CUMBERLAND SCHOOLS WORK PROPOSED 2018

Similar documents
New Hope-Solebury School District Campus Revitalization Plan

Charles Kozminski Elementary Community Academy

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

PROGRAM AREAS - MIDDLE SCHOOL

NYC Department of Education

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647

Emil G Hirsch Metropolitan High School 7740 S Ingleside Ave Chicago, IL 60619

William Howard Taft High School

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

John F Kennedy High School 6325 W 56th St Chicago, IL Co-locating on this campus are KENNEDY HS and KINZIE

Construction Projected Enrollment: 425 Max February 2014 (moved in) First Floor Capacity 732; Second Floor Capacity 2161

Theodore Roosevelt High School 3436 W Wilson Ave Chicago, IL 60625

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045

Shoreview Corporate Center

Liberty-Valley Elementary School

RGM Architects. Eduardo Mata Elementary School

NYC Department of Education

CORDOVAN PARK W I-20, Arlington PROPERTY REPOSITIONING Case Study

M001 EAGLECREST LEARNING CENTER CITY & BOROUGH OF JUNEAU. Inc. CBJ CONTRACT No. E SYMBOLS FAN SCHEDULE HEATING COIL SCHEDULE EQUIPMENT SCHEDULE

Gym Capacity: 710. Stage. Auditeria Capacity: 390. New Bleachers

Ashby, Pepperell, Townsend North Middlesex Regional High School. Preferred Schematic Report Update

The Kaleden. 11 Suite Apartment Building. For Sale. Prime South Granville Location West 13th Avenue, Vancouver, BC

17 N Centre Ave Leesport, PA 19533

Attic Floor Bedrooms 1 & 2 Family Dwellings

Tiny House on Wheels A Tiny House

RIDDLE RIDDLE ASSOCIATES, INC.

DESIGN PRIORITIES. Avenues for Homeless Youth. Charrette Goals AVENUES FOR HOMELESS YOUTH

518 3 rd Avenue South St. Petersburg, Florida

FREEHOLD BOROUGH SCHOOL DISTRICT. Proposed Referendum Schematic Designs & Preliminary Costs

CITY OF NORTH MANKATO CAPITAL ASSET POLICY ADOPTED: JANUARY 1, 2003 REVISED EFFECTIVE: _JANUARY 1, 2016

Technical Specifications

Graduate & Family Housing Master Plan

Corvallis School District 2002 Long Range Facilities Master Plan Projects Update

Mil Palmeras BUILDING SPECIFICATIONS. FOUNDATION: Foundation and armed concrete beams.

2016 Annual Report. Enid Public Schools 2016 Bond. February 2017

Renovation Progress. July 21 Aug 3, Week 42 & 43

SETX Environmental, Inc. Environmental Consulting & Testing Asbestos - Mold Lead ESA s

HOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist

flexible spaces all the right places... fogg.com ...Euclid Corridor Industrial Mall 1100 East 222nd St., Euclid, Ohio I-90 E. 222 St.

SHARPSVILLE AREA SCHOOL DISTRICT

190, Rue Jean-Talon, Fleurimont (Sherbrooke)

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

GREAT FALLS HIGH SCHOOL MASTER PLAN. GFHS Master Plan Task Force

Subject: Class: Number: ( ) Complete Revision Supersedes: Page:

THE TEN AT LAKE FORREST. FROM THE $850's

FORMER EDUCATIONAL FACILITY HOAGLAND RD., HOAGLAND, IN FOR SALE PROPERTY HIGHLIGHTS FOR SALE: $275,000

Local Ballot Measure: E. Enterprise Elementary School District Bond Measure

Solicitation for Offers: 135 Allen Brook Lane Williston, Vermont

Exceptional Multi-Tenant

Commercial For Sale Data Input

Property Details 916 Youngs Road

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

EXHIBIT A FULL TEXT OF BOND PROPOSITION HILMAR UNIFIED SCHOOL DISTRICT CLASSROOM SAFETY, RENOVATION AND CONSTRUCTION MEASURE

St. Charles High School Emergency Plan Instructions. Fire Drill Evacuation Procedures

Renovation Progress. June 2-15, Weeks 35 & 36

Section 3: Primary Function, Employee Work Areas, & Kitchens

flexible spaces all the right places... fogg.com Brookpark Rd. Extension North Olmsted, Ohio

Final RRISD Bond 2018/19 Project List 3 Yr Sale

Four Bedroom 2.5 Bath Colonial: The Grand Maple 2,319 sq. ft. Starting at $329,990

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK

Custom Luxury Attached Townhomes

General Statement Regarding Assessment Analysis Recommendations

FOR SALE OR LEASE. Manufacturing / Distribution Facility 85,262± Square Feet (Divisible) Acres

1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System

1513 & 1515 Greenleaf Street Evanston, IL Karla Thomas & Lina Zoraikat

1185, Rue du Sphinx, Fleurimont (Sherbrooke)

File: C DP/CK Photographs of Subject Property Page v. Duplex. Single Family Dwelling

These requirements are listed in detail in the Decree N of August 26 th 1987 (Download).

TENANT DESIGN MANUAL UPDATED JUNE 2015

NOTICE OF SALE. Old Mill Townhomes 725 Mill Stream Lane Lynchburg, VA 24502

DRAFT CITY OF LONGVIEW PARKS & RECREATION COMPREHENSIVE PLAN Facilities. 62 P age

Residencial Altos del Sabinal - "Viviendas desde *. Plaza y Trastero Incluido"

FOR SALE. 233 Congress Avenue Waterbury, CT MIXED - USE BUILDING AC LOT. 2,542 S/F with 4-1 BR APTS + BAR GAS / HVAC OFF STREET PARKING

Riddhi Siddhi a project by Durga Associates

If the address on this form is different than the address of the building, submit a written explanation.


REGISTRATION NO P AFFORDABLE HOUSING AT DABHA, NAGPUR

Accessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter edge is 12 ).

TENANT DESIGN MANUAL UPDATED AUGUST 2015

Edificio Brillante C/ Periodista José Mª Carulla (esquina Avda. Andalucía),

PREMIUM SERVICED RESIDENCES

RR Building Area: (sf) 19,800 SF. Cost per Square Foot: $207. Construction Cost $4,100,000. Date of Completion: February 2014

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

REQUEST FOR PROPOSAL ON PURCHASE OF HISTORIC SCHOOL BUILDING

Home Plan Approx Bed Baths Garage Slab Basement Sq Ftg Base Price Base Price. Willow (Mstr Main) From $369,900 $410,900

The residential housing development of GRAND LAND, INC.

WEST END. 855 Jervis Street, Vancouver $8,100, Unit Apartment Building Suite Mix 13 - Bachelor 35-1 Bedroom

RENTER'S INSPECTION WORKSHEET Free form provided at

For more information, please call: GINA ALLEN (757)

ACCESSORY DWELLING UNITS

REFLEC TIONS I & II AT CIRCLEPOR T

FICO Realty Group Presents 485 Washington Street Woburn MA 01801

CAPITAL ASSETS POLICY FOR THE VILLAGE OF FLOWER HILL. Section I. Capital Asset Definitions and Guidelines. I. (1) Overview

COLD DARK SHELL LEASE EXHIBIT

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

Harmony Row Dublin 2. Dublin 2

Transcription:

Cost Ashton Elementary School 2 2 Replace HVAC $ 375,000.00 5 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 2 3 Various Technological Improvements $ 191,258.00 2 4 Replace Plumbing Fixtures $ 150,000.00 5 4 Replace Asphalt Pavement $ 29,575.80 2 4 Upgrade Room Lighting $ 82,800.00 2 Corridor Exhaust and Ventilation $ 150,000.00 2 Replace Air Handlers at Gym & Café $ 285,209.00 1 Identify Exterior Doors (Security) $ 10,000.00 1 Open Cubbies $ 57,000.00 1 Renovate ADA Pre-K Restroom $ 50,000.00 1 Drop Off Area Roof Repairs $ 5,000.00 5 New Parking $ 500,000.00 1 Egress Lighting $ 10,000.00 3 Replace Asphalt Shingles at Roof $ 463,260.00 5 Repaint Various Surfaces $ 115,510.00 1 ADA Classroom Sinks $ 20,000.00 2 ADA Faculty Restrooms $ 100,000.00 5 New Curb $ 19,250.00 5 New Driveway $ 12,500.00 2 New ADA Kindergarten Restrooms $ 560,000.00 3 Playground Repairs $ 8,000.00 3 New Playground Fence $ 6,600.00 1 Emergency Generator $ 63,000.00 1 Renovations - Kindergarten $ 270,000.00 1 Renovations - Regular $ 195,000.00 1 Renovations - Educational Master Plan $ 480,000.00 1 Upgrade Security & ADA $ 100,000.00 1 New Wing - Ed. Program to be 3-Track $ 2,500,000.00 Ashton ES Total Cost $ 6,944,941.10 Cost 1... $ 3,760,000.00 2 $ 1,894,267.00 3 $ 477,860.00 4 $ - 5 $ 812,814.10

Cost B.F. Norton Elementary School 1 1 Masonry Repair $ 11,727.90 2 2 Replace Exterior Metal Door $ 5,736.60 3 3 Replace SAT at Various Locations $ 196,964.00 3 3 Replace Concrete Walk $ 40,197.60 5 3 Replace Carpet $ 15,000.00 2 3 Various Technological Improvements $ 324,686.00 4 4 Replace Metal Roof at Entrance $ 55,000.00 5 4 Replace Asphalt Pavement $ 272,100.60 3 4 Upgrade Acoustics at Gym $ 71,898.30 3 4 Upgrade Sound Isolation between Rooms $ 10,198.80 4 4 Replace HVAC Circulation Pump $ 17,037.90 2 5 Plumbing Fixtures at Classroom Lavs $ 7,328.70 2 Replace Aluminum Windows $ 304,010.00 1 Identify Exterior Doors (Security) $ 3,500.00 1 Provide Area of Rescue Assistance $ 7,000.00 2 Replace Unit Ventilators $ 815,000.00 2 Replace All Plumbing Fixtures $ 150,000.00 5 Repaint Corridors $ 39,190.00 3 Replace Rubber Tile at Stairs $ 4,074.00 1 Renovate New Art Room $ 180,000.00 4 New Parking $ 300,000.00 5 Replace Roof System (replace EPDM w/ PVC) $ 290,887.00 2 Repaint Brick Walls at Gym $ 7,397.50 2 Repaint Ceiling at Gym $ 6,082.50 2 Repair Ceramic Tile at Toilet A-1 $ 2,488.00 5 Replace VCT Flooring at Corridors $ 28,800.00 1 Renovate Clinic $ 10,000.00 2 New Kindergarten ADA Restrooms $ 80,000.00 3 Playground Repairs $ 20,000.00 1 Renovations - Kindergarten $ 267,000.00 1 Renovations - Educational Master Plan $ 792,000.00 1 Upgrade Security & ADA $ 894,000.00 B.F. Norton ES Total Cost $ 5,229,305.40 Cost 1... $ 2,165,227.90 2 $ 1,702,729.30 3 $ 343,332.70 4 $ 372,037.90 5 $ 645,977.60

Cost Community Elementary School 2 2 Replace Metal Exterior Doors $ 83,424.00 2 2 Replace Mechanical / HVAC Piping $ 832,484.70 3 3 Replace Carpet $ 25,000.00 2 3 Replace Plumbing Fixtures $ 250,000.00 2 3 Replace Acoustical Ceiling Tile $ 87,000.00 2 3 Replace Unit Ventilators $ 1,750,000.00 3 3 Replace Sanitary Sewer Piping $ 105,088.50 2 3 Various Technological Improvements $ 532,000.00 4 4 Lighting $ 123,000.00 2 4 Replace Ceiling Grid $ 600,000.00 2 4 Abate Deteriorating Caulking (Asbestos) $ 6,160.50 2 4 Abate Deteriorating Glazing Putty (Asbestos) $ 9,127.50 2 4 Abate Damaged Paint (Pre-1978) (Lead) $ 35,837.10 5 4 Replace Asphalt Paving $ 200,000.00 5 5 Repaint Interior Walls $ 175,306.50 2 5 Plumbing Fixtures at Classroom Lavs $ 12,354.30 2 Open Cubbies $ 84,000.00 1 Identify Exterior Doors (Security) $ 13,500.00 2 Chair Lift $ 155,000.00 2 Egress Windows $ 40,000.00 2 ADA Doors & Openers $ 67,500.00 2 Renovate ADA Restrooms $ 400,000.00 1 Area of Rescue Assistance $ 7,000.00 2 Repair Concrete Window Lintels $ 50,000.00 2 Repair Cracks in South Wing (CMU) $ 30,000.00 2 Repair Cracks in West Wing (Brick) $ 30,000.00 1 Emergency Generator $ 63,100.00 2 Replace Asphalt Shingles at Roof $ 466,070.00 2 Replace Aluminum Windows $ 112,000.00 5 New Parking $ 305,625.00 1 Fire Alarm $ 300,000.00 2 Replace Caulking at Exterior Wall $ 20,000.00 1 New Music Room $ 180,000.00 3 Playground Relocation $ 40,000.00 2 Egress Windows $ 28,000.00 1 Renovations - Kindergarten $ 231,000.00 1 New Addition - Cafeteria & Kitchen $ 1,702,500.00 1 Renovations - Educational Master Plan $ 738,000.00 1 Upgrade Security & ADA $ 500,000.00 Community ES Total Cost $ 10,390,078.10 Cost 1... $ 3,735,100.00 2 $ 5,680,958.10 3 $ 170,088.50 4 $ 123,000.00 5 $ 680,931.50

Cost Garvin Elementary School 2 3 Replace Acoustical Ceiling Tiles $ 266,969.00 2 3 Various Technological Improvements $ 300,000.00 2 4 Replace Ceiling Grid $ 315,530.10 2 4 Abate Deteriorating Caulking (Asbestos) $ 5,347.80 2 4 Abate Deteriorating Glazing Putty (Asbestos) $ 2,566.80 2 4 Abate Damaged Paint (pre-1978) (Lead) $ 41,288.40 3 4 Upgrade Room Lighting $ 46,536.30 2 5 Plumbing Fixtures at Classroom Lavs $ 6,412.50 2 Replace Aluminum Windows $ 67,200.00 2 Open Cubbies at Classrooms $ 27,000.00 1 Area of Rescue Assistance $ 7,000.00 1 Identify Exterior Doors (Security) $ 8,500.00 2 Emergency Egress Windows $ 38,000.00 3 Replace Sealant at CMU Walls at Gym $ 80,000.00 1 New Emergency Generator $ 60,385.00 3 Replace Unit Ventilators $ 750,000.00 2 Replace Plumbing Fixtures $ 100,000.00 3 Replace Asphalt Shingles at Roof $ 373,692.00 3 Replace PVC Flat Roof $ 15,600.00 2 Replace Aluminum Windows @ Additions $ 257,600.00 2 Renovate ADA Full Restrooms $ 200,000.00 1 New Art Room $ 180,000.00 1 New Music Room $ 180,000.00 1 New Kindergarten ADA Restrooms $ 80,000.00 4 New Parking & Paving $ 400,000.00 4 New Driveway $ 62,500.00 5 Replace/Repair/Repaint Various $ 75,000.00 1 Renovations - Kindergarten $ 355,500.00 1 New Addition - Cafeteria $ 660,000.00 1 Renovations - Educational Master Plan $ 447,000.00 1 Upgrade Security & ADA $ 200,000.00 Garvin ES Total Cost $ 5,609,627.90 Cost 1... $ 2,178,385.00 2 $ 1,627,914.60 3 $ 1,265,828.30 4 $ 462,500.00 5 $ 75,000.00

Cost McLaughlin Cumberland Hill Elementary School 3 2 Replace EPDM Roofing / Repair Asphalt Shingles $ 59,428.00 3 2 Replace Unit Ventilators $ 1,000,000.00 3 2 Replace Mechanical Ductwork $ 52,924.50 3 2 Replace Steam Hot Water Unit Heaters $ 27,878.40 1 2 Replace Steam Hot Water Radiant Heaters $ 864,802.80 1 2 Replace Electrical Switchgear $ 69,059.00 1 2 Replace Electrical Panelboard $ 24,243.00 3 3 Replace Gutters $ 17,000.00 2 3 Replace SAT at Various Locations $ 79,288.00 2 3 Replace Asphalt Walks $ 76,390.20 2 3 Various Technological Improvements $ 300,000.00 2 4 Replace Ceiling Grid $ 152,890.20 2 4 Replace Plumbing Fixtures $ 190,000.00 5 4 Replace Asphalt Pavement $ 301,676.40 2 4 Replace HVAC Circulation Pump $ 17,154.00 5 4 Abate Damaged Paint (pre-1978) (Lead) $ 29,586.60 3 4 Upgrade Room Lighting $ 281,893.00 3 4 Replace Gyp. Board Ceilings $ 25,032.60 2 5 Plumbing Fixtures at Classroom Lavatories $ 12,798.00 1 Identify Exterior Doors (Security) $ 6,500.00 2 ADA Classroom Sinks $ 50,000.00 2 Renovate Clinic Restroom to be ADA Compliant $ 200,000.00 1 Renovate Clinic $ 60,000.00 3 Replace Emergency Generator $ 60,000.00 2 Upgrade Parking/Pathway Lighting $ 20,000.00 5 Replace Caulking at Brick at Exterior Wall $ 20,000.00 5 Replace Caulking at CMU at Exterior Wall $ 20,000.00 2 Aluminum Egress Windows $ 36,000.00 1 New Music Room $ 180,000.00 1 New Art Room $ 180,000.00 5 Replace/Repair/Repaint Various $ 75,000.00 1 Renovations - Kindergarten $ 348,000.00 1 Renovations - Educational Master Plan $ 246,000.00 1 Upgrade Security & ADA $ 220,500.00 McLaughlin ES Total Cost $ 5,304,044.70 Cost 1... $ 2,199,104.80 2 $ 1,134,520.40 3 $ 1,524,156.50 4 $ - 5 $ 446,263.00

Cost McCourt Middle School 2 1 Plumbing Shutoffs $ 38,000.00 2 2 Replace HVAC Air Handlers $ 425,802.60 2 2 Replace Steam Hot Water Radiant Heaters $ 115,453.80 2 3 Plumbing Fixture Replacement $ 225,090.00 5 3 Replace Concrete Walks $ 5,481.90 5 3 Replace Parking / Roadway Curbs $ 25,835.40 3 3 Replace Air Compressor $ 11,412.00 2 3 Various Technological Improvements $ 300,000.00 4 4 Upgrade Room Lighting $ 14,476.50 2 5 Plumbing Fixtures at Classroom Lavs $ 21,620.70 2 ADA Single Faculty & Student Restrooms $ 78,000.00 2 Replace Aluminum Windows $ 59,500.00 2 Replace SAT at Locker Rooms $ 11,380.00 5 Repaint Gym Ceiling $ 13,737.50 5 Replace SAT at Gym Showers $ 1,200.00 2 Replace SAT at Toilets A-M $ 6,768.00 1 Identify Exterior Doors (Security) $ 3,500.00 1 Cross Corridor Doors $ 16,000.00 1 Door Pullside ADA Clearance at Library / Admin. $ 4,000.00 2 ADA Restrooms $ 400,000.00 2 ADA Door Pullside Clearances $ 6,000.00 5 Replace Sealant at Precast Walls $ 40,000.00 1 Health / Safety Items in Courtyards $ 4,000.00 2 Repair Ceramic Tile Flooring at Toilets A-M $ 5,076.00 2 Cafeteria Folding Partitions $ 270,000.00 1 Science Lab Renovations $ 220,000.00 1 Science Classroom Renovation $ 50,000.00 3 Replace Caulking at Brick Walls $ 40,000.00 2 Replace SAT at Classrooms $ 113,264.00 2 Replace SAT at Library $ 5,160.00 2 Replace SAT at Offices $ 14,184.00 2 Replace SAT at Teachers Lounge $ 2,400.00 1 Repaint Wood / CMU Walls at Lobby $ 4,200.00 1 Renovations - Educational Master Plan $ 1,127,400.00 1 Upgrade Security & ADA $ 100,000.00 McCourt MS Total Cost $ 3,778,942.40 Cost 1... $ 1,529,100.00 2 $ 2,097,699.10 3 $ 51,412.00 4 $ 14,476.50 5 $ 86,254.80

Cost North Cumberland Middle School 2 1 Plumbing Shutoffs $ 49,534.00 2 2 Replace HVAC Air Handler $ 558,713.00 2 2 Replace Steam / Hot Water Unit Heaters $ 40,562.10 2 2 Replace Steam / Hot Water Radiant Heaters $ 239,008.50 1 2 Replace Emergency Generator $ 103,872.00 1 2 Replace Electrical Switchgear $ 68,594.00 1 2 Replace Electrical Panelboards $ 89,520.00 2 2 Replace Backflow Preventer $ 7,789.00 2 3 Replace Acoustical Ceiling Tiles $ 101,140.00 2 4 Replace Ceiling Grid $ 725,024.70 2 3 Replace Plumbing Fixtures $ 310,828.00 5 3 Repair Built-Up Roofing $ 18,067.50 5 3 Replace Parking / Roadway Curbs $ 38,073.60 3 3 Replace Sanitary Sewer Piping $ 115,978.00 2 3 Various Technological Improvements $ 300,000.00 2 3 Replace Air Compressor $ 6,340.00 5 4 Replace Asphalt Pavement $ 301,677.30 2 5 Plumbing Fixtures at Classroom Lavatories $ 32,430.60 2 Stair Guardrails Extension $ 16,000.00 1 Identify Exterior Doors (Security) $ 3,000.00 2 ADA Single Restrooms at Clinic $ 100,000.00 1 Area of Rescue Assistance $ 7,000.00 2 Replace Aluminum Windows $ 179,200.00 2 Repaint Ceramic Tile / Metal Walls at Gym Showers $ 1,535.00 2 Repair Ceramic Tile Flooring at Toilets A-M $ 10,521.00 2 Replace Rubber Tile at Stairs $ 6,300.00 1 New Elevator $ 250,000.00 2 ADA Single Restrooms $ 100,000.00 1 Science Labs $ 220,000.00 1 Science Classrooms $ 50,000.00 5 New Parking $ 400,000.00 3 Replace Caulking at Brick at Walls $ 40,000.00 5 Replace PVC Roofing at Addition $ 102,000.00 2 Replace Aluminum Windows $ 57,400.00 2 Repair Ceramic Tile Flooring at Locker Rooms $ 7,674.00 2 Replace Gyp. Board Ceiling at Locker Rooms $ 12,790.00 2 Repair Ceramic Tile Flooring at Gym Showers $ 1,200.00 2 Replace Gyp. Board Ceiling at Gym Showers $ 2,000.00 1 Renovations - Educational Master Plan $ 1,455,600.00 1 Upgrade Security & ADA $ 556,000.00 N. Cumb. MS Total Cost $ 6,685,372.30 Cost 1... $ 2,803,586.00 2 $ 2,865,989.90 3 $ 155,978.00 4 $ - 5 $ 859,818.40

Cost Cumberland High School 2 1 Plumbing Shutoff Valves $ 159,717.00 2 2 Replace Mechanical and HVAC Piping $ 1,388,411.10 2 2 Replace Mechanical and HVAC Piping, BLDG 3 $ 539,103.60 2 3 Replace Acoustical Ceiling Tiles, BLDG 3 $ 114,426.00 3 3 Replace Carpet Flooring $ 78,381.00 3 3 Replace Carpet Flooring, BLDG 3 $ 136,946.70 2 3 Plumbing Piping Systems Replacement $ 150,000.00 2 3 Various Technological Improvements $ 750,000.00 3 3 Repair Interior CMU Walls, BLDG 3 $ 10,230.30 2 4 Upgrade Controls to Direct Digital Controls (DDC) $ 800,000.00 2 4 Replace Ceiling Grid, BLDG 3 $ 638,727.30 2 4 Lighting Upgrades $ 32,313.00 2 4 Upgrade Room Lighting, BLDG 3 $ 16,049.70 2 4 Replace HVAC Controls, BLDG 3 $ 472,417.20 2 5 Private Shower Area $ 27,635.40 2 Replace Caulking at Windows at Original Building $ 40,000.00 2 Replace Aluminum Windows at ALP $ 127,400.00 2 Replace SAT at ALP Classrooms $ 23,200.00 2 Repaint CMU Walls at ALP Corridors $ 5,000.00 2 Replace SAT at ALP Corridors $ 2,400.00 1 Rescue Assistance Areas $ 14,000.00 2 Stair Tower Guardrail & Rail Extentions $ 10,000.00 1 Identify Exterior Doors (Security) $ 21,500.00 1 Replace 30 Zone Pumps $ 150,000.00 2 Replace Classroom Unit Ventilators - High School $ 300,000.00 2 Provide Ventilation System with HVAC - High School Offices $ 150,000.00 2 Provide Ventilation System with HVAC - High School Media Area $ 150,000.00 2 Replace Convectors and Ventilation Systems - High School Corridor $ 600,000.00 2 Recommission Controls, Add Carbon Dioxide (CO2) Control - Wellness Center $ 50,000.00 2 Upgrade Transitional Building Controls to Direct Digital Controls (DDC) $ 400,000.00 2 Replace Classroom Unit Ventilators - Transitional $ 2,000,000.00 2 Provide Vent System with HVAC - Transitional Offices $ 500,000.00 2 Replace Air Handling Unit (AHU) system with New System - Transitional Gym $ 300,000.00 2 Replace AHU system with New System - Transitional Auditorium $ 300,000.00 2 Provide Ventilation System with HVAC - Transitional Media Area $ 150,000.00 2 Replace Convectors and Ventilation Systems - Transitional Corridor $ 300,000.00 3 Domestic Hot Water Heater $ 50,000.00 3 Install Backflow Preventer $ 10,000.00 4 Aisle Lighting - Auditorium $ 27,000.00 5 Replace Roofing System at Pool Roof (replace EPDM with PVC) $ 122,499.00 3 Replace Rubber Tile at Stairs $ 21,000.00 2 Replace High School Heating Boiler System with NE-CHPS Compliant System $ 480,000.00 3 Replace Caulking at Brick at Walls $ 40,000.00 5 Replace Roofing System at Original (replace Built-Up Roof with PVC) $ 2,313,109.50 2 Replace SAT at Offices $ 12,411.00 3 Repaint Wood / Ceramic Tile Flooring at Corridors - Transitional $ 20,000.00 4 Refinish Wood Flooring at Gym - Transitional $ 18,081.00 1 Renovations - Regular $ 3,900,000.00 1 Renovations - Educational Master Plan $ 2,500,000.00 1 Upgrade Security & ADA $ 521,400.00 Cumberland HS Total Cost $ 20,943,358.80 Cost 1... $ 7,106,900.00 2 $ 10,989,211.30 3 $ 366,558.00 4 $ 45,081.00 5 $ 2,435,608.50

PROJECTED COST BY SCHOOL School Cost Ashton ES $ 6,944,941.10 B.F. Norton ES $ 5,229,305.40 CUMBERLAND SCHOOLS FIVE YEAR COST PROJECTIONS 11/30/2018 PROJECTED COST BY YEAR Community ES $ 10,390,078.10 Cost Garvin ES $ 5,609,627.90 1 $ 25,477,404.00 McLaughlin ES $ 5,304,044.70 2 $ 27,993,289.00 McCourt MS $ 3,778,942.40 3 $ 4,355,214.00 North Cumb. MS $ 6,685,372.30 4 $ 1,017,095.00 Cumberland HS $ 20,943,358.80 5 $ 6,042,668.00 BASE TOTAL $ 64,885,670.70 BASE TOTAL $ 64,885,670.00 SOFT COSTS Soft Cost Item Cost Arch. / Eng. 7% $ 4,541,996.95 Owner's Rep. 4% $ 2,595,426.83 FIVE YEAR GRAND TOTAL Comm. Agent 2% $ 1,297,713.41 BASE TOTAL $ 64,885,670.70 Contingency 5% $ 3,244,283.54 SOFT COSTS $ 11,679,420.73 TOTAL SOFT COSTS $ 11,679,420.73 GRAND TOTAL $ 76,565,091.43