Differential Scanning Calorimetry RB /18/2017

Similar documents
COMMERCIAL COMMERCIAL PROPERTY SURVEY

FALLON CHURCHILL COUNTY, NEVADA RESIDENTIAL REAL ESTATE TRACKING REPORT

Accounting and Finance Policies and Procedures. Contents are subject to change. For the latest updates visit

FALLON CHURCHILL COUNTY, NEVADA RESIDENTIAL REAL ESTATE TRACKING REPORT

Course Residential Modeling Concepts

An Assessment of Current House Price Developments in Germany 1

Guidance. In-service inspection Equipment and instruments

LONGHORN LANE 4-PLEX

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

What is the fee for the UPI Certification and where is it collected?

COMMERCIAL PROPERTY SURVEY

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended March 31, 2007

Definitions ad valorem tax Adaptive Estimation Procedure (AEP) - additive model - adjustments - algorithm - amenities appraisal appraisal schedules

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended December 31, 2007

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended March 31, 2008

IOWA HOME Monitoring Checklist Tenant Based Rental Assistance (TBRA)

Primary Trade Area: Estimated AT 70,778± Population ASHLAN AVENUE SHIELDS AVENUE FWY 99 ON/OFF RAMPS CLINTON AVENUE VALENTINE AVENUE HIGHLIGHTS

City Futures Research Centre

University of Southern California School of Policy, Planning & Development. RED 542: Finance of Real Estate Development Fall 2009

Additional Info if available Restrictions Type of Work REMEMBER to Check 511 TEXT Page for extra information. 12 width restriction

Chapter 201 WTI Houston Crude Oil Futures

PLANNING APPLICATIONS REPORT; MAY 29 - JUNE 11, 2016 Street Direction

Registrar [acting] Memo No. WBUAFS/Admn/ET(18-19)/263

Automated Valuation Model

ALLAMA IQBAL LIBRARY

5 The current system will not be applied retrospectively to past cases where the offers have already been accepted prior to 31 July 2000.

Strengthening DC s Inclusionary Zoning

ARLINGTON COUNTY, VIRGINIA

D Page 1 of 1

17 CFR Ch. II ( Edition)

A Discussion of Commercial Real Estate Career Paths

F 5 STANDING COMMITTEES. Metropolitan Tract Performance Report. For the quarter ended June 30, B. Finance, Audit and Facilities Committee

Puerto Rico Housing Finance Authority Housing Stimulus Programs

Certificate of Analysis

BTNEP AUG 7th MOFFATT & NICHOL. Atchafalaya Long Distance Sediment Pipeline Feasibility Study. Identification of Borrow Sites.

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended December 31, 2006

MADISON AVENUE FEATURES LEASING INFORMATION. 18-foot ceiling heights (slab-to-slab) New building construction

Metropolitan Tract Performance Report for the Quarter Ended September 30, 2009

Cache Logistics Trust Extraordinary General Meeting Presentation

Caliber Aero s Terms and Conditions for Purchase Orders Rev

CONTAMINATED LAND WORKSHOP 2014: SCOPING PSIs AND DSIs. P A T TLE DELAMORE P A RTNERS LTD solutions for your environment

THIS INSTRUMENT DRAFTED BY AND WHEN RECORDED RETURN TO:

Extraordinary General Meeting 19 June 2012 ARA-CWT Trust Management (Cache) Limited KNOWING. BELIEVING. DELIVERING

THE CHARTERED INSTITUTE OF LEGAL EXECUTIVES UNIT 10 CONVEYANCING *

NFPA (2012). In a high-rise building, stairwell pressurization systems typically utilize multiple fans distributed over the height of the stair, a duc

, NE MIAMI CT

Real estate sales validation questionnaires; required to accompany transfers of title; retention time; use of information.

THE MANHATTAN RENTAL MARKET REPORT

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended June 30, 2007

RENTAL MARKET ANALYSIS 1 BR 2 BR 3 BR $562 $664 $1,000 $431 $156 $0.76 $78

FIG WORKING WEEK Athens, Greece May 22-27, 2004 MEETING PROGRAMME

EXPLAINING MASS APPRAISAL

Changing Economic Times. Market Pulse. Dr. Gary Jackson Director, Regional Economic Research Institute Florida Gulf Coast University April 8, 2008

RANIA OMAR AKKAD B.SC M.SC

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended June 30, 2006

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended September 30, 2007

Purchase Price Allocations ASC 805 Business Combinations

Greater Las Vegas Snapshot by Sale Type

/ / FOR LEASE $10,000 PER MONTH 6416 DETROIT AVENUE, CLEVELAND, OH THE FORMER ARCADIAN RESTAURANT.

Non-Deal Roadshow Presentation June 2012 ARA-CWT Trust Management (Cache) Limited KNOWING. BELIEVING. DELIVERING

DAYLIGHT SIMULATION FOR CODE COMPLIANCE: CREATING A DECISION TOOL. Krystle Stewart 1 and Michael Donn 1

555 MOVIE PRODUCTIONS 555 Movie Mania Street Los Angeles, California Telephone: (555) As of January 2, 2010

Village of Glenview Appearance Commission

WIN-WIN PRACTICE TRANSITIONS. Chester J. Gary, DDS, JD MAXIMIZE VALUE, MINIMIZE RISK

ORDINANCE NO. O

Credit Risk. 72 March 2013 The RMA Journal Copyright 2013 by RMA

1.62 ACRES ON KANSAS EXPWY AND JAMES RIVER FREEWAY

International Valuation Standards Board 15 Feb Moorgate London EC2R 6PP United Kingdom

Accounting Standards for Enterprises No Leases No. 3 [2006] of the Ministry of Finance

Click to edit Master title style

Assessment Year 2016 Assessment Valuations / Mass Appraisal Summary Report

MANHATTAN RENTAL MARKET REPORT august 2012 AUGUST 2012

REIDIN United Arab Emirates Residential Property Price Indices: April 2017 Results Edition:101. May 31, 2017

Jackson County Residental Market Trends. November Pending Sales New Listings

Rockwall CAD. Basics of. Appraising Property. For. Property Taxation

How European Standard Setters See the Proposals: Views from the German Accounting Standards Board

Retails in Jabodetabek

Josephine County Residental Market Trends. January Pending Sales New Listings

ASSESSMENT METHODOLOGY

F 6 STANDING COMMITTEES. B. Finance, Audit and Facilities Committee. Metropolitan Tract Performance Report for the Quarter Ended September 30, 2008

Chart 25. Royal Albert Buckingham and Enfield Lodge Culminatum Lodge Lodge Chandos Lodge No No No. 907 No. 1150

General Market Analysis and Highest & Best Use. Learning Objectives

Brooklyn Rental Market Report June 2013 mns.com

Rent Setting. Date: March 2015 Version: 1. Document Reference: Document Owner: Bill Henderson. See also: Date last reviewed: March 2015

Commercial Property Price Indices for Greece

Multiple Listing Service of Southern Arizona Monthly Statistics September 2018

ENGINEERS & SURVEYORS INSTITUTE Peer Review Checklist FAIRFAX COUNTY. SITE/SUBDIVISION PLAN First Submission

Power Analy$I$ Maximizing Inve$tment Return$ With Your Computer

Lending to Green Affordable Housing Developments

Application Information Package

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended September 30, 2005

10. Land and Property Tax in China 1. The categories of tax concerning land and property in China

Demonstration Properties for the TAUREAN Residential Valuation System

Multi-Family Methodology Analysis

ILM Approved Factsheet on Section 117 Charities Act 2011 August 2012

City of Edmonds TEMPORARY CONSTRUCTION EASEMENT

Preparing Financial Statements and the Annual Report

ASSESSMENT METHODOLOGY

DIRECTIVE # This Directive Supersedes Directive # and #92-003

Real Estate Finance and Development Syllabus

Transcription:

Differential Scanning Calorimetry Rebar Size Sales Order Date Produced RB6 34127 Work Order 814869 1/18/2017 Formulation Line Speed RBVEIP2567-15 30RPM - 44 Neat Resin Tg 116.0 C 288.4 25.58 Formulated Resin Tg 115.6 C Neat Resin Per ASTM E1356-08 (Reapproved 2014) ASTM E2160-04 (Reapproved 2012) Ave Resin % Formulated Resin = 1 - (ΔH Residual Cure / ΔH Full Cure) * 100 261.2 ΔH Full Cure Line / Sample 1 Line / Sample 2 Line / Sample 3 Line / Sample 4 Tf Onset 99.3 C 97.3 C 97.0 C 97.3 C 11.1.8 Tg Tm or Tig 103.5 C 101.8 C 101.4 C 101.2 C Sample Weight (mg) 12.7 19.6 18.1 15.9 Reported ΔH Residual Cure.4293.3042.3999.6105 Corrected Residual Enthalpy 1.678 1.189 1.563 2.387 Calculated 99.36% 99.54% 99.40% 99.09% The values in the above fields are taken or calculated from the DSC scans which are attached as icons in the Chart fields DSC Chart 1 DSC Chart 2 DSC Chart 3 DSC Chart 4 DSC Chart 5 DSC Calibration 11.1.5 DSC Verification 11.1.5 DSC Report Hughes Brothers, Inc. Seward, NE

Sample: RB4 WO 814869 Line 1 Size: 12.7000 mg Method: 10 C per Minute Ramp Comment: Q2000, 50 ml/min Ni, Tzero AL Pan 0.1 DSC File: \\...\Rebar\RB6\RB6 WO 814869 Line 1.001 Operator: R Kruse Run Date: 26 Jan 2017 13:00 Instrument: DSC Q2000 V24.11 Build 124 0.004 0.002 0.0 Heat Flow (W/g) 0.1 0.2 99.29 C 103.50 C(H) 107.80 C 160.32 C 147.72 C 0.4293J/g 0.002 0.004 0.006 Deriv. Heat Flow (W/(g C)) 0.3 0.008 20 40 60 80 100 120 140 160 180 200 Exo Up Temperature ( C) Universal V4.5A TA Instruments

Differential Scanning Calorimetry Rebar Size Sales Order Date Produced RB4 34589 Work Order 816944 1/31/2017 Formulation Line Speed RBVEIP234-20 45 rpm - 65 Neat Resin Tg 115.8 C 291.7 26.04 Formulated Resin Tg 114.1 C Neat Resin Per ASTM E1356-08 (Reapproved 2014) ASTM E2160-04 (Reapproved 2012) Ave Resin % Formulated Resin = 1 - (ΔH Residual Cure / ΔH Full Cure) * 100 235.6 ΔH Full Cure Line / Sample 1 Line / Sample 2 Line / Sample 3 Line / Sample 4 Tf Onset 105.4 C 104.2 C 104.8 C 103.8 C 11.1.8 Tg Tm or Tig 109.5 C 108.4 C 107.8 C 107.3 C Sample Weight (mg) 14.6 15.4 16.1 18.7 Reported ΔH Residual Cure.7857 1.045 1.336.7916 Corrected Residual Enthalpy 3.017 4.013 5.130 3.040 Calculated 98.72% 98.30% 97.82% 98.71% The values in the above fields are taken or calculated from the DSC scans which are attached as icons in the Chart fields DSC Chart 1 DSC Chart 2 DSC Chart 3 DSC Chart 4 DSC Chart 5 DSC Calibration 11.1.5 DSC Verification 11.1.5 DSC Report Hughes Brothers, Inc. Seward, NE

Sample: RB4 WO 816944 Line 1 Size: 14.6000 mg Method: 10 C per Minute Ramp Comment: Q2000, 50 ml/min Ni, Tzero AL Pan 0.05 DSC File: \\...\RB4\RB4 WO 816944 Line 1x.001 Operator: R Kruse Run Date: 06 Feb 2017 09:58 Instrument: DSC Q2000 V24.11 Build 124 0.010 0.00 0.005 Heat Flow (W/g) 0.05 0.10 Deriv. Heat Flow (W/(g C)) 0.005 0.15 105.41 C 109.45 C(H) 165.95 C 148.99 C 0.7857J/g 0.20 Exo Up 113.27 C 0.010 0 50 100 150 200 250 Temperature ( C) Universal V4.5A TA Instruments

Differential Scanning Calorimetry Rebar Size Sales Order Date Produced RB5 Work Order 827404 5/16/2017 Formulation Line Speed RBVEIP2567-15 29 Rpm Neat Resin Tg Formulated Resin Tg 115.6 C Neat Resin Per ASTM E1356-08 (Reapproved 2014) ASTM E2160-04 (Reapproved 2012) Ave Resin % 22.39 Formulated Resin = 1 - (ΔH Residual Cure / ΔH Full Cure) * 100 261.2 ΔH Full Cure Line / Sample 1 Line / Sample 2 Line / Sample 3 Line / Sample 4 Tf Onset 101.7 C 100.0 C 100.6 C 98.4 C 11.1.8 Tg Tm or Tig 107.4 C 105.9 C 106.4 C 104.3 C Sample Weight (mg) 15.7 16.8 15.0 15.3 Reported ΔH Residual Cure.6994.1945.6492 1.084 Corrected Residual Enthalpy 3.124 0.869 2.900 4.842 Calculated 98.80% 99.67% 98.89% 98.15% The values in the above fields are taken or calculated from the DSC scans which are attached as icons in the Chart fields DSC Chart 1 DSC Chart 2 DSC Chart 3 DSC Chart 4 DSC Chart 5 DSC Calibration 11.1.5 DSC Verification 11.1.5 DSC Report Hughes Brothers, Inc. Seward, NE

Sample: RB5 WO 827404 Line2 Size: 16.8000 mg Method: 10 C per Minute Ramp Comment: Q2000, 50 ml/min N2, Tzero Al Pan 0.05 DSC File: \\...\Rebar\RB5\RB5 WO 827404 Line 2.001 Operator: R Kruse Run Date: 24 May 2017 12:46 Instrument: DSC Q2000 V24.11 Build 124 0.002 0.00 Heat Flow (W/g) 0.05 0.10 0.002 Deriv. Heat Flow (W/(g C)) 0.15 100.04 C 105.92 C(H) 159.28 C 111.42 C 143.27 C 0.1945J/g 0.20 Exo Up 0.004 0 50 100 150 200 250 Temperature ( C) Universal V4.5A TA Instruments

Differential Scanning Calorimetry Rebar Size Sales Order Date Produced RB8 Work Order 811994 12/20/2016 Formulation Line Speed RBVEIP28910-22 23 rpm - 33 Neat Resin Tg 116.0 C 288.4 25.29 Formulated Resin Tg 114.8 C Neat Resin Per ASTM E1356-08 (Reapproved 2014) ASTM E2160-04 (Reapproved 2012) Ave Resin % Formulated Resin = 1 - (ΔH Residual Cure / ΔH Full Cure) * 100 246.4 ΔH Full Cure Line / Sample 1 Line / Sample 2 Line / Sample 3 Line / Sample 4 Tf Onset 103.4 C 101.2 C 102.8 C 100.4 C 11.1.8 Tg Tm or Tig 107.9 C 105.4 C 106.8 C 104.7 C Sample Weight (mg) 14.5 17.0 14.4 16.4 Reported ΔH Residual Cure.8044.2558.5310 1.102 Corrected Residual Enthalpy 3.180 1.011 2.099 4.357 Calculated 98.71% 99.59% 99.15% 98.23% The values in the above fields are taken or calculated from the DSC scans which are attached as icons in the Chart fields DSC Chart 1 DSC Chart 2 DSC Chart 3 DSC Chart 4 DSC Chart 5 DSC Calibration 11.1.5 DSC Verification 11.1.5 DSC Report Hughes Brothers, Inc. Seward, NE

Sample: RB8 WO 811994 Line 1 Size: 14.5000 mg Method: 10 C per Minute Ramp Comment: Q2000, 50 ml/min Ni, Tzero AL Pan 0.05 DSC File: \\...\Rebar\RB8\RB8 WO 811994 Line 1.001 Operator: R Kruse Run Date: 11 Jan 2017 10:04 Instrument: DSC Q2000 V24.11 Build 124 0.006 0.00 0.004 Heat Flow (W/g) 0.05 0.10 0.002 0.002 Deriv. Heat Flow (W/(g C)) 0.15 103.39 C 107.87 C(H) 171.04 C 0.004 112.49 C 144.14 C 0.8044J/g 0.20 0.006 20 40 60 80 100 120 140 160 180 200 Exo Up Temperature ( C) Universal V4.5A TA Instruments