ENGINEERING DIVISION 130 South Main Street, Lake Elsinore, CA 92530, P , F PRELIMINARY WATER QUALITY MA

Similar documents
TRACT MAP & PARCEL MAP APPLICATION

PLANNED DEVELOPMENT / CONDITIONAL USE PERMIT Application

NON-PRIORITY WATER QUALITY MANAGEMENT PLAN (WQMP)

CUP PUP -PP VAR- SC RP APPLICATION

PLANNING AND DEVELOPMENT APPLICATION PACKET

Variance THIS PACKAGE CONTAINS AND, IF 'D, ALSO CONTAINS SUBMITTAL REQUIREMENTS APPLICATION INDEMNIFICATION AGREEMENT

CERTIFICATE OF COMPLIANCE

Recorded Map Modification

SUBDIVISION APPLICATION

YCCD EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PROGRAM SERVICES FEE SCHEDULE, RULES, & GUIDELINES

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER

VARIANCE APPLICATION PACKET

Minor Conditional Use Permit

City of Nogales Planning & Zoning Commission Rezoning Application

CITY OF LA GRANGE, KENTUCKY ORDINANCE NO. 5, SERIES 2016

Notice of Intent (NOI)

City Of Attleboro Conservation Commission

CHESAPEAKE BAY PRESERVATION AREA EXCEPTION APPLICATION INSTRUCTIONS

10. GENERAL PLAN 11. ZONING 12. LAND USE 13. ASSESSOR S PARCEL NUMBER 18. PROPOSED ZONING 19. PROPOSED LAND USE 20. NO. UNITS 21.

Preliminary Analysis

Plan ID: Plan Date: Rev. Date: No. Pages:

TENTATIVE MAP INFORMATION SHEET

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

CITY OF LANCASTER CITY ENGINEERING DIVISION FINAL MAP SUBMITTAL PACKAGE FINAL MAP APPLICATION

LOCATION AND DESIGN DIVISION

Planning Commission Land Disturbance Permit Application

CITY OF HEMET DEVELOPMENT ENGINEERING FEES

Certified Survey Map (CSM) Submittal Updated: 6/29/18

Chapter 102 Permit Amendments. Frequently Asked Questions (FAQ) Final, October 19, 2018

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

City of Roswell - Fee Schedule

Appendix A: Submittal Checklists

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division

CHAPTER 5 ENVIRONMENTAL COMPLIANCE PLAN REQUIREMENTS

10 Inspection and Enforcement

CITY OF CORNING TENTATIVE MAPS

Grand Rapids, MN Stormwater Utility Best Management Practices Credit Policy (As per Section (b) of Ordinance No )

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

ARTICLE I. IN GENERAL

SUBDIVISION APPLICATION

TOWN OF BRASELTON, GEORGIA STREAM BUFFER AND SETBACK VARIANCE APPLICATION

Statewide Storm Water Management Program Industrial and Commercial Facilities Inspection Training Plan June 20, 2006 DRAFT

APPLICATION CHECKLIST

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

PRELIMINARY SUBDIVISION PLAN APPLICATION

BUREAU OF RECLAMATION PROCESS FOR ABANDONMENT AND RELOCATION OF IRRIGATION LATERALS

ADAMS COUNTY CONSERVATION DISTRICT S

Managing and Funding Local Government Stormwater Enterprises: Fee Options and Calculation Procedures. S. Wayne Miles, PE, DEE

ACCESSORY DWELLING UNIT PLAN CHECK SUBMITTAL REQUIREMENTS

APPLICATION FOR PERMIT: (Pursuant to Ord & Reso ) 4d Habitat Loss Permit Vegetation Removal Tree Removal. Address:

Initial Subdivision Applications Shall Include the Following:

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

MS4 General contact (with Stormwater Pollution Prevention Program [SWPPP] implementation responsibility)

Notice of Intent Supplemental Form for Riverfront Area

STREAM BUFFER VARIANCE APPLICATION PACKET

City of Santa Clarita

CITY OF TAMPA Stormwater Utility Funding Frequently Asked Questions 2017

Natural Resource Assessment/ Site Plan Technical Review Application

REPORT TO THE SHELBY COUNTY PLANNING COMMISSION From the Department of Development Services Planning Services. February 4, 2019

Township of Collier 2418 Hilltop Road Presto, PA 15142

Final Plats for Major Residential and Commercial Subdivisions Checklist

DENTON Developer's Handbook

Regulatory Requirement: This form serves to fulfill the obligations referenced in 25 PA Code (related to Permit Termination).

FILING INSTRUCTIONS FOR LOT LINE ADJUSTMENT APPLICATION

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.

Honolulu District U.S. Army Corps of Engineers

ADMINISTRATIVE REVIEW FOR AN ACCESSORY DWELLING UNIT

Planned Residential Development ( PRD ) Application

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by:

City of McMinnville Community Development Department

Residential Minor Subdivision Review Checklist

Appendix J: Stormwater Utility Ordinance Guidance

APPLICATION FOR 555 Washington Street Tentative Map Red Bluff, CA Subdivision Map (530) ext Parcel Map.

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

Boise County Planning & Zoning Department P.O Box 1300 Idaho City, Idaho Phone (208) Fax (208)

PARCEL MAP Application Package

ZONING BOARD OF APPEALS APPLICATION

Agricultural LCA Contract Application

CAMDEN COUNTY PLANNING BOARD APPLICATION SUBMISSION REQUIREMENTS

APPLICATION FOR MINOR SUBDIVISION INSTRUCTION TO APPLICANTS

FY 18/19 DEVELOPMENT IMPACT FEES

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

DEVELOPMENT IMPACT FEE SCHEDULE (Revised 7/12)

Instructions to the Applicant

3.1 PERMITTEE SITE INSPECTION RESPONSIBILITIES

Ordinance Page 1

AGENDA. 3. PC 15-02: Preliminary Plat of Hawk Hollow Addition (Shawn Christ, Land Development Manager)

TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION

Secondary Dwelling Unit

CITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760)

Kitsap County Department of Community Development. Hearing Examiner Staff Report and Recommendation

Section Preliminary Plat Checklist and Application Forms

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

$ $ $ $ $ Failed Inspection... Residential...$ must be paid prior to re-inspection Miscellaneous $ 146.

ZONING VARIANCE PROCESS

FOR OFFICE USE ONLY Date Submitted Received By Fees Paid $ Receipt No. Received By Application No. Application Complete Final Action Date

Condominium Unit Requirements.

Residential Major Subdivision Review Checklist

Agricultural Preserve Cancellation

Purpose: Regulations:

Transcription:

ENGINEERING DIVISION 130 South Main Street, Lake Elsinore, CA 92530, P 951.674.3124, F 951.674.8761 www.lake-elsinore.org PRELIMINARY WATER QUALITY MANAGEMENT PLAN (WQMP) PLAN CHECK SUBMITTAL APPLICATION Instructions 1. Complete Checklist on reverse side. If any question is answered YES, a project-specific WQMP is required. 2. Complete form below and submit with land use application. If WQMP is required, also submit the below-listed documents and fees. IF A PRELIMINARY WQMP IS REQUIRED, THE PROJECT APPLICATION CANNOT BE DEEMED COMPLETE UNTIL SUCH TIME THAT THE PRELIMINARY WQMP IS APPROVED PROJECT LOCATION APN (S): PARCEL/TRACT NO: PROJECT STREET ADDRESS: AND/OR CROSS STREETS: SUBMITTED BY: COMPANY: ADDRESS: CONTACT INFORMATION PHONE: FAX: EMAIL: ENGINEER: COMPANY: ADDRESS: PHONE: FAX: EMAIL: OWNER/APPLICANT: COMPANY: ADDRESS: PHONE: FAX: EMAIL: SUBMITTAL CHECKLIST IF PRELIMINARY WQMP IS REQURED, SUBMIT THE FOLLOWING ITEMS WITH THIS APPLICATION 1 Copy Preliminary WQMP in approved format. - FORMAT: Use WQMP Guidance Document and Template for Santa Ana Region 8, Riverside County 1 Copy of Proposed Tentative Map and/or Site Plan $1,850.00 Application Fee (Consisting of $1,750.00 Plan Check Fee + $100 Administrative Fee) Submit as a separate check payable to City of Lake Elsinore NOTES: Plan Check Fee covers 3 reviews/plan checks. If more plan checks are required, then additional charges based on time and material will be assessed and due City Plan Check Turnaround Standard: 3 weeks 1 st submittal / 2 weeks each subsequent submittal. Expedited plan check of 2 weeks/1 week available at additional charge of 50% of original plan check fee ($875.00)

Checklist for Identifying Projects Requiring a Project-Specific WQMP within the Santa Ana Region Project File No.: Project Name: Project Location: Project Description: Proposed Project Consists of or Includes: Yes No Significant Redevelopment: The addition or replacement of 5,000 square feet or more of impervious surface on an already developed site. Does not include routine maintenance activities that are conducted to maintain original line and grade, hydraulic capacity, original purpose of the constructed facility or emergency redevelopment activity required to protect public health and safety. Residential developments that create 10,000 square feet or more of impervious surface (collectively over the entire project site), including residential housing subdivisions requiring a Final Map (i.e., detached single family home subdivisions, multifamily attached subdivisions, condominiums, or apartments, etc.). New industrial and commercial development where the land area 1 represented by the proposed map or permit is 10,000 square feet or more. Mixed use developments that create 10,000 square feet or more of impervious surface (collectively over the entire project site). Automotive repair shops [Standard Industrial Classification (SIC) codes 2 5013, 5014, 5541, 7532, 7533, 7534, 7536, 7537, 7538, and 7539]. Restaurants (SIC code 5812) where the land area of development is 5,000 square feet or more. Hillside developments disturbing 5,000 square feet or more which are located on areas with known erosive soil conditions or where the natural slope is 25 percent or more. Developments of 2,500 square feet of impervious surface or more adjacent to (within 200 feet) or discharging directly into ESAs. "Directly" means situated within 200 feet of the ESA; "discharging directly" means outflow from a drainage conveyance system that is composed entirely of flows from the subject development or redevelopment site, and not commingled with flows from adjacent lands. Parking lots of 5,000 square feet or more exposed to stormwater, where "parking lot" is defined as a land area or facility for the temporary parking or storage of motor vehicles. Retail Gasoline Outlets that are either 5,000 square feet or more of impervious surface with a projected average daily traffic of 100 or more vehicles per day. Public Projects, other than Transportation Projects, that are implemented by a Permittee and similar in nature to the priority projects described above and meets the thresholds described herein. Condition of Approval requires preparation of a WQMP. 1 Land area is based on acreage disturbed. 2 Descriptions of SIC codes can be found at http://www.osha.gov/pls/imis/sicsearch.html. DETERMINATION: Circle appropriate determination Any question answered "YES" Project requires a project-specific WQMP. All questions are answered "NO" Project requires incorporation of Site Design BMPs and Source Control BMPs imposed through Conditions of Approval or permit conditions. Contact the City NPDES Coordinator for more information or visit the City s Stormwater/NPDES webpage at www.lakeelsinore.org. U:\engr\NPDES\WQMP\2010 WQMP Required checklist.doc