SELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR STATION CHURCH

Similar documents
The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

BOROUGH OF HOPATCONG ORDINANCE No

Re: Item No THE WILLOW TREE TOWER Landmark Building. Landmark Site.

Composition of traditional residential corridors.

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

The Cannery Marketplace Narrative. Purpose: Site Design Approach: Cannery Commerce District 10/18/2017

Chapter DOWNTOWN ZONING DISTRICTS

DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1

4 DEVELOPMENT STANDARDS FOR

The Town of Parker, Colorado

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch

Infill & Other Residential Design Review

Planning Commission June 25, Lincoln Boulevard

M E M O. September 14, 2017 Agenda Item #4. Planning Commission. David Goodison, Planning Director

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

OTHELLO STATION DEVELOPMENT SITE

River Glen Apartments

City of Lafayette Staff Report Design Review Commission

Accessory Structures Zoning Code Update-, 2015

SECTION 73 CHESTER VILLAGE DISTRICT REGULATIONS

AGENDA SLOT HOME EVALUATION & TEXT AMENDMENT. 5:30 - Welcome

566 Hilson Ave & 148 Clare St., Ottawa Planning Rationale June 20 th, 2014 Prepared by Rosaline J. Hill, B.E.S., B.Arch., O.A.A.

ZA and ZA Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center

Accessory Coach House

Zoning Regulations of the Town of Redding Connecticut

Wilson Bridge Corridor Zoning. Department of Planning & Building

College Avenue. Sowers Street. Calder Way. Beaver Avenue

STAFF DESIGN REVIEW RESIDENTIAL BUILDING APPLICATION SUPPLEMENT

MARKET & OCTAVIA AREA PLAN FUNDAMENTAL DESIGN PRINCIPLES

ACCESSORY DWELLING UNITS IN THE SOUTHEAST SECTOR

Single-Dwelling Zones 110

URGENT 1 MOTION. 1. Temporary Modular Housing Design Guidelines

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

TOWNSHIP OF EVESHAM ORDINANCE NO

Goal 1 - Retain and enhance Cherry Creek North s unique physical character.

WALNUT CREEK DESIGN REVIEW COMMISSION STAFF REPORT. AGENDA: July 6, 2016 ITEM 4b.

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

CHAPTER 5 R ESIDENTIAL

A Better Community Through Cooperation

LINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P JENSON, K P CLARKE, T P

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

City of Tacoma Planning and Development Services

DEVELOPMENT DEPARTMENT STAFF REPORT THE PARK AT 5 TH

City of Coral Gables Planning and Zoning Staff Report

City of Reno October 30, 2012 Draft Midtown Zoning Text Amendments 1

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

Better Housing by Design - Proposed Draft Summary

TOWNHOUSE. TYPICAL UNIT SIZE 1,200 to 1,600 square foot average unit (two to three stories) DENSITY dwelling units/acre without cottages

DEVELOPMENT DEPARTMENT STAFF REPORT STAFF REPORT DRESDEN DRIVE TOWNHOMES DCI

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

ARTICLE 5. COMMERCIAL AND OFFICE DISTRICTS 5.1 PURPOSE STATEMENTS 5.2 USES 5.3 DIMENSIONAL STANDARDS 5.4 DESIGN STANDARDS 5.5 DK DISTRICT STANDARDS 5

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS

5.1 Site Planning & Building Form

R E S O L U T I O N. Residential 384,918 sq. ft. To be demolished Floor Area Ratio (FAR) 0 0.7

Article 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT

Members present: Burchill, Yacoub, Yoerg, Potter, Rhoades and Casanova

URBAN DESIGN COMMISSION REVIEW AND APPROVAL

RedStone Private Country Estate architectural guidelines

2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa

SCANDINAVIAN DESIGNS - CORTE MADERA

DAVIDSON PLANNING ORDINANCE AMENDMENTS AFTER SEPTEMBER 2009 SECTION 9

A.2 MOTION. 2. RM-8 and RM-8N Guidelines. MOVER: Councillor. SECONDER: Councillor

City Avenue District Rezoning. Regional Center Area & Bala Cynwyd Retail District December 14, 2011 Public Hearing

Seth Mallen, Vice President Maximus Real Estate Partners 525 Florida Street, Ste. 150 San Francisco, CA November 10, 2015

Advisory Design Panel Report For the Meeting of February 27, 2019

2. The modification is consistent with the objectives of this chapter.

RM-11 and RM-11N Districts Schedule

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting

PLANNING COMMISSION MAY 3, 2018 PUBLIC HEARING

SCHEDULE 8 TO THE DESIGN AND DEVELOPMENT OVERLAY RESIDENTIAL AREAS SURROUNDING ACTIVITY CENTRES AND ALONG MAIN ROADS

25 Leonard Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Urban Design Brief. Proposed Medical / Dental Office 1444 Adelaide Street North. Vireo Health Facility Ltd.

Multi-unit residential uses code

739 Channing Way PRELIMINARY DESIGN REVIEW

UPDATE Board of Selectmen June 20, 2017

LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA

City of Coral Gables Planning and Zoning Staff Report

Architect: Lucio Trabucco Nunes Trabucco Architects 109 Highland Avenue Needham, MA Tel: Fax:

CHAPTER NORTH LAKE SPECIFIC PLAN

CITY OF MERCED SMALL LOT SINGLE-FAMILY HOME DESIGN GUIDELINES

38 th & Blake Height Amendments: Public Meeting #5 Building Design Comments July 13 th, 2016

RM-10 and RM-10N Districts Schedule

Staff Report. Street Vacation. Salt Lake City Planning Commission. Ashley Scarff, (801) or Date: April 10 th, 2019

Route 6 Corridor Study Bristol Planning Commission Meeting #1. May 25, 2016 FITZGERALD & HALLIDAY, INC. Innovative Planning, Better Communities

LILLIAN WEBB PARK DEVELOPMENT PROPOSAL. City of Norcross, Georgia 2034 Comprehensive Plan

Venice NeighborhoodCouncil PO Box 550, Venice CA / LAND USE AND PLANNING COMMITTEE STAFF REPORT

City Wide Design Guidelines Attachment A Proposed Ordinance

Indicates Council-recommended changes Introduced by: Mr. Tackett Date of introduction: June 14, 2016 SUBSTITUTE NO. 1 TO ORDINANCE NO.

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

TRANSIT-ORIENTED DEVELOPMENT PLAN EXISTING CONDITIONS REPORT LAWRENCE TO BRYN MAWR MODERNIZATION

DIEPENBROCK A R C H I T E C T U R E

Community Affairs and Planning Committee Paul Allore, MCIP, RPP Director of Planning and Development Services

From Policy to Reality

ANDERSON HALL PUD TEXT AMENDMENT PRESENTED BY STEVEN D. HARDIN, ESQ.

COMMERCIAL/INDUSTRIAL DEVELOPMENT GUIDELINES

August 17, 2016 PROJECT INFORMATION:

A DJUSTMENTS. A. Zoning Permits Required: Use Permit to construct a dwelling unit, as required by BMC Section 23D

4.2 RESIDENTIAL ZONING DISTRICTS

ARTICLE 878. PD 878.

Transcription:

SELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR 97202 STATION 503-234-3570 CHURCH 503-233-1497 May 10, 2017 Dear Mr. Graves: The Sellwood-Moreland Improvement League (SMILE) is providing the following comments on for design review of 1944 SE Tacoma (LU 17-140448 DZ). The architects presented plans at the May 3 SMILE Land Use Committee neighborhood; the mixed reaction comments are described in the attached minutes of that meeting. We thank the architects for presenting their design and we are willing to continue working with them and you. Our goal is to allow architectural creativity while satisfying the Community Design Guidelines, especially those related to gateways, pedestrian emphasis, and project design. Below we identify 6 elements of the design that do not meet the Community Design Guidelines and we propose that at a minimum the building facades on Tacoma Street incorporate at least 4 of the 6 elements. The following Community Design Guidelines are applicable to this project: PORTLAND PERSONALITY P3. Gateways. Develop or strengthen the transitional role of gateways identified in adopted community and neighborhood plans. PEDESTRIAN EMPHASIS E3. The Sidewalk-Level of Building. Create sense of enclosure and visual interest to buildings along sidewalks and pedestrian areas by incorporating small scale building design features, creating effective gathering places and differentiating street level façades. PROJECT DESIGN D2. Main Entrances. Make the main entrances to houses and buildings prominent, interesting, pedestrian accessible and transit-oriented. D5. Crime Prevention. Use site design and building orientation to reduce the likelihood of crime through the design and placement of windows, entries, active ground level uses and outdoor areas.

D7. Blending into the Neighborhood. Reduce the impact of new development on established neighborhoods by incorporating elements of nearby, quality buildings such as building details, massing, proportions, and materials. D8. Interest, Quality and Composition. All parts of a building should be interesting to view, of long lasting quality, and designed to form a cohesive composition. Design elements that do not satisfy the Community Design Guidelines are: 1) Eaves: The buildings have no eaves which are a common feature in our neighborhood that provide visual interest and articulation. Does not satisfy D7 (blending into the neighborhood) or D8 (Interest, Quality, and Composition). 2) Windows: The building have only a few narrow windows. Larger windows are more typical of buildings in the neighborhood, would provide more visual connection between the building and street. Does not satisfy E3 (Sidewalk Level of Building), D5 (Crime Prevention), D7 (blending into the neighborhood) or D8 (Interest, Quality, and Composition). Although using small windows as an energy conservation measure is important, small, tall windows located in the front of the buildings detract from a balanced appearance of the façade from Tacoma Street. Consider adding clerestory windows to the front, or better insulated larger windows. 3) Trim: The buildings have no trim, which is a common feature in the neighborhood that helps makes buildings visually interesting. Does not satisfy E3 (Sidewalk Level of Building), D7 (blending into the neighborhood) or D8 (Interest, Quality, and Composition). Consider trim at corners, below the roof line, and around windows and doors. Also consider a belly band and skirt board. 4) Color: The building is a single monotone color, including the roof. Typical buildings in the neighborhood have different roof, body, and trim colors which makes buildings visually interesting. Does not satisfy E3 (Sidewalk Level of Building), D7 (blending into the neighborhood) or D8 (Interest, Quality, and Composition). Consider making the roof a different color, making one or more floors different colors, and making the base of the building a different color. 5) Articulation: The building walls and roofs are extremely planar and have little articulation even compared to new boxy apartment buildings. The two-dimensional planes are featureless. Does not satisfy E3 (Sidewalk Level of Building), D7 (blending into the neighborhood) or D8 (Interest, Quality, and Composition). 6) Main Entrances: The entrances facing Tacoma Street are plain doors that are not inviting, prominent, or interesting and thus do not satisfy D2 (Main entrances), E3 (Sidewalk Level of Building), D7 (blending into the neighborhood) or D8 (Interest, Quality, and Composition). The project is located on SE Tacoma Street which connects the neighborhood to McLoughlin Boulevard, Southeast Portland, the Tacoma Street light rail station, and the Sellwood Bridge.

Thus, SE Tacoma Street serves as a gateway to our neighborhood so the project will be highly visible. Adopting some of the design element listed above on the Tacoma Street facades will help maintain and enhance Tacoma Street as a welcoming gateway that expresses community identity and satisfy Community Design Guideline P3, Gateways. To satisfy the Community Design Guidelines and allow architectural creativity, we recommend that 4 of the 6 design elements listed above be improved on the Tacoma Street facing facades of the front buildings. Whether the additional elements are incorporated into the other facades of the front buildings and the back buildings for consistency is best decided by the architect. In addition, two entrances in the southeast building are located on the south side of the structure and will be not visible from the street. This location does not meet the Crime Prevention guideline (D5) which states that entries that are "directly accessible and visible from the street are the safest" or the Main Entrance guideline (D2) that they be prominent, interesting, and pedestrian accessible. The Land Use Committee recommends that, if feasible, this building be designed to place the entrances on the east side of the building where they would be visible from the street. This modified layout also appears to allow the 2nd story balcony to be changed to the east side of the building instead of being in the current location on the south side where it would directly overlook the backyard of the adjoining property. Project elements that we would like to see retained are: four separate buildings instead of a single box-like building solar panels individual entrances use of energy conserving features owner's willingness to communicate with neighbors owner's commitment to deconstruction Please contact us if you have any questions or would like to discuss the project. Sincerely, David Schoellhamer Chair, Sellwood-Moreland Improvement League Land Use Committee chair.landuse.smile@gmail.com attached: Minutes of May 3, 2017, SMILE Land Use Committee meeting

SMILE Land Use Committee Meeting Minutes SMILE Station, 8210 SE 13th Ave Wednesday May 3, 2017, 600-715PM 600-605PM: Introductions Land use committee members present David Schoellhamer, Miriam Erb, Rocky Johnson, Shari Gilevich, Vikki DeGaa, and Krista Jones. About 17 other people were present at the start of the meeting, including presenters. 605-640PM: 5434 SE Milwaukie: Neighborhood contact meeting for a proposed 4-story 29-unit apartment building per the Community Design Standards and Design Overlay requirements. The project will follow the community design standards. The architect Ralph Tahran presented plans which are posted on the Land Use Committee web page at sellwood.org. Site is narrow - 36 feet wide and 100-ish feet depth. Feedback and questions Resident liked the color scheme. What are the exterior materials? Mostly horizontal siding with some corrugated metal and a second type of siding. Units are all studios (about 250 sq ft). They have to meet the affordable unit standards, which is 4-5 affordable units (15% of the 29 units). But, they are trying to provide make all apartments affordable (about $750-770) because of extra incentives for Inclusionary and Affordable Housing such as tax abatements and reduced System Development Charges (fees) that make the project possible. Developers are trying to find ways to meet the community needs. The first level will have a common kitchen and laundry (units will also have small kitchettes). Maximum occupants per units - unknown/unspecified. Residents expressed frustration with the lack of parking with higher density, increased traffic on narrow streets, and increased density and squeezing people into a small spaces. What about landscaping? They have an expanded sidewalk and 15% landscaping standard (but going to 20%). They are required to have some property screening. Have they met with the neighbors? No. They have not. Construction schedule - hoping to have permits into the City early July. Construction will be staged off of Milwaukie.

640-715PM: 1944 / 2006 SE Tacoma: Michelle Shaheen and Jennifer Dzienis of Works Progress Architecture presented plans for a 3-story 12 unit development. The units will be organized into four structures (3 units per structure), with tuck under parking and common ongrade storage, utility and trash rooms. All units have separate entries. Nine standard parking spaces and 31 bicycle parking spaces are provided. Solar arrays are proposed for south facing roof slopes. The project is subject to a type II design review. Details are available at https://www.portlandoregon.gov/bds/article/636681. The deadline for public comments is May 10. Project is making use of the amenity bonus b/c building 12 units on 10,000 sq ft (zone allows 1 unit per 1000 sq ft). Feedback and questions Owner is looking into relocating the existing two SF homes, but will deconstruct if they are unable to relocate. Units include 1 BDs (500 sq ft), 2 BDs, and 3 BDs. They will have a common outdoor space in the back center of the lot. Each second floor unit will have a small balcony. Few windows because of energy design standards. Buildings will have path lighting that point down (no flood lights). Siding and roofing are shingles of similar colors but different materials. The south side fence is 6 ft. There s an existing fence that a resident would like them to consider keeping. Construction work times are still TBD. They are willing to set up a Good Neighbor Agreement. SMILE LU needs to help set this up. Also setting up a neighborhood contact person has provided effective communication during construction. Why are there no eaves? - modern interpretation Another resident warned about mildew because of the lack of eaves. Multiple residents expressed frustration about the lack of consistency with the existing neighborhood character. Others think it is an interesting departure and design. Residents can submit comments to the City on these designs per the Community Design Guidelines until May 10. The designs will be posted at sellwood.org Land Use Committee webpage.