Similar documents
Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements

Documentation Standard for an Individual Section 4(f) Evaluation

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

Subdivision (Plat) Checklist

Prospective Builders, Utilities, Public Agencies, and Engineering Firms

February 6, Operations Division Regulatory Branch (North) ID No. LRL dlz

Plan Presentation Guide SECTION 60. Chapter 3 RIGHT-OF-WAY SECTION PRESENTATION

City of Palo Alto (ID # 4882) City Council Staff Report

PUBLIC HEARING FM 2499 Section 4

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Chapter 4 Utility Locations and City Utility Easements

Burnett County, WI SUBDIVISION VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS PROCESS (NOTE: PLEASE READ ENTIRE APPLICATION BEFORE PROCEEDING)

Chapter 102 Permit Amendments. Frequently Asked Questions (FAQ) Final, October 19, 2018

6.5 LAND AND WATER CONSERVATION FUND ACT SECTION

PROTOCOL FOR ZONING PERMIT SUBMITTAL

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

IH 35W Public Hearing CSJs: , , , and COMMENT AND RESPONSE REPORT

SITE DEVELOPMENT PERMIT

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

Appendix B Real Estate Plan

Appendix B Draft Real Estate Plan

Burleigh County Water Resource District 1811 East Thayer Avenue Bismarck, North Dakota (701)

Burnett County, WI LAND USE VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS

APPLICATION PROCESSING

JANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E

WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION

Welcome to District 6-0

Floodplain Development Land Use Review

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Zoning Permit Application Cover Page

Putting it all together. Presented by: RIGHT OF WAY SERVICES

Public Notice. Applicant: Avere Real Estate Project No.: SWF Date: May 30, Phone Number:

MAYHILL ROAD WIDENING AND IMPROVEMENTS PROJECT - PUBLIC MEETING December 15, 2010 COMMENT CARD QUESTIONS AND ANSWERS

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS

STAFF REPORT Administrative Subdivision Hearing West 150 South Street, Parcel # , and

APPLICATION FOR PERMIT: (Pursuant to Ord & Reso ) 4d Habitat Loss Permit Vegetation Removal Tree Removal. Address:

How Mitigation Banks and ILF Programs Can Help Conservation

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

QUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements

HUNTING BAYOU FLOOD RISK MANAGEMENT, HARRIS COUNTY, TEXAS DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT

Administrative Plat Application Form

HEC Software and FEMA Submittals

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

ED-900C EDA Application Supplement for Construction Programs

APPLICATION FOR APPROVAL OF A PLAN OF SUBDIVISION OR CONDOMINIUM DESCRIPTION Under Section 51 of the Planning Act

APPENDIX D - REAL ESTATE

Displacement and Relocation

Flood Hazard Development Permit Application & Permit Forms. For Communities with Coastal Velocity Zones [60.3(e)] CONTENTS

San Antonio Water System Guide to Development 2015

NEPA Introduction Course: Farmland

DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

Honolulu District U.S. Army Corps of Engineers

Residential Subdivision Preliminary Plat Application

City of Owasso Public Work Department STATUS REPORT February 6, 2018

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

In Development. Consultant Selection. Consultant - Scope of Work. Design-Permitting. Planning. Construction. Closeout

Welcome to the Location & Design Public Hearing for: Baymont Inn & Suites, Lake Hamilton, Arkansas Thursday, June 25, How do I become involved?

EASEMENT BASICS. Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations.

Floodplain Management: New York State Role

Appendix 4 Agency Approval Letters

[RR , 189R5065C6, RX ] National Environmental Policy Act Implementing Procedures for the Bureau of

Draft Continuing Authorities Program Section 1135 Detailed Project Report and Integrated Environmental Assessment

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

DMS Authority Online. User s Manual

City of Owasso Public Work Department STATUS REPORT January 2, 2018

Draft Integrated Feasibility Report and Environmental Assessment and Draft Finding of No Significant Impact

Town of Jupiter Island Delegated Mangrove Authority For the State of Florida

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

Partner Engineering & Science, Inc.

APPENDIX M. Real Estate Plan

Criteria for Appeals of Flood Insurance Rate Maps. November 30, 201 1

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

MUNICIPALITY OF ANCHORAGE PLANNING AND ZONING COMMISSION RESOLUTION NO

Electric Transmission Right-of-Way Usage Policy

New Electronic Planning Commission Submittal Process

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Documentation Standard Historical Resources Survey Report

$28,145,000 THE COUNTY COMMISSION OF HARRISON COUNTY (WEST VIRGINIA) TAX INCREMENT REVENUE AND REFUNDING BONDS (CHARLES POINTE PROJECT NO

Su-Knik Mitigation Bank Modification Memorandum

RESOLUTION NO

THE CORPORATION OF THE TOWNSHIP OF NORTH FRONTENAC BY-LAW #123-13

R/W PREQUALIFICATION ODOT, 3/14/2018 PROPERTY MAP SHEET

FINAL APPLICATION. N.J.A.C. 7: (Minor disposals or diversions of parkland)

Plat Checklist PLAT TYPES AND DESCRIPTIONS

The Drainage Control Regulations

Lake County Planning, Building and Development Department

TENTATIVE MAP INFORMATION SHEET

APPLICATION PROCESSING STEPS

OFFICE OF REAL ESTATE

State, County, or Municipal Agency or instrumentality thereof, applying for authorization

PUBLIC HEARING APPLICATION FOR AMENDMENTS TO THE OFFICIAL ZONING MAP City Code Section 31-77

Residential Major Subdivision Review Checklist

Figures List for New LPA Manual

Commercial Requirements Packet Sheridan, Indiana Hamilton County

VI. SAFETY ELEMENT I. INTRODUCTION A. PURPOSE B. AUTHORITY. 1. Safety

INFORMATIONAL HANDOUT

SAN ANTONIO WATER SYSTEM Guide to Development

POLICIES & PROCEDURES MANUAL

Transcription:

Page 1 of 7 Comment Report: All Comments Project: 208/408 Reviews Review: IH30-35E Dallas Horseshoe Initial 408 Displaying 20 comments for the criteria specified in this report. 1062 ms to run this page Id Discipline DocType Spec Sheet Detail 4685342 Specifications Design Memorandum or Report Coordinating Discipline(s): Specifications No comments Submitted By: James Wright (817-886-1305). Submitted On: 22-Jun-12 No comments noted. 1-1 Backcheck Recommendation Close Comment Closed without comment. Current Comment Status: Comment Closed 4687823 No comment Engineering Plans and Specs Submitted By: ROBERT BOWERSOCK (817/886-1881). Submitted On: 23-Jun-12 No comments noted. 1-1 Backcheck Recommendation Close Comment Closed without comment. Current Comment Status: Comment Closed 4688671 Structural Other Coordinating Discipline(s): Structural No comment Submitted By: Nizar Almasri ((817) 886-1675). Submitted On: 25-Jun-12 No comments noted. 1-1 Backcheck Recommendation Close Comment Closed without comment.

Page 2 of 7 Current Comment Status: Comment Closed 4689405 (Document Reference: TXDOT/FHWA EA) Page 147, Sentence 6 indicates, "Mitigation banks are used in situations where the construction of a mitigation area is not practical." Compensatory mitigation for impacts to waters of the United States is governed by regulation under 33 CFR 332 Compensatory Mitigation for Losses of Aquatic Resources. This regulation establishes a preference for the use of mitigation bank credits for mitigation. Based on this regulation the above sentence should be removed and information should be added justifying the use of on-site mitigation instead of mitigation bank credits. This justification should include a statement of the need for the swale and how the mitigation area will be protected. The sentence in question was deleted as requested. The following text was inserted: "Pursuant to the 2008 Final Rule on Compensatory Mitigation, the USACE would consider the type and location options for compensatory mitigation in the following order: mitigation bank credits, in-lieu fee program credits, and then permittee responsible mitigation." This general statement is needed in the Cumulative Impact section to explain how mitigation for Section 404 may occur within the RSA and is not project specific. Justification for the use of on-site mitigation and the need for the swale was not added because is not considered applicable in the cumulative impacts section. (Attachment: 4689405- EA.pdf) 4689412 (Document Reference: TXDOT/FHWA EA) Page 93, line 11; Appendix B, page 12, line 1 The EA indicates that no mitigation is proposed for the re-aligned channel. The analysis of the channel realignment is part of the compensatory mitigation process including avoidance and minimization therefore the sentence should be changed to indicated that the modification to the historic river channel at the Able Sump Pond 2 and 3 location would not result in the loss of aquatic function and therefore no additional mitigation would be required for these impacts to waters of the United States. As requested, the EA and Appendix B were revised to explain that the modification to the historic river channel would not result in a loss of aquatic habitat and no additional mitigation is proposed. (Attachment: 4689412- AppB-EA.pdf) 4689423 Table 8-16, page 90; Page 93, line 1-12; Appendix B, Table 2-1, page 10, line 11; Appendix B, page

Page 3 of 7 11, lines 38-40 (Document Reference: TXDOT/FHWA EA) [This item is flagged as a critical issue.] The tables indicate that permanent impacts to waters of the United States would include 909 linear feet of stream, however, the text indicates that 283 feet of stream will be permanently impacted. This discrepancy needs to be resolved. Text revised in EA and Appendix B to explain compensatory mitigation is proposed for the 283 linear feet of permanent stream impact. The remaining 626 linear feet is associated with the realignment of the Historic Trinity River Channel for which compensatory mitigation is not proposed. (Attachment: 4689423- AppB-EA.pdf) 4689434 Page 17, 1st line of 4th paragraph and 2nd line of last paragraph (Document Reference: Project Summary Report) [This item is flagged as a critical issue.] Paragraph states that Dallas Horseshoe project would require relocation of 15 existing Oncor overhead electric transmission towers, then goes on to say that Oncor would be responsible for obtaining USACE construction approval for the relocations. I agree that Oncor should be responsible for getting construction approval for the relocations once they have completed their 100% design, but since the relocations are being required by the IH-30/IH-35 project, the FHWA EA should include the environmental impacts associated with the relocation of the electric lines. More detail on the relocation of the Oncor tower was included in the documents and environmental impacts were determined. The proposed relocation would impact water Feature 65. Results were included in the EA (including Appendix B/Attachment 1). Attachment 1 was revised to include the existing and proposed location of all Oncor transmission towers. (Attachment: 4689434- PS-EA.pdf) 4689442 Appendix 4, page 4, Section 2.0, 2nd paragraph (Document Reference: Project Summary Report) [This item is flagged as a critical issue.] The estimates of potential environmental impacts resulting from the Proposed Action should include the impacts associated with relocation of the Oncor electric transmission line towers based on a preliminary proposed alignment. Revised bullet item b. to read "b. Construction of foundations for the proposed IH 30 and IH 35E

Page 4 of 7 new bridge structures and proposed relocation of Oncor transmission towers; and" (Attachment: 4689442- AppB.pdf) 4689446 (Document Reference: Project Summary Report) Appendix 4, page 8, line 11 Instead of using "800-year event", please use "SPF", since we do not have concensus agreement at this time, of what the updated SPF equates to. Should do a search on Section 408 reports and FHWA EA to make this correction throughout all the documents. Revised as requested globally. A revised electronic version will be provided for ATR review. Appendix 4 revisions attached for reference. (Attachment: 4689446- AppB.pdf) 4689451 (Document Reference: Project Summary Report) Coordinating Discipline(s): Cultural Resources General. Cultural resources team member has no comments. 4689613 Real Estate RE has no comments on the design for IH 30/IH 35E Dallas Horseshore Project.

Page 5 of 7 4689624 Real Estate Is it correct that the TXDOT IH30/IH 35E bridges and road pavements reconstruction are State highways and roads? 1-0 Evaluation For Information Only Yes 4689629 Real Estate Does TXDOT IH 30/IH 35E bridges and road pavements have any affiliations with the Federal Highway Administration? 1-0 Evaluation For Information Only Yes 4689642 Real Estate Project Summary Report, 8. Real Estate, Pg 29, 1st line states, "The proposed project would traverse approximately 48.3 acres of land located within the Dallas Floodway." RE recommends that TXDOT provide the City of Dallas, a real estate map indicating the specific locations of the approx. 48.3 acres of land to be traversed within the Dallas Floodway. The map will be helpful to the City and USACE when the Dallas Floodway project work limits are defined for the particular work to be conducted within the East and West levee alignments that impact the approx. 48.3 acres of land. The State is currently developing ROW maps and exhibits for acquisition of the easements required across the Dallas Floodway. These will be provided to the City of Dallas, and can be provided to USACE if necessary. 4689661 Real Estate Project Summary Report, 8. Real Estate, Pg 29, 5th line states, "TXDOT will acquire a permanent easement from the City of Dallas for the proposed IH 30 and IH 35E bridges across the Dallas Floodway." RE recommends to TXDOT and the City that in the execution of the permanent easement that City incorporate language in the easement to provide right of entry to the United States of America, on behalf of USACE, its representatives, agents, contractors and assigns to the specific locations where the East and West Levees for the reconstructed bridges, road pavements and access roads will traverse at grade the various land sites. USACE will need access to these same permanent easement areas between City and TXDOT for the Dallas Floodway Project, once the feasibility study work is defined.

Page 6 of 7 Forwarded to the appropriate State personnel responsible for preparing the easement agreements. 4689674 Real Estate Project Summary Report, 8. Real Estate, Pg 30, 2nd line states, "There is no right-of-way acquisition cost sharing with the USACE associated with this project." RE concurs with this statement. Later, if any unforeseen acquisition is required by TXDOT along the East and West levees for this project, TXDOT will need to inform the City and USACE RE personnel. City of Dallas and USACE will be notified if there is need for additional ROW. 4689681 Civil Design Memorandum or Report (Document Reference: Project Summary Report) In this report in Section 7.5 Construction, the third paragraph states the number of submittals plans that will be required. The ONCOR plans are only calling out for one submittal for USACE approval. Even thought the design criteria to be used is under the guidance of ONCOR, the construction approval still needs to follow the USACE guidance within the Floodway area. The submittals should be similar to that which TXDOT will provide. Submitted By: Efren Martinez (817-886-1674). Submitted On: 25-Jun-12 The number of submittals will be similar between TxDOT and Oncor provided the plans submitted for Construction Approval Review are not substantially different from the preliminary plans as determined by the USACE to warrant further analyses. Provided there are not substantial changes, Oncor is expected to make one submittal to the USACE for Construction Approval Review for all 15 transmission tower relocations. Whereas TxDOT will make multiple submittals for Construction Approval Review based on the construction packages developed by the Design-Build Contractor. For example, one submittal might be for IH 30 bridge foundations within the Dallas Floodway. A second submittal might be for IH 35E bridge foundations within the Dallas Floodway. 4689686 Civil Design Memorandum or Report (Document Reference: TXDOT Preliminary Plans)

Page 7 of 7 On the plan and profile sheets where future proposed levee modifications by others is shown, the vertical clearance dimension for all areas is less than 15 feet. No reference is shown on the main report stating the approval of this criteria to reduce the vertical clearance. The vertical clearance of 15 feet is for flood fighting measures and access of equipment. Submitted By: Efren Martinez (817-886-1674). Submitted On: 25-Jun-12 The report does not specifically state approval of this criteria. However, the minimum vertical clearance has been previously established through coordination with the City of Dallas Flood Control District and the USACE in August of 2008. The minimum vertical clearance required is 7 ft. above the crown of a 12-inch thick aggregate maintenance road on top of a future levee height set at SPF plus 2 ft. Please reference discussion at top of Page 27 and Exhibit F of the Project Summary Report. The 7 ft. minimum vertical clearance facilitates surveillance activities during floods. Vehicles and equipment that require more than 7 ft. of vertical clearance can use the landside maintenance roads turnoffs that will allow them to cross under the proposed bridges at the base of the levee with significantly greater than 15 ft. of vertical clearance. 4691264 Operations Plans and Specs No comments from OD at this time. Submitted By: Mark Sissom ((817)886-1582). Submitted On: 26-Jun-12 4697043 Geotechnical Plans and Specs Geotech has no comments at this time. Additional comments will be provided at the next review period. Submitted By: Jesse Coleman (817-338-8670). Submitted On: 28-Jun-12 There are currently a total of 415 users online as of 04:03 PM 28-Jun-12. Patent 11/892,984. About ProjNet SM About Us Privacy Policy Test Browser Test Connection Call Center FOUO / SBU Only SM property of ERDC since 2004. Questions and comments to Call Center staff@rcesupport.com, 1-217-367-3273 or 1-800-428-HELP (4357) Classified information is NOT permitted on this site. Do NOT share your ProjNet password.