH: (507) 529-0774 FX: (507) 281-6821 JOB SITE LOCATION: Township: Address: City: State: Zip: PROPERTY OWNER: Name: Address: Home PH#: City: State: Zip: Work PH#: PROPERTY LEGAL DESCRIPTION: Township Section #: Email Address: PROPOSED USE: Description of Project: Dwelling Deck Furnace Dwelling Addition/Year Built: Pole Building 3-Season Porch Water Heater Finish Basement Private Garage Siding Gas Line Dwelling Remodel/Year Built: Business Commercial Re-Roofing Fireplace Other: Building Dimensions: Lot Size/Dimensions: Use & Occupancy: Construction Type: Estimated Value: General Contractor Plumbing Contractor Address Plumber License # Mechanical Contractor License # Phone # Phone # Septic Installer Denotes Required information for all permits Electrician Well Driller Floodplain Management District: YES NO Shoreland Management District: YES NO You must attach two (2) copies of building plans and a free-hand sketch showing land dimensions, building locations and distances in relation to other buildings, lot lines, roads, road right-of-ways, septic & well locations plus neighboring septics & wells if located in a subdivision or on a small acreage in a developed area. Set-backs apply. Designate North. Variance & Conditional Use permits may also be needed. If this activity is located in a shoreland management district, you must also show distance to the ordinary high water level and certify your existing septic system. Wells must meet required distance from septic systems. A building permit will not be issued for any construction until approval is received from TCPA. A penalty may, and will be assessed up to the amount of the building permit fee, if activity is started prior to obtaining a building permit. Additions to the application or re-inspections may be billed separately when they become applicable and must be paid prior to the inspection(s). This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work has commenced. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Refund and Cancellation Policy: upon request of cancellation of building permits, charges or refunds will be based on expenses for office time, inspections, and zoning fees that were completed prior to the cancellation notice. IF YOU HAVE QUESTIONS PLEASE CALL TCPA AT (507) 529-0774 IF THIS APPLICATION IS INCOMPLETE IT WILL BE RETURNED TO THE APPLICANT SIGNATURE: PRINT NAME: APPLICANT MAY BE BILLED FOR INSPECTIONS PREMATURELY REQUESTED (work not ready for inspection) TO BE COMPLETED BY TCPA DATE: Received by: Date Received: Building Permit: $ Plan Review: $ State Surcharge: $ Finished Value (not cost) Plumbing Permit: $ Plan Review: $ State Surcharge: $ Mechanical Permit: $ Plan Review: $ State Surcharge: $ Other: $ TOTAL DUE: $ Permit Approved By: (Building Official) Date:

For Additions