SHKP seafront development # Wings at Sea Offers diverse premium unit layouts for different buyers needs

Similar documents
SHKP seafront development # Wings at Sea

SHKP s Wings at Sea. Unveils unmodified showflat of 2 bedrooms (open kitchen)

SHKP Brand New Luxury Residence in Ho Man Tin Officially Named Ultima Creates Remarkable Lifestyle with 4 Ultimate Geographical Privileges

KADOORIA One-of-a-kind Luxury Residence at Kadoorie Hill

On-site Show Flat of Flat A, 6/F, Tower 30A*

Press Release Immediate

On-site Show Flat of Flat B, 12/F, Tower 15B*

KADOORIA One-of-a-kind Luxury Residence at Kadoorie Hill

SHKP's Lime Gala on Island East is now completed and ready for handover Blends chic and stylish designs with nature

Newly completed Ultima combines distinctive architecture with premium materials in graceful and stylish residence

in North Point, is located at a rare waterfront site on Hong Kong Island with unlimited potentials. With its

SHKP s Century Link with practical design and layouts plus all-inclusive service catered for young families

Property Development 26 SUN HUNG KAI PROPERTIES LIMITED. Manhattan Hill, West Kowloon

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

Appendix: List of CLP Power s EV charging stations (14 December 2018)

No. 1 Ho Man Tin Hill Road

FY2013 Annual Results. 26 September New World One Step Forward We Create New Living Experience

New World One Step Forward. We Create New Living Experience. FY2014 Annual Results 24 Sep 2014

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates

Enriching Living. Quality. homes. We build. for Hong Kong people which connect to our network

Interim Results - FY2015. Sun Hung Kai Properties Limited

Gross Floor Area of HOS Flat by Phase / Estate

MTR Transformation of CBDs in Hong Kong

A NEW NEIGHBOURHOOD IN CLASSIC CAULFIELD. heath 9 BOND STREET, CAULFIELD NORTH

SUN HUNG KAI PROPERTIES LIMITED ANNUAL REPORT 2001/02

FY2016 Annual Results

Access to Quality Living

Name of Development L'Wanchai Phase No. (if any)

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area

S.F. Service Points Update Notice

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

Kowloon Region. Unit No. District Meeting Venue & Contact Tel. Meeting Time. The Salvation Army Chuk Yuen Children and Youth Centre

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG

Property Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4.

Business in Hong Kong Property Development

BUILDING FOR THE BETTER CHINA. Hong Kong

Located at 63 Seymour Road in Mid-

CELESTIAL ASIA SECURITIES HOLDINGS LIMITED ( CASH ) (incorporated in Bermuda with limited liability) (Stock code: 1049)

A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE

Site Plan and Second Phase

Gross Rental Income* Gross Rental Income* by Sector

New Business Districts Why Success or Failure

Site Plan of Launch Phase

Ayia Napa with its spectacular white sandy beaches and its vibrant nightlife is, perhaps, the most popular tourist resort on the island.

A landmark in premier. waterfront living. Sales and Display Centre 8 Brodie Spark Drive, Wolli Creek. discoverypoint.com.au

6 John Anderson House Shore Street, Oban PA34 4NT Offers Over 136,000

FY2018 Interim Results. 27 February 2018

HONG KONG PRIME OFFICE Monthly Report

Property Investment. International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED

Couture Homes Proudly Presents kau to HIGHLAND Perfecting the Privileged Lifestyle with a Global Design Team Led by Steve Leung

HK Island Central. Central / Admiralty / Sheung Wan Admiralty Centre ifc (International Finance Centre) (One & Two) Shanghai Commercial Bank Building

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong

BANGKOK REPORT JUNE 2010

Shatin to Central Link. Transport Advisory Committee 4 May 2011

NO' 333 HIGH STREET. Dalbeattie, Dumfries & Galloway, DG5 4DY

Forum on University Street

1

Whalers Quay, Boat Road NEWPORT-ON-TAY, DD6 8EZ

Hong Kong Property Business

S.F. Service Points Update Notice

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001

Improvement to Hoi Bun Road Park and Adjacent Area

CRAIGLYNNE DALLERIE ROAD CRIEFF

poulton lodge HAZELWOOD ROAD BRISTOL

Redevelopment. The vertical green wall featured in URA redevelopment project One Wanchai Redevelopment Eng (5)a.indd 22

LIBERTY HOUSE TOWER HILL E1

*Artist s Impression Only

SHOP NAME ADDRESS Tel No. Fax No. SHOP G2, AON CHINA BUILDING, 29 QUEEN'S ROAD CENTRAL, CENTRAL, H.K.

40 Brook End Drive Henley In Arden, B95 5JD. Guide Price 285,000. Freehold. Modern Mid Terraced House

HADRIAN S TOWER. Comparison Information

For Sale by Private Treaty. 16 Marine Court, Crofton Road, Dun Laoghaire, Co. Dublin

The highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one

3/6 Lismore House Oban PA34 4NU Offers Over 160,000

HOP HING HOLDINGS LIMITED

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: Kowloon

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach

Schedule of Principal Properties

Content. Mission. Objectives. For the People. People First, a District-based and Public Participatory Approach. Redevelopment.

For Sale Rineen, Dunmore, Clonakilty, Co. Cork

Redeveloping/Upgrading old and dilapidate districts as a form of improving the urban quality of Hong Kong

Much more than just a view

FY2016 Interim Results

For the Hong Kong Housing Society, 1998/1999 has been a year of. facing challenges and finding solutions

Unopened Space: Mapping Equitable Availability of Open Space in Hong Kong Press Conference Report by Carine Lai

(sq.ft.)!!"!!!" HONG KONG 1. No. 1 Chatham Path % 7,800 R Completed Existing Mid-levels, Hong Kong!"#$1

NOGGIE COTTAGE Auchengool, Dundrennan, Kirkcudbright, Dumfries & Galloway, DG6 4QF. In all about 1.05 acres (0.423 ha)

FY2017 Annual Results. 14 September 2017

OPPORTUNITY, REDEFINED.

Couture Homes Presents kau to HIGHLAND The most successful house development of early 2016

PROPERTY ANNUAL REPORT

Key Features Statement. Glades Bay Gardens OVERVIEW

EPC Rating: C Tenure: Freehold Council Tax Band: H

Monthly update of MTR facilities for passengers with disabilities December 2017

8 McKelvie Road Oban PA34 4GB Guide Price 137,000

Newmains 8 Bell View.

THE QUAYS PHASE 2 Ffordd Y Mileniwm, Docks, BARRY, CF62 5AT AN SUPERB RANGE OF 2, 3 & 4 BEDROOM HOMES.

THE COACH HOUSE Smaws Hamlet, Near Tadcaster

The Past, Present and Future Land-forming in Hong Kong

Summary of Major Properties At 31st March, 2001

HIGHWOOD CLOSE EAST DULWICH SE22

Transcription:

Press Release SHKP seafront development # Wings at Sea Offers diverse premium unit layouts for different buyers needs (31 August 2017, Hong Kong) Developed by Sun Hung Kai Properties Limited (SHKP) at MTR LOHAS Park Station, being Phase IVA ( the Phase ) of LOHAS Park ( the Development ), the premium seafront development Wings at Sea is the next brand new large-scale premium residence by SHKP in the district, following the success of The Wings series^ in Tseung Kwan O. Situated near the coastline of Tseung Kwan O #, the Phase is adjacent to over a million square feet of open spaces *, as well as excellent community planning and a complete transport network with close access to two CBDs, Island East and Kowloon East, presenting a brand new seafront metropolis. The developer released the flat mix of Wings at Sea for the first time today, offering a wide variety of options to meet the diverse needs of different buyers. It is expected that Wings at Sea will become a jewel in the market. Under the Government s careful planning, all saleable residential lands in Tseung Kwan O South have been sold out, and all residential developments on the respective lands have already been put on sale, thus the market attention will be cast on the brand new residential development at MTR LOHAS Park Station. Wings at Sea is the brand new premium seafront development by SHKP at MTR LOHAS Park Station, and offers 1-bedroom units ++ and 2-bedroom units +++, which are not available or with a limited supply in previous phases + of the Development, and also a wide variety of 3-bedroom, 4-bedroom and special units for different buyers. Wings at Sea comprises two high-rise residential towers and offers a total of 1,040 residential units in Tower 1 (1A & 1B) and Tower 2 (2A & 2B). The unit layouts of Wings at Sea come in a 1

great variety, including 174 1-bedroom + 1-bathroom (1 en-suite) (open kitchen) units (saleable area from 337 to 340 square feet), 278 2-bedroom + 1-bathroom (open kitchen) units (saleable area from 464 to 491 square feet), 167 2-bedroom + 1-bathroom units (saleable area from 488 to 496 square feet), 158 3-bedroom + 1-bathroom (1 en-suite) (open kitchen) units (saleable area from 618 to 625 square feet), 165 3-bedroom + 2-bathroom (1 en-suite) units (saleable area from 658 to 708 square feet), 38 3-bedroom + 2-bathroom (1 en-suite) + 1-store room + 1-utility room with WC. units (saleable area from 841 to 842 square feet), as well as 12 4-bedroom + 2-bathroom (1 en-suite) + 1-utility room with WC. units (saleable area from 1,040 to 1,120 square feet). In addition, Wings at Sea also offers a precious supply of 40 special units with flat roof and 8 special units with roof. The diversity of unit layouts caters to the housing needs of different family sizes, presenting a carefree premium lifestyle to privileged residents. Wings at Sea towers along the seafront # with views of Island East across the sea @. The development possesses a superb modern appearance with large windows that capture natural sunlight and extensive outdoor views @ to present comfortable premium lifestyle space for residents. In addition, Wings at Sea is privileged with the convenient MTR network offering direct access to Island East only 4 stations away **, and quick access to Kowloon East only 5 stations away ***. The variety of facilities and amenities in the neighbourhood further guarantees that the Phase will become a jewel in the market, and a hot item for buyers within the district as well as areas like Island East and Kowloon East. 2

Unit Layouts Wings at Sea Flat Mix Overview Saleable Area No. of Units (Square Feet) 1-bedroom + 1-bathroom (1 en-suite) (Open Kitchen) 337-340 174 2-bedroom + 1-bathroom (Open Kitchen) 464-491 278 2-bedroom + 1-bathroom 488-496 167 3-bedroom + 1-bathroom (1 en-suite) (Open Kitchen) 618-625 158 3-bedroom + 2-bathroom (1 en-suite) 658-708 165 3-bedroom + 2-bathroom (1 en-suite) + 1-store room + 1-utility room with WC. 841-842 38 4-bedroom + 2-bathroom (1 en-suite) + 1-utility room with WC. 1,040-1,120 12 Special Unit with flat roof 318-1,060 40 Special Unit with roof 787-1,132 8 Total Units: 1,040 ^ The Wings series refers to the development(s) known respectively as The Wings, The Wings II, The Wings IIIA, The Wings IIIB and Ocean Wings. The Wings, The Wings II, The Wings IIIA, The Wings IIIB and Ocean Wings are five independent developments, each of which is governed by a separate set of land grant documents and terms and conditions of agreements for sale and purchase and are not relevant to the Development or the Phase of the Development. * The over one million square feet of open spaces, including The Park and Activity Green with a total area over 200,000 square feet will be completed in phases. MTR Corporation Limited reserves the right to amend the name of the parks, the use of the area and its facilities. The Vendor does not make offer, promise, representation or warranty, whether expressed or implied. Source: The Land Registry. All 12 lands in Tseung Kwan O South have been sold out. The information is for reference only. The Vendor does not make offer, promise, representation or warranty, whether expressed or implied. Source: Register of transaction kept by the Land Registry. All residential developments in Tseung Kwan O South have been put on sale of residential units. The information is for reference only. The Vendor does not make offer, promise, representation or warranty, whether expressed or implied. + Previous phases refers to Phase I, Phase IIA, Phase IIB, Phase IIC and Phase IIIA of the Development. ++ Source: Sales brochures of the Development s previous phases, including Phase I, Phase IIA, Phase IIB, Phase IIC and Phase IIIA, which indicate that 1-bedroom units have not been offered in any of the previous phases. The information 3

is for reference only. The Vendor does not make offer, promise, representation or warranty, whether expressed or implied. +++ Source: Sales brochures of the Development s previous phases, including Phase I, Phase IIA, Phase IIB, Phase IIC and Phase IIIA. Only Phase I of the Development offers 362 2-bedroom units, which comprises less than 5% (rounded off to the nearest whole number) of the 8016 residential units offered by the previous phases of the Development. The information is for reference only. The Vendor does not make offer, promise, representation or warranty, whether expressed or implied. # It is only a brief description of the surrounding area of Wings at Sea. It does not represent all units can enjoy the said view. The view is affected by the unit s floor level, orientation, surrounding buildings and environment, and is not applicable to all units of the Development. The buildings, facilities and environment around the Development may change from time to time. The Vendor does not make any offer, undertaking, representation or warranty whatsoever, whether express or implied regarding the view and surrounding environment of the Development. @ It is only a brief description of the view of Wings at Sea. It does not represent all units can enjoy the said view. The view is affected by the unit s floor level, orientation, surrounding buildings and environment, and is not applicable to all units of the Development. The buildings, facilities and environment around the Development may change from time to time. The Vendor does not make any offer, undertaking, representation or warranty whatsoever, whether express or implied regarding the view and surrounding environment of the Development. Saleable area means the floor area of the residential property, which includes the floor area of balcony, utility platform and verandah (if any), calculated in accordance with Section 8(1) of the Residential Properties (First-hand Sales) Ordinance. Saleable area does not include the area of each item listed in Part 1 of Schedule 2 of the Residential Properties (First-hand Sales) Ordinance. The areas as specified above in square feet are converted at a rate of 1 square metre = 10.764 square feet and rounded to the nearest whole square feet, which may be slightly different from that shown in square metre. ** From MTR LOHAS Park Station to MTR Quarry Bay Station. *** From MTR LOHAS Park Station to MTR Kwun Tong Station. End Name of the Phase of the Development: Phase IVA of LOHAS Park ( the Phase ) Tower 1 (1A & 1B) and Tower 2 (2A & 2B) of and in the Phase are called Wings at Sea District: Tseung Kwan O Name of the street and the street number of the Phase: 1 Lohas Park Road The website address designated by the Vendor for the Phase: www.wingsatsea.com.hk 4

The photographs, images, drawings or sketches shown in this advertisement/promotional material represent an artist s impression of the development concerned only. They are not drawn to scale and/or may have been edited and processed with computerized imaging techniques. Prospective purchasers should make reference to the sales brochure for details of the development. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby. Vendor: MTR Corporation Limited (as Owner ), Globaluck Limited (as Person so engaged ) (Notes: Owner means the legal or beneficial owner of the Phase. Person so engaged means the person who is engaged by the Owner to co-ordinate and supervise the process of designing, planning, constructing, fitting out, completing and marketing the Phase.) Holding company of the Vendor (Owner): Not applicable Holding companies of the Vendor (Person so engaged): Mount East Limited, Time Effort Limited, Sun Hung Kai Properties Limited Authorized Person of the Phase: Cheung Man Ching, Anthony The firm or corporation of which the Authorized Person of the Phase is a proprietor, director or employee in his or her professional capacity: Ronald Lu & Partners (Hong Kong) Limited Building Contractor for the Phase: Yee Fai Construction Company Limited The firms of solicitors acting for the Owner in relation to the sale of residential properties in the Phase: Deacons, Slaughter and May, Woo Kwan Lee & Lo, Mayer Brown JSM Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: Not Applicable Any other person who has made a loan for the construction of the Phase: Sun Hung Kai Properties Holding Investment Limited The estimated material date for the Phase to the best of the Vendor s knowledge: 31 Oct 2019. ( Material date means the date on which the conditions of the land grant are complied with in respect of the Phase. The estimated material date is subject to any extension of time that is permitted under the agreement for sale and purchase.) As at the date of printing of this advertisement/promotional material, the sales brochure of the 5

Phase is not yet available. This advertisement is published by the Person so engaged with the consent of the Owner. Date of Printing: 31 st August 2017 6